drp maintenance and testing dhammica de silva senior technical officer
TRANSCRIPT
DRP Maintenance and Testing
Dhammica De Silva
Senior Technical Officer
Welcome to the ‘mundane’
What comes after the ‘key is turned’?כ Preferably, everyone wants silence.כ One of most tedious jobs in the world.כ …you end up hoping for a small disaster.
The workload …..כ Maintain the ‘system’כ Test the ‘system’
Doesn’t get much more critical than this!
Operations Framework
Initiate BCM
Business Impact Analysis
Risk Assessment
BC Strategy
Organization &Implementation Planning
Implement Stand-byAgreements
Develop Recovery PlansImplement Risk Reduction
Measures
Develop Procedures
Initial Testing
Education &Awareness
Review &Audit
Testing
ChangeManagement
Training
Assurance
Stage 1:Initiation
Stage 2:Requirements & Strategy
Stage 3:Implementation
Stage 4:Operational Management
Project Vs.
Process
Operational Management
Education &Awareness
Review &Audit
Testing
ChangeManagement
Training
Assurance
Stage 4:Operational Management
Why test and maintain?
Three major points to keep in mind:כ Viable and Readied action planכ DRP currency כ Recovery
Maintaining the plan
Helps ensure currency of what is to be recovered Changes, changes, and changes…
כ Test results may indicate problem areasכ Addition of new equipment, application, etc.כ Changes to HW, SW, network, etc.
Regular, and surprise reviews.
Testing the plan
Testing results ‘feed’ maintenance Testing the plan needs a plan:
כ Parameters, objectives, criteria, method, etc.כ Problems are an opportunity to improve
Important criteria for designing testsכ Comprehensive testing of entire planכ Non-prohibitive costs of test proceduresכ Minimal disturbances to normal operationsכ Maximum reliability and accuracy of test result dataכ Usefulness of test data.
Standard testing methodologies
Checklist Testing Walk through testing Virtual Machine Technology Simulation Testing Parallel Testing Full-Interruption Testing
Maintain your will, test your patience..