Welcome to the ‘mundane’
What comes after the ‘key is turned’?כ Preferably, everyone wants silence.כ One of most tedious jobs in the world.כ …you end up hoping for a small disaster.
The workload …..כ Maintain the ‘system’כ Test the ‘system’
Doesn’t get much more critical than this!
![Page 3: DRP Maintenance and Testing Dhammica De Silva Senior Technical Officer](https://reader035.vdocuments.site/reader035/viewer/2022070414/5697c00d1a28abf838cc994d/html5/thumbnails/3.jpg)
Operations Framework
Initiate BCM
Business Impact Analysis
Risk Assessment
BC Strategy
Organization &Implementation Planning
Implement Stand-byAgreements
Develop Recovery PlansImplement Risk Reduction
Measures
Develop Procedures
Initial Testing
Education &Awareness
Review &Audit
Testing
ChangeManagement
Training
Assurance
Stage 1:Initiation
Stage 2:Requirements & Strategy
Stage 3:Implementation
Stage 4:Operational Management
Project Vs.
Process
![Page 4: DRP Maintenance and Testing Dhammica De Silva Senior Technical Officer](https://reader035.vdocuments.site/reader035/viewer/2022070414/5697c00d1a28abf838cc994d/html5/thumbnails/4.jpg)
Operational Management
Education &Awareness
Review &Audit
Testing
ChangeManagement
Training
Assurance
Stage 4:Operational Management
![Page 5: DRP Maintenance and Testing Dhammica De Silva Senior Technical Officer](https://reader035.vdocuments.site/reader035/viewer/2022070414/5697c00d1a28abf838cc994d/html5/thumbnails/5.jpg)
Why test and maintain?
Three major points to keep in mind:כ Viable and Readied action planכ DRP currency כ Recovery
![Page 6: DRP Maintenance and Testing Dhammica De Silva Senior Technical Officer](https://reader035.vdocuments.site/reader035/viewer/2022070414/5697c00d1a28abf838cc994d/html5/thumbnails/6.jpg)
Maintaining the plan
Helps ensure currency of what is to be recovered Changes, changes, and changes…
כ Test results may indicate problem areasכ Addition of new equipment, application, etc.כ Changes to HW, SW, network, etc.
Regular, and surprise reviews.
![Page 7: DRP Maintenance and Testing Dhammica De Silva Senior Technical Officer](https://reader035.vdocuments.site/reader035/viewer/2022070414/5697c00d1a28abf838cc994d/html5/thumbnails/7.jpg)
Testing the plan
Testing results ‘feed’ maintenance Testing the plan needs a plan:
כ Parameters, objectives, criteria, method, etc.כ Problems are an opportunity to improve
Important criteria for designing testsכ Comprehensive testing of entire planכ Non-prohibitive costs of test proceduresכ Minimal disturbances to normal operationsכ Maximum reliability and accuracy of test result dataכ Usefulness of test data.
![Page 8: DRP Maintenance and Testing Dhammica De Silva Senior Technical Officer](https://reader035.vdocuments.site/reader035/viewer/2022070414/5697c00d1a28abf838cc994d/html5/thumbnails/8.jpg)
Standard testing methodologies
Checklist Testing Walk through testing Virtual Machine Technology Simulation Testing Parallel Testing Full-Interruption Testing