driving status of n*grid project in korea

30
Driving Status of N*Grid Project in Korea August 27, 2003 Jongsuk Ruth Lee KISTI Supercomputing Center

Upload: tyne

Post on 19-Mar-2016

71 views

Category:

Documents


8 download

DESCRIPTION

Driving Status of N*Grid Project in Korea. August 27, 2003 Jongsuk Ruth Lee KISTI Supercomputing Center. Table of Contents. Definition of Grid Status of Resources & Grid Necessity N*Grid Project Plans for Activating N*Grid Project Implementation of Grid Testbed - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Driving Status of N*Grid Project in Korea

Driving Status of N*Grid Project in Korea

August 27, 2003

Jongsuk Ruth Lee

KISTI Supercomputing Center

Page 2: Driving Status of N*Grid Project in Korea

Table of Contents

Definition of Grid Status of Resources & Grid Necessity N*Grid Project Plans for Activating N*Grid Project

Implementation of Grid Testbed Development of Grid System Research on Grid Applications Strategy for N*Grid Project Milestones

Summary

Page 3: Driving Status of N*Grid Project in Korea

Definition of Grid

Page 4: Driving Status of N*Grid Project in Korea

Definition of Grid Research Infrastructure for dynamically collecting & integrated sharing Research Resources connected by high-speed network

Large Scale Data

Scientific Research Instrument

Experts Problem Solving

GRIDGRID

Supercomputer

Page 5: Driving Status of N*Grid Project in Korea

Status of Resources&

Grid Necessity

Page 6: Driving Status of N*Grid Project in Korea

Status of Research Resources (1/2)

Status of Supercomputer usage (KSCA, 2003. 3)Organization

Utilization

KISTI

80%

KMA

80%

SNU

70%

DIU

30%

CNU

40%

POSTECH

60%

PNU

70%

K-JIST

60%

Name OrganizationHigh Voltage Transmission Electron Microscopy KBSI

NMR Spectroscopy KBSIHanbit Plasma Equipment KBSI

Electron Linear Accelerator POSTECHResearch Reactor Hanaro KAERI

Wind tunnel KARIFlight Simulator KARI

Status of the only Research Instruments Holding

Page 7: Driving Status of N*Grid Project in Korea

Status of Research Resources (2/2) Status of Research Networks

Domestic KOREN : 30Gbps/1GbPS KREONET2 : 10Gbps/1Gbps

International APII Testbed (Korea – Japan) : 1Gbps etc TEIN : ~ 30Mbps STAR TAP LINK : ~155Mbps

Campus/Industry Network : Gbps

Page 8: Driving Status of N*Grid Project in Korea

Necessity of Introducing Grid (1/2) Demand of Domestic Computing Resources

0

20

40

60

80100

120

140

160

1996 1997 1998 1999 2000 2001 2002

Rmax

(TFl

ops)

USA KOREA Domestic Demand

148.7

12.42.6

Page 9: Driving Status of N*Grid Project in Korea

Necessity of Introducing Grid (2/2)

Necessity of Research Infrastructure Implementation Necessity of investing fund to implement Grid infrastructure for

6T researches to access any computing resources and data any time and any where

* Status of 6T Research Fund ( IT News : 23. 7. 2002)

Areas IT

ResearchFund

1241.7billion

BT

374.2billion

ET

219.3billion

ST

157.2billion

NT

81.9billion

CT

32.3billion

Total

2106.5billion

Page 10: Driving Status of N*Grid Project in Korea

N*Grid Project

Page 11: Driving Status of N*Grid Project in Korea

11

N*Grid includes National Computational Grid National Data Grid National Access Grid National Application Grid (Ex: Bio Grid, CFD Grid, Meteo Grid etc) including application testbed and portals

N*Grid is planned at the government level by MIC(Ministry of Information and Communication)

5 year project (2002-2006) Total budget : ~ 32M USD

N*Grid Project (1/6)

Page 12: Driving Status of N*Grid Project in Korea

History of N*Grid with KISTI 1998-1999: Preceding research

Development of metacomputing technology on heterogeneous supercomputing resources(The result is published at PDPTA2000 conference)

Development of a portable computational steering package: CSP

2000: Initiation of Globus-related research and activity Building of Globus-based metacomputing test-bed Satoshi Sekiguchi(TACC, Japan) proposed Korea to join APGrid(Jun., Dec.)

2001: N*Grid start KISTI Supercomputing Center suggest at MIC to carry out N*Grid(Feb.) MIC announced to start N*Grid as a 5 year(2002-2006) national project(May.) Korea Gird Forum will be launched in Oct., 2001.

N*Grid Project (2/6)

Page 13: Driving Status of N*Grid Project in Korea

Major Contents of N*Grid (2002-2006)

Building and operation of Grid Network (using KOREN, APII Testbed, KREONet2, HPCNet, etc.)

Grid application project survey and support (Bio, CFD, Meteo, etc.)

Grid related R&D and standardization (Grid middleware & Grid browser, etc.)

Promotion for sharing of high performance computers and large-scaled research instruments (Supercomputer, Storage, etc.)

Construction of Grid Forum Korea (Include gov., univ., research inst., etc.)

N*Grid Project (3/6)

Page 14: Driving Status of N*Grid Project in Korea

14

Grid Middleware

Internet 1 & 2

High Speed Network/ATM

Supercomputers

Large capacity Storages

Research Instruments

Creative Experts

GRID Project

Survey & Support

(NGI Killer Appl.)

Increase Research Power for fundamental Science and Industry Application → Activation of NGI Business Application

Leap for World Top 5 Country in Knowledge Infrastructure(Enhancement of National Competitiveness)

Execution of Grid Application Project

Emerging Industry: IT, BT, NT, ET, etc. Industry: Semiconductor, Car, Steel, Machinery, etc.

N*Grid

N*Grid Project (4/6)

Page 15: Driving Status of N*Grid Project in Korea

N*Grid Project (5/6) KISTI is the leading edge institution

Selected research partners from academia, industry, and government lab through a public competition 13 partners in constructing Grid infrastructure (e.g., Constructio

n of national supercomputer Grid) 8 partners in Grid middleware researches (e.g., Grid technology

for high-end Grid environment) 10 partners in Grid applications R&D (e.g., Virtual Wind Tunnel

using Grid) 2 partners in Grid standardization of Grid middleware technology

(e.g., GridIR WG, DAIS WG)

Page 16: Driving Status of N*Grid Project in Korea

N*Grid Project (6/6) GFK (Grid Forum Korea)

The Grid organization in Korea (878 members from 254 organizations & 25 WGs as of Aug. 2003)

Its support is included in the N*Grid project GFK 2002 Summer Workshop (July 11-12, 2002, 280 participants) GFK 2002 Winter Workshop (Dec. 10-11, 2002, 200 participants) GFK 2003 Summer Workshop (Aug. 19-21, 2003, 220 participants)

Working Groups Application Area : 10 WGs Middleware Area : 6 WGs Network Area : 2 WGs Etc.: 7 WGs

Participating Individuals Government Institution :41 University : 95 Research Institute : 475 Industry : 267

Page 17: Driving Status of N*Grid Project in Korea

Plans for Activating N*Grid

Page 18: Driving Status of N*Grid Project in Korea

Plans – Implementation of Grid Testbed (1/2)

Implementation of Computing Grid Testbed Public supercomputer: 8 HPC PC Cluster: 8

KMA

KOREN, APII, TEIN, STARTAP

KREONET2, HPCNET

KAIST

POSTECH

KISTI

CNU

KJISTDIU

SNU

KIAS

SAIT

KIST

KISTI

UOS

PNU

Supercomputer

Cluster

Page 19: Driving Status of N*Grid Project in Korea

CNU

SAIT

Plans – Implementation of Grid Testbed (2/2)

Implementation of Access Grid Testbed Large Scale Storage: 8 VR System: 3 Access Grid System: 3

KOREN, APII, TEIN, STARTAP

KREONET2, HPCNET

Grid Middleware

SNU

KMA

KISTI

EVL

KISTI

KJIST

KNUPNU

KMA

KRIBB

KIST

NCSA

KISTI

Storage

VR System

Access GridSystem

Page 20: Driving Status of N*Grid Project in Korea

Plans – Development of Grid System (1/4) Development of N*Grid Portal System

Providing Grid log-in, distributed file transfer, collection and integration of results, monitoring of Grid resources & jobs, etc

Page 21: Driving Status of N*Grid Project in Korea

Plans – Development of Grid System (2/4) Development of Grid Advanced Information Service System

Providing the integration function of multiple resources query interfaces, dynamic state information, dynamic virtual organization information, etc

Request Distributor

Grid Advanced Information Service(GAIS)

VO Manager

Missing Info. Processing

AgentParticipation

Manager

VO K

GridServiceResource

Resource

ResourceGridService

GridService

QueryProcessor

VO 1

GridServiceResource

Resource

ResourceGridService

GridService

Service RegistryManager

Service Data

ManagerResource manager

ResourceInfo.

Manager

VO info Resource info

Service data info

Service Desc.

GAIS backend

Page 22: Driving Status of N*Grid Project in Korea

Plans – Development of Grid System (3/4) Development of MoreDream Resource Management

Supporting the functions of the Resource discovery, co-allocation, job submission, job monitoring, etc.

Page 23: Driving Status of N*Grid Project in Korea

Plans – Development of Grid System(4/4) Development of N*Grid CA System

Supporting the functions of the Web-interface, PKI, key automatic generation/management/search, etc.

Page 24: Driving Status of N*Grid Project in Korea

Plans – Research on Grid Applications Application Researches on IT+IT, IT+BT, IT+NT, … based on Grid

Applications for the large-volume and repeated computation Applications for massively parallel environment which are can divided

and analyzed Bio, new drug, ST, NT, ET, Computer Graphic (Rendering), etc.

Construction of bio-informatics portal grid Computational chemistry and Nano materials Molecule simulation of Bio/Nano materials Electronic structure computational Grid Nano materials computational Grid Comprehensive environmental flow model Large-scale finite element analysis technique on GRID environment Design shape optimization technology using virtual wind tunnel based

on Grid Realization of virtual design & development Grid system Heat exchanger design under the Grid environment

Examples

Page 25: Driving Status of N*Grid Project in Korea

Plans – Implementation of Grid NOC Construction of Logical Grid Network and Technical Support using National

& International Network

A : Requirement of common use of national/international R&D network / Support of scientific technology application resourcesB : Requirement of scientific technology application resources / support & sharing of R&D network resourcesC: Control of user connection (providing connection channel between domestic R&D network)

MIC

Supercomputer/Cluster, Visualization System (SeeMore) Science Technology Information DB

User Group

Resources Establish PoliciesImplementation &

OperationGRID

Forum

- Korea-Japan, Korea-Singapore Link- Korea-USA Link(via Japan)

- National Size (Backbone over 15 areas)- Joining Institute: about 300 R&D Institutes- R&D Exclusive Korea-Japan and Korea-USA Links

- Backbone over 5 areas- Joining Institute: 32 R&D Institutes

KREONet/HPCNet/KREONet2 KORENAPII-Testbed

- Bandwidth Allocation- User Connecting Control/Management- Network Facility Management/Operation- Network Security/Engineering

GRID-NOC

InterconnectionInterconnectionB A A B

User Group User Group

Domestic R&D Research Network

CC

Page 26: Driving Status of N*Grid Project in Korea

Plans – Strategy for N*Grid Project (1/2)

Phased implementation of N*Grid infrastructure Exhibitory implementation from computing Grid

Phased plans Year 2002-2004

Implementation of Computing Grid Implementation of Grid mobile access environment Research on exhibitory applications

Year 2005-2006 Implementation of Data Grid Implementation of Virtual Realization Grid Research on specific applications

Year 2007-2011 Implementation of scientific research equipment Grid Implementation of open Grid

Page 27: Driving Status of N*Grid Project in Korea

Virtual wind tunnel equipment

Integration of Data Grid

Integration of Access Grid

Supporting mobile Grid

III (2007-2011)

Electron liner acceleratorDB centricVirtual realization

system centricIncluding medium and small size computer

II (2005-2006)

Electron microscopyStorage centricAccess Grid system centric

Medium and large size computing centric

I (2002-2004)

Scientific ResearchEquipment GridData GridAccess GridComputing GridPhase

Phase III(2007-2011)

Phase II(2005-2006)

Phase I(2002-2004)

Computing GridComputing Grid

Access Grid

Data GridData Grid

Access Grid Computing Grid

Scientific Research Scientific Research Equipment GridEquipment Grid

Computing Grid Access Grid

Data Grid

Plans – Strategy for N*Grid Project (2/2)

Page 28: Driving Status of N*Grid Project in Korea

Plans – Milestones

Main Contents Phase 12002 - 2004

Phase 22005 - 2006

Phase 32007 - 2011

- Computing Grid Testbed . Medium and large size computer centric . Medium and small size computer inclusion . Supporting mobile Grid - Latest Access Grid Testbed . VR Grid . Access Grid . Data Grid - Scientific Research Equipment Grid Testbed . Electron microscopy . Liner accelerator . Virtual wind tunnel equipment

Testbed

- Research on Grid Applications . Research on exhibitory applications . Research on specific applications - Development of Grid System . Grid Portal . GNOC system . Collaborative VR System . Mobile Grid Access System

Applications and

System Developmen

t

Page 29: Driving Status of N*Grid Project in Korea

Summary The goal of the N*Grid project is to build a national Grid infra as

a high performance research cyber infra.

The N*Grid project is to enhance research productivity in the fields of science and technology.

The future direction of N*Grid project will be emphasized on the activation of Grid technology research

- by participating in GGF WG/RGs for the international Grid technology standardization, - by implementing international standard Grid testbeds, and - by developing of Grid Middleware and applications.

Page 30: Driving Status of N*Grid Project in Korea

Thank you for your kind attention.

For more information,http://www.gridforumkorea.org