drawing lr-stp-cv-5r179f05009 #2, rev. 21, 'piping and ... · 1. all eoijipment ano piping...

1

Upload: others

Post on 09-Jun-2020

10 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Drawing LR-STP-CV-5R179F05009 #2, Rev. 21, 'Piping and ... · 1. all eoijipment ano piping shown to be located in area maintaineoz 65.f or heat traced. lower loop to extend 12 tn