draft recommendations of the san joaquin water quality management group plan for achieving...
TRANSCRIPT
Draft Recommendations of theDraft Recommendations of theSan Joaquin Water Quality San Joaquin Water Quality
Management GroupManagement Group
Plan for Achieving Salinity/Boron and DO Plan for Achieving Salinity/Boron and DO ObjectivesObjectives
2/1/052/1/05
Plan for Achieving Salinity/Boron and DO Plan for Achieving Salinity/Boron and DO ObjectivesObjectives
Overview
Group and Objectives
General Structure and Strategy
Tools and Management Strategies Evaluated
Draft Recommendations
Critical Implementation Issues
Next Steps
Plan for Achieving Salinity/Boron and DO ObjectivesPlan for Achieving Salinity/Boron and DO ObjectivesList of ParticipantsList of Participants
U.S. Bureau of Reclamation
Department of Water Resources
USFWS
California Dept. Fish and Game
Central California Irrigation District
Friant Water Users Authority
Grassland Water District
James Irrigation District
Merced Irrigation District
Modesto Irrigation District
Oakdale Irrigation District
San Luis Canal Company
San Joaquin County and Delta Water Quality Coalition
San Joaquin County RCD
San Joaquin River Exchange Contractors Water Authority
San Joaquin Valley Drainage Authority
San Joaquin River Group
San Luis and Delta MendotaWater Authority
South San Joaquin Irrigation District
State Water Contractors
South Delta Water Agency
Stockton East Water District
Tranquility Irrigation District
Turlock Irrigation District
Venice Island RD 2023
California Farm Bureau
Western Growers
Plan for Achieving Salinity/Boron and Plan for Achieving Salinity/Boron and DO ObjectivesDO Objectives
• Group Objective: Prepare and implement a plan to meet the water quality objectives for Salt and Boron at Vernalis and Dissolved Oxygen at the Stockton Deep Water Ship Channel in coordination with CALFED Stage I objectives
Plan for Achieving Salinity/Boron and Plan for Achieving Salinity/Boron and DO ObjectivesDO Objectives
• Salinity/Boron Objectives: April-August - 0.7 EC; September-March – 1.0 EC
• Dissolved Oxygen – 6.0 mg/l September – November 6.0 between Turner Cut and Stockton, 5.0 mg/l all other Delta locations, all times
Plan for Achieving Salinity/Boron and Plan for Achieving Salinity/Boron and DO Objectives – Tools and Strategies DO Objectives – Tools and Strategies
EvaluatedEvaluated• Flow Related Actions• Recirculation• Tributary Coordination:
– Operations– Transfers/exchanges– VAMP Modifications
• Management of Urban Wastewater Flows
• South Delta Improvements Project
• Refuge operational modifications
• Load Related Actions• Sub-basin load reduction,
west side of SJ Valley, and others
• Accretion Flow Diversion• Franks Tract Modifications
• Other• Dissolved Oxygen Aerator• Stockton WWTP control• Additional real-time
monitoring
Evaluation with SANMAN Model
• Model predicts salinity at Vernalis based on upstream actions
• Uses revised baseline data – the problem is less than previously believed for salinity
• Operates available recirculation and New Melones storage to achieve salinity objective
• Does not model Dissolved Oxygen but can tell you about flow
Elements of SJRWQMGDraft Preferred Alternative Elements
• A phased solution is necessary:
• Long Term 5+years: Full implementation of certain West Side drainage improvements (SJRIP) eliminates salinity violations @ Vernalis
• Short Term 0-5 years:
– Phased implementation of improvements (SJRIP)
Elements of SJRWQMGDraft Preferred Alternative Elements (cont’d)
• Short –term continued
– Permitted Banks Pumping Plant capacity at 8500 cfs and S. Delta Improvements
– Mid- or high-priority DMC re-circulation July-September
– Move compliance location for Stanislaus River dissolved oxygen upstream to location of Steelhead habitat.
– Strategic water transfers from the SJR Group members
– Continued evaluation/implementation of Refuge actions to help in critical winter/spring periods
Elements of SJRWQMGDraft Preferred Alternative Elements (cont’d)
• Dissolved Oxygen Solution: additional measures
– Additional HOR Barrier use in April-May and July-November to augment LSJR flows.
– Additional recirculation as available July-Sept.
– Implementation of City of Stockton’s ammonia removal project
– Implementation of aeration project in the Stockton DWSC
– Additional real-time monitoring and gap analysis
SJRWQMP Implementation Issues
• Technical– Lowered flows on Lower SJR – evaluating
additional recirculation and HORB use– Brandt Bridge salinity objective – evaluating
additional recirculation and HORB use
• Policy– Allocation of costs and benefits of recirculation for
both salinity purposes and lowering dissolved oxygen; high vs. mid priority recirculation
– Assignment of implementation roles
Vernalis Flow: SJRWQMG Preferred Alternative HP-100
Critical Year Average
Vernalis Flow: SJRWQMG Preferred Alternative HP-100
Critical Year Average
0
1000
2000
3000
4000
5000
6000
7000
Mar Apr1 Apr2 May1 May2 Jun Jul Aug Sep Oct Nov Dec Jan Feb
Flo
w (
cfs
)
-400
-300
-200
-100
0
100
200
300
Flo
w R
ed
uc
tio
n (
cfs
)
Flow Reduction Base Action
Solution Beneficiaries
• Assuming resolution of low-flow issues:– Public/environment – SJR fisheries benefit– Lower SJR water users – reliability/quality– Exporters – improved water quality and 8500 impediment– Upstream users – defined contributions– New Melones users – lessening of other demands– Port of Stockton – aeration partners, other tools– USBR – reduced drainage solution demands, reduced New
Melones conflict, meet permit conditions
SJRWQMP Implementation Issues cont.
NEXT STEPS • Resolution of low flows impact/SDIP
compatibility; finalize recommendation• Form Negotiating Forum/participants for
development of an implementation MOU• Seek element funding
– $40-50 million in drainage actions– Newman wasteway upgrades? $5m
extras
Water Supply Impactswith Phased SJRIP Implementation:
Critical Year Average High vs. Mid Priority Recirculation
0
20
40
60
80
100
120
0 10 20 30 40 50 60 70 80 90 100
SJRIP Load Reduction (%)
Cri
tic
al
Yr
Wa
ter
Co
st
(TA
F)
0
10
20
30
40
50
60
Cri
tic
al
Yr
Re
cir
cu
lati
on
Wa
ter
Co
st
(TA
F)
High Priority (Recirc) Mid Priority (Recirc) High Priority Mid Priority
Water Cost: SJRWQMG Preferred Alternative HP-20
Water Cost: SJRWQMG Preferred Alternative HP-20
4
15
25
49
77
31
79
69
0 0 0
14
31
8
28 27
0
20
40
60
80
100
120
Wet Above Normal Below Normal Dry Critical 1922-94 1929-34 1987-92
Water Year Type
Wat
er C
ost
s (1
000
acre
-ft
per
yea
r)
Delta Re-circulation
Water Cost: SJRWQMG Preferred Alternative HP-100
Water Cost: SJRWQMG Preferred Alternative HP-100
12
28
42
69
118
50
112
104
0 0 0 0 1 0 0 10
20
40
60
80
100
120
Wet Above Normal Below Normal Dry Critical 1922-94 1929-34 1987-92
Water Year Type
Wat
er C
ost
s (1
000
acre
-ft
per
yea
r)
Delta Re-circulation
Water Cost: SJRWQMG Preferred Alternative MP-20
Water Cost: SJRWQMG Preferred Alternative MP-20
4
15
25
35
46
23
51
41
0 0 0 0 2 0 03
0
20
40
60
80
100
120
Wet Above Normal Below Normal Dry Critical 1922-94 1929-34 1987-92
Water Year Type
Wat
er C
ost
s (1
000
acre
-ft
per
yea
r)
Delta Re-circulation
Water Cost: SJRWQMG Preferred Alternative MP-100
Water Cost: SJRWQMG Preferred Alternative MP-100
12
28
42
68
118
50
112
104
0 0 0 0 0 0 0 00
20
40
60
80
100
120
Wet Above Normal Below Normal Dry Critical 1922-94 1929-34 1987-92
Water Year Type
Wat
er C
ost
s (1
000
acre
-ft
per
yea
r)
Delta Re-circulation
Aeration Project Aeration Project AreaArea