1 November 16 th , 2017 Nicholas Heap Sustainability Project Manager City of Richmond Draft Recommendations for Implementing the BC Energy Step Code in Richmond

Upload: others

Post on 14-Jun-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Draft Recommendations for Implementing€¦ · Draft Recommendations for Implementing the BC Energy Step Code in Richmond . 8:00 am Welcome and introductions 8:10 am Overview of Step

1

November 16th, 2017

Nicholas Heap Sustainability Project Manager

City of Richmond

Draft Recommendations for Implementing

the BC Energy Step Code in Richmond

Page 2: Draft Recommendations for Implementing€¦ · Draft Recommendations for Implementing the BC Energy Step Code in Richmond . 8:00 am Welcome and introductions 8:10 am Overview of Step

8:00 am Welcome and introductions 8:10 am Overview of Step Code 8:30 am Educational and training resources re: Step Code 8:40 am Questions 8:55 am Energy Step Code implementation in Richmond - Process 9:00 am Overview of recommendations – Targets and timelines 9:15 am Overview of recommendations – Building permitting process 9:30 am Questions 9:40 am Cost of building to the Energy Step Code 9:55 am Questions 10:10 am Wrap-up

2

Agenda

Page 3: Draft Recommendations for Implementing€¦ · Draft Recommendations for Implementing the BC Energy Step Code in Richmond . 8:00 am Welcome and introductions 8:10 am Overview of Step

3

November 16th, 2017

Nicholas Heap Sustainability Project Manager

City of Richmond

Educational and Training resources re:

BC Energy Step Code

Page 4: Draft Recommendations for Implementing€¦ · Draft Recommendations for Implementing the BC Energy Step Code in Richmond . 8:00 am Welcome and introductions 8:10 am Overview of Step

| LOCAL GOVERNMENTS

| NGOs

| TRADES & PROFESSIONALS

| PROVINCIAL GOVERNMENT

| BUILDERS & DEVELOPERS

| UTILITIES

Research and Support Resources

Completed or Underway:

• Resource hub: energystepcode.ca

• Training and Capacity Study

• Costing / Metrics Study

• Local government readiness survey

• Peer network for local government staff

• Webinars and presentations

4

Page 5: Draft Recommendations for Implementing€¦ · Draft Recommendations for Implementing the BC Energy Step Code in Richmond . 8:00 am Welcome and introductions 8:10 am Overview of Step

Energy Step Code – Overview

Training & Resources: BC Housing publications

5

Anticipated Release Date

Description

September 2017 (available now!)

Illustrated Guide to Achieving Airtight Buildings

Winter 2018 Right-Sizing Your Heating System with F280

December 2017 Design Guide to the BC Energy Step Code for developers & designers

December 2017 Builder Guide to the BC Energy Step Code: (Part 9 Steps 1, 2, and 3; and Part 3 low-rise Steps 1 and 2)

February 2018 Builder Guide to the BC Energy Step Code v.2 (updated to include Part 9 Step 4; and Part 3 low-rise Step 3)

August 2018 Builder Guide to the BC Energy Step Code v.3 (updated to include Part 9 Step 5; and Part 3 low-rise Step 4)

Page 6: Draft Recommendations for Implementing€¦ · Draft Recommendations for Implementing the BC Energy Step Code in Richmond . 8:00 am Welcome and introductions 8:10 am Overview of Step

Energy Step Code – Overview

Training & Resources:

6

Date Description

November 21, 2017 BC Housing: Build Smart: Air and Vapour Barriers (Vancouver / webinar)

November 22 - 24, 2017 Nov. 22: Nov. 23:

BOABC: Fall Education Conference Session: High Performance Buildings Session: Step Code Enforcement for Building Officials

November 23, 2017 GVHBA: High Performance Homes: Energy Step Code Seminar (Vancouver - UBC Robson Square, 800 Robson St.)

November 28, 2017 GVHBA: Cool Drinks - Home energy efficiency and the BC Energy Step Code (North Vancouver)

February 1, 2018 Engineers and Geoscientists British Columbia (EGBC): half-day session on BC Energy Step Code (Vancouver / webinar)

Upcoming BC Energy Step Code Presentations & Webinars

Page 7: Draft Recommendations for Implementing€¦ · Draft Recommendations for Implementing the BC Energy Step Code in Richmond . 8:00 am Welcome and introductions 8:10 am Overview of Step

7

Page 8: Draft Recommendations for Implementing€¦ · Draft Recommendations for Implementing the BC Energy Step Code in Richmond . 8:00 am Welcome and introductions 8:10 am Overview of Step

8

Page 9: Draft Recommendations for Implementing€¦ · Draft Recommendations for Implementing the BC Energy Step Code in Richmond . 8:00 am Welcome and introductions 8:10 am Overview of Step

9

November 16th, 2017

Nicholas Heap Sustainability Project Manager

City of Richmond

City of Richmond process for

BC Energy Step Code implementation

Page 10: Draft Recommendations for Implementing€¦ · Draft Recommendations for Implementing the BC Energy Step Code in Richmond . 8:00 am Welcome and introductions 8:10 am Overview of Step

Richmond’s Energy Step Code Implementation Process

10

• 2009 Central Area Plan: LEED Silver policy for new Part 3 development

• 2010 Council adopts energy and GHG reduction targets

• July 2014 Council adopts energy efficiency policy for townhouse rezonings

• May 2016 Staff report to Council noting development of Energy Step Code

• May Council directs staff to consult stakeholders on “how the Energy Step Code can be implemented in Richmond”

• June City notifies province of intent to reference Energy Step Code

Page 11: Draft Recommendations for Implementing€¦ · Draft Recommendations for Implementing the BC Energy Step Code in Richmond . 8:00 am Welcome and introductions 8:10 am Overview of Step

Richmond’s Consultation Process

11

• June 29th

Builders’ Breakfast: Introduction to Energy Step Code

• July 27th

Builders’ Breakfast: Workshop re: Part 9 new development

• Sept. 6th

Stakeholder Workshop re: Part 3 new development

• Sept. 27th

UDI Liaison Committee update

• Oct. 10th

Energy Advisor focus group re: Part 9 Energy Step Code

• Oct. 26th

Multi-stakeholder workshop re: Part 3 Energy Step Code

• Nov. 16th

Builders’ Breakfast: Review Part 9 draft recommendations

• TBA Stakeholder workshop: Review Part 3 draft recommendations

Page 12: Draft Recommendations for Implementing€¦ · Draft Recommendations for Implementing the BC Energy Step Code in Richmond . 8:00 am Welcome and introductions 8:10 am Overview of Step

Richmond’s Energy Step Code Implementation Process

12

What we heard:

• Enable builders to minimize costs

• Enable builders to access information and training

• Ensure that new standards are implemented & enforced consistently

• Ensure regulatory procedures minimize time delays

• Consistency and standardization

• Clear expectations and clear communication

• Better coordination within building sub-trades

Page 13: Draft Recommendations for Implementing€¦ · Draft Recommendations for Implementing the BC Energy Step Code in Richmond . 8:00 am Welcome and introductions 8:10 am Overview of Step

Richmond’s Energy Step Code Implementation Process

13

• Dec 15, 2017 Local governments can reference Energy Step Code building standards in bylaws

• Jan 2018 Scheduled date of staff report to Council with recommendations for implementing the Energy Step Code.

• June 2018 Earliest proposed date for Energy Step Code entry into force • Townhouse rezoning policy phased out • LEED Silver CCAP policy phased out

Page 14: Draft Recommendations for Implementing€¦ · Draft Recommendations for Implementing the BC Energy Step Code in Richmond . 8:00 am Welcome and introductions 8:10 am Overview of Step

14

November 16th, 2017

Nicholas Heap Sustainability Project Manager

City of Richmond

Draft Recommendations for Implementing

the BC Energy Step Code in Richmond

Page 15: Draft Recommendations for Implementing€¦ · Draft Recommendations for Implementing the BC Energy Step Code in Richmond . 8:00 am Welcome and introductions 8:10 am Overview of Step

15

Page 16: Draft Recommendations for Implementing€¦ · Draft Recommendations for Implementing the BC Energy Step Code in Richmond . 8:00 am Welcome and introductions 8:10 am Overview of Step

Energy Step Code – Overview

Richmond’s Regime: Part 9 Buildings - for Stakeholder Consultation

16

staff proposal as of Nov 7, 2017

Building type Current approximate

Energy Step Code Performance Level

Spring 2018 [lowest incremental cost*]

January 2020 January 2022 January 2025

Part 9 detached homes,

duplexes BC Building Code

Step 1 [0.2%]

Step 3 [0.8%]

Step 3 or 4 Step 4

Part 9 townhouses

~Step 2-3 Step 3 [1.1%]

Step 3 [1.1%]

Step 4 Step 4 or 5

Part 9 low-rise apartments

BC Building Code Step 3 [0.3%]

Step 3 [0.3%]

Step 4 Step 4 or 5

Part 9 commercial /

industrial BC Building Code BC Building Code ? ? ?

Part 9 all renovations /

additions BC Building Code BC Building Code ? ? ?

* BC Housing: Energy Step Code 2017 Metrics Research: Full Report

Staff draft recommendation: ~18 month introductory period at Step 1 gives builders time to gain proficiency in airtight building practices.

Current: City of Richmond Airtightness

Training Program funds local builders to improve their

airtightness construction practices prior to Energy Step Code

implementation.

Page 17: Draft Recommendations for Implementing€¦ · Draft Recommendations for Implementing the BC Energy Step Code in Richmond . 8:00 am Welcome and introductions 8:10 am Overview of Step

Energy Step Code – Overview

Richmond’s Regime: Part 9 Buildings - for Stakeholder Consultation

17

staff proposal as of Nov 7, 2017

Building type Current approximate

Energy Step Code Performance Level

Spring 2018 [lowest incremental cost*]

January 2020 January 2022 January 2025

Part 9 detached homes,

duplexes BC Building Code

Step 1 [0.2%]

Step 3 [0.8%]

Step 3 or 4 Step 4

Part 9 townhouses

~Step 2 Step 3 [1.1%]

Step 3 [1.1%]

Step 4 Step 4 or 5

Part 9 low-rise apartments

BC Building Code Step 3 [0.3%]

Step 3 [0.3%]

Step 4 Step 4 or 5

Part 9 commercial /

industrial BC Building Code BC Building Code ? ? ?

Part 9 all renovations /

additions BC Building Code BC Building Code ? ? ?

* BC Housing: Energy Step Code 2017 Metrics Research: Full Report

Current policy: Rezoned townhouses are required

to comply with the BC Solar Hot Water Ready regulation

Staff draft recommendation: Upon Energy Step Code adoption, drop the requirement to comply with the BC Solar Hot Water Ready regulation.

Page 18: Draft Recommendations for Implementing€¦ · Draft Recommendations for Implementing the BC Energy Step Code in Richmond . 8:00 am Welcome and introductions 8:10 am Overview of Step

Energy Step Code – Overview

Richmond’s Regime: Part 9 Buildings - for Stakeholder Consultation

18

staff proposal as of Nov 7, 2017

Building type Current approximate

Energy Step Code Performance Level

Spring 2018 [lowest incremental cost*]

January 2020 January 2022 January 2025

Part 9 detached homes,

duplexes BC Building Code

Step 1 [0.2%]

Step 3 [0.8%]

Step 3 or 4 Step 4

Part 9 townhouses

~Step 2-3 Step 3 [1.1%]

Step 3 [1.1%]

Step 4 Step 4 or 5

Part 9 low-rise apartments

BC Building Code Step 3 [0.3%]

Step 3 [0.3%]

Step 4 Step 4 or 5

Part 9 commercial /

industrial BC Building Code BC Building Code ? ? ?

Part 9 all renovations /

additions BC Building Code BC Building Code ? ? ?

* BC Housing: Energy Step Code 2017 Metrics Research: Full Report

Current: City of Richmond Airtightness Training Program funds local builders to improve their airtightness construction practices prior to Energy Step Code implementation.

Page 19: Draft Recommendations for Implementing€¦ · Draft Recommendations for Implementing the BC Energy Step Code in Richmond . 8:00 am Welcome and introductions 8:10 am Overview of Step

Energy Step Code – Overview

In-Stream Applications

19

Staff draft recommendation: • Requirements effective three months after bylaw

adoption.

• Active rezoning and development permit applications at ESC adoption have one year after bylaw adoption to submit an acceptable Building Permit application under previous requirements.

• Projects endorsed by Development Permit Panel within six months of ESC adoption will have one year from DP issuance to submit an acceptable BP application under previous requirements.

Page 20: Draft Recommendations for Implementing€¦ · Draft Recommendations for Implementing the BC Energy Step Code in Richmond . 8:00 am Welcome and introductions 8:10 am Overview of Step

Energy Step Code – Overview

Richmond’s Regime: Part 9 Buildings - for Stakeholder Consultation

20

Page 21: Draft Recommendations for Implementing€¦ · Draft Recommendations for Implementing the BC Energy Step Code in Richmond . 8:00 am Welcome and introductions 8:10 am Overview of Step

Step Code Pre-Construction Report

21

Page 22: Draft Recommendations for Implementing€¦ · Draft Recommendations for Implementing the BC Energy Step Code in Richmond . 8:00 am Welcome and introductions 8:10 am Overview of Step

Step Code As-Built Report

22

Page 23: Draft Recommendations for Implementing€¦ · Draft Recommendations for Implementing the BC Energy Step Code in Richmond . 8:00 am Welcome and introductions 8:10 am Overview of Step

Energy Advisors

23

Staff draft recommendation: (per existing City policy for registered professionals) • Energy Advisors are to provide proof of general and professional liability

insurance: • at application for building permit, and • prior to occupancy

Note: •Under the BC Building Code, use of the EnerGuide Rating System / HOT2000 for energy modelling comes with a requirement to submit files to NRCan for quality assurance purposes. [Section 9.36.6.4. and A‐9.36.6.4.(2)(b)]

Page 24: Draft Recommendations for Implementing€¦ · Draft Recommendations for Implementing the BC Energy Step Code in Richmond . 8:00 am Welcome and introductions 8:10 am Overview of Step

Non - Compliance

24

City of Vancouver policy: If post-construction blower door test result is above 5.5 ACH50: -Implement mitigation measures to improve building performance to 5.5 ACH50 or better; and -See below. If post-construction blower door test result is above [target] but below 5.5 ACH50: -Provide EnerGuide report showing 5.5 ACH50 or below; -Pay for two staff responsible for airtightness to attend one-day airtightness techniques training course, and show proof of course registration.

Page 25: Draft Recommendations for Implementing€¦ · Draft Recommendations for Implementing the BC Energy Step Code in Richmond . 8:00 am Welcome and introductions 8:10 am Overview of Step

25

November 16th, 2017

Nicholas Heap Sustainability Project Manager

City of Richmond

BC Housing study and preliminary

analysis of common low-cost upgrades

Page 26: Draft Recommendations for Implementing€¦ · Draft Recommendations for Implementing the BC Energy Step Code in Richmond . 8:00 am Welcome and introductions 8:10 am Overview of Step

Costing / Metrics Study

26

In Brief…

Largest energy modelling exercise for a building

code in Canada

Costs were extensively vetted by industry

Tested 15 building archetypes for both Part 9 and

Part 3, for all BC climate zones

Key focus was to measure the potential impact of

the policy on construction affordability and

practicality

Page 27: Draft Recommendations for Implementing€¦ · Draft Recommendations for Implementing the BC Energy Step Code in Richmond . 8:00 am Welcome and introductions 8:10 am Overview of Step

Costing / Metrics Study

27

Page 28: Draft Recommendations for Implementing€¦ · Draft Recommendations for Implementing the BC Energy Step Code in Richmond . 8:00 am Welcome and introductions 8:10 am Overview of Step

Energy Step Code – Overview

BC Housing – Costing Study

28

Page 29: Draft Recommendations for Implementing€¦ · Draft Recommendations for Implementing the BC Energy Step Code in Richmond . 8:00 am Welcome and introductions 8:10 am Overview of Step

Costing / Metrics Study

29

“In most situations, builders can achieve the Lower Steps for less

than a 2% construction cost premium above that of a home built to

the requirements of the BC Building Code.”

ENERGY STEP CODE – ROW HOUSE EXAMPLE Location: Surrey Type: Six-unit row house Size: 1,720 sq. ft. per unit Sales Price (per unit): $550,000 to $800,000

STEPS COST PREMIUM

1 $560 per unit

2 $1,250 per unit

3 $2,950 per unit

4 $5,500 per unit

5 $9,400 per unit

Page 31: Draft Recommendations for Implementing€¦ · Draft Recommendations for Implementing the BC Energy Step Code in Richmond . 8:00 am Welcome and introductions 8:10 am Overview of Step

Medium Detached House: Measures implemented per house

31

• The BC Housing study identified 10 low-

cost upgrade portfolios that achieve Step 3

for less than 1% of construction costs.

• Each consists of 3 to 5 upgrades beyond

minimum prescriptive code requirements.

• Airtightness

• Domestic hot water heating

• Heat recovery: air and/or water

• Insulation: under slab, foundation,

wall and/or attic

• Windows

• Space heating

0%

20%

40%

60%

3 4 5Number of upgrades implemented per

lowest-cost modelled home

N = 10

Page 32: Draft Recommendations for Implementing€¦ · Draft Recommendations for Implementing the BC Energy Step Code in Richmond . 8:00 am Welcome and introductions 8:10 am Overview of Step

Medium Detached House: Airtightness

32

• In 70% of the lowest-cost upgrade

portfolios, airtightness levels are

better than Step Code minimum

requirements for Step 3

0%

10%

20%

30%

40%

50%

2.5 ACH 1.5 ACH 1.0 ACH 0.6 ACH

Airtightness is not just

required: it is also the

most cost-effective

efficiency measure.

Air Changes per Hour (ACH50)

STEP

3 t

arge

t

Page 33: Draft Recommendations for Implementing€¦ · Draft Recommendations for Implementing the BC Energy Step Code in Richmond . 8:00 am Welcome and introductions 8:10 am Overview of Step

Medium Detached House: Windows, Space Heating & DWHR units

33

• More than 2/3 of the lowest-cost upgrade

portfolios used prescriptive code minimum

U-1.8 windows.

0%

20%

40%

60%

80%

U-1.8 U-1.6 U-1.4

None of the lowest-cost upgrade

portfolios used space heating or

drain water heat recovery unit (DWHR)

upgrades.

Window thermal resistance (U-value)

Page 34: Draft Recommendations for Implementing€¦ · Draft Recommendations for Implementing the BC Energy Step Code in Richmond . 8:00 am Welcome and introductions 8:10 am Overview of Step

Medium Detached House: Below-slab and attic insulation

34

• Attic insulation is at prescriptive code

minimum levels in half of the lowest-

cost portfolios.

• 80% of lowest-cost portfolios have no

under-slab insulation.

0%

20%

40%

60%

80%

100%

none R-11.1 (eff.) R-15 (eff.)

0%

20%

40%

60%

R-40(eff.) R-50(eff.) R-60(eff.) R-80(eff.)

Thermal resistance (R-value)

Thermal resistance (R-value)

Page 35: Draft Recommendations for Implementing€¦ · Draft Recommendations for Implementing the BC Energy Step Code in Richmond . 8:00 am Welcome and introductions 8:10 am Overview of Step

Medium Detached House: Wall and foundation insulation

35

• All lowest-cost portfolios use R-16 or

R-18 effective walls

• Increased levels of foundation

insulation used in the majority of

lowest-cost portfolios.

Thermal resistance (R-value)

0%

20%

40%

60%

80%

R-16 (eff.) R-18 (eff.)

0%

20%

40%

60%

R-11.3(eff.) R-16.9 (eff.) R-19.6 (eff.) R-25 (eff.)

Thermal resistance (R-value)

Page 36: Draft Recommendations for Implementing€¦ · Draft Recommendations for Implementing the BC Energy Step Code in Richmond . 8:00 am Welcome and introductions 8:10 am Overview of Step

36

• HRVs or ERVs are used in 60% of

lowest-cost upgrade portfolios.

• High-performance Domestic Hot

Water systems are found in 70% of

lowest-cost upgrade portfolios.

0%

20%

40%

60%

none 0.6 0.7 0.75

0%

20%

40%

60%

Elec

tric

Sto

rage

Gas

Inst

anta

neo

us

-Lo

w

Gas

Inst

anta

neo

us

Hea

t P

um

p -

Ho

tW

ater

Efficiency of HRV / ERV units

Medium Detached House: DHW and Heat Recovery Ventilators

Page 38: Draft Recommendations for Implementing€¦ · Draft Recommendations for Implementing the BC Energy Step Code in Richmond . 8:00 am Welcome and introductions 8:10 am Overview of Step

0%

20%

40%

60%

2 3 4 5

Six-unit Townhouse: Measures implemented per building

38

• Airtightness

• Domestic hot water heating

• Heat recovery: air and/or water

• Insulation: under slab, foundation,

wall and/or attic

• Windows

• Space heating Number of upgrades implemented per lowest-cost modelled home

N = 24

• The BC Housing study identified 24 low-

cost upgrade portfolios that achieve Step 3

for less than 1.5% of construction costs.

• Each consists of 2 to 5 upgrades beyond

minimum prescriptive code requirements.

Page 39: Draft Recommendations for Implementing€¦ · Draft Recommendations for Implementing the BC Energy Step Code in Richmond . 8:00 am Welcome and introductions 8:10 am Overview of Step

0%

20%

40%

60%

2.5 ACH 1.5 ACH 1.0 ACH 0.6 ACH

Six-unit Townhouse: Airtightness

39

• In 7/8ths of the lowest-cost upgrade

portfolios, airtightness levels are

better than Step Code minimum

requirements for Step 3

Airtightness is not just

required: it is also the

most cost-effective

efficiency measure.

Air Changes per Hour (ACH50)

STEP

3

targ

et

Page 40: Draft Recommendations for Implementing€¦ · Draft Recommendations for Implementing the BC Energy Step Code in Richmond . 8:00 am Welcome and introductions 8:10 am Overview of Step

0%

20%

40%

60%

80%

100%

U-1.8 U-1.6 U-1.4

Six-unit Townhouse: Windows, Space Heating & DWHR units

40

• More than 75% of the lowest-cost upgrade

portfolios use minimum prescriptive code

U-1.8 windows.

• All of the lowest-cost upgrade portfolios use

minimum prescriptive code space heating. Window thermal resistance (U-value)

0%

20%

40%

60%

none 30% 42% 55%

Efficiency of Drain Water Heat Recovery units

• Almost 50%

use DWHRs as

a cost-effective

upgrade.

Page 41: Draft Recommendations for Implementing€¦ · Draft Recommendations for Implementing the BC Energy Step Code in Richmond . 8:00 am Welcome and introductions 8:10 am Overview of Step

Six-unit Townhouse: Below-slab and attic insulation

41

• Attic insulation is at prescriptive code

minimum levels in almost half of the

lowest-cost portfolios.

• Two-thirds of lowest-cost portfolios

have no under-slab insulation.

Thermal resistance (R-value)

0%

20%

40%

60%

R-40(eff.) R-50(eff.) R-60(eff.) R-80(eff.)

0%

20%

40%

60%

80%

none R-11.1 (eff.) R-15 (eff.)

Thermal resistance (R-value)

Page 42: Draft Recommendations for Implementing€¦ · Draft Recommendations for Implementing the BC Energy Step Code in Richmond . 8:00 am Welcome and introductions 8:10 am Overview of Step

Six-unit Townhouse: Wall insulation

42

• Two-thirds of lowest-cost portfolios use R-16 effective walls, but better

insulated walls can also be a low-cost solution.

Thermal resistance (R-value)

0%

20%

40%

60%

80%

R-16 (eff.) R-18 (eff.) R-22 (eff.) R-24 (eff.)

Page 43: Draft Recommendations for Implementing€¦ · Draft Recommendations for Implementing the BC Energy Step Code in Richmond . 8:00 am Welcome and introductions 8:10 am Overview of Step

0%

20%

40%

60%

Elec

tric

Sto

rage

Gas

Inst

anta

neo

us

-Lo

w

Gas

Inst

anta

neo

us

Hea

t P

um

p -

Ho

tW

ate

r

Six-unit Townhouse: DHW and Heat Recovery Ventilators

43

• HRVs or ERVs are used in 45% of lowest-cost upgrade portfolios.

• Domestic hot water is evenly split between minimum prescriptive code electric storage and high-efficiency low-carbon heat pumps.

Efficiency of HRV / ERV units

0%

20%

40%

60%

none 60% 70% 75%

Page 44: Draft Recommendations for Implementing€¦ · Draft Recommendations for Implementing the BC Energy Step Code in Richmond . 8:00 am Welcome and introductions 8:10 am Overview of Step

Thank You!

44

Nicholas Heap

Sustainability Project Manager

City of Richmond

[email protected]

Energy Save Richmond:

energy.richmond.ca

QUESTIONS?