![Page 1: Wind Farm Construction Practices and Considerationswind.nrel.gov/.../02-01_Roberts_Wind-Farm-Construction.pdf · Wind Farm Construction Practices and ... site prep ( geotech and turbine](https://reader035.vdocuments.site/reader035/viewer/2022062600/5ad254037f8b9afa798c91c5/html5/thumbnails/1.jpg)
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable Energy, LLC
Wind Farm Construction Practices and Considerations
Joseph Owen Roberts
1 September 2010
![Page 2: Wind Farm Construction Practices and Considerationswind.nrel.gov/.../02-01_Roberts_Wind-Farm-Construction.pdf · Wind Farm Construction Practices and ... site prep ( geotech and turbine](https://reader035.vdocuments.site/reader035/viewer/2022062600/5ad254037f8b9afa798c91c5/html5/thumbnails/2.jpg)
National Renewable Energy Laboratory Innovation for Our Energy Future
Presentation Overview
• Land impacts before, during, and after construction
• Typical construction practices
![Page 3: Wind Farm Construction Practices and Considerationswind.nrel.gov/.../02-01_Roberts_Wind-Farm-Construction.pdf · Wind Farm Construction Practices and ... site prep ( geotech and turbine](https://reader035.vdocuments.site/reader035/viewer/2022062600/5ad254037f8b9afa798c91c5/html5/thumbnails/3.jpg)
National Renewable Energy Laboratory Innovation for Our Energy Future
Land Impacts
• Disturbed areas
• Laydown yard, site prep (geotech and turbine component delivery,
road construction, crane paths, borrow pits (quarry), water usage,
storm water controls, foundation excavation, blasting, and material
stockpiling, large rock disposal,
![Page 4: Wind Farm Construction Practices and Considerationswind.nrel.gov/.../02-01_Roberts_Wind-Farm-Construction.pdf · Wind Farm Construction Practices and ... site prep ( geotech and turbine](https://reader035.vdocuments.site/reader035/viewer/2022062600/5ad254037f8b9afa798c91c5/html5/thumbnails/4.jpg)
National Renewable Energy Laboratory Innovation for Our Energy Future
Existing Uses - Pipelines/Underground UtilitiesExisting users• Mines, pipelines, oil and gas, quarry, etc
![Page 5: Wind Farm Construction Practices and Considerationswind.nrel.gov/.../02-01_Roberts_Wind-Farm-Construction.pdf · Wind Farm Construction Practices and ... site prep ( geotech and turbine](https://reader035.vdocuments.site/reader035/viewer/2022062600/5ad254037f8b9afa798c91c5/html5/thumbnails/5.jpg)
National Renewable Energy Laboratory Innovation for Our Energy Future
Stormwater Pollution PreventionWater Usage During Construction• State regulations vary widely as to permitting process
![Page 6: Wind Farm Construction Practices and Considerationswind.nrel.gov/.../02-01_Roberts_Wind-Farm-Construction.pdf · Wind Farm Construction Practices and ... site prep ( geotech and turbine](https://reader035.vdocuments.site/reader035/viewer/2022062600/5ad254037f8b9afa798c91c5/html5/thumbnails/6.jpg)
National Renewable Energy Laboratory Innovation for Our Energy Future
Geotechnical InvestigationWhat are the subsurface conditions of the rock or soil?• One hole per foundation, depth depends on foundation design
• Measure rock or soil type, ‘hardness’ of rock or soil, remove core samples and examine to understand how fractured the rock is, ground water level,
• Was the material previously disturbed (mining, reclamation, etc)
• Goal is to determine bearing capacity
![Page 7: Wind Farm Construction Practices and Considerationswind.nrel.gov/.../02-01_Roberts_Wind-Farm-Construction.pdf · Wind Farm Construction Practices and ... site prep ( geotech and turbine](https://reader035.vdocuments.site/reader035/viewer/2022062600/5ad254037f8b9afa798c91c5/html5/thumbnails/7.jpg)
National Renewable Energy Laboratory Innovation for Our Energy Future
Road ConstructionRoad and Site Preparation• Clear and grub, subsoil preparation and compaction, road base, maintenance
![Page 8: Wind Farm Construction Practices and Considerationswind.nrel.gov/.../02-01_Roberts_Wind-Farm-Construction.pdf · Wind Farm Construction Practices and ... site prep ( geotech and turbine](https://reader035.vdocuments.site/reader035/viewer/2022062600/5ad254037f8b9afa798c91c5/html5/thumbnails/8.jpg)
National Renewable Energy Laboratory Innovation for Our Energy Future
Site PreparationSite Preparation• Clear and grub, subsoil preparation and compaction, road base, maintenance
![Page 9: Wind Farm Construction Practices and Considerationswind.nrel.gov/.../02-01_Roberts_Wind-Farm-Construction.pdf · Wind Farm Construction Practices and ... site prep ( geotech and turbine](https://reader035.vdocuments.site/reader035/viewer/2022062600/5ad254037f8b9afa798c91c5/html5/thumbnails/9.jpg)
National Renewable Energy Laboratory Innovation for Our Energy Future
Foundation Water UsageWater Usage During Construction• Dust control, component washing, backfill compaction (foundation backfill and
trench backfill), concrete mixing (on site batch plants )
• Rock anchor 1.5MW 80m Hub Height ~3,300 gal/foundation• Monopier 1.5MW 80m Hub Height ~5,500gal/foundation• Spreadfoot 1.5MW 80m Hub Height ~6,500 gal/foundation• Spreadoot 3.0mw 80m Hub Height ~11,000 gal/foundation
• Dust control ~1,500 gal/mile/day during construction depending on location• Mag chloride is an option, possibly more expensive, some landowners object
![Page 10: Wind Farm Construction Practices and Considerationswind.nrel.gov/.../02-01_Roberts_Wind-Farm-Construction.pdf · Wind Farm Construction Practices and ... site prep ( geotech and turbine](https://reader035.vdocuments.site/reader035/viewer/2022062600/5ad254037f8b9afa798c91c5/html5/thumbnails/10.jpg)
National Renewable Energy Laboratory Innovation for Our Energy Future
Rock Anchor Side ViewRock anchor• Needs suitable non highly fractured rock to be cost effective• More labor intensive• Fewer commodities (steel, concrete)
![Page 11: Wind Farm Construction Practices and Considerationswind.nrel.gov/.../02-01_Roberts_Wind-Farm-Construction.pdf · Wind Farm Construction Practices and ... site prep ( geotech and turbine](https://reader035.vdocuments.site/reader035/viewer/2022062600/5ad254037f8b9afa798c91c5/html5/thumbnails/11.jpg)
National Renewable Energy Laboratory Innovation for Our Energy Future
Tensionless Mono-pierMono-pier• Specifically designed for soils, special applications for unstable soils (mine tailings,
previously disturbed soil)• Less concrete and steel than spreadfoot, more labor and equipment costs• Can be 5-10% cheaper overall than spreadfootings depending on labor and materials
costs
![Page 12: Wind Farm Construction Practices and Considerationswind.nrel.gov/.../02-01_Roberts_Wind-Farm-Construction.pdf · Wind Farm Construction Practices and ... site prep ( geotech and turbine](https://reader035.vdocuments.site/reader035/viewer/2022062600/5ad254037f8b9afa798c91c5/html5/thumbnails/12.jpg)
National Renewable Energy Laboratory Innovation for Our Energy Future
Spreadfooting “T”Spreadfoot• Most common• Typical 1.5MW spreadfoot foundation ~250 yd^3/foundation• Simple construction, fewer variables than piers, rock anchors
![Page 13: Wind Farm Construction Practices and Considerationswind.nrel.gov/.../02-01_Roberts_Wind-Farm-Construction.pdf · Wind Farm Construction Practices and ... site prep ( geotech and turbine](https://reader035.vdocuments.site/reader035/viewer/2022062600/5ad254037f8b9afa798c91c5/html5/thumbnails/13.jpg)
National Renewable Energy Laboratory Innovation for Our Energy Future
Pile Foundations
Driven Pile• Applicable in unstable soils• Much more costly to construct
depending on depth to bedrock• Similar to rock anchor but piles can be
placed in compression or tension.• PA project, 60,000 LF of pile cost
$6million for 35 foundations
![Page 14: Wind Farm Construction Practices and Considerationswind.nrel.gov/.../02-01_Roberts_Wind-Farm-Construction.pdf · Wind Farm Construction Practices and ... site prep ( geotech and turbine](https://reader035.vdocuments.site/reader035/viewer/2022062600/5ad254037f8b9afa798c91c5/html5/thumbnails/14.jpg)
National Renewable Energy Laboratory Innovation for Our Energy Future
Collection System
Less labor dependence, more material and commodity drivenHIGHLY soil dependant, thermal resistivity drives cable costCable cost can be 40-50% of collection system cost
![Page 15: Wind Farm Construction Practices and Considerationswind.nrel.gov/.../02-01_Roberts_Wind-Farm-Construction.pdf · Wind Farm Construction Practices and ... site prep ( geotech and turbine](https://reader035.vdocuments.site/reader035/viewer/2022062600/5ad254037f8b9afa798c91c5/html5/thumbnails/15.jpg)
National Renewable Energy Laboratory Innovation for Our Energy Future
Collection System – Typical Cable Cross Section
![Page 16: Wind Farm Construction Practices and Considerationswind.nrel.gov/.../02-01_Roberts_Wind-Farm-Construction.pdf · Wind Farm Construction Practices and ... site prep ( geotech and turbine](https://reader035.vdocuments.site/reader035/viewer/2022062600/5ad254037f8b9afa798c91c5/html5/thumbnails/16.jpg)
National Renewable Energy Laboratory Innovation for Our Energy Future
Typical Road Configuration• Typical 16’ roadway to allow component travel• Compacted shoulders required for crane travel, testing is critical• Shoulders can typically be decompacted after the farm enters operation
![Page 17: Wind Farm Construction Practices and Considerationswind.nrel.gov/.../02-01_Roberts_Wind-Farm-Construction.pdf · Wind Farm Construction Practices and ... site prep ( geotech and turbine](https://reader035.vdocuments.site/reader035/viewer/2022062600/5ad254037f8b9afa798c91c5/html5/thumbnails/17.jpg)
National Renewable Energy Laboratory Innovation for Our Energy Future
Typical Turbine Site Configuration
• Note: Single blade erection is possible with most modern turbines which decreases the amount of disturbed area.
• Other options such as delivering each component as needed is a common practice in space constrained sites, but expensive.
![Page 18: Wind Farm Construction Practices and Considerationswind.nrel.gov/.../02-01_Roberts_Wind-Farm-Construction.pdf · Wind Farm Construction Practices and ... site prep ( geotech and turbine](https://reader035.vdocuments.site/reader035/viewer/2022062600/5ad254037f8b9afa798c91c5/html5/thumbnails/18.jpg)
National Renewable Energy Laboratory Innovation for Our Energy Future
Buffalo Mountain, TN
• Note lack of laydown areas, each component delivered as needed to each location
• Compacted shoulders required for crane travel, testing is critical• Shoulders can typically be decompacted after the farm enters operation
![Page 19: Wind Farm Construction Practices and Considerationswind.nrel.gov/.../02-01_Roberts_Wind-Farm-Construction.pdf · Wind Farm Construction Practices and ... site prep ( geotech and turbine](https://reader035.vdocuments.site/reader035/viewer/2022062600/5ad254037f8b9afa798c91c5/html5/thumbnails/19.jpg)
National Renewable Energy Laboratory Innovation for Our Energy Future
Buffalo Mountain, TN
Photo credit: Barnhart Crane and Rigging
![Page 20: Wind Farm Construction Practices and Considerationswind.nrel.gov/.../02-01_Roberts_Wind-Farm-Construction.pdf · Wind Farm Construction Practices and ... site prep ( geotech and turbine](https://reader035.vdocuments.site/reader035/viewer/2022062600/5ad254037f8b9afa798c91c5/html5/thumbnails/20.jpg)
National Renewable Energy Laboratory Innovation for Our Energy Future
Turbine Installation
![Page 21: Wind Farm Construction Practices and Considerationswind.nrel.gov/.../02-01_Roberts_Wind-Farm-Construction.pdf · Wind Farm Construction Practices and ... site prep ( geotech and turbine](https://reader035.vdocuments.site/reader035/viewer/2022062600/5ad254037f8b9afa798c91c5/html5/thumbnails/21.jpg)
National Renewable Energy Laboratory Innovation for Our Energy Future
Substation
![Page 22: Wind Farm Construction Practices and Considerationswind.nrel.gov/.../02-01_Roberts_Wind-Farm-Construction.pdf · Wind Farm Construction Practices and ... site prep ( geotech and turbine](https://reader035.vdocuments.site/reader035/viewer/2022062600/5ad254037f8b9afa798c91c5/html5/thumbnails/22.jpg)
National Renewable Energy Laboratory Innovation for Our Energy Future
Main Erection
![Page 23: Wind Farm Construction Practices and Considerationswind.nrel.gov/.../02-01_Roberts_Wind-Farm-Construction.pdf · Wind Farm Construction Practices and ... site prep ( geotech and turbine](https://reader035.vdocuments.site/reader035/viewer/2022062600/5ad254037f8b9afa798c91c5/html5/thumbnails/23.jpg)
National Renewable Energy Laboratory Innovation for Our Energy Future
Crane Movement
![Page 24: Wind Farm Construction Practices and Considerationswind.nrel.gov/.../02-01_Roberts_Wind-Farm-Construction.pdf · Wind Farm Construction Practices and ... site prep ( geotech and turbine](https://reader035.vdocuments.site/reader035/viewer/2022062600/5ad254037f8b9afa798c91c5/html5/thumbnails/24.jpg)
National Renewable Energy Laboratory Innovation for Our Energy Future
Component Offload
![Page 25: Wind Farm Construction Practices and Considerationswind.nrel.gov/.../02-01_Roberts_Wind-Farm-Construction.pdf · Wind Farm Construction Practices and ... site prep ( geotech and turbine](https://reader035.vdocuments.site/reader035/viewer/2022062600/5ad254037f8b9afa798c91c5/html5/thumbnails/25.jpg)
National Renewable Energy Laboratory Innovation for Our Energy Future
Component Offload
![Page 26: Wind Farm Construction Practices and Considerationswind.nrel.gov/.../02-01_Roberts_Wind-Farm-Construction.pdf · Wind Farm Construction Practices and ... site prep ( geotech and turbine](https://reader035.vdocuments.site/reader035/viewer/2022062600/5ad254037f8b9afa798c91c5/html5/thumbnails/26.jpg)
National Renewable Energy Laboratory Innovation for Our Energy Future
Erection Sequence
![Page 27: Wind Farm Construction Practices and Considerationswind.nrel.gov/.../02-01_Roberts_Wind-Farm-Construction.pdf · Wind Farm Construction Practices and ... site prep ( geotech and turbine](https://reader035.vdocuments.site/reader035/viewer/2022062600/5ad254037f8b9afa798c91c5/html5/thumbnails/27.jpg)
National Renewable Energy Laboratory Innovation for Our Energy Future
Erection Sequence
![Page 28: Wind Farm Construction Practices and Considerationswind.nrel.gov/.../02-01_Roberts_Wind-Farm-Construction.pdf · Wind Farm Construction Practices and ... site prep ( geotech and turbine](https://reader035.vdocuments.site/reader035/viewer/2022062600/5ad254037f8b9afa798c91c5/html5/thumbnails/28.jpg)
National Renewable Energy Laboratory Innovation for Our Energy Future
Erection Sequence
![Page 29: Wind Farm Construction Practices and Considerationswind.nrel.gov/.../02-01_Roberts_Wind-Farm-Construction.pdf · Wind Farm Construction Practices and ... site prep ( geotech and turbine](https://reader035.vdocuments.site/reader035/viewer/2022062600/5ad254037f8b9afa798c91c5/html5/thumbnails/29.jpg)
National Renewable Energy Laboratory Innovation for Our Energy Future
Erection Sequence
![Page 30: Wind Farm Construction Practices and Considerationswind.nrel.gov/.../02-01_Roberts_Wind-Farm-Construction.pdf · Wind Farm Construction Practices and ... site prep ( geotech and turbine](https://reader035.vdocuments.site/reader035/viewer/2022062600/5ad254037f8b9afa798c91c5/html5/thumbnails/30.jpg)
National Renewable Energy Laboratory Innovation for Our Energy Future
Erection Sequence
![Page 31: Wind Farm Construction Practices and Considerationswind.nrel.gov/.../02-01_Roberts_Wind-Farm-Construction.pdf · Wind Farm Construction Practices and ... site prep ( geotech and turbine](https://reader035.vdocuments.site/reader035/viewer/2022062600/5ad254037f8b9afa798c91c5/html5/thumbnails/31.jpg)
National Renewable Energy Laboratory Innovation for Our Energy Future
Erection Sequence
![Page 32: Wind Farm Construction Practices and Considerationswind.nrel.gov/.../02-01_Roberts_Wind-Farm-Construction.pdf · Wind Farm Construction Practices and ... site prep ( geotech and turbine](https://reader035.vdocuments.site/reader035/viewer/2022062600/5ad254037f8b9afa798c91c5/html5/thumbnails/32.jpg)
National Renewable Energy Laboratory Innovation for Our Energy Future
Questions?