Download - Weekly Projects Update - w/e 14th January
Weekly Waste Projects Update – week ending 14th
January 2016
Weekly Waste Projects Update: week ending 14th
January 2016 Source: AcuComm Business Database
01
Biofuel
49.8%
Other
26.4%
Waste processing
10.3%
Recycling
9.8%
Biogas
2.6%Others
1.1%
Est. Value of New Projects by Facility Type (w/e 14th Jan 2016)
New/Updated Projects Reported (w/e 14th Jan 2016)
Number
Estimated Value (all projects)
Estimated Value (new projects only)
US$ millions US$ millions
Anaerobic Digestion 3 75 3
Biofuel 3 219 134
Biogas 1 7 7
Gasification 1 200 -
Incineration (with energy recovery) 19 1,824 817
Incineration (without energy recovery) - - -
Integrated/mixed facilities - - -
Landfill 2 25 -
MBT 1 69 -
Other 3 129 71
Recycling 3 26 26
Waste processing 5 206 28
Total 41 2,780 1,086
In the week ended 14rd January 2016, AcuComm added 41 new or updated waste projects to
our Business Database, worth an estimated US$2,780 million and waste capacity of just over
8.0 million tonnes.
This takes the cumulative total to 3,794 active projects since 2013,
with a total estimated investment value of US$326 billion.
To find out more information about the projects and investments
covered in this update, click here
Weekly Waste Projects Update – week ending 14th
January 2016
Weekly Waste Projects Update: week ending 14th
January 2016 Source: AcuComm Business Database
02
New/Updated Projects Reported (w/e 14th Jan 2016)
Number Capacity (tonnes) MW
Anaerobic Digestion 3 386,928 8
Biofuel 3 1,015,106 48
Biogas 1 14,600 3
Gasification 1 127,006 37
Incineration (with energy recovery) 19 4,014,436 661
Incineration (without energy recovery) - - -
Integrated/mixed facilities - - -
Landfill 2 1,314,550 13
MBT 1 108,851 4
Other 3 310,269 45
Recycling 3 153,368 -
Waste processing 5 555,768 24
Total 41 8,000,882 844
The total estimated waste capacity of projects reported on
in the past week is just over 8.0 million tonnes. WtE
incineration was the largest category, accounting for 4.0
million tonnes.
The total estimated power generation from these projects
was 844 MW. WtE incineration was the largest category,
accounting for 661 MW.
Incineration (with
energy recovery)
50.2%
Landfill
16.4%
Biofuel
12.7%
Others
20.7%
Reported Capacity of Projects by Facility Type (w/e
14th Jan 2016)
To find out more information about the projects and investments
covered in this update, click here
Weekly Waste Projects Update – week ending 14th
January 2016
Weekly Waste Projects Update: week ending 14th
January 2016 Source: AcuComm Business Database
03
New Projects Reported by Waste Types (w/e 14th Jan 2016)
Number Capacity (tonnes) MW
Animal 1 6,000 3
Clinical - - -
Construction/Demolition 1 120,000 -
e-Waste - - -
Food 4 352,750 8
Gas - - -
Glass - - -
Hazardous - - -
Heat - - -
Industrial - - -
Metals - - -
MSW 13 3,718,191 229
Oil - - -
Organic (general/unspecified) 2 438,539 69
Other 2 36,000 6
Paper 1 408,233 117
Plant biomass (non-waste) 1 748,324 36
Plant biomass (waste) 4 700,494 65
Plastics 2 118,087 20
Radioactive - - -
Rubber - - -
Sewage/wastewater 1 121,778 4
Wood 9 1,232,485 288
Total 41 8,000,882 844
Municipal Solid Waste accounted for the largest
share of projects by feedstock type in the past
week, with an annualised figure of just over 3.7
million tonnes.
MSW
46.5%
Wood
15.4%
Plant biomass (non-
waste)
9.4%
Others
28.8%
Reported Capacity of Projects by Waste Type (w/e
14th Jan 2016)
To find out more information about the projects and investments
covered in this update, click here
Weekly Waste Projects Update – week ending 14th
January 2016
Weekly Waste Projects Update: week ending 14th
January 2016 Source: AcuComm Business Database
04
New/Updated Projects, Country Coverage, (w/e 14th Jan 2016)
Projects
USA 9
UK 8
Sweden 3
Malta 2
Austria 2
Canada 2
China 2
India 2
Other 11
Total 41
The leading countries in the past week were the USA with
nine projects and the UK with eight projects.
9
8
3
2 2 2 2 2
11
0
2
4
6
8
10
12
US
A
UK
Sw
ed
en
Ma
lta
Au
stria
Can
ad
a
Ch
ina
Ind
ia
Oth
ers
Reported Projects by Country (w/e 14th Jan 2016)
To find out more information about the projects and investments
covered in this update, click here
Weekly Waste Projects Update – week ending 14th
January 2016
Weekly Waste Projects Update: week ending 14th
January 2016 Source: AcuComm Business Database
05
Average Project Values by Facility Type
US$ millions
Anaerobic Digestion 23
Biofuel 121
Biogas 28
Gasification 172
Incineration (with energy recovery) 107
Incineration (without energy recovery) 85
Integrated/mixed facilities 184
Landfill 23
MBT 67
Other 320
Recycling 27
Waste processing 67
All Projects 86
Average Project Values by Feedstock Type
US$ millions
Animal 20
Clinical 34
Construction/Demolition 9
e-Waste 26
Food 19
Gas 221
Glass 14
Hazardous 88
Heat 25
Industrial 117
Metals 41
MSW 96
Oil 57
Organic (general/unspecified) 86
Other 71
Paper 89
Plant biomass (non-waste) 107
Plant biomass (waste) 82
Plastics 16
Radioactive 603
Rubber 44
Sewage/wastewater 44
Wood 84
All Projects 86
The average waste project is worth US$86 million. There are naturally wide
variations in average project value, due to the size, duration and complexity
of different types of project. The figures on this page represent our latest
estimates, based on data from 2013 to the current week.
To find out more information about the projects and investments
covered in this update, click here
Weekly Waste Projects Update – week ending 14th
January 2016
Weekly Waste Projects Update: week ending 14th
January 2016 Source: AcuComm Business Database
06
Top Five New/Updated Projects in Latest Week by Estimated US$m Value Click the flag for more information on each project
1 UK 268 Construction of a 44.2 MW biomass plant.
2 USA 200 Construction of a biomass-to-fuel plant.
3 UK 160 Construction of a <19 MW WtE facility.
4 UK 153 Construction of a WtE facility.
5 UK 153 Construction of a waste-to-energy facility with a capacity of 245,000 tpa.
Top Five New/Updated Projects in Latest Week by Reported Waste Capacity
1 Canada 955,600 Construction of new solid waste facilities.
2 Turkey 408,233 Delivery of a biomass power plant to a paper/cardboard manufacturer.
3 India 365,000 Construction of an 11.5 MW WtE plant.
4 China 365,000 Construction of a 25 MW WtE plant and associated leachate treatment facility.
5 UK 272,155 Construction of a <19 MW WtE facility.
Top Five New/Updated Projects in Latest Week by Reported MW Power Generation
1 Turkey 117 Delivery of a biomass power plant to a paper/cardboard manufacturer.
2 Sweden 110 Supply of a new biofuel-fired boiler to upgrade an existing CHP plant.
3 UK 46 Construction of a waste-to-energy facility with a capacity of 245,000 tpa.
4 UK 44 Construction of a 44.2 MW biomass plant.
5 France 41 Construction of a 41 MW biomass plant.
acucomm.net 01243 788 [email protected]