Download - Vlesg roadmap review1.2
![Page 1: Vlesg roadmap review1.2](https://reader036.vdocuments.site/reader036/viewer/2022082923/55652e7bd8b42a313f8b4569/html5/thumbnails/1.jpg)
NOW RoadmapReview 12-13
By Vicki McGarveyPresented by Elaine Swift
![Page 2: Vlesg roadmap review1.2](https://reader036.vdocuments.site/reader036/viewer/2022082923/55652e7bd8b42a313f8b4569/html5/thumbnails/2.jpg)
Tools Rolled Out Roadmap 13-14 Tools Removed from Roadmap
HTML Editor: Insert YouTube & Flickr Nov 12
BinderNB: VLE SGP decide if want fast track
Rubrics & CompetenciesReasons: Implementation would take away resource from Assessment Project ; Contrary to strategic requirements & approach of GBA Possibility Rubrics will be revisited part eAssessment solution
User Profile: New fields for Facebook & Flickr Already Released
Eportfolio Enhancements: import/export; push content; invite extertnal users; presentations; chrome plugin; liked on Facebook Twitter
Mobile Web: Option to disableReason: Not available in version 10
Notifications Dec 12 Manage Dates Course BuilderReason: Redesigned content area in v.10 will be superseding this
Dropbox: Doc viewer Dec 12 Multiple Tools Video Capture – attachments Discussions; Dropbox; Forms & News
Instructional Design WizardReason: Focusing on templates
Course Design AcceleratorReason: Limited value; lack of customisation too prescriptive
Intelligent Agents Jan 13 Eassessment Related 1. iPAD Grader2. Turnitin integration similarity score feedback area3. Core (System) User Information Privacy (allows anon. marking)4. Dropbox: Out of score from Grademark (don’t have Gradebook switched on )NB Do we manage the following as part of eAssessment Solution
Calendar settings review Jan 13
Audio Capture: Mar 13
Aggregated News:Upgrade
![Page 3: Vlesg roadmap review1.2](https://reader036.vdocuments.site/reader036/viewer/2022082923/55652e7bd8b42a313f8b4569/html5/thumbnails/3.jpg)
Review feature tool release: Let’s do the maths
No. to release = 16 No. released/evaluated before upgrade = 6 No. released part of upgrade = 1No. already released = 1No. postponed 13-14 = 3No. removed = 5
No. new fm. upgrade = 5
![Page 4: Vlesg roadmap review1.2](https://reader036.vdocuments.site/reader036/viewer/2022082923/55652e7bd8b42a313f8b4569/html5/thumbnails/4.jpg)
Review ResourcesRelease time duration = 1-2 mnthsTime taken = 3-5 dys No. staff = 5 implementation
(CADQ, CPLD, IS, LLR, LTSU)= 6 peer review
(CADQ, CPLD, IS, LLR, VLE SG Staff & Student Rep;)
![Page 5: Vlesg roadmap review1.2](https://reader036.vdocuments.site/reader036/viewer/2022082923/55652e7bd8b42a313f8b4569/html5/thumbnails/5.jpg)
Where next ?• Review the process:– Successful but resource intensive – less peer
reviewers/implementers?– Less tools new tools/features with upgrade may
speed up process & make part of annual upgrade? • Prioritise Roadmap for next year, identify leads
& get sign-off• Review outstanding feature requests in the
context of the Roadmap
![Page 6: Vlesg roadmap review1.2](https://reader036.vdocuments.site/reader036/viewer/2022082923/55652e7bd8b42a313f8b4569/html5/thumbnails/6.jpg)
Questions• Binder escalate release beginning of next academic
year?• Assessment related tools part of the eAssessment
solution implementation or part of the Roadmap?• Do we want a process for turning tools off e.g. the
Blog? • How do we evaluate tools we have not purchased e.g.
Campus Life; Analytics?• Do we want to review Rubrics & Competencies
outside of the eAssessment Solution Implementation?