Objectives• Try to find out the reason of damaged concrete
towers in the distribution network
![Page 3: THE VERIFICATION OF SHUNTING METHOD FOR LIMITATION OF EARTH FAULT CURRENT IN MV COMPENSATED NETWORKS Petr TOMAN Jaroslava ORSÁGOVÁ David TOPOLÁNEK Vladimír](https://reader035.vdocuments.site/reader035/viewer/2022062516/56649d745503460f94a54dd5/html5/thumbnails/3.jpg)
![Page 4: THE VERIFICATION OF SHUNTING METHOD FOR LIMITATION OF EARTH FAULT CURRENT IN MV COMPENSATED NETWORKS Petr TOMAN Jaroslava ORSÁGOVÁ David TOPOLÁNEK Vladimír](https://reader035.vdocuments.site/reader035/viewer/2022062516/56649d745503460f94a54dd5/html5/thumbnails/4.jpg)
Objectives• Try to find out the reason of damaged concrete
towers in the distribution network• To measure the voltage and currents during the
earth fault for fault on unearthed console of concrete tower and for other types of fault
• The method of shunting (connecting affected phase to earth system in substation) should be tested
• The conditions during the fault state should be the same as in normal operation
![Page 5: THE VERIFICATION OF SHUNTING METHOD FOR LIMITATION OF EARTH FAULT CURRENT IN MV COMPENSATED NETWORKS Petr TOMAN Jaroslava ORSÁGOVÁ David TOPOLÁNEK Vladimír](https://reader035.vdocuments.site/reader035/viewer/2022062516/56649d745503460f94a54dd5/html5/thumbnails/5.jpg)
The network
• The distribution grids (22 and 35 kV) in the Czech Republic are operated as compensated via Petersen coil or as earthed via resistor (urban predominantly cable grids)
• When the earth fault comes the automatic of coil tuning stops and the dispatcher tries to find out the point of fault. During this process the mistuning caused by switching operation could rise
![Page 6: THE VERIFICATION OF SHUNTING METHOD FOR LIMITATION OF EARTH FAULT CURRENT IN MV COMPENSATED NETWORKS Petr TOMAN Jaroslava ORSÁGOVÁ David TOPOLÁNEK Vladimír](https://reader035.vdocuments.site/reader035/viewer/2022062516/56649d745503460f94a54dd5/html5/thumbnails/6.jpg)
The measuring
Six types of fault were realized– Low impednace – conductor lying on the earth– Arc - spark gap– Arc - damaged MV cable– 400 – 1600 – Unearthed console of concrete tower
![Page 7: THE VERIFICATION OF SHUNTING METHOD FOR LIMITATION OF EARTH FAULT CURRENT IN MV COMPENSATED NETWORKS Petr TOMAN Jaroslava ORSÁGOVÁ David TOPOLÁNEK Vladimír](https://reader035.vdocuments.site/reader035/viewer/2022062516/56649d745503460f94a54dd5/html5/thumbnails/7.jpg)
The measuring
The size of the network was 140 A:– Tuned Petersen coil– Mistuned Petersen coil about 40 A low
All experiments was made in three places of fault:
– Close to substation (busbar)– The long distance (about 25 km) from busbar– The middle distance (about 12 km) from busbar
![Page 8: THE VERIFICATION OF SHUNTING METHOD FOR LIMITATION OF EARTH FAULT CURRENT IN MV COMPENSATED NETWORKS Petr TOMAN Jaroslava ORSÁGOVÁ David TOPOLÁNEK Vladimír](https://reader035.vdocuments.site/reader035/viewer/2022062516/56649d745503460f94a54dd5/html5/thumbnails/8.jpg)
L2L1 L3
110kV/22kV
Petersencoil
Line 1
Line 2
Transformer
busbar
Shuntingcircuit breaker
Fault
![Page 9: THE VERIFICATION OF SHUNTING METHOD FOR LIMITATION OF EARTH FAULT CURRENT IN MV COMPENSATED NETWORKS Petr TOMAN Jaroslava ORSÁGOVÁ David TOPOLÁNEK Vladimír](https://reader035.vdocuments.site/reader035/viewer/2022062516/56649d745503460f94a54dd5/html5/thumbnails/9.jpg)
The time sequence of fault
1. Switch on the fault
2. Switch on the shunting circuit breaker
3. Switch off the fault
4. Switch off the shunting circuit breaker
![Page 10: THE VERIFICATION OF SHUNTING METHOD FOR LIMITATION OF EARTH FAULT CURRENT IN MV COMPENSATED NETWORKS Petr TOMAN Jaroslava ORSÁGOVÁ David TOPOLÁNEK Vladimír](https://reader035.vdocuments.site/reader035/viewer/2022062516/56649d745503460f94a54dd5/html5/thumbnails/10.jpg)
Tuned coil
![Page 11: THE VERIFICATION OF SHUNTING METHOD FOR LIMITATION OF EARTH FAULT CURRENT IN MV COMPENSATED NETWORKS Petr TOMAN Jaroslava ORSÁGOVÁ David TOPOLÁNEK Vladimír](https://reader035.vdocuments.site/reader035/viewer/2022062516/56649d745503460f94a54dd5/html5/thumbnails/11.jpg)
Mistuned coil
![Page 12: THE VERIFICATION OF SHUNTING METHOD FOR LIMITATION OF EARTH FAULT CURRENT IN MV COMPENSATED NETWORKS Petr TOMAN Jaroslava ORSÁGOVÁ David TOPOLÁNEK Vladimír](https://reader035.vdocuments.site/reader035/viewer/2022062516/56649d745503460f94a54dd5/html5/thumbnails/12.jpg)
Earth fault on unearthed console of concrete tower-tuned coil
![Page 13: THE VERIFICATION OF SHUNTING METHOD FOR LIMITATION OF EARTH FAULT CURRENT IN MV COMPENSATED NETWORKS Petr TOMAN Jaroslava ORSÁGOVÁ David TOPOLÁNEK Vladimír](https://reader035.vdocuments.site/reader035/viewer/2022062516/56649d745503460f94a54dd5/html5/thumbnails/13.jpg)
Earth fault on unearthed console of concrete tower- mistuned coil
![Page 14: THE VERIFICATION OF SHUNTING METHOD FOR LIMITATION OF EARTH FAULT CURRENT IN MV COMPENSATED NETWORKS Petr TOMAN Jaroslava ORSÁGOVÁ David TOPOLÁNEK Vladimír](https://reader035.vdocuments.site/reader035/viewer/2022062516/56649d745503460f94a54dd5/html5/thumbnails/14.jpg)
Earth fault on unearthed console
![Page 15: THE VERIFICATION OF SHUNTING METHOD FOR LIMITATION OF EARTH FAULT CURRENT IN MV COMPENSATED NETWORKS Petr TOMAN Jaroslava ORSÁGOVÁ David TOPOLÁNEK Vladimír](https://reader035.vdocuments.site/reader035/viewer/2022062516/56649d745503460f94a54dd5/html5/thumbnails/15.jpg)
Conclusion
• The longer operation of earth faulton unearthed console of concrete towercould be very dangerous for the lifecycle of towers
• Fault currents after closing shunting circuit breaker decreased practically to zero during all experiments
![Page 16: THE VERIFICATION OF SHUNTING METHOD FOR LIMITATION OF EARTH FAULT CURRENT IN MV COMPENSATED NETWORKS Petr TOMAN Jaroslava ORSÁGOVÁ David TOPOLÁNEK Vladimír](https://reader035.vdocuments.site/reader035/viewer/2022062516/56649d745503460f94a54dd5/html5/thumbnails/16.jpg)
Conclusion
• DSO on the base of series of experiments decided about the pilot project of shunting in substation Medlanky in the periphery of Brno city.
• The equipment could shortly make the second earth fault in substation in the other phase.
![Page 17: THE VERIFICATION OF SHUNTING METHOD FOR LIMITATION OF EARTH FAULT CURRENT IN MV COMPENSATED NETWORKS Petr TOMAN Jaroslava ORSÁGOVÁ David TOPOLÁNEK Vladimír](https://reader035.vdocuments.site/reader035/viewer/2022062516/56649d745503460f94a54dd5/html5/thumbnails/17.jpg)
Conclusion
• The next series of experiments are prepared. The main aim is to verify touch voltage for specified cases and evaluate the possibilities of fault location by distance principle (during double earth fault)