The Loft at Tobin Lake
2008
2009
2010Ready to start
The walls are built
The walls are up
Time to cutout the windows and doors
Windows, doors, and corner posts
Hip rafters are up (whew!)
Half rafters, creepers, and fascia (whew!! again)
Half rafters, creepers, and some nogging
Half rafters, creepers, and all the nogging
Sheeting is half done
Sheeting is done
Still a little airy
Windows, and doors are in…
…and shingles are done!
End of season 2010 Looking good
Electrical is done
Walls are insulated…
…and now they’re covered.
Ceiling is insulated…
…and now it’s covered. Looking good!
The floor is down
Furniture and window covering
Log siding is going on…More to come!