Mr Roberto GhidiniSESAR-JU
SESAR – Digital Remote Tower Solutions. V3 Validation Objectives and transition to deployment
Asker 7th March 2019
The SESAR 2020 pipeline to innovation
2
Budget: EUR 1,6 billionTimeline: 2016-2024Calls: open and closed
3 research strands
SESAR –Digital Remote Tower Solutions. V3 Validation Objectives and transition to deployment
Visit the SESAR Solution portal: sesarju.eu/activities-solutions
PJ02 – Increased Runway and Airport
Throughput
PJ07 – Optimised Airspace Users
Operations/UDPP
BigData4ATM
INTUIT
BEST
DART
TaCo
TBO-MET
MINIMA
PNOWWA
AGENT
MALORCA
AUTOPACE
ATM4E
STRESS
COCTA
COMPAIR
Vista
MOTO
RETINA
SALSA
R-WAKE
OptiFrame
COPTRA
PARTAKE
PJ03a – Integrated Surface Management
PJ03b – Airport Safety Nets
AURORA PACAS
APACHE
NAVISAS
SAPIENT
PJ08 – Advanced Airspace Management
PJ10 – Separation Management
en-route & TMA
PJ11 – Enhanced Air & Ground Safety Nets
PJ06 – Trajectory Based Free Routing
PJ04 – Total Airport Management
PJ05 – Remote Tower for Multiple Airport
High-performing airport operations
Optimised ATMnetwork services
Advanced airtraffic services
Enabling aviationinfrastructure PJ14 – CNS
PJ15 – Common Services
PJ09 – Advanced DCB
PJ16 – CWP/HMI
PJ01 – Enhanced Arrivals & Departures
PJ17 – SWIM Infrastructures
PJ18 – 4D Trajectory Management
PJ20 – Master Plan Maintenance
PJ19 – Content Integration
FundamentalScientific Research
ATM Application Oriented Research
Industrial Research & Validation
Very Large Scale Demonstration
Very Large Scale Demonstration
Open Calls
SESAR 2020
PJ22 – Validation, Verification & Demo
Infrastructure
PJ28 – Integrated Airport Ops (incl. TBS)
PJ24 – Network Collaborative Management
PJ31 – Initial Trajectory
Information Sharing
PJ27 – Flight Information
Exchange
PJ25 – Arrival Management Extended to
en-route Airspace
3SESAR –Digital Remote Tower Solutions. V3 Validation Objectives and transition to deployment
SESAR lifecycle
4SESAR –Digital Remote Tower Solutions. V3 Validation Objectives and transition to deployment
Solution-Oriented ApproachWhat is a SESAR Solution?
SESAR Solution: Programme output of R&I activities which relates to either an operational or a technological improvement which have been designed, developed and validated in response to performance needs identified in the European ATM Plan.
There are two types of SESAR Solutions:• SESAR ATM Solutions• SESAR Technological Solutions
SESAR Solution
Validated operational
improvement
Business needs
PerformanceKnowledge
transfer (deliverables)
Infrastructure and
standards
5SESAR –Digital Remote Tower Solutions. V3 Validation Objectives and transition to deployment
Validation and Standards/Regulations
V0ATM Needs
V1Scope
V2Feasibility
V3Pre-industrial
development & integration
V4 Industrializatio
n
V5 Deployment
V6 Operations
V7 Decomission.
SESAR JU SCOPE
CONCEPT MATURITY LIFECYCLE MODEL
INITIALCONCEPT IDEA
CONCEPT REMOVED & REPLACED
Focus of SESAR Releases
STANDARDS
REGULATIONS
The maturity assessments establish whether the needs for standardization and regulation are adequately justified and whether material is sufficiently developed and mature to support the standardisation and regulatory process in the next phase
GATES
SESAR –Digital Remote Tower Solutions. V3 Validation Objectives and transition to deployment 6
analogy between this solution and the development of a super car
7
V1 SCOPE
• Identification of operational/technical solutions to meet performance targets.
• Identification of benefit mechanisms
• Scope of potential applicability
• Initial cost estimates to justify R&D.
• Identification of major research and development issues/needs (R&D needs)
SESAR –Digital Remote Tower Solutions. V3 Validation Objectives and transition to deployment
analogy between this solution and the development of a super car
8
V2 FEASIBILITY
• Elaboration and development of the operational concept
• Validation in representative operational contexts to establish the concept’s actual applicability
• Performance, operability and acceptability of operational aspects are primary concerns
• Operational procedures (nominal / non-nominal conditions) and operational requirements are stable.
• Human and technology integration and phraseology / information exchange requirements are defined
SESAR –Digital Remote Tower Solutions. V3 Validation Objectives and transition to deployment
analogy between this solution and the development of a super car
9
V3 PRE-INDUSTRIAL DEVELOPMENT & INTEGRATION
• Further develop and refine concepts to prepare their transition from research to an operational environment
• Validate that concepts can work coherently together and deliver the required benefits
• Establish that they can be integrated into the target ATM system.
• V3 requires integration of pre-industrial prototypes in representative system platforms.
SESAR –Digital Remote Tower Solutions. V3 Validation Objectives and transition to deployment
analogy between this solution and the development of a super car
10
V4 Industrialization V5 Deployment V6 Operations
SESAR –Digital Remote Tower Solutions. V3 Validation Objectives and transition to deployment
Concept Maturity Lifecycle
V0ATM Needs
V1Scope
V2Feasibility
V3Pre-industrial
development & integration
V4 Industrializati
on
V5 Deployment
V6 Operations
V7 Decomission.
CONCEPT MATURITY LIFECYCLE MODEL
INITIALCONCEPT IDEA
CONCEPT REMOVED & REPLACED
+ 2 up to 10 years!
VALIDATION PHASE DEPLOYMENT STARTS
SESAR –Digital Remote Tower Solutions. V3 Validation Objectives and transition to deployment 11
SESAR-JU develop technologies and procedures (“SESAR SOLUTIONS”) for a new ATM system at End of V3 maturity level
Validation results and SESAR Solution datapacks contain the main output of SESAR activities to feed the development/update of standards and regulations
•Industrialization and deployment of SESAR technologies and procedures is the natural sequence of their development and validation by the SESAR-JU
(IT MAY TAKE LONGER THAN THE VALIDATION PHASE)
•SESAR deployment must be:
– Performance driven
– Synchronised: NOT ALWAYS REQUIRED
From Validation to Deployment
SESAR –Digital Remote Tower Solutions. V3 Validation Objectives and transition to deployment 12
Thank you very much for your attention!
SESAR –Digital Remote Tower Solutions. V3 Validation Objectives and transition to deployment