![Page 1: Rosehill Reservoir Rehabilitation - City of Toronto › wp-content › uploads › 2017 › 10 › 95d7...• Spring 2016: Site signage installed, project business cards distributed](https://reader034.vdocuments.site/reader034/viewer/2022042322/5f0cbfeb7e708231d436f1ce/html5/thumbnails/1.jpg)
Rosehill Reservoir RehabilitationSeptember 13, 2017
![Page 2: Rosehill Reservoir Rehabilitation - City of Toronto › wp-content › uploads › 2017 › 10 › 95d7...• Spring 2016: Site signage installed, project business cards distributed](https://reader034.vdocuments.site/reader034/viewer/2022042322/5f0cbfeb7e708231d436f1ce/html5/thumbnails/2.jpg)
Doors open 6:00pm – 7:00pmWelcome and introductions 7:00pm – 7:05pmCouncillors Wong-Tam and Matlow 7:05pm – 7:15pmWorking Group(led by Rosehill Vision Committee) 7:15pm – 7:20pmPresentation 7:20pm – 8:00pmQuestions 8:00pm – 8:30pmOpen forum 8:30pm – 9:00pm
Agenda
2
![Page 3: Rosehill Reservoir Rehabilitation - City of Toronto › wp-content › uploads › 2017 › 10 › 95d7...• Spring 2016: Site signage installed, project business cards distributed](https://reader034.vdocuments.site/reader034/viewer/2022042322/5f0cbfeb7e708231d436f1ce/html5/thumbnails/3.jpg)
Meeting Ground Rules
• As the facilitator, my purpose is to ensure we have a goodmeeting, stay on topic, on time with the agenda and finishon time
• Please show decorum and respect to both yourneighbours and staff. We want to create a safeenvironment at this meeting to respect all opinions andfeedback
• One speaker or discussion at a time please• Please hold all questions until after the presentation
3
![Page 4: Rosehill Reservoir Rehabilitation - City of Toronto › wp-content › uploads › 2017 › 10 › 95d7...• Spring 2016: Site signage installed, project business cards distributed](https://reader034.vdocuments.site/reader034/viewer/2022042322/5f0cbfeb7e708231d436f1ce/html5/thumbnails/4.jpg)
Welcome and Introductions
4
![Page 5: Rosehill Reservoir Rehabilitation - City of Toronto › wp-content › uploads › 2017 › 10 › 95d7...• Spring 2016: Site signage installed, project business cards distributed](https://reader034.vdocuments.site/reader034/viewer/2022042322/5f0cbfeb7e708231d436f1ce/html5/thumbnails/5.jpg)
• City Team:• Engineering & Construction
Services• Toronto Water• Public Consultation Unit• Heritage Preservation Services• Parks, Forestry & Recreation• Toronto and Region
Conservation Authority
Introductions
• Consultant Team:• Associated Engineering• Brodie & Associates Landscape
Architects• Brown & Storey Architects
• Councillors:• Kristyn Wong-Tam – Ward 27• Josh Matlow – Ward 22
5
![Page 6: Rosehill Reservoir Rehabilitation - City of Toronto › wp-content › uploads › 2017 › 10 › 95d7...• Spring 2016: Site signage installed, project business cards distributed](https://reader034.vdocuments.site/reader034/viewer/2022042322/5f0cbfeb7e708231d436f1ce/html5/thumbnails/6.jpg)
Councillors’ Address
6
![Page 7: Rosehill Reservoir Rehabilitation - City of Toronto › wp-content › uploads › 2017 › 10 › 95d7...• Spring 2016: Site signage installed, project business cards distributed](https://reader034.vdocuments.site/reader034/viewer/2022042322/5f0cbfeb7e708231d436f1ce/html5/thumbnails/7.jpg)
Working Group Address(Rosehill Vision Committee)
7
![Page 8: Rosehill Reservoir Rehabilitation - City of Toronto › wp-content › uploads › 2017 › 10 › 95d7...• Spring 2016: Site signage installed, project business cards distributed](https://reader034.vdocuments.site/reader034/viewer/2022042322/5f0cbfeb7e708231d436f1ce/html5/thumbnails/8.jpg)
Project Background
8
![Page 9: Rosehill Reservoir Rehabilitation - City of Toronto › wp-content › uploads › 2017 › 10 › 95d7...• Spring 2016: Site signage installed, project business cards distributed](https://reader034.vdocuments.site/reader034/viewer/2022042322/5f0cbfeb7e708231d436f1ce/html5/thumbnails/9.jpg)
Back
grou
nd
9
![Page 10: Rosehill Reservoir Rehabilitation - City of Toronto › wp-content › uploads › 2017 › 10 › 95d7...• Spring 2016: Site signage installed, project business cards distributed](https://reader034.vdocuments.site/reader034/viewer/2022042322/5f0cbfeb7e708231d436f1ce/html5/thumbnails/10.jpg)
Distribution Map
Island WTP
RosehillReservoir
10
![Page 11: Rosehill Reservoir Rehabilitation - City of Toronto › wp-content › uploads › 2017 › 10 › 95d7...• Spring 2016: Site signage installed, project business cards distributed](https://reader034.vdocuments.site/reader034/viewer/2022042322/5f0cbfeb7e708231d436f1ce/html5/thumbnails/11.jpg)
Infrastructure Rehabilitation Scope
11
![Page 12: Rosehill Reservoir Rehabilitation - City of Toronto › wp-content › uploads › 2017 › 10 › 95d7...• Spring 2016: Site signage installed, project business cards distributed](https://reader034.vdocuments.site/reader034/viewer/2022042322/5f0cbfeb7e708231d436f1ce/html5/thumbnails/12.jpg)
Rehabilitation Needs
• The Rosehill Reservoir was last upgraded 51 years ago(1966)
• Condition assessment was completed in 2014• Due to the age and critical nature of the reservoir
infrastructure, rehabilitation and upgrades are required to:• Ensure the structural integrity of the reservoir• Extend the service life of the reservoir• Bring the infrastructure to a state of good repair
12
![Page 13: Rosehill Reservoir Rehabilitation - City of Toronto › wp-content › uploads › 2017 › 10 › 95d7...• Spring 2016: Site signage installed, project business cards distributed](https://reader034.vdocuments.site/reader034/viewer/2022042322/5f0cbfeb7e708231d436f1ce/html5/thumbnails/13.jpg)
Infr
astr
uctu
re
13
![Page 14: Rosehill Reservoir Rehabilitation - City of Toronto › wp-content › uploads › 2017 › 10 › 95d7...• Spring 2016: Site signage installed, project business cards distributed](https://reader034.vdocuments.site/reader034/viewer/2022042322/5f0cbfeb7e708231d436f1ce/html5/thumbnails/14.jpg)
Her
itage
Impa
ct
14
![Page 15: Rosehill Reservoir Rehabilitation - City of Toronto › wp-content › uploads › 2017 › 10 › 95d7...• Spring 2016: Site signage installed, project business cards distributed](https://reader034.vdocuments.site/reader034/viewer/2022042322/5f0cbfeb7e708231d436f1ce/html5/thumbnails/15.jpg)
Cons
truc
tion
Back
grou
nd
15
![Page 16: Rosehill Reservoir Rehabilitation - City of Toronto › wp-content › uploads › 2017 › 10 › 95d7...• Spring 2016: Site signage installed, project business cards distributed](https://reader034.vdocuments.site/reader034/viewer/2022042322/5f0cbfeb7e708231d436f1ce/html5/thumbnails/16.jpg)
Scop
eof
Wor
k
16
![Page 17: Rosehill Reservoir Rehabilitation - City of Toronto › wp-content › uploads › 2017 › 10 › 95d7...• Spring 2016: Site signage installed, project business cards distributed](https://reader034.vdocuments.site/reader034/viewer/2022042322/5f0cbfeb7e708231d436f1ce/html5/thumbnails/17.jpg)
Wat
erpr
oofin
gRe
quire
men
ts
17
![Page 18: Rosehill Reservoir Rehabilitation - City of Toronto › wp-content › uploads › 2017 › 10 › 95d7...• Spring 2016: Site signage installed, project business cards distributed](https://reader034.vdocuments.site/reader034/viewer/2022042322/5f0cbfeb7e708231d436f1ce/html5/thumbnails/18.jpg)
Wat
erpr
oofin
gA
ppro
ach
18
![Page 19: Rosehill Reservoir Rehabilitation - City of Toronto › wp-content › uploads › 2017 › 10 › 95d7...• Spring 2016: Site signage installed, project business cards distributed](https://reader034.vdocuments.site/reader034/viewer/2022042322/5f0cbfeb7e708231d436f1ce/html5/thumbnails/19.jpg)
Was
hroo
mRe
desig
n
19
![Page 20: Rosehill Reservoir Rehabilitation - City of Toronto › wp-content › uploads › 2017 › 10 › 95d7...• Spring 2016: Site signage installed, project business cards distributed](https://reader034.vdocuments.site/reader034/viewer/2022042322/5f0cbfeb7e708231d436f1ce/html5/thumbnails/20.jpg)
Phas
e1:
Q2
2018
–Q
220
19
20
![Page 21: Rosehill Reservoir Rehabilitation - City of Toronto › wp-content › uploads › 2017 › 10 › 95d7...• Spring 2016: Site signage installed, project business cards distributed](https://reader034.vdocuments.site/reader034/viewer/2022042322/5f0cbfeb7e708231d436f1ce/html5/thumbnails/21.jpg)
Phas
e2:
Q2
2019
–Q
320
20
21
![Page 22: Rosehill Reservoir Rehabilitation - City of Toronto › wp-content › uploads › 2017 › 10 › 95d7...• Spring 2016: Site signage installed, project business cards distributed](https://reader034.vdocuments.site/reader034/viewer/2022042322/5f0cbfeb7e708231d436f1ce/html5/thumbnails/22.jpg)
Phas
e3:
Q3
2020
–Q
420
21
22
![Page 23: Rosehill Reservoir Rehabilitation - City of Toronto › wp-content › uploads › 2017 › 10 › 95d7...• Spring 2016: Site signage installed, project business cards distributed](https://reader034.vdocuments.site/reader034/viewer/2022042322/5f0cbfeb7e708231d436f1ce/html5/thumbnails/23.jpg)
Public Consultation Process
23
![Page 24: Rosehill Reservoir Rehabilitation - City of Toronto › wp-content › uploads › 2017 › 10 › 95d7...• Spring 2016: Site signage installed, project business cards distributed](https://reader034.vdocuments.site/reader034/viewer/2022042322/5f0cbfeb7e708231d436f1ce/html5/thumbnails/24.jpg)
• Wards 22 and 27 Councillors• City Divisions (Toronto Water, Engineering & Construction
Services, Public Consultation Unit, Parks, Forestry & Recreation,Planning/Heritage Preservation Services)
• Toronto Regional Conservation Authority (TRCA)• Residents and park users• Working Group (with the Rosehill Vision Committee)• Summerhill Residents Association• Rosehill Garden Volunteers• Permit takers (including sports groups and local schools)
Project Stakeholders
24
![Page 25: Rosehill Reservoir Rehabilitation - City of Toronto › wp-content › uploads › 2017 › 10 › 95d7...• Spring 2016: Site signage installed, project business cards distributed](https://reader034.vdocuments.site/reader034/viewer/2022042322/5f0cbfeb7e708231d436f1ce/html5/thumbnails/25.jpg)
• 2015 onwards: Meetings and conversations with the Rosehill GardenVolunteers and local stakeholder groups, schools, and park permit holders(including sports organizations)
• Late 2015: Notices of site works delivered to study area, email listestablished, project website established (www.toronto.ca/rosehill)
• Spring 2016: Site signage installed, project business cards distributed on-site
• Fall 2016: Presentation to Summerhill Residents Association
• May 2017: Rosehill Vision Committee Community Meeting
• Ongoing: Email list is growing, updates are sent out regularly, website isupdated regularly, and the project team continues to receive and reviewcomments from the public via phone and email
Consultation Process So Far
25
![Page 26: Rosehill Reservoir Rehabilitation - City of Toronto › wp-content › uploads › 2017 › 10 › 95d7...• Spring 2016: Site signage installed, project business cards distributed](https://reader034.vdocuments.site/reader034/viewer/2022042322/5f0cbfeb7e708231d436f1ce/html5/thumbnails/26.jpg)
Landscape Vision
26
![Page 27: Rosehill Reservoir Rehabilitation - City of Toronto › wp-content › uploads › 2017 › 10 › 95d7...• Spring 2016: Site signage installed, project business cards distributed](https://reader034.vdocuments.site/reader034/viewer/2022042322/5f0cbfeb7e708231d436f1ce/html5/thumbnails/27.jpg)
Exist
ing
Feat
ures
27
![Page 28: Rosehill Reservoir Rehabilitation - City of Toronto › wp-content › uploads › 2017 › 10 › 95d7...• Spring 2016: Site signage installed, project business cards distributed](https://reader034.vdocuments.site/reader034/viewer/2022042322/5f0cbfeb7e708231d436f1ce/html5/thumbnails/28.jpg)
Land
scap
eV
ision
28
![Page 29: Rosehill Reservoir Rehabilitation - City of Toronto › wp-content › uploads › 2017 › 10 › 95d7...• Spring 2016: Site signage installed, project business cards distributed](https://reader034.vdocuments.site/reader034/viewer/2022042322/5f0cbfeb7e708231d436f1ce/html5/thumbnails/29.jpg)
Land
scap
eV
ision
29
![Page 30: Rosehill Reservoir Rehabilitation - City of Toronto › wp-content › uploads › 2017 › 10 › 95d7...• Spring 2016: Site signage installed, project business cards distributed](https://reader034.vdocuments.site/reader034/viewer/2022042322/5f0cbfeb7e708231d436f1ce/html5/thumbnails/30.jpg)
Land
scap
eV
ision
30
![Page 31: Rosehill Reservoir Rehabilitation - City of Toronto › wp-content › uploads › 2017 › 10 › 95d7...• Spring 2016: Site signage installed, project business cards distributed](https://reader034.vdocuments.site/reader034/viewer/2022042322/5f0cbfeb7e708231d436f1ce/html5/thumbnails/31.jpg)
Land
scap
eV
ision
31
![Page 32: Rosehill Reservoir Rehabilitation - City of Toronto › wp-content › uploads › 2017 › 10 › 95d7...• Spring 2016: Site signage installed, project business cards distributed](https://reader034.vdocuments.site/reader034/viewer/2022042322/5f0cbfeb7e708231d436f1ce/html5/thumbnails/32.jpg)
Land
scap
eV
ision
32
![Page 33: Rosehill Reservoir Rehabilitation - City of Toronto › wp-content › uploads › 2017 › 10 › 95d7...• Spring 2016: Site signage installed, project business cards distributed](https://reader034.vdocuments.site/reader034/viewer/2022042322/5f0cbfeb7e708231d436f1ce/html5/thumbnails/33.jpg)
Land
scap
eV
ision
33
![Page 34: Rosehill Reservoir Rehabilitation - City of Toronto › wp-content › uploads › 2017 › 10 › 95d7...• Spring 2016: Site signage installed, project business cards distributed](https://reader034.vdocuments.site/reader034/viewer/2022042322/5f0cbfeb7e708231d436f1ce/html5/thumbnails/34.jpg)
Land
scap
eV
ision
34
![Page 35: Rosehill Reservoir Rehabilitation - City of Toronto › wp-content › uploads › 2017 › 10 › 95d7...• Spring 2016: Site signage installed, project business cards distributed](https://reader034.vdocuments.site/reader034/viewer/2022042322/5f0cbfeb7e708231d436f1ce/html5/thumbnails/35.jpg)
Land
scap
eV
ision
35
![Page 36: Rosehill Reservoir Rehabilitation - City of Toronto › wp-content › uploads › 2017 › 10 › 95d7...• Spring 2016: Site signage installed, project business cards distributed](https://reader034.vdocuments.site/reader034/viewer/2022042322/5f0cbfeb7e708231d436f1ce/html5/thumbnails/36.jpg)
Land
scap
eV
ision
36
![Page 37: Rosehill Reservoir Rehabilitation - City of Toronto › wp-content › uploads › 2017 › 10 › 95d7...• Spring 2016: Site signage installed, project business cards distributed](https://reader034.vdocuments.site/reader034/viewer/2022042322/5f0cbfeb7e708231d436f1ce/html5/thumbnails/37.jpg)
Land
scap
eV
ision
37
![Page 38: Rosehill Reservoir Rehabilitation - City of Toronto › wp-content › uploads › 2017 › 10 › 95d7...• Spring 2016: Site signage installed, project business cards distributed](https://reader034.vdocuments.site/reader034/viewer/2022042322/5f0cbfeb7e708231d436f1ce/html5/thumbnails/38.jpg)
Land
scap
eV
ision
38
![Page 39: Rosehill Reservoir Rehabilitation - City of Toronto › wp-content › uploads › 2017 › 10 › 95d7...• Spring 2016: Site signage installed, project business cards distributed](https://reader034.vdocuments.site/reader034/viewer/2022042322/5f0cbfeb7e708231d436f1ce/html5/thumbnails/39.jpg)
Land
scap
eV
ision
39
![Page 40: Rosehill Reservoir Rehabilitation - City of Toronto › wp-content › uploads › 2017 › 10 › 95d7...• Spring 2016: Site signage installed, project business cards distributed](https://reader034.vdocuments.site/reader034/viewer/2022042322/5f0cbfeb7e708231d436f1ce/html5/thumbnails/40.jpg)
Land
scap
eV
ision
40
![Page 41: Rosehill Reservoir Rehabilitation - City of Toronto › wp-content › uploads › 2017 › 10 › 95d7...• Spring 2016: Site signage installed, project business cards distributed](https://reader034.vdocuments.site/reader034/viewer/2022042322/5f0cbfeb7e708231d436f1ce/html5/thumbnails/41.jpg)
Land
scap
eV
ision
41
![Page 42: Rosehill Reservoir Rehabilitation - City of Toronto › wp-content › uploads › 2017 › 10 › 95d7...• Spring 2016: Site signage installed, project business cards distributed](https://reader034.vdocuments.site/reader034/viewer/2022042322/5f0cbfeb7e708231d436f1ce/html5/thumbnails/42.jpg)
Land
scap
eV
ision
42
![Page 43: Rosehill Reservoir Rehabilitation - City of Toronto › wp-content › uploads › 2017 › 10 › 95d7...• Spring 2016: Site signage installed, project business cards distributed](https://reader034.vdocuments.site/reader034/viewer/2022042322/5f0cbfeb7e708231d436f1ce/html5/thumbnails/43.jpg)
Wrap-up
43
![Page 44: Rosehill Reservoir Rehabilitation - City of Toronto › wp-content › uploads › 2017 › 10 › 95d7...• Spring 2016: Site signage installed, project business cards distributed](https://reader034.vdocuments.site/reader034/viewer/2022042322/5f0cbfeb7e708231d436f1ce/html5/thumbnails/44.jpg)
Project Schedule
44
![Page 45: Rosehill Reservoir Rehabilitation - City of Toronto › wp-content › uploads › 2017 › 10 › 95d7...• Spring 2016: Site signage installed, project business cards distributed](https://reader034.vdocuments.site/reader034/viewer/2022042322/5f0cbfeb7e708231d436f1ce/html5/thumbnails/45.jpg)
Following this meeting, the project team will:
• Review the comments received tonight and any commentssubmitted prior to the September 22nd, 2017 deadline
• Make revisions to the landscape plan based on these comments• Provide a revised landscape plan to the contract bidders before
the contract tender closes• Select and confirm a contractor with City Council’s approval• Hold a second Public Meeting in the new year to share the
finalized landscape plan and details of the construction schedule
Next Steps
45
![Page 46: Rosehill Reservoir Rehabilitation - City of Toronto › wp-content › uploads › 2017 › 10 › 95d7...• Spring 2016: Site signage installed, project business cards distributed](https://reader034.vdocuments.site/reader034/viewer/2022042322/5f0cbfeb7e708231d436f1ce/html5/thumbnails/46.jpg)
There are a number of ways that you can participate in the RosehillReservoir Rehabilitation project and stay updated:
• Fill out a feedback form or speak with staff tonight• Submit comments by September 22nd, 2017• Request to be added to the project email list to receive
updates• Visit the project website for information and updates:
www.toronto.ca/rosehillContact: Kate Nelischer, Sr. Public Consultation Coordinator
Get Involved
46
![Page 47: Rosehill Reservoir Rehabilitation - City of Toronto › wp-content › uploads › 2017 › 10 › 95d7...• Spring 2016: Site signage installed, project business cards distributed](https://reader034.vdocuments.site/reader034/viewer/2022042322/5f0cbfeb7e708231d436f1ce/html5/thumbnails/47.jpg)
Q&A Ground Rules
1. All questions should be directed through the facilitatorwho will moderate the Q&A session
2. A standing microphone will be used so everyone canhear the question/comment and the response
3. The person at the microphone has the floor, please donot interrupt the speaker who has the floor
4. Please introduce yourself before your question orcomment for the record of the meeting
5. Please do not interrupt the response to your question47
![Page 48: Rosehill Reservoir Rehabilitation - City of Toronto › wp-content › uploads › 2017 › 10 › 95d7...• Spring 2016: Site signage installed, project business cards distributed](https://reader034.vdocuments.site/reader034/viewer/2022042322/5f0cbfeb7e708231d436f1ce/html5/thumbnails/48.jpg)
Open Forum
Ian Darragh photo
48