Page 2: REPUBLIC OF SUDAN MINISTRY OF ROADS & TRANSPORT  SEA PORTS CORPORATION

2

By:KAMAL ELDIN M.A.MANSOUR

D. General Manager for Planning & Development

DEC. 2008

Page 3: REPUBLIC OF SUDAN MINISTRY OF ROADS & TRANSPORT  SEA PORTS CORPORATION

3

Introduction: Sudan is an Afro-Arab country with a population of (35) million. It has

area of (2.5) million square kilometers,(750) km coast on the Red Sea and (9) neighboring countries. It is multi-lingual, multi-national and

multi-racial. Located in the centre of Africa continent.

Page 4: REPUBLIC OF SUDAN MINISTRY OF ROADS & TRANSPORT  SEA PORTS CORPORATION

4

Sea Ports Corporation (SPC) is the Sudanese Ports Authority under the auspices of the Ministry Of Roads &Transport; It is responsible for construction, maintenance and operation of the Sudanese Ports. The chain of ports / terminals under SPC responsibilities are:

1.Port Sudan port consisting of the following ports : A. North Port (General cargo). B. South Port (Container terminal). C Green Port (Bulk cargo). D. Elkhair Port (Dama Dama) (Oil Terminal (Gas, refined oil).

2.Osman Digna Port(Suakin) (General cargo, passenger terminal, livestock). Oseif Port (Not operated).

4. El-Shaheed El-Zebeir River Port(Wadi Halfa) (Passenger, general cargo).

5.Kosti Dry Port (Kosti).

Page 5: REPUBLIC OF SUDAN MINISTRY OF ROADS & TRANSPORT  SEA PORTS CORPORATION

5

1. Port Sudan: It is located at Red Sea Coast, (850) km north – east of Khartoum, the

capital of Sudan. The Port comprises of the following terminals :

Page 6: REPUBLIC OF SUDAN MINISTRY OF ROADS & TRANSPORT  SEA PORTS CORPORATION

6

A : North Port:Dedicated for general cargo, bulk, edible oil, molasses and vehicles with annual throughput of (8) million tons .It has (15) berths with drafts ranging from (8) m to (10.5)m.The terminal operational facilities are :

- (5) Cement silos with a total storage capacity of (90.000) tons. - Grain silo with (50.000) tons capacity. - Edible oil tanks with (60.000) tons capacity. - Molasses storage tanks with (100.000) tons capacity. - (120) private owned warehouses, and (25) port owned warehouses. - Fully equipped with handling equipment as mobile cranes(20-60)ton ,harbour cranes (65)ton,tracters,trallers,forklifts trukes(3-35)ton,(39) quay

cranes(6)ton and tugboats launches common for all ports .

Page 7: REPUBLIC OF SUDAN MINISTRY OF ROADS & TRANSPORT  SEA PORTS CORPORATION

7

B. SOUTH PORT :Has (3) berths for container ships and a separate berth for the Grain Silo with (50000) tons storage capacity. The annual capacity is (400.000) TEUs and the terminal is equipped with :

- Four ship to shore gantry cranes (SSG).

- Two mobile harbour cranes.

- Eleven rubber tyred gantries (RTG).

- Adequate number of modern container handling equipment including reach stakers, forklifts, chassis, trailers and tractors .harbour cranes.

- Total length is about 600m,and draft of 11-12.2m.

Page 8: REPUBLIC OF SUDAN MINISTRY OF ROADS & TRANSPORT  SEA PORTS CORPORATION

8

C. EL KHAIR OIL TERMINAL :

Draft of (14.2)m dolphin type terminal for handling of Gas and refined oil products with an annual capacity of (2) million tons .

Page 9: REPUBLIC OF SUDAN MINISTRY OF ROADS & TRANSPORT  SEA PORTS CORPORATION

9

D. Green Port:

It is a new port for multi-purposes. It consists of (4) berths with a total length (1200)m & (14.2)m

draft.The storage area available behind the berths is about (650.000)sq.m.

Page 10: REPUBLIC OF SUDAN MINISTRY OF ROADS & TRANSPORT  SEA PORTS CORPORATION

10

2 .Suakin (Osman Digna) Port:

It is located (60) km to the south of Port Sudan with (8) specialized berths dedicated to passengers ,general cargo, livestock, asphalt, cement with a (25000) ton silo capacity.

Page 11: REPUBLIC OF SUDAN MINISTRY OF ROADS & TRANSPORT  SEA PORTS CORPORATION

11

3 .Osaief Port:It is small wharf for exporting Iron Ore and is located some (260)km north of Port Sudan, now not operated.

4 .Wadi Halfa:A river port on the Nile River on the Sudanese – Egyptian boarder serving mainly passengers and trade between the two countries.

Page 12: REPUBLIC OF SUDAN MINISTRY OF ROADS & TRANSPORT  SEA PORTS CORPORATION

12

5 .Kosti Dry Port :

Kosti Dry Port is a logistic depot ,located (400) km south of Khartoum, and near the Kosti River Port. It is meant to serve the southern and western parts of Sudan.

Page 13: REPUBLIC OF SUDAN MINISTRY OF ROADS & TRANSPORT  SEA PORTS CORPORATION

13

In 1974 the port of Sudan separated from Railways and became an autonomous body under the Ministry of Transport. It is responsible for development, construction and operation of the Sudanese ports. The Port Authority prepares forthcoming plans & operational strategies for the development of the ports to cope with development in Maritime Industry. In addition, it faces the political, and economic challenges (internally & externally) especially regarding the requirements of WTO ,COMESA…etc. It also concerned with the discover and exploitation of Sudanese oil and the development after the Peace Agreements in Sudan. The most important development stages are mentioned below:

Port Development Stages:1.From (1977 – 1995): This time period consisted of two stages, these stages were influenced

by the World Bank Fund and the International Economic Institutions Strategies and Financing .They aimed at raising the Port throughput from (2.5) million tons to (5.5) million tons in the first stage and from (5.5) m tons to (8.5) m tons in the second stage.

Page 14: REPUBLIC OF SUDAN MINISTRY OF ROADS & TRANSPORT  SEA PORTS CORPORATION

14

2. From (1995 Till Now):

During this period the development focused on the container terminal, SPC synchronized the terminal infrastructures and services with the international

practices and approaches through development strategy plan as follows: 1. Rehabilitation of berth 17/18 and increasing the length of the berth from

(178)m to (420)m. 2. Purchase of(4) Gantry cranes and (11) Rubber Tyred Gantries (RTG) .

3. Increasing of storage areas from( 450.000)sq.m to (1.300.000)sq.m. 4. Construction of multi-purposes births terminal (Green port stages 1&2).

5. Introduction of a Container Terminal Information System (CTIS). 6. construction of new container terminal,( will be completed by June 2009). 7. Dredging port Sudan and Suakin (6) million cubic meters for berths and

entrance channel. 8. Purchase of(4) additional Gantry crane and (8) Rubber Tyred Gantries

(RTG) (1st stage).

9. Re-structuring and management services.

Page 15: REPUBLIC OF SUDAN MINISTRY OF ROADS & TRANSPORT  SEA PORTS CORPORATION

15

Since year 2000 the following projects are executed :

1. A Container Terminal Information System (CTIS):

An Electronic Data Interchange (EDI) and management assistance was introduced in 2003 & 2004 in co-operation with (Germany).

Page 16: REPUBLIC OF SUDAN MINISTRY OF ROADS & TRANSPORT  SEA PORTS CORPORATION

16

2. Green Port Stages 1&2: It includes dredging and construction of (4) berths of multi-purpose cargo with a total length of (1200)m & (14.2) draft and (450.000) sq.m of reclaimed stacking area, project completed in (2006).

Page 17: REPUBLIC OF SUDAN MINISTRY OF ROADS & TRANSPORT  SEA PORTS CORPORATION

17

3. New Container Berths Project: This project consists of two container berths with a total length

of (791m) and (16m) depth, fully equipped with ship-to-shore cranes, RTGs, Container Handling Equipments and a stacking area of (200.000)sq.m. The project started in June 2006 and will be completed in 2010.The project is aimed to coping with the rapidly growing container traffic in the Port Sudan.

Page 18: REPUBLIC OF SUDAN MINISTRY OF ROADS & TRANSPORT  SEA PORTS CORPORATION

18

4. Re-structuring and management services :

Since 2003 S.P.C adopted a re-structuring strategy plan to develop the operational performances and efficiency of the Sudanese ports. As a result in July 2005 the S.P.C and HPC Hamburg Port Consulting GmbH signed a service contract for preparing a strategy plan for the Future Container Terminal in Port Sudan. The consultant’s proposal ,which is an elementary part of the service contract, outlines the work programme and approach for the implementation of the strategy plan for both the container terminals by the following :

1.Establishing an immediate plan for the development of the operational performance of the container terminal ,included Information Technology system( IT) .

2. Involvement of the private sector with regard to all operative activities in the port.

3.Re-structiring the Sudanese ports.

As a result of these recommendations ,the S.P.C authority has authorized HPC to implement a re-structuring program to establish a (LANDLORD AUTHORITY) and a privatization program. At the same time there is a program for the development of the operational performances and efficiency of the container terminal by management contract services.

Page 19: REPUBLIC OF SUDAN MINISTRY OF ROADS & TRANSPORT  SEA PORTS CORPORATION

19

Future Development Plan:

The future projects include: 1 -Construction of container terminal (Suakin).

2- Livestock Terminal (Marsa Elshaikh Ebrahim).

3- In-land container terminal (6.000.000) cubic meters (Asotreba – Port Sudan).

Page 20: REPUBLIC OF SUDAN MINISTRY OF ROADS & TRANSPORT  SEA PORTS CORPORATION

20

1. Construction of container terminal (Suakin): SPC is preparing study for the Osman Digna Port to become a modern Port,

with (12-15) berths for container handling, general cargo and bulk, in addition to a special berth for tourism.

The dredging work is started , and the construction of the first stage (2 berths) will start in 2009.

Page 21: REPUBLIC OF SUDAN MINISTRY OF ROADS & TRANSPORT  SEA PORTS CORPORATION

21

2. Livestock Terminal (Marsa Elshaikh Ebrahim):

S.P.C has a program for constructing a special port for livestock and fish export about 30 km south of Suakin Port. It is expected the start of construction will take place in 2010.

Page 22: REPUBLIC OF SUDAN MINISTRY OF ROADS & TRANSPORT  SEA PORTS CORPORATION

22

3. In-land container terminal:

Page 23: REPUBLIC OF SUDAN MINISTRY OF ROADS & TRANSPORT  SEA PORTS CORPORATION

23

Port Statistics (2003-2007):

SHIPS CALLED PORT SUDAN ( 2003-2007)

Year20032004200520062007

Ships12161379151212341014

0

200

400

600

800

1000

1200

1400

1600

2003 2004 2005 2006 2007

Page 24: REPUBLIC OF SUDAN MINISTRY OF ROADS & TRANSPORT  SEA PORTS CORPORATION

24

Port Statistics (2003-2007): Containers Traffic Handling (TEUS)

0

20000

40000

60000

80000

100000

120000

140000

160000

180000

200000

2003 2004 2005 2006 2007

FULL EMPTY

Page 25: REPUBLIC OF SUDAN MINISTRY OF ROADS & TRANSPORT  SEA PORTS CORPORATION

25

Total Handled Tonnage (2003-2007) (North Port):

0

1000000

2000000

3000000

4000000

5000000

6000000

2003 2004 2005 2006 2007

IMPORTS EXPORTS

Page 26: REPUBLIC OF SUDAN MINISTRY OF ROADS & TRANSPORT  SEA PORTS CORPORATION