Project Eligibility
• The State Highway must be located within the City Limits.
• The population must be
-
NOTE: Attach an 8 % x 11 or 11x17 map showing the project location.
Local Road or Street Name
Beginning of Project
End of Project
Length of Project
ND State Highway 18
215Y Street SE (Cass County Highway 34)
22"d Street SE
1300 feet
Social or Economic Developments near Project Location
The section of the Northern Cass Pass Rail-to-Trails project that is to be realigned is immediately adjacent to
the Arthur Elevator (the elevator is located west of the trail), and to the east is the Arthur downtown district
which includes the Arthur Community Hall, Petro-Serve USA, First State Bank, Titan Machinery, the U.S. Post
Office, Arthur Mall and the City Offices.
Current AADT 1485 (2015)
Forecasted AADT Forecasted AADT not available from ND DOT
Posted or Statutory Speed Limit 25 MPH
Number of Lanes 2 driving Lanes
Lane Width 12 feet
Cross Section 42 feet
Shoulder Type Bituminous
Shoulder Width 2-9 foot wide shoulders
Pavement Type Bituminous
Pavement rating or condition (2016) DIST 89 RIDE 3.33 PRPI GOOD IR191 RUT 0.25
How are the existing geometrics of the roadway? No roadway geometrics proposed to change
-
When was the current section built? Reconstructed in 1975 (RF-8-018(004)055, PCN 6920
Year last surfaced or received maintenance? Microsurfacing in 2014 (SS-8-018(058)074
Lighting Yes, cobraheads on wood poles located on East side of Hwy IS
Traffic Control None
Crash Rate or Number of Crashes? 7 crashes (2008 — 2017)
Other Known Safety Concerns? Location of the Arthur Elevator and semi traffic in relation to the Northern Cass
Pass trail. Conflicts occur between the vehicle traffic and the pedestrians/bikes.
Intersections (how many, type, control, etc.) 19 Driveways, no control
12 stop sign controlled driveways/streets
Is parking allowed? Yes parking is allowed both sides in the project area
Are there any bridges, box culverts, etc. within the project corridor?
No
What is the condition of the existing sanitary sewer, storm sewer, and water lines?
Satisfactory
Are there any Access points to adjoining property that present a special concern?
No
Bicycle/Pedestrian Accommodations (Sidewalk or shared use paths)?
Yes, Northern Cass Pass shared use path is located on the west side of ND
18 and City sidewalk located on the East side of ND 18
Is there an existing transit or other public transportation facility located within the project limits?
No
Do any school buses, transit buses, other multi-modal vehicles, etc. use this route?
Northern Cass School Buses
Does a RRX or RR facility exist within the project limits?
No
Other existing conditions that are not listed identified above? No
-
Explain why the project is needed, including the scope and appropriate detail on the project's uniqueness and
complexity. Include any 100% locally funded components of the project that are part of the overall project. Or
other planned projects that may compliment this project?
The Northern Cass Pass is aRails-to-Trails project located immediately adjacent to ND Highway 18 which runs from
the City of Arthur to the City of Hunter. There is a portion of the trail (this project) that is in the City of Arthur and
is situated between the Arthur Elevator and ND Highway 18. The original placement of the Arthur Elevator was
specifically completed to be on the BNSF Railway. As part of the Rails-to-Trails project, the Hunter/ArthurJPA
purchased the BNSF Right-of-Way and is proceeding to convert the route into a hard surfaced shared use path.
Because of the location of the Elevator, there is a 1,300 lineal foot length of the trail that is in direct conflict with
elevator vehicle access. This conflict results in Grain Trucks, semi's, pickups, etc causing safety concerns with
pedestrians that utilize the shared use path. It is the scope of this NDSTREET application to move the portion of
the trail (that is in direct conflict with the elevator access), 40 feet to the East. The new section of the trail will
abut the curb on ND Highway 18. The shared use path will be constructed as a 10 foot wide concrete section. The
separation created between the path and the elevator access road will create a safe environment for pedestrians
on the path.
Describe the public input process used to gain public acceptance of the proposed project.
This project was discussed as a public input meeting at two separate Joint Park Board meetings which included
posting of their agenda. Along with that, the Hunter/Arthur JPA has been fund raising for the development and
improvement of the Northern Cass Pass for 7 years.
What are the proposed Improvements? Realignment of 1,3001. f. of Northern Cass Pass Shared use path. The path
is currently situated on the old BNSF Railway ballast and 1,300 lineal feet of the path is in conflict with existing
Elevator traffic (grain trucks, semi's, cars, etc) and is to be relocated away from the Arthur Elevator access roads (40
feet to the east). The new path will be 10 foot wide concrete abutfinq the ND Highway 18 curb and gutter.
Proposed Length: 1,300 L.F.
Proposed Number of Lanes: One
Proposed Lane Width(s): Entire width of relocated path to be 10 feet
Proposed Cross Section: 10 feet
Proposed Surfacing Type: Concrete
Proposed Driving Surface Width: No change to ND Highway IS
-
Describe any proposed corrections to the geometrics of the roadway if required: N/A
Proposed Shoulder Surfacing Type, if applicable: N/A
Proposed Shoulder Width, if applicable: No change to existing shoulders on ND Highway 18
Proposed Lighting: N/A
Proposed Traffic Control changes: N/A
Proposed Safety Improvements: Separation of the shared use path from vehicle traffic
Proposed Intersection Improvements: N/A
Proposed Traffic Calming Measures: N/A
Will parking be allowed? No changes to parking rules on ND Highway 18
Will any bridges, box culverts, etc. be built/replaced within the project corridor? No
Will any private utilities, water lines, sanitary sewer, and/or storm sewer lines need to be
replaced or worked on with this projector potentially in the recent future (identify year)? Have
private utilities been coordinated with? No city utilities to be replaced or worked on with this
project. The City of Arthur has recently replaced water lines in this area.
Are there any access points along the project corridor that need to be addressed for mobility or
safety concerns? No
Will a sidewalk or shared use path be installed or replaced? Yes, this project is the realignment of a section of the
Northern Cass Pass Shared use path.
What ADA improvements will need to be made on this project? No
Will there be a transit or other public transportation facility located within the project limits? No
Do any special accommodations need to be made for school buses, transit buses, other multi-modal vehicles, etc. on
this route? No
Proposed Railroad Crossing Work: None
Other Proposed Improvements: None
-
Identify Yes, No, or Unknown for each environmental/cultural issue. If Yes, provide a brief description of the issue in
the Comments box.
Agricultural, Archeological sites, and/or Historical sites:
Unknown, will be investigated upon successful grant award.
Lakes, waterways, floodplains Wetland:
Unknown, will be investigated upon successful grant award.
Stormwater management: Yes, Appropriate SWPPP Stormwater Management measures will be utilized during
construction due to minor excavation/dirt work.
Hazardous materials sites:
Unknown, will be investigated upon successful grant award.
Hazardous materials on existing structure:
Unknown, will be investigated upon successful grant award.
Upland habitat:Unknown, will be investigated upon successful grant award.
Endangered/threatened/migratory species:
Unknown, will be investigated upon successful grant award.
$2Cti011 4(f~ (Refers to the use of qublicly owned park and recreational lands, wildlife and waterfowl refuges, and significant historical or
archeological sites in transportation project development.):
Unknown, will be investigated upon successful grant award.
S2Cti011 6(f~ (Refers to Land and Water Conservation Fund (LWCF) Act -the conversion to other use of lands or facilities acquired with LWCF
Act funds and requires replacement of used land with lands of equal value and use.):
Unknown, will be investigated upon successful grant award.
Through/adjacent to tribal land: No
Additional comments on Environmental/Cultural Issues section:
All Environmental/Cultural issues will be investigated upon successful grant award.
-
Construction Restrictions (migratory bird, local events, etc.):At this time there are no known construction restrictions. This will be reviewed prior to construction.
Right-of-Way Required (parcels, Ow11e1'S, relOCatlOns, etC.) (NOTE: It is recommended that local funds be used to acquire right-of-way on the LPA system.)
All improvements will be constructed within existing State and Local Right-of-Ways
Proposed Traffic Control during ConstructionUtilization of current State Traffic Control measures will be utilized
Ineligible Project Items: None
Additional comments on Miscellaneous Issues section: None
Item Total Federal State Local
Preliminary Engineering $ 11,083 $ 8,866 $ 1,018 $ 1,018
ROW $ 0 $ 0 $ 0 $ 0
Utilities $ 0 $ 0 $ 0 $ 0
Construction $ 110,830 $ 88,664 $ 11,083 $ 11,083
Construction Engineering $ 16,624 $ 13,299 $ 1,662 $ 1,662
Bridges $ 0 $ 0 $ 0 $ 0
Miscellaneous $ 0 $ 0 $ 0 $ 0
Totals $ 138,537 $ 110,829 $ 13,763 $ 13,763
Where are the local funds come from (i.e. identify the source of the matching funds)?
The Hunter/Arthur JPA has committed Funds from their General Budget
-
ENGINEERS ESTIMATE
-
NDSTREET 2020-2021
HUNTERARTHERIPA
NORTHERN LASS PA55 SHARED USE PATH
ND Highway 18
Engineer's Es
tima
te of Pr
obab
le Cos
t
ITEM
SPEC
CODE ITEM DESCRIPTION
1
103
100
CONTRACT BOND
2 203
0101
COMMON EXCAVATION -TYPE A
3
251
0100
SEEDING CLASSI
4
302
0120
AGGREGATE BASE COURSE CL 5
5
702
0100
MOBILIZATION
6
704
1100
TRAFFIC CONTROL
7
750
0115
SIDEWALKCONCRETE4IN
8
750
2115
DETECTABLE WARNING PANELS
9
754
0592
RESET SIGN PANEL
10
754
0593
RESET SIGN SUPPORT
UNIT
QUANTITY
LSUM
1CY
361
ACRE
0.15
TON
407
LSUM
1LSUM
1SY
1,300
SF
72
EA
4EA
4
TOW I Co
nstr
ucti
on Cost
Prelim/Design Engineering -10°~
Con
stru
ctio
n En
gine
erin
g -15%
Tot
al Project Cost
FUNDING
UNIT PRICE
TOTAL
FEDERAL
STATE
LOCAL
LOCAL %
$5,
000.
00 $
5,00
0.00
$
4,000.00 $
$500.00 $
$500.00
10.00
Szo.00 S
~,zzo.00 S
Ss,ne.00 S
S~zz.00 S
S~zz.oa
io.00r
Ss,oao.00
S ~so.oa S
S600.o0 5
S~s.00 S
S~s.00
io.00r
$zo.oa S
s,iao.00 S
S6,siz.00
S Sain.00 S
Ssia.00
io.00r
Ss,000.00
S s,000.00 S
S4,000.00
S Ssoo.00
S Ssoo.00
so.00i
$3,
000.
00 $
3,00
0.00
$
$2,400.00 $
$300.00 $
$300.00
10.00%
S6o.
00 S
~s,000.00
S S6
z,ao
o.00
S
S~,soo.00 S
S~,soo.00
so.0
0rSa
o.00 S
z,sso.00 5
Sz,soa.00 S
Szss.00 S
Szss.00
io.0
0rS6
o.00
S
zao.00 S
519z.00 S
Sza.00 S
Sza.
00
ia.0
0r$150.00 $
600.00 $
5480.00 $
$60.00 $
$60.00
10.00%
$
110,
830.
00
$
88,664.00
$
11,083.00
$
11,0
83.0
0
$
11,083.00
$
8,86
6.00
$
1,01
8.00
$
1,01
8.00
$
16,624.00
$
13,299.00
$
1,66
2.00
$
1,66
2.00
$138,537.00
$110,829.00
$13,763.00
$13,763.00
-
PROJECT LOCATION MAP
-
Hunter Arthur Northern Cass Pass Proposed Trail for ND STREET ~ &MEN KHuntedArthur JPA Park Board, ND February, 2018 Real People. RealSolutions.
-
PROJECT SITE PICTURES
-
.,r ;~` -y ~ ,~vmaq~nmmmmrii~J
yJ Z•1_ _ ~
- I~ `~ti ~ i~.~~-
i
~,`- _ „~r
Y ~J
., ..~,.
.;a
~.(
~~~.
I~ 'q~' ~
~ ~ , ~~~ - -ar"I' ~~~ ~~ -
~ a ~ ~ f t̀om ~ F~ ~` r4~
~~,
_ ~~-_ ~ ~̂ ~
-
'~~~ ~~
—~~ ~ .
~ _ ~~a
'"
R' ~ .. i i
~:
~ '. ~ ~~~,..r.
L::,Ja~ ̀~
~ _
'r~• (,
-~: j~~,~,1~.a .;:~ ~ ,
z ~~~::1v ~* ~~ - lE
~,~ ~~4.~~ Y7~~`
:, .. ~ , ~:" ~I~ f _ S
~ n
~ ~
~.~ 5 ..
T r'
_ .t .. .~
~Z 1 ~aT ''~'~~r
•~~ ~ ti'v ~ f ~ ~~e~
~~" a~l r ,J }.
y,
i , .
,. I ~ ( / / ~/
) {/a~' V ~~r
~ ~ ~' / /J `x - (~ s lip}"'~~f~f~~~~!~. 'rl~4t~.~~~t
. ` i ' ~ .
c` 1 J~ 1 ~' ! ~ yy'(~l`r.~f ."C r71 i f t'fy~R rl ++[
. ~ ~ F ~` JAM ha X~, A,~i~ t 4t ah ~yJrF~,( ~f 1 ~u ~,. , k ,,~ ~ .; ~'{~~~ sA4ri ai `•, r
_ _ 2 #zt't at~~z ~''~c ̀ t ~~~`Y~ .sr!r ~MF+y, l~llt y
t ~! V~~ +_
rS~l~ I ~~~ ~
s~'
'~. kf
'.~
i
1
i~l,.,~a
Kf..
f•1 ::
~ .~!: . y~ A
.'~
4
-
z...;~,,, ..-.. s,~y;
~,f .i~..~':..
R F
~ - ik
STOP -~.. ~` ~~
.~.:.
-- /—~
C̀ '
. ,
~ ~ ~ _
,.
_ j
_ s
;.
____-. t
t __
A.
-., ,_. ~, a
~ ~~
,, t, ~. '__ -
,.. r _ .
~' , ' ~~_ -~, 4f~~
~~ ~~j ~ .~, ~~aa~'~
~~ ~ -f.4 .~
~ x.,. .g: ,~fi =~"
'.fie
E I }
l
z r - a
y~- _ •7 y
t
~:;:: i.. ~
~,: t~
f .'~3 %"
~{:,~5s_
. _ n'' - ,.~ ~. _ ~
R̀1Y ~ a 3
k~7 ~f y~. _
- ~. t C~;-
r ~y
~ ~i
.~.. ..
~, ,~ f. .'}S
-
., ,
r, ~
/ _- _''~ /