Download - Presenting AUGIER Energy
AUGIER S.AAUGIER S.A
FRANCEFRANCE
AUGIER
HISTORYHISTORY
Manufacturer of Airfield Lighting system since 40 Manufacturer of Airfield Lighting system since 40 yearsyears40 years in Power Distribution (Public Lighting)40 years in Power Distribution (Public Lighting)First Installation of Medium Voltage distribution First Installation of Medium Voltage distribution in in 19681968 – Rungis Market Lighting, Paris – Rungis Market Lighting, ParisRoissy Charles De Gaulle (Paris Airport) MV Roissy Charles De Gaulle (Paris Airport) MV installation in installation in 19711971 – Road Lighting – Road LightingFirst Middle east installation – First Middle east installation – 19851985 (Ruwais) (Ruwais)More than 400 Installations – through out the More than 400 Installations – through out the world.world.
synopsis
CHINA…CHINA…JIANGYINJIANGYIN bridgebridge(land of Jiangsu, 18 Km)(land of Jiangsu, 18 Km)
Nanjing YANTSE bridgeNanjing YANTSE bridge (Nanjing town, 21,6 (Nanjing town, 21,6 Km)Km)
MV major MV major referencesreferences
AFRICA…AFRICA…OUAGADOUGOU airportOUAGADOUGOU airport
M’WENGUE airportM’WENGUE airportMIDDLE-EAST…MIDDLE-EAST…
Ruwais industrial complex - UAERuwais industrial complex - UAE
Training Center in SAUDI ARABIATraining Center in SAUDI ARABIA
Janadria Home Prince SAUDI ARABIAJanadria Home Prince SAUDI ARABIA
EUROPA…EUROPA…Tunnel of Gran’Sasso - ITALYTunnel of Gran’Sasso - ITALY
Tunnel of Oviedo - SPAINTunnel of Oviedo - SPAIN
Dourges Project - FRANCEDourges Project - FRANCE
Normandie bridge - FRANCENormandie bridge - FRANCE
Eurotunnel - FRANCE/ENGLANDEurotunnel - FRANCE/ENGLAND
Few Augier ProjectsFew Augier Projects
AUGIER ACTIVITIESAUGIER ACTIVITIES
1.1. MEDIUM VOLTAGE DISTRIBUTIONMEDIUM VOLTAGE DISTRIBUTION
2.2. ENERGY SAVING SYSTEMENERGY SAVING SYSTEM
3.3. REMOTE MONITORING SYSTEMREMOTE MONITORING SYSTEM
4.AIR FIELD LIGHTING 4.AIR FIELD LIGHTING
DISTRIBUTIONDISTRIBUTION
MEDIUM VOLTAGE DISTRIBUTIONMEDIUM VOLTAGE DISTRIBUTION
CONCEPTCONCEPT
ConventionalConventional MV systemMV system
HV (11kV)
LV415V
Lighting command
HV (11kV)
MV (6.6kV)
LV415V
Lighting command
PRESENT example in Middle eastPRESENT example in Middle eastHIGH WAY LIGHTING – SHK ZAYED ROADHIGH WAY LIGHTING – SHK ZAYED ROAD
ABUDHBAI Border to JEBEL ALIABUDHBAI Border to JEBEL ALI
AUH border
Jebel Ali
11 KV source
11 KV O/h line11 KV/415 V
Transformer
Big size LV cable – 500 MRoad Intersection every KM
20 KM• COST for 18 P/S Substation
• COST for Big LV Cable
• Obstruction to road work
• Local Lighting control - Switching ON by Photocell
- Fault status of any substation not reported immediately
• No Energy Savings possible
AUGIER solutionAUGIER solution
AUH border Jebel
Ali
11KV/6.6 KV substation
6.6 KV cable3C x 25Sq.mm 6.6 KV/230V
Underground IP 68 Transformer
• Only 1 substation - RMU - 11KV / 6.6 KV Tr. - 6.6KV Sw.Gear
• Smaller 3C x 25 sq.mm 7.2KV class cable
• Buriable – IP68 tr. - Medium Voltage Fuse - LV breaker - Overload protection
• 2C x 16sq.mm LV cable
• No Protruding Feeder Pillar / Lighting cabinet
• Centralized Lighting control. - ON / OFF by Astrn.clock & by Photo cell - All Parameters recorded
MV CONCEPTMV CONCEPT
Sectionator
Contactor
Contactor
CELLS 5500 V
PRINCIPLE OF DIAGRAM MV - STEP-DOWN STATION
HV
MV
Transfo
Variator
Transfo
TED
Cable BT 2 x 25 mm²
10 Poles10 Poles
5500 V 3 x 35 mm² cable
Transfo
TED
CELL 33 kV / 11kV
Doc MC 041020/3
Fujairah AirportFujairah Airport
Boundary wall lighting distribution systemBoundary wall lighting distribution system
A REAL TIME EXAMPLEA REAL TIME EXAMPLEProject for Dept of Military Works UAEProject for Dept of Military Works UAE
Project Name : Fujairah Airport Boundary wall lighting Contractor : Capriole construction (Year 2008-2009)
RUNWAY
16 KM
ONLY ONE LV power source, 400V, 300 kVA
Max 2 KM each way (400V)
4C x 185+ sq.mm
BEYOND 4 KM????? With Low voltage (400V)
!!!NO WAY TO LIGHT!!!
DMW projectDMW project
Project Name :Project Name : Fujairah Airport Boundary wall lighting Fujairah Airport Boundary wall lighting ContractorContractor :: Capriole constructionCapriole construction
RUNWAYSOLUTION 1
SOLAR POWERED LIGHTS
ISSUES
LESS POWERFUL LIGHTS
HIGH MAINTENANCE
QUICKER REPLACEMENTS
DMW projectDMW project
Project Name :Project Name : Fujairah Airport Boundary wall lighting Fujairah Airport Boundary wall lighting ContractorContractor :: Capriole constructionCapriole construction
RUNWAYSOLUTION 2SOLUTION 2HELLO AUGIER!
URGENT PLEASE!!
DMW projectDMW project
Project Name :Project Name : Fujairah Airport Boundary wall Fujairah Airport Boundary wall lighting lighting ContractorContractor :: Capriole constructionCapriole construction
RUNWAY
MAIN STATION
400V/5500V – 630kVA transformer
5500V switchgear – 1 incomer & 3 outgoings
Lighting control cabinet
5500 V cable
3C x 16 sq.mm cable
OD – 35mm
DMW projectDMW project
Project Name :Project Name : Fujairah Airport Boundary wall lighting Fujairah Airport Boundary wall lighting ContractorContractor :: Capriole constructionCapriole construction
Mafraq to Gweifhat HighwayMafraq to Gweifhat Highway
Street lighting distribution Street lighting distribution systemsystem
Mafraq – Ghweifhat HighwayMafraq – Ghweifhat Highway
Highlights of the HighwayHighlights of the Highway
• One of the longest Highway in UAEOne of the longest Highway in UAE• Serves as a strategic road link between UAE Serves as a strategic road link between UAE
and Saudi Arabiaand Saudi Arabia• Serves as the only road linking the Ruwais - Serves as the only road linking the Ruwais -
UAE’s prominent Industrial HUB with the Capital.UAE’s prominent Industrial HUB with the Capital.• Serves as the only road to thousands of HaJ Serves as the only road to thousands of HaJ
PilgrimsPilgrims• Traffic movement is expected to increase with Traffic movement is expected to increase with
more developments on the western regionmore developments on the western region
Initial condition of the HighwayInitial condition of the Highway
• Total Length of 320KMSTotal Length of 320KMS• Two lanes – Dual carriage wayTwo lanes – Dual carriage way• NO Street LightingNO Street Lighting
SOLUTIONS FOR STREET LIGHTINGSOLUTIONS FOR STREET LIGHTING
(Conventional Method)(Conventional Method) 2 KM 4C x 25 sq.mm cable 4C x 25 sq.mm cable 4C x70 sq.mm cable
4C x 120 sq.mm Cable
LCC LCC
ST
Package Substation 500 KVA or
Pole Mounted Transformer
11KV or 22KV Overhead Line / Underground cable
11KV or 22KV Overhead Line / Underground cable
ST-1 ST-2 ST-3 ST-4 ST-5 ST-6 ST-7 ST-8 ST-9 ST-10
LV to MVLV to MV
11KV or 22KV Overhead Line / Underground cable
ST-1 ST-2 ST-3 ST-4 ST-5 ST-6 ST-7 ST-8 ST-9 ST-10
ST-1
Mafraq – Gweifhat HighwayMafraq – Gweifhat Highway
Constraints in Providing Street lightingConstraints in Providing Street lighting• Power supply required all along the highwayPower supply required all along the highway• Insufficient power sourcesInsufficient power sources• Trespassing others properties.Trespassing others properties.• Trouble crossing industrial hazards.Trouble crossing industrial hazards.• Table waterTable water• Power consumption of closer to 10MWPower consumption of closer to 10MW• Requires very High Maintenance.Requires very High Maintenance.
Mafraq – Ghweifhat HighwayMafraq – Ghweifhat Highway
Mafraq – Ghweifhat HighwayMafraq – Ghweifhat Highway
PHASE 1 – RUWAIS BYPASS 78KM
Mafraq – Ghweifhat HighwayMafraq – Ghweifhat HighwayNew Ruwais BypassNew Ruwais Bypass
Mafraq – Gweihat RoadMafraq – Gweihat RoadPhase 1Phase 1
Proposed SchemeProposed Scheme
MAIN SUBSTATIONMAIN SUBSTATION
High voltage Switch board 33 KVHigh voltage Switch board 33 KV
HV / MV (33KV / 6.6KV) TransformerHV / MV (33KV / 6.6KV) Transformer
6.6 kV switchgear6.6 kV switchgear
Lighting control cabinetLighting control cabinet
6.6kV Dimmer6.6kV Dimmer
HV / MV TransformerHV / MV Transformer
Outdoor typeOutdoor type
1000 KVA KVA1000 KVA KVA
Oil cooledOil cooled
Offload tap changersOffload tap changers
DGPT2 protection relayDGPT2 protection relay
MV SwitchgearMV Switchgear
Indoor typeIndoor type
Incoming Isolating Incoming Isolating switchswitch
Draw out type feederDraw out type feeder
Control by User-friendly Control by User-friendly Keypad interfaceKeypad interface
MeasurementsMeasurements
- - Output currentOutput current
- MV voltage- MV voltage
- Active power- Active power
- Reactive power- Reactive power
- Power factor- Power factor
- Consumed Energy- Consumed Energy
ProtectionProtection
- - MV protection – FusesMV protection – Fuses
- Under voltage- Under voltage
- Overcurrent- Overcurrent
- Earth Fault- Earth Fault
- Short circuit- Short circuit
- Control supply failure- Control supply failure
- Frequency Imbalance- Frequency Imbalance
Control & MonitoringControl & Monitoring
- - Manual & Auto ModeManual & Auto Mode
- - PhotocellPhotocell
- Fixed Timer- Fixed Timer
- Astronomical Clock- Astronomical Clock
- Volt free contacts- Volt free contacts
- RS 232 port- RS 232 port
- J Bus (Serial communication)- J Bus (Serial communication)
MV NetworkMV Network
6.6KV / 0.4kV Underground transformer6.6KV / 0.4kV Underground transformer
32kVA transformer32kVA transformer
3C x 35 Sq.mm Direct burial cable3C x 35 Sq.mm Direct burial cable
1 c x 25 sq.mm Network earthing1 c x 25 sq.mm Network earthing
7.2 KV insulation class cable7.2 KV insulation class cable
Plug in Cable termination or direct Plug in Cable termination or direct terminationtermination
Transformer installed inside the pitTransformer installed inside the pit
Underground TransformerUnderground Transformer
MV / LV transformerMV / LV transformer
IP 68 transformerIP 68 transformer
Installation in PitInstallation in Pit
MV fusible protectionMV fusible protection
Thermal ProtectionThermal Protection
LV ProtectionLV Protection
Offload tap changerOffload tap changer
LV NetworkLV Network
LV IP 67 distribution LV IP 67 distribution box (Inside the pit)box (Inside the pit)
600V / 1000 V cable600V / 1000 V cable
4C x 25 Sq.mm4C x 25 Sq.mm
Street Lighting polesStreet Lighting poles
COMPARISION (MV to LV)COMPARISION (MV to LV)
TechnicalTechnical
Description LV System MV System
System Well Known New to ADDC
Power Source Many Places Few Places
Control Local control Centralized
Maintenance More manpower Simple and less
Reliability Moderate Very good
Installation Longer Quick
Energy Saving Very High CAPEX Less CAPEX
Network voltage Unstable Stable
COMPARISION (MV to LV)COMPARISION (MV to LV)CommercialCommercial
MV SystemDescription Quantity Material
costInstallation
Cost
Substation 20 60,000,000 10,000,000
6,000,000HV (33 or 11kV)
cables60KM 24,000,000
Road Duct 20 50,0005,000,000
Pit transformer 500 18,000,000
MV cable3C x 35 sq.mm
370 KM 35,733,0008,510,000
LV cable4C x 25 sq.mm
370 KM 29,600,000
Earthing cable1C x 25 sq.mm
370 KM 3,700,000 3,700,000
Remote monit &Energy saver
20 8,000,000 included ins/s installation
Commissioning 1 lot 1,000,000
LV SystemDescription Quantity Material
costInstallation
Cost
Substation 200 56,000,000 4,000,0004,000,000
11kV cables 320KM 120,000,000
32,000,00032,000,000
Road Duct 200 500,000
Service Turret 200 1,200,000 400,000400,000
Control cabinet 400 4,600,000 800,000800,000
LV cable4C x 120 Sq.mm
20 KM 5,000,000 420,000
LV cable4C x 70 sq.mm
185 KM 29,600,000 3,330,000
LV cable4C x 25 Sq.mm
370 KM 29,600,000 5,920,000
Earthing 370 KM370 KM 3,700,0003,700,000 3,700,0003,700,000
Remote monit &Energy saver
400400 16,000,00016,000,000 1,000,000
Commissioning 2,000,000
Total cost –
AED 319,770,000
Total cost
– AED 213,293,000
CAPITAL COST SAVING – 50 %
ENERGY SAVERENERGY SAVER
DIMMING SYSTEM FOR STREET LIGHTINGDIMMING SYSTEM FOR STREET LIGHTING
ENERGY CONSUMPTION IN PUBLIC LIGHTINGENERGY CONSUMPTION IN PUBLIC LIGHTING
Abudhabi to Al-Ain road – 160 KMAbudhabi to Al-Ain road – 160 KMFor 1 KM - 10 Light poles For 1 KM - 10 Light poles Each pole – 6 x 1000W lampsEach pole – 6 x 1000W lamps1 pole consumes 6KWH(6 units) per hr1 pole consumes 6KWH(6 units) per hrFor 1 night (avg 10 hours) – 60 unitsFor 1 night (avg 10 hours) – 60 unitsFor 1 KM – 600 units for 1 nightFor 1 KM – 600 units for 1 night
For the highway – For the highway – 96,000 units / 96,000 units / nightnightAverage consumption of Power at home – 300 Average consumption of Power at home – 300 units per month.units per month.
Possible Energy Saving – 30% to 40%Abudhabi to Al ain – 96,000 x 30% = 28,800 units / night
For a Month ?????
AUGIER DIMMERAUGIER DIMMER
Vary the voltage to the group of lampsVary the voltage to the group of lamps
Control the power consumptionControl the power consumption
160v 180v 200v 220v 240v
%
ENERGY SAVEDENERGY SAVED
Consumed Energy
Energy saved
230V
Voltage on network
6 pm 10 pm 5 am 6 am
210V
180V
240V
AdvantagesAdvantagesEnergy savingEnergy saving
Stable network voltageStable network voltage
Lesser stress to the lamps hence longer life Lesser stress to the lamps hence longer life of lampsof lamps
Smooth ramping of light intensity (No Smooth ramping of light intensity (No distraction to drivers)distraction to drivers)
Power ON & OFF by Astronmical clockPower ON & OFF by Astronmical clock
Immediate fault notificationsImmediate fault notifications
CompactoCompacto
Compact dimmerCompact dimmerEasy installation in LDBEasy installation in LDBSingle phase : 3 - 12 KVASingle phase : 3 - 12 KVAProgrammable by PC (only at Programmable by PC (only at initial installation)initial installation)Serial communicationSerial communicationIndication led’s for normal working, Indication led’s for normal working, fault, economyfault, economyEconomicalEconomicalEasy to incorporate to existing Easy to incorporate to existing street lighting networkstreet lighting network
MEDIUM VOLTAGE DIMMERMEDIUM VOLTAGE DIMMER
ONE DIMMER TO CONTROL ONE DIMMER TO CONTROL THE COMPLETE CIRCUIT OF THE COMPLETE CIRCUIT OF LAMPSLAMPS
COST EFFECTIVECOST EFFECTIVE
FULLY ELECTRICALFULLY ELECTRICAL
6.6kV
AUTOMATIONAUTOMATION
REMOTE MONITORINGREMOTE MONITORING
Remote MonitoringRemote Monitoring
Ready to Install in existing Lighting Control Cabinet Communication options by GSM/GPRS/Serial/Fiber optic Monitors Lighting Circuit ON/OFF Monitors Power consumption from existing kWH meter Monitors voltage fluctuations if any Monitors time of fault and rectification Monitors Open contactor Monitors Cable fault Monitors state of lamps Monitors Over consumption in case of theftMonitors Open door of Lighting control cabinet.
Example
Remote MonitoringRemote MonitoringSubstation Monitoring - STEPIISubstation Monitoring - STEPII
Remote MonitoringRemote MonitoringSubstation Monitoring - STEPIISubstation Monitoring - STEPII
Remote MonitoringRemote MonitoringSubstation Monitoring - STEPIISubstation Monitoring - STEPII
ENERGY SAVING in C.C.V.EENERGY SAVING in C.C.V.E(Community of communes in the Esteron Valley)(Community of communes in the Esteron Valley)
Remote control and monitoring of street lighting networks with AUGIER systems
Charles-Albert bridge
THE ESTERON VALLEYTHE ESTERON VALLEY Provence Alpes Côte d’Azur (French Riviera) Area Provence Alpes Côte d’Azur (French Riviera) Area
135 km2 - 10 Villages
60 Street Lighting Cabinets and 2600 street lights
Gilette
TargetTargetPut in safety the street Put in safety the street lighting installations lighting installations 35% of energy saving35% of energy saving..Limitations of maintenance, Limitations of maintenance, repair and operations.repair and operations.Remote supervision and Remote supervision and control of lighting network.control of lighting network.
Before
After
Technical means Technical means
Installation of Installation of Compacto dimmer Compacto dimmer in each in each cabinet in order to reduce the energy cabinet in order to reduce the energy consumption of the street lighting network consumption of the street lighting network during the night . during the night .
Installation of Installation of Augier Box Augier Box programmable programmable Logic Controller to analyse the faults and Logic Controller to analyse the faults and breakdowns, to remote control the lighting breakdowns, to remote control the lighting (astronomical clock) and to modify the setting (astronomical clock) and to modify the setting
of compacto from the PC.of compacto from the PC...A software used by the customer (CCVE) A software used by the customer (CCVE) displays the faults and the consumption of the displays the faults and the consumption of the lighting network, day by day.lighting network, day by day.
Street lighting overviewStreet lighting overview
A software installed at the customer displays an overview of the Esteron Valley..
Each color point symbolizes a commune. The laptop receives automatically the network status once a day by GSM data.
It is possible to communicate with a cabinet whenever you want.
A green point indicates the lack of fault in a commune.A red point indicates a warning.
OVERVIEW - MappingOVERVIEW - Mapping
A zoom on the map allows the display of all street lights associated to a cabinet.
All the lighting cabinets and points are supervised by GPS.
OVERVIEW – Lighting OVERVIEW – Lighting substationsubstation
A cabinet is symbolized by a leaflet containing all the information concerning working, status, faults and consumptions history.
The leaflet can also contain the picture of the installation.
Energy savingEnergy saving
Lighting at nominal power rating Lighting at reduced power rating
There is 50% of energy saving between the lights at full power and the Lights in reduced mode.
Connection example on the substation GIL31
Other ReferencesOther References Some examples of customer using our material as Compacto and Augier Box Some examples of customer using our material as Compacto and Augier Box
Toulouse cityToulouse city
Alès cityAlès city
Albi cityAlbi city
Mende cityMende city
Brignoles cityBrignoles city
Puget sur Argens cityPuget sur Argens city
Evian city Evian city
Limoges cityLimoges city
MontMélian cityMontMélian city
Carros cityCarros city
Quimper cityQuimper city
Reims cityReims city
Rennes cityRennes city
Martigne sur Mayenne cityMartigne sur Mayenne city
Mans cityMans city
Douarnenez cityDouarnenez city
Ugine cityUgine city
MontRigaud cityMontRigaud city
Romans sur Isère cityRomans sur Isère city
Thonon les Bains cityThonon les Bains city
Chartres cityChartres city
Nimes cityNimes city
Blois cityBlois city
Toury cityToury city
Fleury les Aubrais cityFleury les Aubrais city
Cagnes sur Mer cityCagnes sur Mer city
Strasbourg cityStrasbourg city
Angoulême cityAngoulême city
Marmande cityMarmande city
Jussecourt cityJussecourt city
Mareuil cityMareuil city
Aulnay cityAulnay city
Commune of St Pierre (La Réunion)Commune of St Pierre (La Réunion)
Industrial area of Beau séjour (la Réunion)Industrial area of Beau séjour (la Réunion)
Pru of St Marie (la Réunion)Pru of St Marie (la Réunion)
Nice airportNice airport
Marseille airportMarseille airport
Lyon airportLyon airport
Paris airportParis airport
Hospital of GrasseHospital of Grasse
Texas Instrument (Villeneuve-Loubet)Texas Instrument (Villeneuve-Loubet)
AUGIER STRENGTHAUGIER STRENGTHREPUTATION & EXPERIENCEREPUTATION & EXPERIENCE
Sauveur Beninati – Commerical DirectorSauveur Beninati – Commerical Director -- 31 years31 years Raymond Grenneiser – Technical Director Raymond Grenneiser – Technical Director -- 27 years27 years Yannick Pied – Production DirectorYannick Pied – Production Director -- 20 years20 years Pascal Disdier – MV System design Incharge -Pascal Disdier – MV System design Incharge - 22 years22 years Thien Vudo - Airport system InchargeThien Vudo - Airport system Incharge -- 10 years10 years Pierre girin – Dimmer system & salesPierre girin – Dimmer system & sales -- 15 years15 years Murielle Deweist – Sales & SupportMurielle Deweist – Sales & Support -- 15 years15 years Gil Daver – Sales & SupportGil Daver – Sales & Support -- 13 years13 years Gilbert Grec – Test & Comm Airfield systemsGilbert Grec – Test & Comm Airfield systems -- 20 years20 years Jean Louis Tardy – Test & comm MV & dimm -Jean Louis Tardy – Test & comm MV & dimm - 14 years14 years Serge villa – Technical incharge – Dimmer Serge villa – Technical incharge – Dimmer -- 5 years5 years
AUGIER S.AAUGIER S.A
TO LIGHT THE WORLD BETTERTO LIGHT THE WORLD BETTER
THANK YOUTHANK YOU