Download - Portfolio, Urban planning
Ignacio Reboto
Civil&Structural Engineer
Portfolio
Final year projectConstruction and urban development project of Ollarretxe street
and Los chopos avenue
• Location
Getxo is located
in the Basque
country, in the
province of
Vizcaya. It is part
of the
metropolitan
area of Bilbao
Project location
Previous Situation
• The project
covered a length of
approximately
1350 meters.
• There was a lack of
parking areas and
pedestrian
crossings.
• There was only
bicycle lane on
Ollaretxe street.
Objective of the project
• Designing of a new road layout; removing
intersections, reducing the width of roadways,
expanding the size of sidewalks and creating new
pedestrian crossings.
• Bicycle lane along the entire length of the road.
• Demolition of a pedestrian underpass.
• Improvement of sewage network.
• Designing of new parking areas to increase the
number of parking places.
Traffic simulation model• To prove the project
viability a computer traffic simulation was used (Aimsun); data collected and used: Peak hours, information movements at intersections and origin-destination matrix.
Project drawings
Final solution adopted, Ollarretxe street
New roundabout
Section 1
Road layout, Ollarretxe street
1. Road axes
Road layout, Ollarretxe street
2. Schematic floor plan
Road layout, Ollarretxe street
3. Longitudinal profile, Ollarretxe axe 1
Road layout, Ollarretxe street
4. Cross section, Ollarretxe axe 1
Road layout, Ollarretxe street
5. Road typical sections
Water supply network, Los Chopos avenue
Sewage network, Los Chopos avenue
Longitudinal profiles sewage network, Los Chopos avenue
Telephone network, Los Chopos avenue
Electricity network, Los Chopos avenue
Gas network, Los Chopos avenue
Road signs, Los Chopos avenue
Budget Summary
Chapters EUROS
Demolitions 371.883,91
Pavements 1.643.047,16
Street lightning 611.115,27
Projected and affected services 841.290,55
Gardening 132.196,34
Road signing 42.293,98
Street furniture 178.995,29
Miscellaneous cost 55.000,00
Quality control 15.565,51
Waste management 22.275,29
Safety and health 42.223,46
MATERIAL EXECUTION BUDGET 3.955.886,76
13 % Overhead costs 514.265,28
6 % Industrial benefit 237.353,21
21 % VAT 988.576,10
Total budget 5.696.081,35
9,40%
41,53%
15,45%
21,27%
3,34%1,07%
4,52%1,39%
0,39% 0,56%
1,07%
Demolitions
Pavements
Street lightning
Projected and affected services
Gardening
Road signing
Street furniture
Miscellaneous cost
Quality control
Waste management
Safety and health