![Page 1: POMPANO G.O. BOND STREETSCAPEpompanobeachfl.gov/assets/docs/pages/go_bond/outreach_presenta… · hammondville rd. illustration & phasing -2012 blanche ely / 6 th ave atlantic blvd](https://reader033.vdocuments.site/reader033/viewer/2022050116/5f4cdaf10e622d5fb15f0334/html5/thumbnails/1.jpg)
POMPANO G.O. BOND STREETSCAPEMARTIN LUTHER KING BLVD. IMPROVEMENTS
PHASE 2 (BETWEEN NW 10th AVE. AND NW 6th AVE.)CITY PROJECT NO. 19356CONSTRUCTION PUBLIC OUTREACH MEETING
JUNE 3, 2019
![Page 2: POMPANO G.O. BOND STREETSCAPEpompanobeachfl.gov/assets/docs/pages/go_bond/outreach_presenta… · hammondville rd. illustration & phasing -2012 blanche ely / 6 th ave atlantic blvd](https://reader033.vdocuments.site/reader033/viewer/2022050116/5f4cdaf10e622d5fb15f0334/html5/thumbnails/2.jpg)
Tradition, Integrity, Excellence
![Page 3: POMPANO G.O. BOND STREETSCAPEpompanobeachfl.gov/assets/docs/pages/go_bond/outreach_presenta… · hammondville rd. illustration & phasing -2012 blanche ely / 6 th ave atlantic blvd](https://reader033.vdocuments.site/reader033/viewer/2022050116/5f4cdaf10e622d5fb15f0334/html5/thumbnails/3.jpg)
![Page 4: POMPANO G.O. BOND STREETSCAPEpompanobeachfl.gov/assets/docs/pages/go_bond/outreach_presenta… · hammondville rd. illustration & phasing -2012 blanche ely / 6 th ave atlantic blvd](https://reader033.vdocuments.site/reader033/viewer/2022050116/5f4cdaf10e622d5fb15f0334/html5/thumbnails/4.jpg)
MLK BLVD. – PHASE 2PROJECT DESCRIPTION
• PROJECT IS AN EXTENSION OF THE PREVIOUSLY COMPLETED MLK BLVD. PHASE 1 (NW 6th AVE. TO DIXIE HWY.) AND IS PART OF THE DOWNTOWN CONNECTIVITY MASTER PLAN.
![Page 5: POMPANO G.O. BOND STREETSCAPEpompanobeachfl.gov/assets/docs/pages/go_bond/outreach_presenta… · hammondville rd. illustration & phasing -2012 blanche ely / 6 th ave atlantic blvd](https://reader033.vdocuments.site/reader033/viewer/2022050116/5f4cdaf10e622d5fb15f0334/html5/thumbnails/5.jpg)
Overall Site Plan - 2012
DOWNTOWN CONNECTIVITY PLAN
ATLANTIC BLVD
BLA
NC
HE
ELY
6TH
AVE
1ST
AVE
MLK/HAMMONDVILLE RD
NE 3RD ST
NE 2ND ST
NE 1ST ST
I -95
![Page 6: POMPANO G.O. BOND STREETSCAPEpompanobeachfl.gov/assets/docs/pages/go_bond/outreach_presenta… · hammondville rd. illustration & phasing -2012 blanche ely / 6 th ave atlantic blvd](https://reader033.vdocuments.site/reader033/viewer/2022050116/5f4cdaf10e622d5fb15f0334/html5/thumbnails/6.jpg)
DOWNTOWN CONNECTIVITY PLAN
Study Districts - 2012
MLK / HAMMONDVILLE RD.MLK / HAMMONDVILLE RD.
CIVIC CAMPUS
CIVIC CAMPUS
OLD POMPANO
OLD POMPANO
ATLANTIC BLVD
![Page 7: POMPANO G.O. BOND STREETSCAPEpompanobeachfl.gov/assets/docs/pages/go_bond/outreach_presenta… · hammondville rd. illustration & phasing -2012 blanche ely / 6 th ave atlantic blvd](https://reader033.vdocuments.site/reader033/viewer/2022050116/5f4cdaf10e622d5fb15f0334/html5/thumbnails/7.jpg)
MLK BLVD / HAMMONDVILLE RD.
Illustration & Phasing - 2012
BLA
NC
HE
ELY
/ 6TH
AVE
ATLANTIC BLVD
I-95
MLK/HAMMONDVILLE RD
PHASE 2PHASE 2 PHASE 1PHASE 1
![Page 8: POMPANO G.O. BOND STREETSCAPEpompanobeachfl.gov/assets/docs/pages/go_bond/outreach_presenta… · hammondville rd. illustration & phasing -2012 blanche ely / 6 th ave atlantic blvd](https://reader033.vdocuments.site/reader033/viewer/2022050116/5f4cdaf10e622d5fb15f0334/html5/thumbnails/8.jpg)
MLK BLVD. – PHASE 2PROJECT DESCRIPTION
• PROJECT IS AN EXTENSION OF THE PREVIOUSLY COMPLETED MLK BLVD. PHASE 1 (NW 6th AVE. TO DIXIE HWY.) AND IS PART OF THE DOWNTOWN CONNECTIVITY MASTER PLAN.
• ROADWAY RECONSTRUCTION AND STREETSCAPE PROJECT.
• LANDSCAPE/HARDSCAPE BEAUTIFICATION FEATURES INCLUDING:NEW DECORATIVE WIDE SIDEWALKSPEDESTRIAN LIGHTINGSTREETSCAPE FURNITURE (TRASH RECEPTACLES/BENCHES/BICYCLE RACKS)LANDSCAPE ISLANDS AND PLANTER AREAS.
• MULTI‐MODAL (PEDESTRIAN/BICYCLE/TRANSIT) FACILITIES:WIDE SIDEWALKSBICYCLE LANESBUS STOPS WITH SHELTERSON‐STREET PARKING
• PEDESTRIAN SAFETY IMPROVEMENTS ALONG THE CORRIDOR AND AT INTERSECTIONS.
• OVERHEAD UTILITY INFRASTRUCTURE HARDENING (NEW CONCRETE POLES).
• WATER DISTRIBUTION SYSTEM UPGRADE (NEW 12‐INCH WATER MAIN).
![Page 9: POMPANO G.O. BOND STREETSCAPEpompanobeachfl.gov/assets/docs/pages/go_bond/outreach_presenta… · hammondville rd. illustration & phasing -2012 blanche ely / 6 th ave atlantic blvd](https://reader033.vdocuments.site/reader033/viewer/2022050116/5f4cdaf10e622d5fb15f0334/html5/thumbnails/9.jpg)
MLK BLVD / HAMMONDVILLE RD.
Sidewalk Concept - 2012
![Page 10: POMPANO G.O. BOND STREETSCAPEpompanobeachfl.gov/assets/docs/pages/go_bond/outreach_presenta… · hammondville rd. illustration & phasing -2012 blanche ely / 6 th ave atlantic blvd](https://reader033.vdocuments.site/reader033/viewer/2022050116/5f4cdaf10e622d5fb15f0334/html5/thumbnails/10.jpg)
MLK BLVD / HAMMONDVILLE RD.
Landscape Concept - 2012
![Page 11: POMPANO G.O. BOND STREETSCAPEpompanobeachfl.gov/assets/docs/pages/go_bond/outreach_presenta… · hammondville rd. illustration & phasing -2012 blanche ely / 6 th ave atlantic blvd](https://reader033.vdocuments.site/reader033/viewer/2022050116/5f4cdaf10e622d5fb15f0334/html5/thumbnails/11.jpg)
MLK BLVD. – PHASE 2MAJOR POINTS
• MLK PHASE 1 AND 2 WERE PREVIOUSLY FULLY DESIGNED AND PERMITTED.
• ONLY SOME PERMITS HAVE EXPIRED FOR PHASE 2 AND WILL NEED TO BE REPROCESSED.
![Page 12: POMPANO G.O. BOND STREETSCAPEpompanobeachfl.gov/assets/docs/pages/go_bond/outreach_presenta… · hammondville rd. illustration & phasing -2012 blanche ely / 6 th ave atlantic blvd](https://reader033.vdocuments.site/reader033/viewer/2022050116/5f4cdaf10e622d5fb15f0334/html5/thumbnails/12.jpg)
MLK BLVD. – PHASE 2PROJECT FEATURES – COMPLETED PHASE 1 (EAST OF NW 6th AVENUE)
![Page 13: POMPANO G.O. BOND STREETSCAPEpompanobeachfl.gov/assets/docs/pages/go_bond/outreach_presenta… · hammondville rd. illustration & phasing -2012 blanche ely / 6 th ave atlantic blvd](https://reader033.vdocuments.site/reader033/viewer/2022050116/5f4cdaf10e622d5fb15f0334/html5/thumbnails/13.jpg)
MLK BLVD. – PHASE 2PROJECT FEATURES – COMPLETED PHASE 1 (EAST OF NW 6th AVENUE)
![Page 14: POMPANO G.O. BOND STREETSCAPEpompanobeachfl.gov/assets/docs/pages/go_bond/outreach_presenta… · hammondville rd. illustration & phasing -2012 blanche ely / 6 th ave atlantic blvd](https://reader033.vdocuments.site/reader033/viewer/2022050116/5f4cdaf10e622d5fb15f0334/html5/thumbnails/14.jpg)
MLK BLVD. – PHASE 2PROJECT FEATURES
![Page 15: POMPANO G.O. BOND STREETSCAPEpompanobeachfl.gov/assets/docs/pages/go_bond/outreach_presenta… · hammondville rd. illustration & phasing -2012 blanche ely / 6 th ave atlantic blvd](https://reader033.vdocuments.site/reader033/viewer/2022050116/5f4cdaf10e622d5fb15f0334/html5/thumbnails/15.jpg)
MLK BLVD. – PHASE 2MAJOR POINTS
• MLK PHASE 1 AND 2 WERE PREVIOUSLY FULLY DESIGNED AND PERMITTED.
• ONLY SOME PERMITS HAVE EXPIRED FOR PHASE 2 AND WILL NEED TO BE REPROCESSED.
• THE CITY’s INTENT IS TO HAVE THE PROJECT CONSTRUCTION START BY THE 1st QUARTER OF 2020.
• IN ORDER TO ACCELERATE CONSTRUCTION THE CITY IS KEEPING THE SAME TEAM AS IN PHASE 1.
DESIGN ENGINEER (KEITH)CONTRUCTION‐MANAGER‐AT‐RISK ‐ CMAR (WHITING‐TURNER)
• PROJECT SCHEDULECONSTRUCTION START – 1st QUARTER 2020CONSTRUCTION COMPLETION – 1st QUARTER 2021
![Page 16: POMPANO G.O. BOND STREETSCAPEpompanobeachfl.gov/assets/docs/pages/go_bond/outreach_presenta… · hammondville rd. illustration & phasing -2012 blanche ely / 6 th ave atlantic blvd](https://reader033.vdocuments.site/reader033/viewer/2022050116/5f4cdaf10e622d5fb15f0334/html5/thumbnails/16.jpg)
MLK BLVD. – PHASE 2PROJECT SCHEDULE
![Page 17: POMPANO G.O. BOND STREETSCAPEpompanobeachfl.gov/assets/docs/pages/go_bond/outreach_presenta… · hammondville rd. illustration & phasing -2012 blanche ely / 6 th ave atlantic blvd](https://reader033.vdocuments.site/reader033/viewer/2022050116/5f4cdaf10e622d5fb15f0334/html5/thumbnails/17.jpg)