Download - OpSUITE v6.0 new features
SMART Summit 2013 11
OpSUITE v6.0 new features
Henry BoshoffPrincipal Consultant
SMART Summit 2013 2
Session Objectives
• Describe current state of development• Educate on new features
SMART Summit 2013 33
FlexiLOG
• Business Rules• Enhanced Data Grid
SMART Summit 2013 44
IntelliPERMIT• Copy Isolation Procedures between Units• Create Isolation Procedure from Permit
SMART Summit 2013 55
IntelliPERMIT• Modifications to Isolation Procedure Management Screen • Edit Isolations Screen
SMART Summit 2013 66
IntelliPERMIT
• Enhancement to functional location unit filter • Permit Priority • Email copy of permit
SMART Summit 2013 77
IntelliPERMIT
• Document Attachments
SMART Summit 2013 88
IntelliPERMIT16 new business rules:• Control isolation witness signatures (#40, #42, #43, #44)
• Suspension of multiple permits (#33)
• Warn of expiring competencies (#38)
• Hold points for exceptions (#32)
• Enforce isolation procedures (#35, #36, #40, #41, #42, #44, # 51, # 52, # 53)
• Reviewing and editing permits (# 37, # 45, # 47)
• Master/slave permit relationships (#37, #46)
• Rules that pair/separate signatures (#34, #39, #48)
• Notifications (#50)
• Integration (#54)
SMART Summit 2013 99
OptiRUN– Document References
SMART Summit 2013 1010
OptiRUN - Spares Inventory
SMART Summit 2013 1111
OptiRUN - Preventative Maintenance Checklists
SMART Summit 2013 1212
SmartSUR Lists• Colour coding• Icons• Reports from the list
SMART Summit 2013 1313
Searching for Incidents• Using the Quick search to find incidents
• Using the advanced search
SMART Summit 2013 1414
Viewing Incident Details
SMART Summit 2013 15
Shift Roster• Planning of shift work• Adequate coverage of all positions/roles by competent persons• Access to “Fall back” rosters eg “A Shift Off”
• Visibility on the current shift teams• See which individuals are currently filling a role
• Record keeping• John Doe (qualified operator), B Shift, Unit 2 Controller, 2013/04/01, Night
Shift)
SMART Summit 2013 16
“The Big Picture”•Teams, Members, Roles, Activities, Patterns & Rules
Configuration(once)
•Link roles and units, set period and processProcess Roster
(annual)
•Define and allocate competencies•Assignment of roles
Populate Roster(continuous)
•User schedule•Reports
View (on demand)
SMART Summit 2013 1717
Changes to Electronic Shift Roster• View more than one role at the same
time (multi-select from dropdown)
SMART Summit 2013 1818
Changes to Electronic Shift Roster• Adding comments to more than one row
SMART Summit 2013 1919
Changes to Electronic Shift Roster• Rules reminders when
assigning users
SMART Summit 2013 2020
Changes to Electronic Shift Roster• Quick User
Assignment
SMART Summit 2013 2121
Electronic Meeting Minutes
• Function to delete scheduled meetings
SMART Summit 2013 2222
Electronic Meeting Minutes
• Allowing items to be captured without a target date
SMART Summit 2013 2323
Electronic Meeting Minutes
• Displaying the title of the item on the feedback tab• Order minute items by Priority