DWELLING ATTRIBUTES

- Floor Area less than 500sqm

- Standard concrete strip foundation

- No in-floor heating

FLOORS:

- Insulation to be installed around vertical edge of perimeter

- 300mm under finished ground level

- R-value to be 1,0 or more

- as per SANS 204-4.3.2

-by specialist

- No insulation installed under slab

ESTIMATED ENERGY CONSUMPTION

ELECTRICAL INSTALLATION ENDORSED BY SPECIALIST

EXISTING Low Voltage internal/external Light fitting - 14 Watt

NEW Low Voltage internal internal/external Light fitting - 14 Watt

Fluorescent light fitting (2 globes) - 36 Watt

SUBTOTAL: 534 Watt

Estimate Maximum Energy Demand as per SANS10420.

5 W/m² x 424m² = 2120W

Estimate Maximum Annual Energy Demand as per

SANS 10420.

5 W/m².a x 424m² = 2120W (a = 1 year)

Estimate Maximum Annual Energy Consumption:

Assume lights are on from 18:00 - 22:00 each day per year

(4h/day)

52 weeks x 7 days x 4 hours = 1456 hours/year

Lights = 534W or 0,534kW

0,534kW x 1456h.a = 777,5kWh.a

(less than 2120kWh.a)

QTY

24

9

2

House Area(NETT)

Watt/m² (permitted = 5 Watt/m²)

424,0m²

1,25W/m²

NOTE: The use of other light fittings permitted as per owner's approval on condition

that the Watt usage per light fitting does not change.

CONCLUSION: THE DESIGN COMPLIES WITH THE REQUIREMENT OF SANS

10400-XA:2011 FOR ENERGY CONSUMPTION.

ROOF ASSEMBLY THERMAL RESISTIVILY:

METAL ROOF SHEETING

ROOF TO BE ENDORSED BY ENGINEER

According to SANS10400-XA and SANS204 to min. thermal resistivity value is as follows:

To achieve the resistivity of 3,7one of the following is recommended.

Think Pink Aerolite thermal and acoustic ceiling insulation with a min. thickness of 135mm which has an R-value of 3,38.

CONCLUSION:

THE DESIGN COMPLIES WITH SANS 10400-ZA:20011 IF THE ABOVE CONDITION IS MET.

NOTES

Total R-Value is a combination of roof assembly and isolation

R-Value of roof & ceiling material calculated for metal roof

sheets & rhinoboard ceiling

Min. value of added thermal resistivity for required isolation

Climate Zone

4

Direction

UP

Total Required resistivity

R=(m².K/W)

3,7 (min required)

0.4

3.3

METAL ELEV./

SECT

FLOOR PLAN

WALL PLAN

CONCRETE

WALL ELEVATION

GLAZING

TIMBER ELEV./

SECTION

COUNCIL LEGEND

Existing House Ground Floor: 264,0sqm

Existing House 1st Floor: 126,0sqm

TOTAL EXISTING: 390,0sqm

New Additions: 70,0sqm

New Balcony 26,0sqm

TOTAL NEW: 96,0sqm

NEW TOTAL FOOTPRINT 486,0sqm

ERF AREA: 1053,0sqm

Coverage (new only): 9,2%

Total coverage(including existing): 46,1%

Coverage Allowed: 0.5 (50%)

AREAS

CALCULATIONS AS PER SANS10400-XA (4.4.3)

EXTERNAL WALL CALCULATIONS:

PARAMETERS

Occupancy

Climate Zone

Min R-Value

Wall Type

R-Value of Wall type achieved

CONCLUSION

H4 - Dwelling House

4

0,35

Double skin masonry with cavity,

plastered BOTH sides

0,36

Wall type complies with min. R-value

of 0.35 for walls

CALCULATION:

External plasterwork

Brickwork with cavity

Internal plasterwork

TOTAL

Conductivity(W/m.k)

0.6

0.7

0.6

Thickness (mm)

15

230

15

260

Resistivity (m²K/W)

0.03

0.33

0.03

0.39

HOT WATER SYSTEMS

Calculated as per SANS 10252-1:2004

HOT WATER SYSTEMS TO BE ENDORSED BY

SPECIALIST

ACCOMODATION TYPE

ASSUMED HOT WATER CONSUMPTION

NUMBER OF PERSONS

ASSUMED DAILY HOT WATER

CONSUMPTION

ASSUMED ANNUAL HOT WATER

CONSUMPTION

50% OF DAILY HOT WATER

CONSUMPTION

INSULATION REQUIREMENTS

Residential Low Rental 80-115L capital/day

115

4 persons per day

460

163,760kL (based on daily design occupancy/week

230L (to be provided by means other than electrical resistance

less than 80mm

1.0 (as per SANS 204 (4.5.2)

HOT WATER VESSEL

MINIMUM REQUIRED R-VALUE

FOR VESEL/TANK

2.0(additional insulation to manuf.'s may be req.)

CONCLUSION

Dwelling to be provided with 1x 200L Hot solar powered water tank to comply with SANS

10254

Solar Panel to be installed by specialist to comply with SANS 10400

Optionally a hot water pump can be installed by a specialist to comply with SANS 10400.

The design complies with the requirement of SANS 10400-XA:2011 and SANS

10252-1:2004 for hot water calculations, and provides min. 50% alterative power source.

Ground Floor Level:

FENESTRATION CALCULATIONS: New Extensions

Nett Area Glazing

N/A N/A

%

N/A

As per SANS 204:2011 South African National Standard and

SANS 10400-XA:2011. "Buildings with up to 15% fenestration

area to nett floor area per storey comply with the minimum

energy performance requirements. Buildings with a fenestration

area per storey that exceeds 15% shall comply with the

requirements for fenestration in accordance with SANS 204

Total Area of Glazed Elements(Fenestration) allowed as per

NBR:

1st Floor: 15% of 62,2 = 9,33sqm

CONCLUSION:

SANS 204 DOES NOT apply

N E

W

S

45,945m

B

oundary Line

200

1100

97

0

FFL = 10.000

lintel = 12.100

EXIST. DWELLING

EXIST. ROOF

new glass &

timber window

South West Elevation(front)

scale 1:100

lintel = 12.100

FFL = 10.000

EXIST. DWELLING

EXIST. ROOF

new

roof over

North East Elevation(rear)

scale 1:100

re-used timber windows

where applicable

exist. window

removed,

new glass & timber

door

exist.

bedroom 4

exist.

en-suite

exist.

dressing

exist.

lounge

exist.

double

volume

exist.

study

d1-1

d1-3

bath

wc

wh

b's

d1-2

bic

dre

sse

r

New Bedroom 6

New

Study

re-used

window

w2

re-used

window

w1-1

remove exist. window & door,

brick up and make good

d2-1

existing roof space

converted into New Balcony

exist. roof light

exist. roof light

shr

tiling

New

Bathroom 3

re

-u

se

d la

min

ate

d tim

be

r

New

P

assage

carpet

carpet

remove exist. window,

re-use elsewhere, new door

S/Steel & cable balustrade to

be min. 1m high

E

X

I

S

T

I

N

G

D

W

E

L

L

I

N

G

-

1

s

t

S

t

o

r

e

y

3

,0

m

b

u

ild

in

g

lin

e

B

a

th

ro

o

m

3

to

b

e

m

e

c

h

a

n

ic

a

lly

v

e

n

tila

te

d

2

5

litre

s

p

e

r s

e

c

o

n

d

,

o

p

e

ra

te

d

o

n

s

w

itc

h

17,5sqm

20,5sqm

13,0sqm

12

,0

sq

m

ne

w b

ic

skylight

roof over

dre

sse

r

now New

Bedroom 5

carpet

19,0sqm

d1-4

display/bookshelf

w1-2

new

roof over

new glass

& timber

door

display/bookshelf

bic

skylight

roof over

1st Storey Plan

scale 1:100

CURRENT ZONING: Single Residential 1

Building usage: Residential Dwelling

Erf bigger than 650sqm

Building lines: Front/street - 3,5m

Common - 3,0m

plaster & paint

to match existing

plaster & paint

to match existing

1590

11

84

91

6

1100

15

50

55

0

Glass Note as per SABS 1037 & NBR Part N

Area Thickness

0 - 0,75sqm 3mm

- 1,5sqm 4mm

- 2,4sqm 5mm

- 3,2sqm 6mm

SAFETY GLASS IN ALL SLIDING DOORS AND OTHER GLASS DOORS. ALL GLASS

PANELS IN WINDOWS IN EXCESS OM 1SQM OR 500mm & LOWER ABOVE

FINISHED FLOOR LEVEL TO BE SABS APPROVED SAFETY GLASS.

Visible markers at eye level on all glass doors. Frosted/obscured glass fitted in all

bathrooms & toilets.

PRECAST LINTELS ACROSS ALL OPENINGS AND 2100MM ABOVE FLOOR FINISH.

ALL WINDOWS 2100 ABOVE F.F.L. PC LINTELS TO HAVE MIN. 4 COURSES

BRICKWORK WITH BRICKFORCE IN EVERY COURSE OVER ALL OPENINGS NOT

MORE THAN 3,0m

exist.

study

New Bedroom 6

New

Study

New

Bathroom 3

New

P

assage

now New

Bedroom 5

Ceiling Light Point

Wall Light Point - exterior

ELECTRICAL LEGEND

Double Electrical 15A Socket with Hight AFFL

Light Switch 1300 AFFL

Recessed Downlighter

Extractor Fan

TV Connection Point

1st Storey

Electrical Plan

scale 1:100

gutter

& rwdp

gutter

& rwdp

Fa

ll @

3

de

g

EXIST. ROOF

Roof Plan

scale 1:100

230 5415

2028 1590 2028

5645

23

05

25

0

54

80

23

04

00

09

0

NGL

NGL

NGL

39

00

90

49

45

23

0

13

48

5

1100

90 3536

230 4583

304 900 1323 1100 1187

4813

21

70

23

0

24

00

2475

demolish exist.

and make good

for new opening

demolish exist.

and make good

for new door

North West Elevation(side)

scale 1:100

NGL

South East Elevation(side)

scale 1:100

line of roof

behind parapet

@ 3deg

EXIST. GARAGE

gutter

& rwdp

Fall @ 3deg

pa

ra

pe

t w

all w

ith

a

pp

ro

ve

d fla

sh

in

g

parapet wall with approved flashing

parapet wall with approved flashing

2475

18

50

30

0

13

02

6

5380

4618

d2-2

50mm

w/step

50mm

w/step

2000

900

1594

900

900

21

00

900

21

00

new glass

& timber

window

10

00

SIT

E B

OU

ND

AR

Y L

IN

E

plaster & paint

to match existing

FFL = 13.000

FFL = 13.000

FFL = 13.000

10

00

line of roof

behind parapet @ 3deg

EXIST. DWELLING

EXIST. ROOF

EXIST. ROOF

37

20

exist. windowexist. windowexist. window

exist. window

exist. window

exist. window

exist. windowexist. window

10

00

chimney to be extended

(min. 1m above roof level)

chimney to be extended

(min. 1m above roof level)

EXIST. GARAGE

plaster & paint

to match existing

EXIST. ROOF

FFL = 10.000

lintel = 12.100

FFL = 10.000

lintel = 12.100

A

F

F

L

=

1

3

.

0

0

0

FFL = 13.000

FFL = 12.950

24

00

FFL = 10.000

lintel = 12.100

FFL = 13.000

lintel = 15.100

wallplate = 15.400

SIT

E B

OU

ND

AR

Y L

IN

E

SIT

E

BO

UN

DA

RY

LIN

E

ROOF CONSTRUCTION:Metal roofsheeting on 76x50mm

SAP timber purlins @ 950mm centres on pre-manufactured

228x50mm SAP timber rafters Grade 4 @ 760mm centres

with steel hoop-irons built in min. 3

brick courses into wall on 114x38mm SAP timber

wallplate. Roofpitch=3°

CEILING CONSTRUCTION:

6,5mm Rhinoboard fixed to

38x38mm SAP

battens @ 400mm centre fixed

to underside of trusses with cove

cornice detail to match existing

with 135mm thk Think Pink

Aerolite ceiling insulation

FLOOR CONSTRUCTION:

Specified and approved floor finish on

25mm sand cement screed on 200mm

Reinforced concrete slab.

New

Bathroom 3

now New

Bedroom 5

exist.

study

Section A-A

scale 1:100

exist.

study

exist.

garage

New

P

assage

NOTE: EXIST. ROOF

TO BE MODIFIED

TO ACCOMODATE

NEW ROOF

& PARAPET

10

00

WINDOWS & DOORS

WINDOWS: QTY

W1 = 1590w x 1184h mm Glass & Timber window Swartland SB3FSP x1

W2 = 1100w x 1550h mm Glass & Timber Sliding window(re-used) x1

gutter

& rwdp

DOORS:

D1 = 813w x 2032h mm flush panel door with timber frame x4

D2 = 813w x 2032h mm Glass & Timber door x2

1st Floor Level: 62,2sqm 9,12sqm 14,6%

gutter

& rwdp

gutter

& rwdp

gutter

& rwdp

n

e

w

1

1

0

d

ia

u

P

V

C

so

ilp

ip

e

@

1

:6

0

fa

ll

1590

11

84

91

6

hardwood timber decking to fall

existing roof space

converted into New Balcony

23

10

FFL = 13.000

lintel = 15.100

wallplate = 15.400

lintel = 15.100

wallplate = 15.400

lintel = 15.100

wallplate = 15.400

parapet = 16.200

parapet = 16.200

parapet = 16.200

parapet = 16.200

existing

RC slab

FFL = 10.000

FFL = 13.000

lintel = 15.100

now New

Bedroom 5

exist.

study

Section B-B

scale 1:100

exist.

dining room

exist.

kitchen

New

P

assage

exist. roof light

dpc

dpc

dpc

gutter

& rwdp

24

00

NGL

wallplate = 15.400

ROOF CONSTRUCTION:Metal roofsheeting on 76x50mm

SAP timber purlins @ 950mm centres on pre-manufactured

114x38mm SAP timber rafters Grade 4 @ 760mm centres

with steel hoop-irons built in min. 3

brick courses into wall on 114x38mm SAP timber

wallplate. Roofpitch=3°

NOTE: EXIST. ROOF

TO BE MODIFIED

TO ACCOMODATE

NEW ROOF

& PARAPET

A

10

00

wallplate = 15.400

ss/vv

110dia FS drop to

level below

200x200 GMS angle

fixed to existing wall

& floor with chemical

anchors

FLOOR CONSTRUCTION: 22x112mm T & G

Hardwood flooring nailed to 152x50mm

Hardwood timber beams(timber grade 7) @ max.

450mm centres, built into walls and secured with

steel hoop irons. Timber beam ends to be

wrapped in approved waterproofing membrane.

All timber built into masonry shall be coated with

carbolineum or a similar preservative

FFL = 13.000

FFL = 13.000

EXIST. ROOF

exist.

study

exist.

entrance hall

exist.

bedroom 1

exist.

bedroom 2

exist.

bedroom 3

exist.

bathroom 1

exist.

bathroom 2

E

X

I

S

T

I

N

G

D

W

E

L

L

I

N

G

-

G

r

o

u

n

d

S

t

o

r

e

y

exist.

porch

exist.

dining room

exist.

kitchen

exist.

covered patio

exist.

garage

exist.

scullery

exist.

wc

exist.

tv room

exist.

guest bedroom

exist.

en-suite 2

10 S

ER

PE

NT

INE

RO

AD

N E

W

S

45,945m

B

oundary Line

17,425m

B

oundary Lin

e

21,029m

B

oundary Lin

e

45,153m

B

oundary Line

7,635m Boundary Line

Erf 2

77

1053sqm

3,0m

B

uildin

g Lin

e

3,0m

B

uilding Line

3

,0

m

B

u

ild

in

g

L

in

e

3,5m

B

uildin

g Lin

e

EXIST IC

EXIST IC

EXIST IC

exist.

swimming pool

exist. window exist. window

exist. windows & door

exist. window

exist. window

exist. w

in

do

w

exist. window

exist. window exist. window

a

d

jo

in

in

g

e

rf 2

7

6

adjoining erf 279

adjo

inin

g e

rf 4143

adjo

inin

g e

rf 275

F

F

L

=

1

0

.

0

0

0

EXIST.

Driveway

Site/Ground Storey Plan

scale 1:150

exist. 160dia uP

VC

soilpipe

@

1:60 fall

exis

t. 160dia

uP

V

C

soilpip

e

@

1:60 fall

e

xist. 1

6

0

d

ia

u

P

V

C

so

ilp

ip

e

@

1

:6

0

fa

ll

110dia FS drop from

level above

Depth: 550mm

Cover Level: 9.850

Invert level: 9.300

Depth: 670mm

Cover Level: 9.850

Invert level: 9.180

Depth: 900mm

Cover Level: 9.850

Invert level: 8.950

Depth: 550mm

Cover Level: 9.850

Invert level: 9.300

Depth: 660mm

Cover Level: 9.190

Invert level: 9.300

E

X

IS

TIN

G

T

R

E

E

S

EX

IS

TIN

G

T

RE

ES

EX

IS

TIN

G

T

RE

ES

EX

IST

ING

TR

EE

S

Burnt clay or sand/cement bricks only shall be used, unless specific

approval is obtained from the Architect for the use of an alternative

type of brick.

Quality of all materials and workmanship to comply with the

relevant

Local Building Regulations, By-Laws and relevant specifications and

shall conform to the minimum standards specified in the Standard

Preambles in the Bills of Quantities or, in the absence of a Bill of

Quantities, available for persual at the offices of the Architects .

Contractor is responsible for correct setting out of the buildings, all

external and all internal walls with particular reference to

boundaries, building lines, etc.

Contractors to verify all levels, heights and dimensionson Site and

to check same against the drawings before putting any work in

hand.

All Contractors to check the details shown on this drawing for

compliance with standards of good building practice with particular

reference to special requirments necessitated by local and-or on

site conditions and to report any comment to the Architects.

Contractors are to ensure that all details shown on this drawing are

in complience with Local Authority bye-law and regulations.

Contractors are to locate and identify existing services on Site and

to protect these from damage throughout the duration of the

works.

Any errors, discrepancies or omissions to be reported to the

Architect immediately.

Contractor is to build in approved D.P.C.'s, whether or not these are

shown on drawings, to all external walls at each floor, beam or

parapet level and to all windows, doors, grilles or other openings in

external walls. Cavity walls to have stepped D.P.C.'s.

Any queries arising from all the above must be reported to the

Architects for clarification before any work is put in hand.

This drawing is not to be scaled. Figured dimensions to be used at

all times.

Provide in non-ventilated rooms extractor fan (25 litres per second)

ducted to exterior, operated by light switch.

Glazing to doors and windows in excess of 1 sqm or less that

300mm above FFL to be safety glazed in accordance with N.B.R.

part N.

Tie cavity wall together with 2,5 wire ties per square metre.

Damp-proof membrane is to be 150mm minimum above FGL.

Light areas : 10% of floor area (natural light), 5% ventilated.

All plumbing and drainage work and installation of sanitary fittings

to comply with the relevant Local Authority bye-laws, regulations

and requirments.

Provide inspection (rodding) eyes to all bends, junctions or every

15m with suitable markers at ground level

Minimum fall to all drainage pipes to be 1:60.

Provide approved reseal traps to all waste fittings.

Provide vent caps and-or vent valves to all stacks.

Inspection eyes to waste pipes to be fully accessible at all times.

All soil pipes passing under buildings, footings or traffic areas to be

encased in concreteof minimum 150mm thickness all round pipe.

SANS 10400 NOTES:

All new walls to be constructed in accordance with Part K of

SANS 10400

All new concr. foundations to be built in accordance with Part H of

SANS 10400 (no portion of footing to project beyond property

boundary)

All new floors to be constructed in accordance with Part J of

SANS 10400

All new roofs to be constructed in accordance with Part L of SANS

10400

Glazing to doors & windows to be safety glazing in accordance

with Part N SANS 10400

Drainage to be constructed (and protected where to be constructed

under any structure) in accordance with Part P of SANS 10400

DRAWN

DATE

SCALE

PROJECT DESCRIPTION:

PROJECT

NUMBER:

DRAWING:

PURPOSE OF ISSUE:

REV

CHECKED

brynn van zyl

PROPOSED ALTERATIONS TO EXISTING

HOUSE ON ERF 277, 10 SERPENTINE

ROAD, PINELANDS, WESTERN CAPE

CLIENT:

SITE/FLOOR PLANS, ELEVATIONS,

SECTIONS, SANS CALCULATIONS

24.08.2018

as shown @ A1

DRAWING

BRYNN

BRYNN

2018-018/001

professional architectural technologist

SACAP Reg. NO: PAT20763

physical address:

26 aroma park village

welgelee street

vredekloof, brackenfell

7560

cell: (+27) 078 263 7777

e-mail: [email protected]

0

SIGNATURES:

FOR COUNCIL APPROVAL

DESIGNER: CLIENT:

COUNCIL STAMP(S) HERE

Top Related