Download - MIHAN SPECIAL ECONOMIC ZONE
![Page 1: MIHAN SPECIAL ECONOMIC ZONE](https://reader036.vdocuments.site/reader036/viewer/2022062312/554b86a0b4c90561588b513f/html5/thumbnails/1.jpg)
Maharashtra Airport Development Co. Ltd. (MADC)
1
MIHAN – Multi-modal International Hub
Airport & Special Economic Zone
at Nagpur
![Page 2: MIHAN SPECIAL ECONOMIC ZONE](https://reader036.vdocuments.site/reader036/viewer/2022062312/554b86a0b4c90561588b513f/html5/thumbnails/2.jpg)
2
ABOUT MADC
• Maharashtra Airport Development Company Ltd.
(MADC) is a wholly owned Govt. Company for
developing aviation infrastructure in the State of
Maharashtra
• Chief Minister of Maharashtra is the Chairman of MADC.
Experts from private sector and high level Government
officers are on the Board
• Special Planning Authority for MIHAN Project at Nagpur.
![Page 3: MIHAN SPECIAL ECONOMIC ZONE](https://reader036.vdocuments.site/reader036/viewer/2022062312/554b86a0b4c90561588b513f/html5/thumbnails/3.jpg)
3
MANDATE
• Development of International / Regional Airports in the
State (3 international and 7 domestic airports identified
for construction)
• Operating airports either directly or through PPP
• Development of real estate for supporting the Airports
– Multiproduct SEZ at Nagpur
• Financial model: Land Acquisition cost is borne by
State Government, balance work on BOT basis
![Page 4: MIHAN SPECIAL ECONOMIC ZONE](https://reader036.vdocuments.site/reader036/viewer/2022062312/554b86a0b4c90561588b513f/html5/thumbnails/4.jpg)
4
ABOUT MAHARASHTRA
Highest Industrialized State, with 10% of population contributing 20% of India’s GDP
Attracted maximum foreign inflows of Rs.35,000 Crs leading in country’s FDI investment during 2012-13.
Second highest urbanized State with over 42% urban population.
Has 4 International and 16 domestic airports (all 4 international and 5 domestic commercially operational)
3 new large international airports to be constructed – Nagpur, Pune and Navi Mumbai
![Page 5: MIHAN SPECIAL ECONOMIC ZONE](https://reader036.vdocuments.site/reader036/viewer/2022062312/554b86a0b4c90561588b513f/html5/thumbnails/5.jpg)
5Airports in Maharashtra
![Page 6: MIHAN SPECIAL ECONOMIC ZONE](https://reader036.vdocuments.site/reader036/viewer/2022062312/554b86a0b4c90561588b513f/html5/thumbnails/6.jpg)
ABOUT NAGPUR
• Central location in Indian sub-continent & strategic place
on International aviation routes – an ideal hub
• Nagpur, is second Capital of Maharashtra with 3 million
population
• Existing International Airport
• Excellent rail, road & air connectivity to all parts of India
• India’s fastest growing cosmopolitan city
• 27 engineering colleges, 8,700 graduates every year6
![Page 7: MIHAN SPECIAL ECONOMIC ZONE](https://reader036.vdocuments.site/reader036/viewer/2022062312/554b86a0b4c90561588b513f/html5/thumbnails/7.jpg)
7
NAGPUR : Strategic Location For International Aviation Hub
Nagpur
![Page 8: MIHAN SPECIAL ECONOMIC ZONE](https://reader036.vdocuments.site/reader036/viewer/2022062312/554b86a0b4c90561588b513f/html5/thumbnails/8.jpg)
8
Existing Transportation Network – NAGPUR
ROAD RAIL AIR
![Page 9: MIHAN SPECIAL ECONOMIC ZONE](https://reader036.vdocuments.site/reader036/viewer/2022062312/554b86a0b4c90561588b513f/html5/thumbnails/9.jpg)
9
MIHAN PROJECT, NAGPUR
Multi-Modal International Hub Airport at Nagpur (MIHAN) includes:
1. Expansion / Upgradation of the existing airport as International Passenger & Cargo Hub
2. Development of a multi-product SEZ abutting the airport
3. Development of support activities
• Total project area 4354 Hectares • Total project cost: $1.2 billion
![Page 10: MIHAN SPECIAL ECONOMIC ZONE](https://reader036.vdocuments.site/reader036/viewer/2022062312/554b86a0b4c90561588b513f/html5/thumbnails/10.jpg)
Existing Airport, NAGPUR
10
• Single runway of 3200 m x 45 m• Parking bay for 7 aircrafts• Terminal building of 25,000 m2
• 2 aerobridges
![Page 11: MIHAN SPECIAL ECONOMIC ZONE](https://reader036.vdocuments.site/reader036/viewer/2022062312/554b86a0b4c90561588b513f/html5/thumbnails/11.jpg)
MIHAN, Nagpur – Master Plan
11
![Page 12: MIHAN SPECIAL ECONOMIC ZONE](https://reader036.vdocuments.site/reader036/viewer/2022062312/554b86a0b4c90561588b513f/html5/thumbnails/12.jpg)
New Airport at Nagpur
• Airport project area – about 1468 Ha.
• Two Parallel runways of 4000 m x 60 m & 3600 m x 60 m
• A semi-circular terminal building of 300,000 m2 area
• Separate international and domestic passenger & cargo
terminals
• Parking facility for 50 aircrafts in the Terminal & 50 aircrafts
remote
• Provision for maintenance hangers & workshops12
![Page 13: MIHAN SPECIAL ECONOMIC ZONE](https://reader036.vdocuments.site/reader036/viewer/2022062312/554b86a0b4c90561588b513f/html5/thumbnails/13.jpg)
New Airport at Nagpur - contd.
• Projected Traffic: 14 million passengers p.a. by 2030
(70% international) and 870,000 tons of cargo p.a.
(90% international)
• Multi-modal connectivity – Rail & Road Terminals for
passengers & goods
• MRO facilities
• Logistic Hub
13
![Page 14: MIHAN SPECIAL ECONOMIC ZONE](https://reader036.vdocuments.site/reader036/viewer/2022062312/554b86a0b4c90561588b513f/html5/thumbnails/14.jpg)
14
Special Economic Zone
• Multi-product SEZ
• Total area about 2,086 Ha (500 Ha. of IT Parks)
• Maintenance, Repairs & Overhauling (MROs) Units
• Special area for smaller export units
• Land allocated to 68 companies
• Investment envisaged $ 2 billion in 5 Years
• Total employment on completion – direct 150,000 &
indirect 300,000
![Page 15: MIHAN SPECIAL ECONOMIC ZONE](https://reader036.vdocuments.site/reader036/viewer/2022062312/554b86a0b4c90561588b513f/html5/thumbnails/15.jpg)
15
Special Economic Zone – Amenities 1
• Captive Power plant of 246 MW with 25 MW DG set
backup – power generation started
• Water treatment plant of 100 mld with dual water supply
system – completed
• Sewage treatment plant of 40 mld – completed
• Network of 6, 4, 3 & 2 lane roads – completed
• Telecommunication network with OFC – completed
![Page 16: MIHAN SPECIAL ECONOMIC ZONE](https://reader036.vdocuments.site/reader036/viewer/2022062312/554b86a0b4c90561588b513f/html5/thumbnails/16.jpg)
16
Special Economic Zone – Amenities 2
• Telephone Exchange Building – completed
• Street Lighting – completed
• Fire Station – completed
• International School – operational
• Hospital – planned
• Rail Terminal & Warehousing - commenced
• Central Facility Building of 30,000 sq m – operational
All infrastructure works completed, with an investment of
over $ 476 million
![Page 17: MIHAN SPECIAL ECONOMIC ZONE](https://reader036.vdocuments.site/reader036/viewer/2022062312/554b86a0b4c90561588b513f/html5/thumbnails/17.jpg)
Roads with Street Lights
17
![Page 18: MIHAN SPECIAL ECONOMIC ZONE](https://reader036.vdocuments.site/reader036/viewer/2022062312/554b86a0b4c90561588b513f/html5/thumbnails/18.jpg)
Central Facility Building
18
![Page 19: MIHAN SPECIAL ECONOMIC ZONE](https://reader036.vdocuments.site/reader036/viewer/2022062312/554b86a0b4c90561588b513f/html5/thumbnails/19.jpg)
Water Supply & Sewerage
19
![Page 20: MIHAN SPECIAL ECONOMIC ZONE](https://reader036.vdocuments.site/reader036/viewer/2022062312/554b86a0b4c90561588b513f/html5/thumbnails/20.jpg)
Telecom Centre
20
![Page 21: MIHAN SPECIAL ECONOMIC ZONE](https://reader036.vdocuments.site/reader036/viewer/2022062312/554b86a0b4c90561588b513f/html5/thumbnails/21.jpg)
21
Power Plant
![Page 22: MIHAN SPECIAL ECONOMIC ZONE](https://reader036.vdocuments.site/reader036/viewer/2022062312/554b86a0b4c90561588b513f/html5/thumbnails/22.jpg)
22
• Rail and Road Terminals (43 H and 40 H)
• Warehousing of 40,000 Sq. m.
• Hotels, Conventional Centres
• Residential Townships
• LIG Residential Area
• Domestic Industrial Area
Other Support Facilities
![Page 23: MIHAN SPECIAL ECONOMIC ZONE](https://reader036.vdocuments.site/reader036/viewer/2022062312/554b86a0b4c90561588b513f/html5/thumbnails/23.jpg)
Warehouse Building for Future Group
23
![Page 24: MIHAN SPECIAL ECONOMIC ZONE](https://reader036.vdocuments.site/reader036/viewer/2022062312/554b86a0b4c90561588b513f/html5/thumbnails/24.jpg)
24
LIG Tenements
![Page 25: MIHAN SPECIAL ECONOMIC ZONE](https://reader036.vdocuments.site/reader036/viewer/2022062312/554b86a0b4c90561588b513f/html5/thumbnails/25.jpg)
25
1. Boeing MRO
2. TCS
3. Infosys
4. HCL
5. Mahindra Satyam
6. L&T Infrastructure
7. Lupin
8. Mahindra Lifespaces
9. Shapoorji Pallonji
Major Companies In MIHAN
10. TAJ SATS Air Catering
11.TAL Manufacturing Solutions
12. Wipro
13. Ambuja Realities Limited
14. Caliber Point
15. Haldiram
16.Futura Group
17. Laurelton Diamonds (Tiffany &
Co.)
![Page 26: MIHAN SPECIAL ECONOMIC ZONE](https://reader036.vdocuments.site/reader036/viewer/2022062312/554b86a0b4c90561588b513f/html5/thumbnails/26.jpg)
26
TAL Manufacturing Solutions Ltd
![Page 27: MIHAN SPECIAL ECONOMIC ZONE](https://reader036.vdocuments.site/reader036/viewer/2022062312/554b86a0b4c90561588b513f/html5/thumbnails/27.jpg)
27
CALIBER POINT
![Page 28: MIHAN SPECIAL ECONOMIC ZONE](https://reader036.vdocuments.site/reader036/viewer/2022062312/554b86a0b4c90561588b513f/html5/thumbnails/28.jpg)
28
We thank for the opport
unity .
We invite you r to
participate in MIHAN, which
has the potential to become
one of the best investment
centres in Asia …..