Woodwater House, Exeter
Solar PV for businessesThe money-making overhead
![Page 2: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/2.jpg)
Introduction
Ian HolyoakHead of Energy & Renewables
![Page 3: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/3.jpg)
Seminar Programme
• 6.10pm: Financial Considerations» Andrew Killick, Francis Clark
• 6.30pm: Legal Considerations» Philip Wolfgang & Mark Howard, Michelmores
• 6.50pm: Forward planning for lasting returns» Gabriel Wondrausch & Matthew Lauri, SunGift Solar
• 7.10pm: Why we chose solar PV» James Dart, Darts Farm
• 7.20pm: Questions • 7.30pm: Networking & Refreshments
![Page 4: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/4.jpg)
www.francisclark.co.uk 4
Andrew KillickCorporate Finance Partner
Financial considerations for PV installations
![Page 5: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/5.jpg)
www.francisclark.co.uk 5
Contents
• An overview of the economics of solar generation
• The potential effect on the valuation of a business
• Factors to consider for investment appraisal
• Fundraising
• An brief overview of related tax matters
![Page 6: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/6.jpg)
www.francisclark.co.uk 6
Electricity price forecast - Wholesale
![Page 7: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/7.jpg)
www.francisclark.co.uk 7
Electricity price forecast
![Page 8: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/8.jpg)
www.francisclark.co.uk 8
Electricity price forecast
![Page 9: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/9.jpg)
www.francisclark.co.uk 9
The inevitability of Solar - price
![Page 10: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/10.jpg)
www.francisclark.co.uk 10
Electricity market
• Electricity today – where is it coming from?
Coal - 39% Gas - 28% Nuclear - 19% Renewables - 11% Other – 3%
• Heavily distorted market
• Decarbonisation/reduction in generating capacity/electrification
• Price freeze 2015 - 2017?
• Market uncertainty
• The US experience
Supply/Demand ≠ Price
![Page 11: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/11.jpg)
www.francisclark.co.uk 11
The inevitability of Solar
• Increased concerns over security of traditional supply
• Increasing costs (whatever happens in 2015)
• Significant benefits of self-generation
• A reliable and cost-effective alternative technology?
Solar PV
![Page 12: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/12.jpg)
www.francisclark.co.uk 12
Impact on business valuation
Valuation = Maintainable earnings X Multiplier
Maintainable earnings:
• Lower cost base
• More profitable
• Diversification
• Index linking
Multiplier:
• Differentiation
• Security over energy supply
• Diversification
• CSR
![Page 13: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/13.jpg)
www.francisclark.co.uk 13
Investment appraisal
• Appropriate installation
• Irradiation
• Planning/construction costs
• Grid connection?
• Operation and maintenance/warranties
• Tax
• FIT administration
![Page 14: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/14.jpg)
www.francisclark.co.uk 14
Financial summary - example
Installation of 500m2 (approx size of 2 tennis courts):
Installed capacity
Capital spend
Estimated output
Annual income
Annual savings (assuming 50% used)
Total income and savings
Simple pay-back (pre tax)
- 49.9kW
- £45K - £60K (net of VAT)
- 45,000kWh
- £6,700
- £2,250 (£0.10 per kWh)
- £8,950
- 5.0 – 6.7 years
![Page 15: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/15.jpg)
www.francisclark.co.uk 15
Fundraising
• High Street Banks will look for existing business security
• Standalone finance emerging
• Some specialised financing companies available
• Present your proposal fully/projections
• Who owns it? Lease/Rental? No funding required?!
![Page 16: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/16.jpg)
www.francisclark.co.uk 16
Related tax matters
• Capital allowances – kit AND directly attributable costs Carry back?
• AIA of £250K until 31 Dec 2014
• Corporation tax - separate trade?
• CGT – considered as F&F
• Inheritance tax – 100% BPR?
• VAT
![Page 17: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/17.jpg)
www.francisclark.co.uk 17
Summary
• Uncertainty in the supply and pricing of traditional power
• Enhancement to profits and value
• Short term payback
• Maximise the tax allowance treatment
Timing important – leaving it until later may result in lower returns
![Page 18: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/18.jpg)
www.francisclark.co.uk 18
![Page 19: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/19.jpg)
www.francisclark.co.uk
(c) copyright Francis Clark LLP, 2013
You shall not copy, make available, retransmit, reproduce, sell, disseminate, separate, licence, distribute, store electronically, publish, broadcast or otherwise circulate either within your business or for public or commercial purposes any of (or any part of) these materials and / or any services provided by Francis Clark LLP in any format whatsoever unless you have obtained prior written consent from Francis Clark LLP to do so and entered into a licence.
To the maximum extent permitted by applicable law Francis Clark LLP excludes all representations, warranties and conditions (including, without limitation, the conditions implied by law) in respect of these materials and /or any services provided by Francis Clark LLP.
These materials and /or any services provided by Francis Clark LLP are designed solely for the benefit of delegates of Francis Clark LLP. The content of these materials and / or any services provided by Francis Clark LLP does not constitute advice and whilst Francis Clark LLP endeavours to ensure that the materials and / or any services provided by Francis Clark LLP are correct, we do not warrant the completeness or accuracy of the materials and /or any services provided by Francis Clark LLP; nor do we commit to ensuring that these materials and / or any services provided by Francis Clark LLP are up-to-date or error or omission-free.
Where indicated, these materials are subject to Crown copyright protection. Re-use of any such Crown copyright-protected material is subject to current law and related regulations on the re-use of Crown copyright extracts in England and Wales.
These materials and / or any services provided by Francis Clark LLP are subject to our terms and conditions of business as amended from time to time, a copy of which is available on request.
Our liability is limited and to the maximum extent permitted under applicable law Francis Clark LLP will not be liable for any direct, indirect or consequential loss or damage arising in connection with these materials and / or any services provided by Francis Clark LLP, whether arising in tort, contract, or otherwise, including, without limitation, any loss of profit, contracts, business, goodwill, data, income or revenue. Please note however, that our liability for fraud, for death or personal injury caused by our negligence, or for any other liability is not excluded or limited.
Disclaimer & copyright
![Page 20: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/20.jpg)
Solar PV for BusinessesLegal Considerations
Philip Wolfgang
![Page 21: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/21.jpg)
Preliminary considerations
• Is an option necessary?• Is a crane licence necessary?
![Page 22: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/22.jpg)
Lease Terms
• Are there pre-existing occupiers?• What do the “premises” comprise?• Dilapidations
– Should there be a schedule of condition?
• Warranties for roof structure?• Lift and shift provisions?• Who owns the panels?
![Page 23: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/23.jpg)
• Landlord & Tenant Act 1954• Direct agreement with funder• Multiple sites and formalities
![Page 24: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/24.jpg)
Solar PV for BusinessesPlanning Law
Mark Howard
![Page 25: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/25.jpg)
Topics for the day
• Planning - core concepts• Planning - Permitted Development• Government policy
![Page 26: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/26.jpg)
Planning – core concepts
• planning permission required for the development of land
• ‘development’ is either:– operations affecting land; or– changes of use of land
![Page 27: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/27.jpg)
Planning – core concepts
• The main exceptions are:– use for agriculture or forestry– change of use within the same class e.g. from a
butcher’s shop to a baker’s shop– interior of the building only– external appearance is unaltered
![Page 28: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/28.jpg)
Planning – core concepts
Types of consent•outline planning consent•reserved matters•full planning consent•listed building consent•S106 Agreements
![Page 29: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/29.jpg)
Planning – Permitted Development
• Certain ‘development’ does not require planning permission
• Permitted Development
![Page 30: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/30.jpg)
Permitted Development
• General Permitted Development Order 1995 – permission is deemed granted
• Permission granted by SoS subject to conditions
• Stray beyond the description of permitted development then the whole development needs consent, or it is unlawful
![Page 31: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/31.jpg)
Permitted Development
Take care:•Article 4 (GPDO 1995) – permitted development rights can be removed•Permitted development rights attaching to a particular use of land are only available if that use is lawful•Permitted development rights attaching to buildings are only available if that building has been constructed lawfully
![Page 32: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/32.jpg)
Permitted Development
Take care:•You cannot stray beyond the description in the GPDO•Over 40 different classes of PD rights in the Order•Most PD rights are subject to restrictions:
– Size– Location– Noise levels– Visual impact
![Page 33: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/33.jpg)
Permitted Development
The key Order for non-domestic renewables:•Town and Country Planning (General Permitted Development) (Amendment) (England) Order 2012 – non-domestic micro-generation
![Page 34: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/34.jpg)
Roof mounted solar
Conditions:•Minimise effect on external appearance•Remove as soon as not neededLimits:•Panels protrude no more than 200mm•No more than 1 metre above highest part of a flat roof
![Page 35: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/35.jpg)
Roof mounted solar- limits
• Not within 1 metre of the edge of the roof• Not visible from a highway in a conservation
area• Not on a listed building
• Building Regs- check your roof loading
![Page 36: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/36.jpg)
Free standing solar
Conditions:•Minimise effect on amenity of the area (glare, landscape)•Remove as soon as not neededLimits:•No more than four metres high•At least five metres from the boundary
![Page 37: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/37.jpg)
Free standing solar- limits
• No more than 9 square metres• No nearer to the highway than the building (in
a conservation area)• Not within the boundary of a listed building
![Page 38: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/38.jpg)
Summary of Planning
Consider permitted development•Have the rights been removed?•Can you meet the requirements of the GPDO?Planning permission•consult•address issues•address current policy
![Page 39: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/39.jpg)
Government Policy
Key themes of localism and reducing red tape•planning policy – National Planning Policy Framework•sustainable development – a golden thread running through both plan-making and decision-taking•five principles
– live within planet’s limits– strong, healthy and just society– sustainable economy– good governance– use sound science responsibly
![Page 40: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/40.jpg)
Government Policy – Localism• May 2010 – the ideological basis for localism and the big society• The NPPF – process begins December 2010, finalised March 2012• Community involvement• Planning Minister – Bob Neill MP
• September 2012 – the economy bites back and realisation dawns• George Osborne – relax the rules on greenbelt development• David Cameron – build more houses• Reshuffle. Planning Minister – Nick Boles MP• And so it continues…
![Page 41: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/41.jpg)
Government Policy - Localism
Localism•version 1 – people power•version 2 – consultation•version 3 – a move back to people power?
![Page 42: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/42.jpg)
PD Policy
• Re-use of redundant agricultural buildings• Change of use: redundant offices to residential
• Note – change of use is PD, works are not
• Time limited policy – 3 years and then review
![Page 43: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/43.jpg)
Renewables Policy
Planning Practice Guidance for Renewables and Low Carbon Energy (not PPS 22)
•Onshore wind farms•Large solar PV schemes
![Page 44: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/44.jpg)
Renewables Policy
• More weight to local concerns• Cumulative impact requires attention• The need for renewable energy no longer a
trump card
![Page 45: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/45.jpg)
SunGift Solar
Forward Planning for Lasting Returns
Matthew LauriCommercial Project Development
![Page 46: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/46.jpg)
Contents
Gathering the correct information at site survey The design and installation process System commissioning, handover, aftercare
support and application for Feed-In Tariffs.
![Page 47: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/47.jpg)
How It Works
![Page 48: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/48.jpg)
How It Works
DC
ACMeterAppliances/Machinery
Grid
![Page 49: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/49.jpg)
Are two solar installations the same?
![Page 50: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/50.jpg)
Are all 2ltr cars the same?
![Page 51: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/51.jpg)
2ltr Comparison
![Page 52: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/52.jpg)
Solar PV variables
Efficiency Appearance Performance Warranty Life expectancy Price
![Page 53: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/53.jpg)
Solar PV comparison
Cost Capacity Aesthetics ROI and Payback Profit BUT are they really the same?
![Page 54: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/54.jpg)
Installation example
![Page 55: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/55.jpg)
Installation example
![Page 56: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/56.jpg)
String layout
Show how important the string layout is.
The wrong string layout
![Page 57: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/57.jpg)
String layout
Show how important the string layout is.
The right string layout
![Page 58: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/58.jpg)
![Page 59: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/59.jpg)
The wrong panel layout
Panel layout
![Page 60: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/60.jpg)
The right panel layout
Panel layout
![Page 61: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/61.jpg)
The preferred installation
![Page 62: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/62.jpg)
Financial comparison
System Panels close to parapet wall with poor string layout
Close to parapet wall with improved string layout
Panels repositioned further from parapet
wall Cost per watt installation £1.05 £1.05 £1.05
System Cost excluding 20% VAT £52,500.00 £52,500.00 £52,500.00
Annual Energy Generation (kWh) - as PV Sol simulation 46,979 47,116 47,632
FIT Rate (p/kWh) 12.57 12.57 12.57
Payback Period (Yrs) 4.59 4.58 4.51
Annual Return on Investment 21.8% 21.8% 22.2%
IRR % 21.4% 21.4% 21.8%
20yr Profit £235,513.73 £236,353.64 £240,680.18Carbon Savings per year (tonnes) 24.85 24.92 25.20
![Page 63: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/63.jpg)
Less is more
![Page 64: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/64.jpg)
Shading impact
![Page 65: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/65.jpg)
Preferred method
![Page 66: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/66.jpg)
Financial comparison
System 65.25kWp System 92.5kWp System
Cost per watt installation £1.05 £1.05
System Cost excluding 20% VAT £68,512.50 £97,125.00
Annual Energy Generation (kWh) - as PV Sol simulation 63,856 85,049
FIT Rate (p/kWh) 11.10 11.10
Payback Period (Yrs) 4.70 5.04
Annual Return on Investment 21.3% 19.8%
IRR % 20.7% 18.9%
20yr Profit £298,054.29 £385,389.52 Carbon Savings per year (tonnes) 33.78 44.99
![Page 67: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/67.jpg)
Current system costs
System 50kWp System 150kWp System 250kWp System
System Cost excluding 20% VAT £52,265.68 £151,077.41 £245,092.96
Annual Energy Generation (kWh) 47,889 134,955 219,318
FIT Rate (p/kWh) 12.57 11.10 10.62
Payback Period (Yrs)
Annual Return on Investment 21.6% 19.7% 19.4%
IRR % 21.1% 18.7% 18.3%
20yr Profit
Carbon Savings per year (tonnes) 25.33 71.39 116.02
4.64 5.07 5.154.64 5.07 5.15
£231,158.39 £594,978.88 £944,750.86£231,158.39 £594,978.88 £944,750.86
![Page 68: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/68.jpg)
PPA options
Power Purchase Agreement (PPA) Zero cost Reduced electricity rate Index linked Protected from rising costs Green credentials Carbon savings
![Page 69: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/69.jpg)
Invested installations
£1,912Savings
Yr1£76,979Total Yr
20
![Page 70: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/70.jpg)
System commissioning
MCS certificate EPC certificate System handover and training Servicing and maintenance FiT application form
![Page 71: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/71.jpg)
70kWp PV roof array (30 & 40kWp)Estimated payback less than 6 yearsEstimated return higher than 16%
Exeter CouncilCivic Centre:
![Page 72: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/72.jpg)
Met Office, Exeter: 250kWp PV array Estimated payback 7.3 years Estimated return 13.5%
![Page 73: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/73.jpg)
Numatic Int Ltd: 250kWp PV arrayEstimated payback 4.6 yearsEstimated return 21.6%
![Page 74: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/74.jpg)
SunGift test array
![Page 75: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/75.jpg)
Customer Portfolio
![Page 76: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/76.jpg)
![Page 77: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/77.jpg)
SunGift Solar
![Page 78: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/78.jpg)
Darts FarmSolar
ProjectIn partnership with
SunGift Solar
![Page 79: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/79.jpg)
![Page 80: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/80.jpg)
![Page 81: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/81.jpg)
![Page 82: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/82.jpg)
![Page 83: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/83.jpg)
![Page 84: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/84.jpg)
BENEFITS OF BUYING LOCAL
• Money spent with local farmers and producers all stays close to home and is reinvested with businesses and services in your community.
• Local foods promote a safer food supply, the further you are from the source of your food, the greater the chance of contamination.
![Page 85: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/85.jpg)
![Page 86: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/86.jpg)
![Page 87: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/87.jpg)
![Page 88: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/88.jpg)
ECO-FRIENDLY DARTS FARM
• Cardboard baling and recycling• Plastic baling and recycling• Glass recycling• Water sourced from on site bore hole• Wetlands project• Solar panels
![Page 89: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/89.jpg)
![Page 90: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/90.jpg)
DARTS FARM PV SCHEME
• Conceived April 2011• Installed end July 2011• Eligible for the higher feed in tariff
rate of 32.9p• Proposed performance of around
70,000kwh• Aim to reduce our carbon footprint
and utility bills
![Page 91: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/91.jpg)
![Page 92: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/92.jpg)
DARTS FARM PV SCHEME
• Estimated 67,347 kwh • Feed in tariff 32.9p per kwh• Estimated annual earnings EDF £22,157 • Annual savings from electricity bill £4,714 (50%)• Total system cost £171,606• Estimated payback 6.15 years• Income generated over 25 years £697,025• Total profit over 25 years £525,418• Carbon emissions offset 43.5t per
annum• Equivalent rate of return 16.25%
![Page 93: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/93.jpg)
![Page 94: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/94.jpg)
DARTS FARM PV SCHEME
• Estimated 7,410 kwh • Feed in tariff 32.9p per kwh• Estimated annual earnings EDF £2,438• Annual savings from electricity bill £518 (50%)• Total system cost £29,500• Estimated payback 9.6 years• Income generated over 25 years £76,693• Total profit over 25 years £47,165• Carbon emissions offset 4.8t per
annum• Equivalent rate of return 10.4%
![Page 95: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/95.jpg)
DARTS FARM PV SCHEME
Actual income received period from June 2012 – June 2013
• Total projected income FIT £24,595• Actual income received EDF £25,818• Assumed electricity usage 50%• Actual electricity usage 100%• New projected payback approx
6 years
![Page 96: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/96.jpg)
FUTURE DARTS FARM PV SCHEME
![Page 97: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/97.jpg)
FUTURE DARTS FARM PV SCHEME
![Page 98: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/98.jpg)
FUTURE DARTS FARM PV SCHEME
• Estimated 65,000 kwh • Feed in tariff 10.62p per kwh• Estimated annual earnings EDF £6,920• Annual savings from electricity bill £5,213• Total system cost £75,500• Estimated payback 5.55 years• Income generated over 20 years £187,600• Total profit over 20 years £ 262,600• Carbon emissions offset 34.5t per
annum• Equivalent rate of return 18%
![Page 99: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/99.jpg)
DARTS FARM CARBON OFFSET
• According to Forestry Commission data we save 27,865 trees a years.
• An average of 76 trees per day.
![Page 100: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/100.jpg)
Thank you for
listening.
![Page 101: Michelmores renewables seminar](https://reader030.vdocuments.site/reader030/viewer/2022020217/55531f41b4c90575768b4cee/html5/thumbnails/101.jpg)
Question & Answers