Download - Michael Park Portfolio
YJPY O U N G J E A P A R KA R C H I T E C T U R E
MICHAELPARK>> (510) 828-8849>> [email protected]
SKILLS
RELATED COURSEWORK
Design Softwares:AutoCAD, Rhinoceros, V-Ray and Maxwell Render, Adobe Creative Suite, Google SketchUP
Analogue Techniques:Woodworking, Metalworking, Sketching, Drafting, Modelmaking, Silkscreen Printing
Office Productivity:Microsoft Office, HTML (Basic)
Energy and Environmental ManagementStudies of Thermodynamics, Day lighting, and Solar Control in design
Introduction to ConstructionMaterials and processes of construc-tion - Wood, Steel, Concrete, and Glass
Social and Cultural Basis of DesignEthnographic study of local businesses
Fundamentals of Architectural Design Design Studio with an emphasis of conceptual strategies of form and space, site relationships and social, technological and environmental determinants
Inhabiture Design+Build // Palo Alto, CAINTERN ARCHITECT[JAN 2013 - APRIL 2013]
Involved in producing CAD drawings for a non-profit organization “Dreams Happen”—playhouse project. Structure will be showcased on Stanford Mall in May 2013.
Involved in a sustainable residential renovation project. Provided as-built drawings, elevations and details.
Assisted architects with documentations and drawings.
Diablo Valley CollegePleasant Hill, CAVice President of Architecture Con-struction and Engineering Club[2007 - 2009]
Bachelor of Arts in ArchitectureUniversity of California, Berkeley[2009 - 2011]
REFERENCES
Guitar, Photography, Jazz, Vinyl Collection, Abalone Diving, Fishing
tel: (650) 324-0288 ext. 22email: [email protected]
Margot Gardias // Owner of Studiogar-dias and Design Manager at Inhabiture
Forrest Linebarger // Founder & CEO of Inhabiture
tel: (650) 324-0688 ext. 27email: [email protected]
Daniel Abbott // Professor of Architec-ture, Department Chair of Engineering at Diablo Valley Collegetel: (925) 685-1230 ext. 2428email: [email protected]
INTERESTS
EXPERIENCE
Habitat for Humanity // East Bay[Mar. 2009 - Apr. 2010]
Helped construct affordable homes in San Leandro, CA
VOLUNTEER EXPERIENCE
HAND DRAFTING CASE STUDY STUDIO PY
ARC
HITE
CTU
RE P
ORT
FOLI
O
RENDERINGS INTERNSHIP EXPERIENCE
1
HAND DRAFTING PENCIL ON VELLUM
2
WIDE FLANGE
TENSILE REINFORCEMENT
SMS TO EACH SIDESAND TO EACH STUDS
STUDS AND BRIDGINGPER DETAIL 12FT
STUD
INSULATEDCONCRETE FORMS
NO. 6 REBAR
DOUBLE-LAYERGYPSUM BOARD
SUBFLOOR
CONCRETE
WIDE FLANGE
RAMSET TO POWER DRIVEN FASTENER
SMS TO STUD
STUD WITH BRIDGING
SHEET METAL SCREW
400612-54 BRACE @ 24’ O.C
RAMSET DRIVEN FASTENER
HSS BEAM
CUT FLANGESAND BENT WEB FOR ATTACHMENTTO HSS
SHOTCRETE WALL 12FT
STRUCTURAL SYSTEM: BUILDING SKIN DIAGRAMArchitect: Ennead Architects, LLPCommissioner: Helen and Peter BingBudget: $111.9 MillionCompletion Date: Summer of 2012
WALL SECTION WALL DETAILCASE STUDY // BING AUDITORIUM
3
NORTH ELEVATION WALL SECTION BUCKLING RESTRAINED BRACED FRAME (BRB) STUDYArchitect: Harwell Hamilton HarrisCommissioner: Weston HavensLocation: Berkeley, CACompletion Date: 1941
CASE STUDY // HAVENS HOUSE
Set Posts
Foundation
6”x6” Postto I-Beam
Flank Floor
Header Flush with exteriorface of framing withinsulation infill
2”x12” Joists
2”x4” StrippingSolid Block
Compo
Stud Frame
Rails
Detail: Gusset Plate Joints
A
BRB Frame Testing Configuration Diagram
Section A
Steel Core
Concrete Fill
Steel Casting
Deboned Gap
4
LONGITUDINAL SECTIONArchitect: MVRDVCommissioner: The Koek FamilyLocation: Utrecht, NetherlandsCompletion Date: 1997
CASE STUDY // DOUBLE HOUSE
Stacking/Layering
Floor Plan F1 Floor Plan F2 Floor Plan F3
5
DESIGN PROCESS
TOP LEFT: TRANSVERSAL SECTION (FRONT)TOP CENTER: LONGITUDINAL SECTION (BACK)TOP RIGHT: TRANSVERSAL SECTION (BACK) PROFESSOR: Harrison Fraker
ARCH 100BAPRIL 2011
STUDIO // CENTER FOR COLLABORATIVE RESEARCH
Floor Plan F1 1’ - 16” Floor Plan F2
Gallery
Laboratory
Conference Room
Cafe
Loading Dock
Storage
Technician Office
Office
Laboratory
Conference Room
Office
Laboratory
Gathering Space
Library
Site + Entry Diagram
Site Orientation Diagram
6
RENDERINGSRHINOCEROS + VRAY RENDER
7
Architect: Inhabiture DesignClient: Robert KooLocation: Mountain View, CACompletion Date: March, 2013
Top Left: Rendering using the Dennis Technique. SketchUp and Photoshop.Bottom Left: Stylized front elevation using AutoCAD and Photoshop.
Center Top: Floor Plan F2Center Mid: Floor Plan F1Center Bottom: Floor Plan B1
Right: 3D model using SketchUPINTERNSHIP EXPERIENCE // KOO RESIDENCE
FRONT BALCONY
GREEN ROOF
MASTER BEDROOM
MASTER BATH
OFFICE
WALK-IN-CLOSET
GA
RAG
E LI
NE
REARBALCONY
SKYLIGHT
8
Architect: Inhabiture DesignClient: Rebuilding Together Penninsula “Dreams Happen Gala and Playhouse Auction”Location: Stanford Mall, Palo Alto, CACompletion Date: May, 2013
Program: Create an interactive playhouse for kids.Purpose: Finished structure to be showased on the Stanford Shopping Center. The playhouse will be auctioned off and the money will be donated to “Rebuilding Together Penninsula”, a non-profit organization. The materials used to construct the playhouse were donated and are comprised of recycled, environmentally-friendly and locally produced/manufactured materials.
FRONT ELEVATION REAR ELEVATION
LEFT ELEVATION
SECTION CUT
FLOOR PLANRIGHT ELEVATION
INTERNSHIP EXPERIENCE // MOD POD TIME MACHINE
9
Architect: Inhabiture DesignClient: Rebuilding Together Penninsula “Dreams Happen Gala and Playhouse Auction”Location: Stanford Mall, Palo Alto, CACompletion Date: May, 2013
Top Left: Parapet/Roof & SIP Wall Detail.Bottom Left: Living Wall Detail & LED Tapelight Detail.
Center Top: Roof Framing PlanCenter Mid: Roof PlanCenter Bottom: Wiring Detail
INTERNSHIP EXPERIENCE // MOD POD TIME MACHINE
RGB LED TAPELIGHT
METAL SPACER
2-LAYERED GRADE D TAR PAPER
SIP WALL
1"X4" RECYCLED REDWOODEXTERIOR SIDING, RIP TO SIZE
CLEAR PEROFIN OIL FINISH
2" X 4" RIPPED FASCIA
12" EXT. PLYWOOD
SHEET METAL WATERFALL,SOLDER ALL SIDES, BRONZE FINISH
1 X 1 REDWOODVERTICAL SLATS 16" O.C
ATTACH SIDING WITH BLINDFASTENERS (TYPICAL)
DRYWALL
SOLID FILL FIBERGLASSBATT INSULATION AT ROOF
10
Architect: Inhabiture DesignClient: The Khuntia FamilyLocation: Los Altos Hills, CACompletion Date: Schematic design phase, ongoing talks with clients.
Top Left: Existing Roof PlanBottom Left: Existing Floor Plan
AS BUILT: Top Right 1: Existing Front ElevationTop Right 2: Existing Rear ElevationTop Right 3: Existing Left ElevationTop Right 4: Existing Right Elevation
Bottom Right: Proposed Floor PlanINTERNSHIP EXPERIENCE // KHUNTIA RESIDENCE REMODELING PROJECT
WD
HEATER
COUNTER
REF.
CAB
CAB
COUNTER
WATER HEATER
KITCHEN
LIVING ROOM BEDROOM 3
BEDROOM 4
MASTER BEDROOM
HALL
BATH
BATH
MASTER BATH
BATH
LAUNDRY
BEDROOM 1
DINING ROOM
BEDROOM 2
FAMILY
W.I.C
W.I.C
BRAKFAST
GARAGE
STORAGE
BEDROOM 3
BEDROOM 4
GUEST
HALL
BATH #4
GUEST BATH #2
W.I.C
MUD
GARAGE
ROOM
BEDROOM #2
BATH #3
OPENSTORAGE
OFFICE
BEDROOM 5
MASTER
HALL
SUITE
M.B.
P.R.
BTH. 5
LAUNDRY
MECH.
CLOSET
KITCHEN
DINING
FAMILY
REF.
ENTRYHALL
ROOM
ROOM
LIVINGROOM
CAB
1 3
42
11
THANK YOU FOR YOUR TIME AND CONSIDERATION PY
ARC
HITE
CTU
RE P
ORT
FOLI
O