  • 8/12/2019 MD1-0-V-121-01-00001

    1/2

    APPROVED

    Approved without exception

    APPROVED WITH COMMENTS

    Approved Subject to Incorporation of comm

    RETURNED FOR CORRECTION

    Insufficient Information/ Detail

    Resubmit for Approval

    REJECTED

    Complete redesign required

    RECEIVED FOR INFORMATION

    Returned without comments

    RECEIVED FOR INFORMATION

    Returned with comments

    any obligations covered under contra

    Engineer:

    Discipline:

    Date:

    Note: Approval or comments does not relie

    TWO(2) X 500MW

    MONG DUONG 1 THERMAL POWER PLANT

    avi anghorneSenior Mec Engineer07-Dec-12

  • 8/12/2019 MD1-0-V-121-01-00001

    2/2

    Pyry CommentTwo(2) x 500MW Mong Duong 1 Thermal Power Plant Project

    Dwg. / Doc. TitleG A Drawing BFP andBooster Pump Dwg. / Doc. No. MD1-0-V-121-01-00001

    HDEC DT No. MD1-HDH-EVN-X-1219 Submitted Date Rev. A

    PyryTR No. Received DateNew HDEC DT No. Re-Submitted Date

    Status Submitted for Information Returned with Comment

    Page 1/ 1

    No. Pyrys Comments Contractors Reply / Action

    1 Please provide KKS identifying number forequipment and instruments on the drawings.

    2 Include a parts list for the major components(e.g. main pump, variable speed drive etc) withreference drawings.

    3 Foundation drawings with loading data andanchor bolt information to be provided. Thesedrawings shall be identified as referencedrawings.

    4 Confirm that there is personnel protection for allrotating components.

    5 State what DBSE means

    6 Identify the equipment on the edge of the

    booster and main pump base plates at gridreference A2, A3, C5 and C6.