FISCAL METERING SYSTEM DESIGN
- some design evaluations with respect to lifecyclecost/benefit
NFOGM Temadag, Sola, 22 March 2012
Morten Marstein, Senior Systems Engineer, FMC Kongsberg Metering AS
-
7/29/2019 Mater Prover
2/17
Design Categories
Case: Liquid Metering Station
Design
Conventional liquid metering station with volume prover
Liquid metering station with master meter and portable prover
connections
Liquid metering station with master meter (no inline proving)
Multi-phase metering
Configuration
Serial configuration
Parallel configuration
Z-configuration
-
7/29/2019 Mater Prover
3/17
Evaluation Criterias
Price and delivery time (project phase)
Cost of parts, engineering, complexity
Accuracy
Conformance to fiscal accuracy requirements
Functionality
Flow range, online maintenance, online calibration, online diagnostics
Reliability / Maintenance cost
Maintenance and diagnostics facilities, complexity, maintenanceintervals, knowledge for maintenance
-
7/29/2019 Mater Prover
4/17
Evaluation Design Categories
Price anddelivery time
Accuracy Functionality Reliability /Maintenance
Sum
Conventional
with volumeprover
- + + - 0
Mastermeter andportableproverconnections
0 0 + + ++
Inline metersonly
+ - - - --
Multi-phasemetering
+ - 0 - -
+ Advantage
- Disadvantage
-
7/29/2019 Mater Prover
5/17
Liquid Metering Station with Prover
-
7/29/2019 Mater Prover
6/17
Liquid Metering Station with Master Meters
-
7/29/2019 Mater Prover
7/17
Liquid USM Metering Station- no master meter or proving facility
-
7/29/2019 Mater Prover
8/17
Multiphase Metering
-
7/29/2019 Mater Prover
9/17
Evaluation Design Configuration
Price anddelivery time
Accuracy Functionality Reliability /Maintenance
Sum
Serialconfiguration
+ + + - ++
Parallelconfiguration
0 + 0 0 +
Z-configuration
- + + + ++
-
7/29/2019 Mater Prover
10/17
Serial vs. Parallel Configuration
0
0,2
0,4
0,6
0,8
1
1,2
-1 -0,5 0 0,5 1
Rel.comb.std.unc
ertainty
[%]
Correlation
Two meters in series
0
0,2
0,4
0,6
0,8
1
1,2
0 20 40 60 80 100
Rel.comb.std.uncertainty
[%]
Percentage of flow in pipe 2
Two meters in parallel
-
7/29/2019 Mater Prover
11/17
Flow Measurement Technologies
Liquid
PD (Positive Displacement) Meters
Turbine Meters
Ultrasonic Meters
Coriolis Meters
Gas
DP Meters (Orifice, Venturi)
Cone Meters
Ultrasonic
Coriolis
-
7/29/2019 Mater Prover
12/17
Evaluation Flow MeasurementTechnologies - Liquid
Price anddelivery time
Accuracy Functionality Reliability /Maintenance
Sum
Liquid PD - + 0 0 0
Liquid
Turbine
0 + 0 + ++
LiquidUltrasonic
0 0 + 0 +
LiquidCoriolis
+ 0 + + +++
-
7/29/2019 Mater Prover
13/17
PD Metering Station
-
7/29/2019 Mater Prover
14/17
Coriolis Metering Station
-
7/29/2019 Mater Prover
15/17
Evaluation Flow MeasurementTechnologies - Gas
Price anddelivery time
Accuracy Functionality Reliability /Maintenance
Sum
Gas DP 0 - - + -
Gas Cone + - - + 0
GasUltrasonic
0 + + - +
Gas Coriolis + 0 + 0 +
-
7/29/2019 Mater Prover
16/17
Gas Metering Stations
-
7/29/2019 Mater Prover
17/17
Important Issues in the Project Phase
Metering knowledge at Operator / Contractor
Calibration arrangement (provers, master meters)
Proven technology
Combine measurement techniques Quality (fluid property) measurements
Preferred solution:
Solid technical design based on proven technologyincluding inline calibration/verification arrangement