WelcomeUUSD Land & Building Committee
Capital Campaign UpdatesOctober 20, 2013Town Hall Meeting
![Page 2: Land & Building Committee Walt SmithGary Schmidt](https://reader036.vdocuments.site/reader036/viewer/2022062811/56815f3f550346895dce143a/html5/thumbnails/2.jpg)
Land & Building CommitteeWalt Smith Gary Schmidt
Our Second Phase
Began: August 11, 2013
![Page 3: Land & Building Committee Walt SmithGary Schmidt](https://reader036.vdocuments.site/reader036/viewer/2022062811/56815f3f550346895dce143a/html5/thumbnails/3.jpg)
What have we accomplished so far?
1. We determined we needed to move.
2. We analyzed our budget to determine our ability fund a new space.
3. We looked for land, and, with the help of the Pioneers, located a property on Rt. 9.
4. We developed a concept plan for our new
sanctuary and existing building modifications. 5. WE voted YES to go forward!
![Page 4: Land & Building Committee Walt SmithGary Schmidt](https://reader036.vdocuments.site/reader036/viewer/2022062811/56815f3f550346895dce143a/html5/thumbnails/4.jpg)
Now the Hard Work Begins
There are two “projects” going on concurrently:
1. Development of clear final architectural plans and securing of cost estimates.
2. Engaging an Engineering Firm to complete a “Site Plan.”
![Page 5: Land & Building Committee Walt SmithGary Schmidt](https://reader036.vdocuments.site/reader036/viewer/2022062811/56815f3f550346895dce143a/html5/thumbnails/5.jpg)
Architectural Plans: Mike Molyneux, an experienced local Designer developed a basic plan. After numerous modifications, he is currently finalizing material requirements to allow us to submit plans to pre-screened builders for construction estimates. We have two potential options. One is the conventional stick-built construction method and the other is the post-frame method. BOTH will comply with our requirement of seamlessly tying into the existing structure.
![Page 6: Land & Building Committee Walt SmithGary Schmidt](https://reader036.vdocuments.site/reader036/viewer/2022062811/56815f3f550346895dce143a/html5/thumbnails/6.jpg)
Site Plans
What are the components of a Site Plan? 1. Wetland Delineation. 2. Property Boundary Survey. 3. Topographic Survey. 4. Concept Plans. 5. Preliminary Plans for the County. 6. Construction Plans including submitting applications
to appropriate State/County agencies; securing necessary Fire Marshal approvals, water system plans, wastewater disposal, and entrance design.
7. Submitting of all final plans to Sussex County Planning and Zoning for final approval.
![Page 7: Land & Building Committee Walt SmithGary Schmidt](https://reader036.vdocuments.site/reader036/viewer/2022062811/56815f3f550346895dce143a/html5/thumbnails/7.jpg)
We have interviewed three qualified engineering firms:
1. Davis, Bowen and Friedel
2. True North
3. Pennoni Associates (internal referral)
We are concluding a second interview with Pennoni Associates on Monday, 10/21, with the anticipation of issuing them the contract.
![Page 8: Land & Building Committee Walt SmithGary Schmidt](https://reader036.vdocuments.site/reader036/viewer/2022062811/56815f3f550346895dce143a/html5/thumbnails/8.jpg)
Challenges Ahead
Timing! Timing! Timing!
Our most important challenge ahead is to promptly secure construction estimates and site costs to be submitted to the BOT and to the Finance Committee so that they are both satisfied that the building of our new Sanctuary is economically viable and UUSD should move on with the negotiation for the purchase of the Pioneer property.
![Page 9: Land & Building Committee Walt SmithGary Schmidt](https://reader036.vdocuments.site/reader036/viewer/2022062811/56815f3f550346895dce143a/html5/thumbnails/9.jpg)
AND
We start construction as early as possible to complete the building of our new home by 12/31/15.
![Page 10: Land & Building Committee Walt SmithGary Schmidt](https://reader036.vdocuments.site/reader036/viewer/2022062811/56815f3f550346895dce143a/html5/thumbnails/10.jpg)
UUSD Capital Campaign
Gary Colangelo
![Page 11: Land & Building Committee Walt SmithGary Schmidt](https://reader036.vdocuments.site/reader036/viewer/2022062811/56815f3f550346895dce143a/html5/thumbnails/11.jpg)
GOAL: RAISE $510,000 FOR THE BUILDING FUND
Current Building Fund: $52,000
2014: $306,000
2016: $562,000
![Page 12: Land & Building Committee Walt SmithGary Schmidt](https://reader036.vdocuments.site/reader036/viewer/2022062811/56815f3f550346895dce143a/html5/thumbnails/12.jpg)
Where are we?
UUSD Capital Campaign
$0
$100,000
$200,000
$300,000
$400,000
$500,000
$600,000
510000
280700
3000
Goal Pledges Fulfilled
![Page 13: Land & Building Committee Walt SmithGary Schmidt](https://reader036.vdocuments.site/reader036/viewer/2022062811/56815f3f550346895dce143a/html5/thumbnails/13.jpg)
How are we going to get there?Unitarian Universalists of Southern Delaware Financial Feasibility Study David L. Rickard, UUA Congregational Stewardship Consultant, May 2, 2013
“The capital campaign results will likely be in the range of $450,000 to $530,000.”
Essential gift chart: 19 pledges $10,000 to $60,000
88 pledges $300 to $9,999
![Page 14: Land & Building Committee Walt SmithGary Schmidt](https://reader036.vdocuments.site/reader036/viewer/2022062811/56815f3f550346895dce143a/html5/thumbnails/14.jpg)
Essential Gifts
Range Number Have Need$25,000 to $60,000+
9 4 5
$10,000 to $24,999 10 8 2$5,000 to $9,999 12 5 7$1,000 to $4,999 30 3 27$300 to $999 45 1 44
• Three year fulfillment period
• Equal opportunity giving—an economically diverse community where everyone gives according to their means
• We are counting on all members pledging!
![Page 15: Land & Building Committee Walt SmithGary Schmidt](https://reader036.vdocuments.site/reader036/viewer/2022062811/56815f3f550346895dce143a/html5/thumbnails/15.jpg)
What does a future home mean to you?
• Pride of ownership• Leaving a legacy• Establishing a visible and permanent church• Promoting a liberal religious tradition in this
region• Providing space for future Church initiatives
and programs, including Lifespan Faith Development
• Providing a space for community functions, not related to church programs
• Providing a suitable space for the ministry of music
![Page 16: Land & Building Committee Walt SmithGary Schmidt](https://reader036.vdocuments.site/reader036/viewer/2022062811/56815f3f550346895dce143a/html5/thumbnails/16.jpg)
- The face of this campaign.- A source of information prior
to commitments being made.- The physical link that carries
out the act of giving.
![Page 17: Land & Building Committee Walt SmithGary Schmidt](https://reader036.vdocuments.site/reader036/viewer/2022062811/56815f3f550346895dce143a/html5/thumbnails/17.jpg)
ResourcesCommuniqué 1 How do I plan and fulfil a pledge to the UUSD Capital
Communiqué 2 Guidelines for Making a Pledge
Communiqué 3 The Visiting Steward
Case Statement
UUSD Capital Campaign Brochure
The Visiting Stewards
Capital Campaign Committee Members
![Page 18: Land & Building Committee Walt SmithGary Schmidt](https://reader036.vdocuments.site/reader036/viewer/2022062811/56815f3f550346895dce143a/html5/thumbnails/18.jpg)
Key DatesFriday, Leadership Meeting with Bill ClontzOctober 18 Saturday, CC Visiting Stewards Training 1:00 to 4:00PM UUSD. Training to be October 19 conducted by Bill Clontz
Sunday, Town Hall Meeting 11:30AM, L&B/Capital Campaign UpdatesOctober 20
Saturday, Capital Campaign Kick-Off GalaOctober 26 Virden Center, 5:30 to 9:00PM November 1 to 23 Capital Campaign Visits
December 1 to 31 Mailings to former members and friends
December 13 (tentative) Capital Campaign Review
December 1, 2013 to October 1, 2016 Pledge Fulfillment Period