![Page 1: INVEST Implementation at the Tollway · 3 Implementation of INVEST at the Tollway The Illinois Tollway has integrated INVEST throughout it processes Will use all three INVEST Modules](https://reader031.vdocuments.site/reader031/viewer/2022022601/5b4f08f97f8b9a346e8b6b4c/html5/thumbnails/1.jpg)
INVEST Implementation at the Tollway October 27, 2014
![Page 2: INVEST Implementation at the Tollway · 3 Implementation of INVEST at the Tollway The Illinois Tollway has integrated INVEST throughout it processes Will use all three INVEST Modules](https://reader031.vdocuments.site/reader031/viewer/2022022601/5b4f08f97f8b9a346e8b6b4c/html5/thumbnails/2.jpg)
Move Illinois Capital Program
2
![Page 3: INVEST Implementation at the Tollway · 3 Implementation of INVEST at the Tollway The Illinois Tollway has integrated INVEST throughout it processes Will use all three INVEST Modules](https://reader031.vdocuments.site/reader031/viewer/2022022601/5b4f08f97f8b9a346e8b6b4c/html5/thumbnails/3.jpg)
3
Implementation of INVEST at the Tollway The Illinois Tollway has integrated
INVEST throughout it processes
Will use all three INVEST Modules System Planning Operations & Maintenance Project Development
INVEST will help the Tollway
incorporate sustainability into the program measure progress identify barriers to sustainability report sustainability consistently to our
stakeholders
![Page 4: INVEST Implementation at the Tollway · 3 Implementation of INVEST at the Tollway The Illinois Tollway has integrated INVEST throughout it processes Will use all three INVEST Modules](https://reader031.vdocuments.site/reader031/viewer/2022022601/5b4f08f97f8b9a346e8b6b4c/html5/thumbnails/4.jpg)
INVEST Implementation – Annual and Project Processes
4
1. Goal Setting
2. Training
4. Program-wide Analysis
5. Identify Improvement
Initiatives
6. Implement Improvement
Initiatives
7. Annual Reporting
3.2 Implement Solutions
3.3 QA/QC
Evaluations
3.4 Evaluate Corridors
3.1 Evaluate Projects
Project Process (inner cycle)
Annual Process (outer cycle)
![Page 5: INVEST Implementation at the Tollway · 3 Implementation of INVEST at the Tollway The Illinois Tollway has integrated INVEST throughout it processes Will use all three INVEST Modules](https://reader031.vdocuments.site/reader031/viewer/2022022601/5b4f08f97f8b9a346e8b6b4c/html5/thumbnails/5.jpg)
System Planning
Sustainability evaluations were conducted on Tollway processes before INVEST was implemented, in order to obtain a baseline score the Tollway used for its most recent funding programs each program showed steady progress on
sustainability above the level of the previous one
5
![Page 6: INVEST Implementation at the Tollway · 3 Implementation of INVEST at the Tollway The Illinois Tollway has integrated INVEST throughout it processes Will use all three INVEST Modules](https://reader031.vdocuments.site/reader031/viewer/2022022601/5b4f08f97f8b9a346e8b6b4c/html5/thumbnails/6.jpg)
6
0
50
100
150
200
250
ILLINOIS TOLLWAY System Planning Baseline Scores
Total Points Available Total Annual Score
2000 Tollway 2000 62 points Not rated
2004 Pre-CRP 100 points Silver
2011 Move Illinois 148 points Platinum
2013 Move Illinois 159 points Platinum
Total Points Available = 240
![Page 7: INVEST Implementation at the Tollway · 3 Implementation of INVEST at the Tollway The Illinois Tollway has integrated INVEST throughout it processes Will use all three INVEST Modules](https://reader031.vdocuments.site/reader031/viewer/2022022601/5b4f08f97f8b9a346e8b6b4c/html5/thumbnails/7.jpg)
System Planning Highlights
Demonstrating Industry Leadership Integrating planning with the three legs of the Triple
Bottom Line of Sustainability (Social, Economic and Environmental)
Leveraging available technologies to improve capacity and efficiency of operations
Coordination with Operations & Maintenance and Project Development is positively affecting efficiency of delivery of Tollway projects
7
![Page 8: INVEST Implementation at the Tollway · 3 Implementation of INVEST at the Tollway The Illinois Tollway has integrated INVEST throughout it processes Will use all three INVEST Modules](https://reader031.vdocuments.site/reader031/viewer/2022022601/5b4f08f97f8b9a346e8b6b4c/html5/thumbnails/8.jpg)
System Planning Highlights (continued)
Opportunities for Improvement Continue coordination with CMAP and positively affect
sustainability of Analysis Methods, Air Quality, and Travel Demand Management in the region and at the Tollway
Improve focus on the Reduction of Energy and Fossil Fuel Consumption of the road users
Focus on Infrastructure Resiliency, including the use of Life Cycle Assessments of roadway components
Climate Change Adaptation of Tollway facilities
8
![Page 9: INVEST Implementation at the Tollway · 3 Implementation of INVEST at the Tollway The Illinois Tollway has integrated INVEST throughout it processes Will use all three INVEST Modules](https://reader031.vdocuments.site/reader031/viewer/2022022601/5b4f08f97f8b9a346e8b6b4c/html5/thumbnails/9.jpg)
Operations & Maintenance
Decisions made in earlier System Planning and
Project Development steps influence the sustainability of the infrastructure, including operations and maintenance
Data collected in O&M in turn influences System
Planning and Project Development
9
![Page 10: INVEST Implementation at the Tollway · 3 Implementation of INVEST at the Tollway The Illinois Tollway has integrated INVEST throughout it processes Will use all three INVEST Modules](https://reader031.vdocuments.site/reader031/viewer/2022022601/5b4f08f97f8b9a346e8b6b4c/html5/thumbnails/10.jpg)
10
0
50
100
150
200
250
ILLINOIS TOLLWAY Operations & Maintenance Baseline Scores
Total Annual Score % Available Points Earned
2004 Pre-CRP 99 points Silver
2000 Tollway 2000 85 points Silver
2009 Most Pre-CRP Implementation 128 points Platinum
2013 Move Illinois 139 points Platinum
Total Points Available = 210
![Page 11: INVEST Implementation at the Tollway · 3 Implementation of INVEST at the Tollway The Illinois Tollway has integrated INVEST throughout it processes Will use all three INVEST Modules](https://reader031.vdocuments.site/reader031/viewer/2022022601/5b4f08f97f8b9a346e8b6b4c/html5/thumbnails/11.jpg)
Operations & Maintenance Highlights
Demonstrating Industry Leadership Leveraging data in Pavement and Bridge Asset
Management system to evaluate the condition of roadways and provide input to planning and design (OM-7)
Efficiently and sustainably performing snow and ice control activities (OM-12)
Leveraging available technology for improvement operations and incident management (OM-13)
11
![Page 12: INVEST Implementation at the Tollway · 3 Implementation of INVEST at the Tollway The Illinois Tollway has integrated INVEST throughout it processes Will use all three INVEST Modules](https://reader031.vdocuments.site/reader031/viewer/2022022601/5b4f08f97f8b9a346e8b6b4c/html5/thumbnails/12.jpg)
Operations & Maintenance (continued)
Opportunities for Improvement Focus on Internal Sustainability Planning and
execution of daily activities Tracking commitments made during permitting, right-
of-way acquisition, planning and design into design, construction and operations & maintenance
More efficiently leverage the data in the Asset Management system to inform planning and design phases
12
![Page 13: INVEST Implementation at the Tollway · 3 Implementation of INVEST at the Tollway The Illinois Tollway has integrated INVEST throughout it processes Will use all three INVEST Modules](https://reader031.vdocuments.site/reader031/viewer/2022022601/5b4f08f97f8b9a346e8b6b4c/html5/thumbnails/13.jpg)
Project Development
Tollway implementing FHWA’s Project Development
module as base for their program Tollway has made adjustments based on Illinois
DOT’s I-Last rating system Tollway has made adjustments based on Tollway-
specific practices.
13
![Page 14: INVEST Implementation at the Tollway · 3 Implementation of INVEST at the Tollway The Illinois Tollway has integrated INVEST throughout it processes Will use all three INVEST Modules](https://reader031.vdocuments.site/reader031/viewer/2022022601/5b4f08f97f8b9a346e8b6b4c/html5/thumbnails/14.jpg)
Project Development The Illinois DOT has their
own sustainability program: I-LAST
Illinois stakeholders were influential in developing I-LAST
The Tollway incorporated I-LAST measures into their INVEST program with the Tollway-specific supplements and criteria
14
![Page 15: INVEST Implementation at the Tollway · 3 Implementation of INVEST at the Tollway The Illinois Tollway has integrated INVEST throughout it processes Will use all three INVEST Modules](https://reader031.vdocuments.site/reader031/viewer/2022022601/5b4f08f97f8b9a346e8b6b4c/html5/thumbnails/15.jpg)
Tollway’s INVEST Project Development Module
15
Tollway’s Project Development Module
FHWA’s 29 Criteria Tollway supplements to
10 of the FHWA criteria 8 Tollway-specific
criteria
![Page 16: INVEST Implementation at the Tollway · 3 Implementation of INVEST at the Tollway The Illinois Tollway has integrated INVEST throughout it processes Will use all three INVEST Modules](https://reader031.vdocuments.site/reader031/viewer/2022022601/5b4f08f97f8b9a346e8b6b4c/html5/thumbnails/16.jpg)
Tollway-Specific Criteria
PD-50T: Alignment Selection PD-51T: Visual Aesthetics PD-52T: Noise Abatement PD-53T: Reduce, Reuse and Recycle Materials
(Design) PD-54T: Light Pollution PD-55T: Regional Employment PD-56T: Permeable Pavement PD-57T: Innovations
16
![Page 17: INVEST Implementation at the Tollway · 3 Implementation of INVEST at the Tollway The Illinois Tollway has integrated INVEST throughout it processes Will use all three INVEST Modules](https://reader031.vdocuments.site/reader031/viewer/2022022601/5b4f08f97f8b9a346e8b6b4c/html5/thumbnails/17.jpg)
Tollway-Specific Supplements
PD-07 Habitat Restoration PD-09 Ecological Connectivity PD-10 Pedestrian Access PD-13 Freight Mobility PD-17 Energy Efficiency PD-18 Site Vegetation PD-19 Reduce and Reuse Materials PD-20 Recycle Materials PD-21 Earthwork Balance PD-24 Contractor Warranty (deleting)
17
![Page 18: INVEST Implementation at the Tollway · 3 Implementation of INVEST at the Tollway The Illinois Tollway has integrated INVEST throughout it processes Will use all three INVEST Modules](https://reader031.vdocuments.site/reader031/viewer/2022022601/5b4f08f97f8b9a346e8b6b4c/html5/thumbnails/18.jpg)
Project Development
The Tollway’s INVEST Program consists of 10 steps Process is divided
into planning and construction stages
Submittals are required at each stage to ensure the process is followed
18
![Page 19: INVEST Implementation at the Tollway · 3 Implementation of INVEST at the Tollway The Illinois Tollway has integrated INVEST throughout it processes Will use all three INVEST Modules](https://reader031.vdocuments.site/reader031/viewer/2022022601/5b4f08f97f8b9a346e8b6b4c/html5/thumbnails/19.jpg)
Project Development
Baseline Evaluations (before INVEST was implemented) More than 35 projects constructed between 1998 and
2014 Construction costs vary from $400k to $134M Equal distribution of bridge, HMA and PCC projects Equitable distribution of projects between Tollway’s
four capital improvement programs: Tollway 2000, Congestion Relief Program, On Road Tolling, and Move Illinois
19
![Page 20: INVEST Implementation at the Tollway · 3 Implementation of INVEST at the Tollway The Illinois Tollway has integrated INVEST throughout it processes Will use all three INVEST Modules](https://reader031.vdocuments.site/reader031/viewer/2022022601/5b4f08f97f8b9a346e8b6b4c/html5/thumbnails/20.jpg)
Project Development
Demonstrating Industry Leadership Long-term economic analyses and financial sustainability
(PD-1) Progressive investigation and use of methods to recycle,
reduce and reuse materials (PD-20) Extensive use of available technologies to improve incident
management, safety and operational efficiency (PD-14) Strong vegetative management planning (PD-18) Proactive earthwork balancing on projects and between
projects (PD-21) Use of warm mix asphalt (PD-23)
20
![Page 21: INVEST Implementation at the Tollway · 3 Implementation of INVEST at the Tollway The Illinois Tollway has integrated INVEST throughout it processes Will use all three INVEST Modules](https://reader031.vdocuments.site/reader031/viewer/2022022601/5b4f08f97f8b9a346e8b6b4c/html5/thumbnails/21.jpg)
Project Development
Opportunities for Improvement Consider Incorporation of Life Cycle Cost Analyses to
inform bridge and major elements type selection Implementation of FHWA’s newly released Highway Safety
Manual Tracking commitments made during permitting, right-of-
way acquisition, planning and design into design, construction and operations & maintenance
Focus on reduction of energy consumption by project by reducing demand and adding renewable energy sources
Focus on Contractor activities that promote sustainability, such as Environmental Training, Construction Noise Mitigation, Waste Management, etc.
21
![Page 22: INVEST Implementation at the Tollway · 3 Implementation of INVEST at the Tollway The Illinois Tollway has integrated INVEST throughout it processes Will use all three INVEST Modules](https://reader031.vdocuments.site/reader031/viewer/2022022601/5b4f08f97f8b9a346e8b6b4c/html5/thumbnails/22.jpg)
Future Project Development
Use of Life Cycle Assesment (LCA) – to develop a sustainability architecture for an objective environmental assessment of Tollway Construction Projects Pavement LCA Drainage LCA Structures LCA Lighting LCA Landscape LCA
22