Transcript
  • 7/27/2019 Hrs g Operating and Maintenance Issues

    1/21

    HRSG Maintenance &

    Operating Issues

    David Buzza

    Region 7 Engineering

    August 6, 2012

  • 7/27/2019 Hrs g Operating and Maintenance Issues

    2/21

    Lawrenceburg Primary Reheat Tube Failures

    Looking Up

    Tubes bowed at header ends

  • 7/27/2019 Hrs g Operating and Maintenance Issues

    3/21

    Lawrenceburg Primary Reheat Failures & Cracks

    Four HRSG Units

    From Feb 2009 toAug 2011 - 9 forcedrepairs and 5

    unforced repairs. 37 of 45 tube repairs

    are near header ends

    versus over drainlines.

    Panel Top Header

    Crack at toe of fillet

    weld (tube side)

  • 7/27/2019 Hrs g Operating and Maintenance Issues

    4/21

    Reducing Lawrenceburg Primary Reheat Failures

    Condensate in bottom headercreates preferential steam path for

    tubes over drains. Tubes over drains are cooler.

    Tubes at ends are hotter.

    Found attemperator water leakingthrough between starts.

    Corrective Action Manually closed all attemperator

    water between starts.

    Increased manual drain to 2 inchand drained header prior to each

    start.

  • 7/27/2019 Hrs g Operating and Maintenance Issues

    5/21

    Lawrenceburg LP FW Heater / Economizer Deposits

    Deposit may be corrosion and/or ammonium sulfate /bisulfate deposit. Need sample to verify.

  • 7/27/2019 Hrs g Operating and Maintenance Issues

    6/21

    LP Economizer ProtectionMaintain FW inlet temperature 15F above fluegas dew point with FW recirculation system.

  • 7/27/2019 Hrs g Operating and Maintenance Issues

    7/21

    Lawrenceburg Distribution Grid Failure

    Turbine to HRSGexpansion joint

    GridStart of TubePanels

    Duct

    Burner

    SCR

  • 7/27/2019 Hrs g Operating and Maintenance Issues

    8/21

    Distribution Grid

    Supports

    Guides

    (7/8 overlap)

    Guides

    (1 overlap)

    54feet

    25 feet

    HRSG Casing

    Distribution Grid

    Top = SS

    Bottom = P11

  • 7/27/2019 Hrs g Operating and Maintenance Issues

    9/21

    Lawrenceburg Failed Distribution Grid

    Failure

    GasFlow

    DistributionGrid

    Tube Bundledownstream

    of Grid

  • 7/27/2019 Hrs g Operating and Maintenance Issues

    10/21

    Turbine Exhaust Gas Velocity at Turbine Exhaust

    25 m/s

    83 m/s

    33 m/s

  • 7/27/2019 Hrs g Operating and Maintenance Issues

    11/21

    Turbine Exhaust Gas Velocity at the SCR

    With Distribution Grid No Distribution Grid

    5 m/s

  • 7/27/2019 Hrs g Operating and Maintenance Issues

    12/21

    Turbine Exhaust Gas Velocity at the Duct Burners

    With Distribution Grid No Distribution Grid

    9 m/s

    6 m/s

  • 7/27/2019 Hrs g Operating and Maintenance Issues

    13/21

    Turbine Exhaust Gas Velocity at First Tube Bundle

    With Distribution Grid No Distribution Grid

    16 m/s

    8 m/s

    8 m/s

    26 m/s

    32 m/s

    Concern Gas & acoustic baffles and/or tube ties may fail with nodistribution grid because of higher gas velocity / higher tube vibration.

  • 7/27/2019 Hrs g Operating and Maintenance Issues

    14/21

    Eliminating Single Point Trips / Runbacks

    Lawrenceburg Plant DCS

    Event Single Points Resolution

    Gas Turbine

    trip

    high HRSG duct P Remove trip, already protected

    by GT exhaust P trip

    Gas Turbinerunback

    high HP or HRH steamT

    Add 2 XMTRs for 2/3 medianselect for each

    Boiler Feed

    Pump trip

    High vibration or high

    bearing T

    Remove trip, allow operator to

    decide

    Boiler FeedPump trip

    Low NPSH (P&T) Add 2 XMTRs for each for 2/3median select

    Condensate

    Pump trip

    Low condenser level Add 2 XMTRs for 2/3 median

    select

    Duct Burnertrip

    High HP 2ndary P

    High HP 1st or 2nd T

    High RH 1

    st

    or 2

    nd

    T

    Add 2 XMTRs for 2/3 medianselect for each

  • 7/27/2019 Hrs g Operating and Maintenance Issues

    15/21

    Waterford HP Pipe Support Cracking

    Crack

    Crack

    Pipe Movement

    Stanchion

  • 7/27/2019 Hrs g Operating and Maintenance Issues

    16/21

    Waterford HP Pipe Support Repair

    Shortened stanchion

    from 27 to 9 longto reduce moment

    arm

    Added plateto bottom ofstanchion toimprovesliding

  • 7/27/2019 Hrs g Operating and Maintenance Issues

    17/21

    Waterford HRSG Drain Line Pipe Buckling andSupport Failures

    Buckled

    DrainLine

    BentSupport

  • 7/27/2019 Hrs g Operating and Maintenance Issues

    18/21

    Waterford HRSG Drain Line Repair

    Re-ran thepipe withexpansion

    loops

  • 7/27/2019 Hrs g Operating and Maintenance Issues

    19/21

    Lawrenceburg Boiler Feed Pump Piping Support

    To BFP

    Suction

    ExistingSupport

    Existing

    Support

    ExistingSupport

    NewSupport

  • 7/27/2019 Hrs g Operating and Maintenance Issues

    20/21

    Lawrenceburg Boiler Feedwater Pump Vibration

    Time

    PumpDriv

    eEnd&Non

    DriveEndVib

    ration,mils

    BFP 1

    BFP 2

    0

    9

    0

    9

    0

    0

    9

    9

    BFP 3

    BFP 4

    Before After

  • 7/27/2019 Hrs g Operating and Maintenance Issues

    21/21

    Improving Reliability of Gas Regulating Station for Duct Burners

    Need PM that includes replacement of regulator soft goods. Verify that all regulator valves have proper set points. Add vortex heater to prevent freeze up of regulator orifice & distillate drop out in pilot

    gas.

    Lawrenceburg Plant