Page 1: Honey Creek OEPA 319 Stream Restoration Project 2008-2009 Pre and Post Construction Photos

Honey Creek OEPA 319 Stream Restoration Project 2008-2009Pre and Post Construction Photos

75 foot Live Lift Will Defuse the Stream’s High Flow Energy and Prevent Bank Erosion

524 Linear Foot Project Area

Creation of Point Bar Spillway for Floodwater Release

In-stream Boulder Construction (Rock Cross Vane) for Guiding the Direction of Main Current