honey creek oepa 319 stream restoration project 2008-2009 pre and post construction photos

1
Honey Creek OEPA 319 Stream Restoration Project 2008-2009 Pre and Post Construction Photos 75 foot Live Lift Will Defuse the Stream’s High Flow Energy and Prevent Bank Erosion 524 Linear Foot Project Area Creation of Point Bar Spillway for Floodwater Release In-stream Boulder Construction (Rock Cross Vane) for Guiding the Direction Main Current

Upload: tuwa

Post on 14-Jan-2016

31 views

Category:

Documents


0 download

DESCRIPTION

Honey Creek OEPA 319 Stream Restoration Project 2008-2009 Pre and Post Construction Photos. 524 Linear Foot Project Area. In-stream Boulder Construction (Rock Cross Vane) for Guiding the Direction of Main Current. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Honey Creek OEPA 319 Stream Restoration Project 2008-2009 Pre and Post Construction Photos

Honey Creek OEPA 319 Stream Restoration Project 2008-2009Pre and Post Construction Photos

75 foot Live Lift Will Defuse the Stream’s High Flow Energy and Prevent Bank Erosion

524 Linear Foot Project Area

Creation of Point Bar Spillway for Floodwater Release

In-stream Boulder Construction (Rock Cross Vane) for Guiding the Direction of Main Current