CHEMICAL SAFETY REPORT
Functional chrome plating
-PART A-
PUBLIC VERSION
Substance Name: chromium trioxide
EC Number: 215-607-8
CAS Number: 1333-82-0
Applicants: CROMOMED S.A.
CRONOR S.A.
CROMO EUROPA S.A.
CHROMATLANTIQUE INDUSTRIEL S.A.
VILA ELECTROQUIMICA S.A.
Chromium trioxide
NOTE TO THE READER
In 2012, a group of more than 150 companies came together to form the Chromium Trioxide REACH
Authorization Consortium (CTAC). The sole purpose of this consortium is the joint development of
the documentation required to submit REACH authorisations for several Chromium Trioxide uses.
All the companies included in this application are SMEs (small enterprises) that were founding
members of the CTAC, actively participating and providing data for the development of the file
relating to the use of chromium trioxide in hard chrome plating - along with 90 other companies
specifically interested in this use-.
As a result of the work carried out under the CTAC, this Chemical Safety Report (CSR) was
completed in April 2015. It includes a Generic Exposure Scenario (GES) with a number of conditions
of use and risk management measures that lead to an exposure estimation directly associated with a
Socio-economic Analysis (SEA) which shows that the benefits of continuing to use the substance
greatly outweigh the non-use scenario.
In order to demonstrate that the conditions of use developed in applicants' facilities are carried out
within the limits and boundaries set by the Generic Exposure Scenario, and that the exposure remains
at the lowest threshold possible through the use of best industry practices, this CSR has been
completed and refined with specific information for each installation for which authorisation is
sought.
EC number:
215-607-8
Chromium trioxide – Functional Chrome Plating CAS number:
1333-82-0
2015-11-11 CHEMICAL SAFETY REPORT iii
Table of Contents
Part A ...................................................................................................................................................................... 1
1. SUMMARY OF RISK MANAGEMENT MEASURES ................................................................................ 1 2. DECLARATION THAT RISK MANAGEMENT MEASURES ARE IMPLEMENTED .......................... 11 3. DECLARATION THAT RISK MANAGEMENT MEASURES ARE COMMUNICATED ...................... 11
EC number:
215-607-8
Chromium trioxide – Functional Chrome Plating CAS number:
1333-82-0
2015-11-11 CHEMICAL SAFETY REPORT 1
Part A
1. SUMMARY OF RISK MANAGEMENT MEASURES
Summary of Risk Management Measures and operational conditions for each applicant is presented in the
following tables. Please refer to 9.0.2.3 (Table 10) for more detailed information on RMM and hygiene practices.
Summary of Working Contributing Scenarios and (estimated) resulting exposure levels are presented in section
10.1.1 (table 19).
EC number:
215-607-8
Chromium trioxide – Functional Chrome Plating CAS number:
1333-82-0
2015-11-11 CHEMICAL SAFETY REPORT 2
SUMMARY OF RISK MANAGEMENT MEASURES FOR APPLICANTS: CROMOMED S.A; CRONOR S.A. & CROMO EUROPA S.A.
ECS
and
WCS
Task (ERC/spERC
or PROC)
Annual
amount
per site
(t/year)
Technical RMMs
Organisational RMMs
[See 9.0.2.3. (Table 10)]
PPE
[See 9.0.2.3. (Table 10)]
Other conditions/Task
explanation
Effectivenes
s of waste
water and
waste air
treatment
(for ERC)
Release
factors:
water,
air and
soil (for
ERC)
Detaile
d info.
in CSR
(section
)
ECS Functional chrome
plating (ERC 6b)
< 10
tn/year
each
applicant
- Air emission
abatement (Wet
Scrubber + mist
suction system)
- Duration: 8 h
- Frequency: Daily
- All solid and any liquid waste is
collected and the collected waste
is directly forwarded to an
external waste management
company, (licenced contractor)
for disposal as hazardous waste
- -
Air: 99.9%
Water: No
discharge,
closed loop
operation.
Soil: No
release to
soil
ERC
default
(see
9.1.1.1)
9.1.1.
WCS
1
Delivery and storage
of raw material
(PROC 1)
-
- Containment:
Closed system
- LEV: No
- General ventilation:
Good natural
ventilation
- Duration of activity: < 1 hour
- Frequency: max. 2 times/year
- Place of use: Indoor
- Occupational Health and Safety
Management System: Advanced
- Highly trained workers
Respiratory Protection: No
Chemical resistant gloves
Work coveralls
Safety shoes
Safety goggles
Chromium trioxide is delivered
always as dry powder in
watertight drums and stored in
a chemical storage room
- - 9.1.2.
WCS
2
Decanting of liquids
(PROC 8b) Included in CTAC Generic Exposure Scenario but not relevant for applicants 9.1.3.
WCS
3
Decanting of solids
(PROC 8b) Included in CTAC Generic Exposure Scenario but not relevant for applicants 9.1.4.
WCS
4
Mixing - liquids
(PROC 5) Included in CTAC Generic Exposure Scenario but not relevant for applicants 9.1.5.
WCS
5
Mixing - solids
(PROC 5) Included in CTAC Generic Exposure Scenario but not relevant for applicants 9.1.6.
EC number:
215-607-8
Chromium trioxide – Functional Chrome Plating CAS number:
1333-82-0
2015-11-11 CHEMICAL SAFETY REPORT 3
WCS
6
Re-filling of baths-
liquids (PROC 8b) -
- Containment: No
- LEV: YES
- Duration of activity: < 10 min
- Frequency: 1 time/week
- Work area: Indoors
- Occupational Health and Safety
Management System:
Advanced
- Highly trained workers
Respiratory Protection: No
Chemical resistant gloves
Work coveralls
Safety shoes
Safety goggles
The chromium trioxide solution
is transferred to and manually
filled into the bath for
adjustment of the concentration
in the bath.
Concentration of the substance
in the bath: 15-30%
- - 9.1.7.
WCS
7
Re-filling of baths -
solids (PROC 8b) -
- Containment: No
- LEV: YES
- Duration of activity: < 20 min
- Frequency: 1 time/month
- Work area: Indoors
- Occupational Health and Safety
Management System:
Advanced
- Highly trained workers
Respiratory Protection: Yes
[Respirator with APF 30]
[Effectiveness Inhal:
96.67%]
Chemical resistant gloves
Work coveralls
Safety shoes
Safety goggles
The solid chromium trioxide is
transferred to and manually
filled into bath for adjustment
of the concentration in the bath
Concentration of the substance
in the bath: 15-30%
- 9.1.8.
WCS
8
Loading of jigs
(PROC 4) Included in CTAC Generic Exposure Scenario but not relevant for applicants 9.1.9.
WCS
9
Chemical pre-
treatment (PROC 13) Included in CTAC Generic Exposure Scenario but not relevant for applicants 9.1.10.
WCS
10
Dipping/immersion
(PROC 2, PROC 13) -
- Containment:
Partial enclosure
- LEV: YES
- Duration of activity: < 8 hours
- Frequency: Daily
- Place of use: Indoor
- Occupational Health and Safety
Management System:
Advanced
- Highly trained workers
Respiratory Protection: No
Chemical resistant gloves
Work coveralls
Safety shoes
Safety goggles
Cylinders are submerged into
CR (VI) containing bath in a
semi-automatic process in
which articles are moved by the
operator using an overhead
travelling crane. DC
coupling/decoupling.
LEV is always operating during
the whole task.
Concentration of the substance
in the bath: 15-30%
- - 9.1.11.
EC number:
215-607-8
Chromium trioxide – Functional Chrome Plating CAS number:
1333-82-0
2015-11-11 CHEMICAL SAFETY REPORT 4
WCS
11
Rinsing/drying
(PROC 13) -
- Containment: No
- LEV: No
- General ventilation:
Good natural
ventilation
- Duration of activity: < 8 hours
- Frequency: Daily
- Place of use: Indoor
- Occupational Health and Safety
Management System:
Advanced
- Highly trained workers
Respiratory Protection: No
Chemical resistant gloves
Work coveralls
Safety shoes
Safety goggles
Cylinders are manually or
automatically washed with
deionized water while hoisted
from plating bath.
Wash water falls on the bath
itself: All the wash water is
collected and reused. LEV is
always operating during this
task.
Once the cylinder is washed, it
is moved away from the bath
and manually dried. Then is
ready for being stored.
- - 9.1.12.
WCS
12
Chemical post-
treatment (PROC 13) Included in CTAC Generic Exposure Scenario but not relevant for applicants 9.1.13.
WCS
13
Cleaning and
unloading of jigs
(PROC 4)
Included in CTAC Generic Exposure Scenario but not relevant for applicants 9.1.14.
WCS
14
Cleaning of
equipment (PROC 8b) -
- Containment: No
- LEV: No
- General ventilation:
Good natural
ventilation
- Duration of activity: < 1 hour
- Frequency: Daily
- Place of use: Indoor
- Occupational Health and Safety
Management System:
Advanced
- Highly trained workers
Respiratory Protection: No
Chemical resistant gloves
Work Coveralls
Safety shoes
Safety goggles
Cleaning of equipment is not a
separate task but conducted by
those employees working in the
bath area as part of their normal
working procedure.
- - 9.1.15.
WCS
15
Maintenance of
equipment (PROC 8a) -
- Containment: No
- LEV: No
- General ventilation:
Good natural
ventilation
- Duration of activity: < 1 hour
- Frequency: 1 time/week
- Place of use: Indoor
- Occupational Health and Safety
Management System:
Advanced
- Highly trained workers
Respiratory Protection: No
Chemical resistant gloves
Work Coveralls
Safety shoes
Safety goggles
Regular maintenance of the
baths and related equipment
(e.g. LEV, rectifier, pumps,
panels etc.).
- - 9.1.16.
EC number:
215-607-8
Chromium trioxide – Functional Chrome Plating CAS number:
1333-82-0
2015-11-11 CHEMICAL SAFETY REPORT 5
WCS
16
Laboratory analysis
(sampling, laboratory
analysis) (PROC 15)
- - Containment: No
- LEV: YES
- Duration of activity: < 30 min
- Frequency: 1 time/month
- Work area: Indoors
- Occupational Health and Safety
Management System:
Advanced
Respiratory Protection: No
Chemical resistant gloves
Work Coveralls
Safety shoes
Safety goggles
One or more samples are drawn
at the bath(s) and then
transferred in a closed flask to
the laboratory, then the
sample(s) will be diluted and
then analysed (this task could
be outsourced).
- - 9.1.17.
WCS
17
Storage of articles
(PROC 1) -
- Containment: No
- LEV: No
- General ventilation:
Good natural
ventilation
- Duration of activity: < 8 hours
- Frequency: Daily
- Place of use: Indoor/outdoors
- Occupational Health and Safety
Management System:
Advanced
- Highly trained workers
Respiratory Protection: No
Chemical resistant gloves
Work Coveralls
Safety shoes
Safety goggles
The finished articles are stored
in a separate storage area. There
is no potential for exposure.
- - 9.1.18.
WCS
18
Waste management
(PROC 8b) -
- Containment:
Partial enclosure
- LEV: No
- General ventilation:
Good natural
ventilation
- Duration of activity: 30 min
- Frequency: Daily
- Work area: Indoors
- Occupational Health and Safety
Management System:
Advanced
- Highly trained workers
Respiratory Protection: Yes
[Respirator with APF 30]
[Effectiveness Inhal:
96.67%]
Chemical resistant gloves
Work coveralls
Safety shoes
Safety goggles
No on-site wastewater
treatment. No discharge of Cr
(VI) in wastewater from site is
expected.
Process waste (empty bags,
containers, filters, waste from
cleaning activities) are stored in
closed containers which further
are collected by licensed waste
management companies for
treatment in accordance with
relevant waste management
regulations. This task describes
the transfer of such type of
waste (e.g. empty bags) to the
storage area.
- - 9.1.19.
EC number:
215-607-8
Chromium trioxide – Functional Chrome Plating CAS number:
1333-82-0
2015-11-11 CHEMICAL SAFETY REPORT 6
SUMMARY OF RISK MANAGEMENT MEASURES FOR APPLICANTS: CHROMATLANTIQUE INDUSTRIEL SA & VILA ELECTROQUIMICA SA
ECS
and
WCS
Task (ERC/spERC
or PROC)
Annual
amount
per site
(t/year)
Technical RMMs
Organisational RMMs
[See 9.0.2.3. (Table 10)]
PPE
[See 9.0.2.3. (Table 10)]
Other conditions/Task
explanation
Effectivene
ss of waste
water and
waste air
treatment
(for ERC)
Release
factors:
water,
air and
soil (for
ERC)
Detailed
info. in
CSR
(section)
ECS Functional chrome
plating (ERC 6b)
< 10
tn/year
each
applicant
- Air emission
abatement: Droplet
separator
(condenser)
- Duration: <8 h
- Frequency: Daily
- All solid and any liquid waste is
collected and the collected waste
is directly forwarded to an
external waste management
company, (licenced contractor)
for disposal as hazardous waste
- -
Air: 99%
Water: No
discharge,
closed loop
operation.
Soil: No
release to
soil
ERC
default
(see
9.1.1.1)
9.1.1.
WCS
1
Delivery and storage
of raw material
(PROC 1)
-
- Containment:
Closed system
- LEV: No
- General ventilation:
Good natural
ventilation
- Duration of activity: < 1 hour
- Frequency: 1 time/month
- Place of use: Indoor
- Occupational Health and Safety
Management System: Advanced
- Highly trained workers
Respiratory Protection: No
Chemical resistant gloves
Work coveralls
Safety shoes
Safety goggles
Chromium trioxide is delivered
as dry powder in watertight
drums or as aqueous solution in
sealed containers and stored in
a chemical storage room
- - 9.1.2.
WCS
2
Decanting of liquids
(PROC 8b) Included in CTAC Generic Exposure Scenario but not relevant for applicants 9.1.3.
WCS
3
Decanting of solids
(PROC 8b) Included in CTAC Generic Exposure Scenario but not relevant for applicants 9.1.4.
WCS
4
Mixing - liquids
(PROC 5) Included in CTAC Generic Exposure Scenario but not relevant for applicants 9.1.5.
WCS
5
Mixing - solids
(PROC 5) Included in CTAC Generic Exposure Scenario but not relevant for applicants 9.1.6.
EC number:
215-607-8
Chromium trioxide – Functional Chrome Plating CAS number:
1333-82-0
2015-11-11 CHEMICAL SAFETY REPORT 7
WCS
6
Re-filling of baths-
liquids (PROC 8b) -
- Containment: No
- LEV: YES
- Duration of activity: < 1 hour
- Frequency: 1 time/month
- Work area: Indoors
- Occupational Health and Safety
Management System: Advanced
- Highly trained workers
Respiratory Protection: No
Chemical resistant gloves
Work coveralls
Safety shoes
Safety goggles
The chromium trioxide solution
is transferred to and manually
filled into the bath for
adjustment of the level/
concentration in the bath.
Concentration of the substance
in the bath: 15-30%
- - 9.1.7.
WCS
7
Re-filling of baths -
solids (PROC 8b) -
- Containment: No
- LEV: YES
- Duration of activity: < 1 hour
- Frequency: 1 time/month
- Work area: Indoors
- Occupational Health and Safety
Management System: Advanced
- Highly trained workers
Respiratory Protection: Yes
[Respirator with APF 30]
[Effectiveness Inhal:
96.67%]
Chemical resistant gloves
Work coveralls
Safety shoes
Safety goggles
The solid chromium trioxide is
transferred to and manually
filled into bath for adjustment
of the concentration in the bath
Concentration of the substance
in the bath: 15-30%
- - 9.1.8.
WCS
8
Loading of jigs
(PROC 4) -
- Containment: No
- LEV: No
- General ventilation:
Good natural
ventilation
Duration of activity: < 3 hour
Frequency: Daily. Work area: Indoors
Occupational Health and Safety
Management System: Advanced
Highly trained workers
Respiratory Protection: No
Chemical resistant gloves
Work coveralls
Safety shoes
Parts to be plated are manually
loaded into jigs or hangers.
Exposure to Cr(VI) cannot
occur directly but through
secondary sources (e.g. baths in
the same room)
- - 9.1.9.
WCS
9
Chemical pre-
treatment (PROC 13) -
- Containment: No
- LEV: YES
- Duration of activity: <3 hours
- Frequency: 1 time/week
- Work area: Indoors
- Occupational Health and Safety
Management System: Advanced - Highly trained workers
Respiratory Protection: No
Chemical resistant gloves
Work coveralls
Safety shoes
Safety goggles
Parts are dipped into pre-
treatment acid or basic baths in
a semi-automatic process in
which they are moved by the
operator using an overhead
hoist. LEV is always operating
during this pre-treatment.
9.1.10.
EC number:
215-607-8
Chromium trioxide – Functional Chrome Plating CAS number:
1333-82-0
2015-11-11 CHEMICAL SAFETY REPORT 8
WCS
10
Dipping/immersion
(PROC 2, PROC 13) -
- Containment:
Partial enclosure
- LEV: YES
- Duration of activity: < 8 hours
- Frequency: Daily
- Place of use: Indoor
- Occupational Health and Safety
Management System: Advanced
- Highly trained workers
Respiratory Protection: No
Chemical resistant gloves
Work coveralls
Safety shoes
Safety goggles
Parts are submerged into
CR(VI) containing bath in a
semi-automatic process in
which articles are moved by the
operator using an overhead
hoist. DC coupling/decoupling.
LEV is always operating during
the whole task.
Concentration of the substance
in the bath: 15-30%
- - 9.1.11.
WCS
11
Rinsing/drying
(PROC 13) -
- Containment: No
- LEV: No
- General ventilation:
Good natural
ventilation
- Duration of activity: < 8 hours
- Frequency: Daily
- Place of use: Indoor
- Occupational Health and Safety
Management System: Advanced
- Highly trained workers
Respiratory Protection: No
Chemical resistant gloves
Work coveralls
Safety shoes
Safety goggles
Parts are automatically or
manually washed with
deionized water while hoisted
from plating bath.
Wash water falls on the bath
itself: All the wash water is
collected and reused. LEV is
always operating during this
task.
Once the part is washed, it is
moved away from the bath and
manually dried. Then is ready
for being stored or further
processing.
- - 9.1.12.
WCS
12
Chemical post-
treatment (PROC 13) Included in CTAC Generic Exposure Scenario but not relevant for applicant 9.1.13.
WCS
13
Cleaning and
unloading of jigs
(PROC 4)
-
- Containment: No
- LEV: No
- General ventilation:
Good natural
ventilation
Duration of activity: < 3 hours
Frequency: Daily
Work area: Indoors
- Occupational Health and Safety
Management System: Advanced
Highly trained workers
Respiratory Protection: No
Chemical resistant gloves
Work coveralls
Safety shoes
After functional chrome plating,
articles are cleaned and
unloaded from hangers.
9.1.14.
EC number:
215-607-8
Chromium trioxide – Functional Chrome Plating CAS number:
1333-82-0
2015-11-11 CHEMICAL SAFETY REPORT 9
WCS
14
Cleaning of
equipment (PROC 8b) -
- Containment: No
- LEV: No
- General ventilation:
Good natural
ventilation
- Duration of activity: < 1 hour
- Frequency: Daily
- Place of use: Indoor
- Occupational Health and Safety
Management System: Advanced
- Highly trained workers
Respiratory Protection: No
Chemical resistant gloves
Work Coveralls
Safety shoes
Safety goggles
Cleaning of equipment is not a
separate task but conducted by
those employees working in the
bath area as part of their normal
working procedure.
- - 9.1.15.
WCS
15
Maintenance of
equipment (PROC 8a) -
- Containment: No
- LEV: No
- General ventilation:
Good natural
ventilation
- Duration of activity: < 1 hour
- Frequency: 1 time/week
- Place of use: Indoor
- Occupational Health and Safety
Management System: Advanced
- Highly trained workers
Respiratory Protection: No
Chemical resistant gloves
Work Coveralls
Safety shoes
Safety goggles
Regular maintenance of the
baths and related equipment
(e.g. LEV, rectifier, pumps,
panels etc.).
- - 9.1.16.
WCS
16
Laboratory analysis
(sampling, laboratory
analysis) (PROC 15)
- - Containment: No
- LEV: YES
- Duration of activity: < 1 hour
- Frequency: 1 time/week
- Work area: Indoors
- Occupational Health and Safety
Management System: Advanced
Respiratory Protection: No
Chemical resistant gloves
Work Coveralls
Safety shoes
Safety goggles
One or more samples are drawn
at the bath(s) and then
transferred in a closed flask to
the laboratory, then the
sample(s) will be diluted and
then analysed (this task could
be outsourced).
- - 9.1.17.
WCS
17
Storage of articles
(PROC 1) -
- Containment: No
- LEV: No
- General ventilation:
Good natural
ventilation
- Duration of activity: < 8 hours
- Frequency: Daily
- Place of use: Indoor/outdoors
- Occupational Health and Safety
Management System: Advanced
- Highly trained workers
Respiratory Protection: No
Chemical resistant gloves
Work Coveralls
Safety shoes
Safety goggles
The finished articles are stored
in a separate storage area. There
is no potential for exposure.
- - 9.1.18.
EC number:
215-607-8
Chromium trioxide – Functional Chrome Plating CAS number:
1333-82-0
2015-11-11 CHEMICAL SAFETY REPORT 10
WCS
18
Waste management
(PROC 8b) -
- Containment:
Partial enclosure
- LEV: No
- General ventilation:
Good natural
ventilation
- Duration of activity: < 30 min
- Frequency: Daily
- Work area: Indoors
- Occupational Health and Safety
Management System: Advanced
- Highly trained workers
Respiratory Protection: Yes
[Respirator with APF 30]
[Effectiveness Inhal:
96.67%]
Chemical resistant gloves
Work coveralls
Safety shoes
Safety goggles
No on-site wastewater
treatment. No discharge of
Cr(VI) in wastewater from site
is expected.
Process waste (empty bags,
containers, filters, waste from
cleaning activities) are stored in
closed containers which further
are collected by licensed waste
management companies for
treatment in accordance with
relevant waste management
regulations. This task describes
the transfer of such type of
waste (e.g. empty bags) to the
storage area.
- - 9.1.19.
EC number:
234-190-3
Chromium trioxide – Functional Chrome Plating CAS number:
10588-01-9
2015-11-11 CHEMICAL SAFETY REPORT 11
Copy right protected – Applicants: Cromomed SA & others.
2. DECLARATION THAT RISK MANAGEMENT
MEASURES ARE IMPLEMENTED
We declare that the risk management measures referred to in Section 9 are implemented.
3. DECLARATION THAT RISK MANAGEMENT
MEASURES ARE COMMUNICATED
We declare that the risk management measures referred to in Section 9 are communicated to our customers when
relevant.