Download - Dri Roof BIM Profile
![Page 1: Dri Roof BIM Profile](https://reader031.vdocuments.site/reader031/viewer/2022020203/588792141a28ab5b1a8b53c3/html5/thumbnails/1.jpg)
Dri Roof MEP BIM Consultancy
Profile
![Page 2: Dri Roof BIM Profile](https://reader031.vdocuments.site/reader031/viewer/2022020203/588792141a28ab5b1a8b53c3/html5/thumbnails/2.jpg)
Services
BIM (Architectural, MEP,Structure)
Clash Detection & Model Based Coordination
Model Driven Quantification
Development of Fabrication Level MEP BIM (High-Detail)
Development of Fabrication Level Structural BIM (High-
Detail)
BIM Driven – Project Planning & Cost Control – 4D / 5D Model
![Page 3: Dri Roof BIM Profile](https://reader031.vdocuments.site/reader031/viewer/2022020203/588792141a28ab5b1a8b53c3/html5/thumbnails/3.jpg)
Services
Infrastructure BIM ServicesTerrain Modelling from GPS Survey, Point Cloud Data, Survey Points and Grading
Roads and Bridge Modeling
Sewer, Surface, Underground Networks and Simulation
Quantification - BoM, Cut/Fill Analysis
Reinforcement Model Dev.Clash Detection
Automatic Bar Bending Schedule Extraction
Accurate Steel Quantity Extraction
Interactive Walkthroughs
Operable with Mouse / Keyboard
Photorealistic
Supports Virtual Reality
![Page 4: Dri Roof BIM Profile](https://reader031.vdocuments.site/reader031/viewer/2022020203/588792141a28ab5b1a8b53c3/html5/thumbnails/4.jpg)
Projects || Industrial Development in Middle East. Area – Over 8000 Sqm
![Page 5: Dri Roof BIM Profile](https://reader031.vdocuments.site/reader031/viewer/2022020203/588792141a28ab5b1a8b53c3/html5/thumbnails/5.jpg)
Projects || Industrial Development in Middle East. Area – Over 8000 Sqm
Overall Factory Zone with Underground Services
![Page 6: Dri Roof BIM Profile](https://reader031.vdocuments.site/reader031/viewer/2022020203/588792141a28ab5b1a8b53c3/html5/thumbnails/6.jpg)
Projects || Industrial Development in Middle East. Area – Over 8000 Sqm
Complex HVAC Systems inside Factory
![Page 7: Dri Roof BIM Profile](https://reader031.vdocuments.site/reader031/viewer/2022020203/588792141a28ab5b1a8b53c3/html5/thumbnails/7.jpg)
Projects || Industrial Development in Middle East. Area – Over 8000 Sqm
BIM Federated for Production Factory
![Page 8: Dri Roof BIM Profile](https://reader031.vdocuments.site/reader031/viewer/2022020203/588792141a28ab5b1a8b53c3/html5/thumbnails/8.jpg)
Projects || Industrial Development in Middle East. Area – Over 8000 Sqm
HVAC Installation Assembly
![Page 9: Dri Roof BIM Profile](https://reader031.vdocuments.site/reader031/viewer/2022020203/588792141a28ab5b1a8b53c3/html5/thumbnails/9.jpg)
Projects || Industrial Development in Middle East. Area – Over 8000 Sqm
Clash Detection &
Coordination
![Page 10: Dri Roof BIM Profile](https://reader031.vdocuments.site/reader031/viewer/2022020203/588792141a28ab5b1a8b53c3/html5/thumbnails/10.jpg)
Projects || 21 Storey Commercial Tower, Kenya
![Page 11: Dri Roof BIM Profile](https://reader031.vdocuments.site/reader031/viewer/2022020203/588792141a28ab5b1a8b53c3/html5/thumbnails/11.jpg)
Projects || 21 Storey Commercial Tower, Kenya
Structural BIM with
technically accurate Façade
Systems.
![Page 12: Dri Roof BIM Profile](https://reader031.vdocuments.site/reader031/viewer/2022020203/588792141a28ab5b1a8b53c3/html5/thumbnails/12.jpg)
Projects || 21 Storey Commercial Tower, Kenya
Complex MEP Systems at Sub-Structure
Levels
Clash Detection & Coordination
![Page 13: Dri Roof BIM Profile](https://reader031.vdocuments.site/reader031/viewer/2022020203/588792141a28ab5b1a8b53c3/html5/thumbnails/13.jpg)
Projects || 21 Storey Commercial Tower, Kenya
Project Schedule BIM Based 4D
Simulation from Contractor’s Schedule
prepared in Microsoft Project.
![Page 14: Dri Roof BIM Profile](https://reader031.vdocuments.site/reader031/viewer/2022020203/588792141a28ab5b1a8b53c3/html5/thumbnails/14.jpg)
Projects || Riverside Drive, SA
![Page 15: Dri Roof BIM Profile](https://reader031.vdocuments.site/reader031/viewer/2022020203/588792141a28ab5b1a8b53c3/html5/thumbnails/15.jpg)
Projects || Riverside Drive, SA
Federated BIM Model on Autodesk Revit
BIM Platform
![Page 16: Dri Roof BIM Profile](https://reader031.vdocuments.site/reader031/viewer/2022020203/588792141a28ab5b1a8b53c3/html5/thumbnails/16.jpg)
Projects || Riverside Drive, SA
Clash Detection & Coordination
BCF (BIM Collaboration Format) enables software independent Clash Test Sharing
![Page 17: Dri Roof BIM Profile](https://reader031.vdocuments.site/reader031/viewer/2022020203/588792141a28ab5b1a8b53c3/html5/thumbnails/17.jpg)
Projects || Riverside Drive, SA
![Page 18: Dri Roof BIM Profile](https://reader031.vdocuments.site/reader031/viewer/2022020203/588792141a28ab5b1a8b53c3/html5/thumbnails/18.jpg)
Projects || 21 Storey Commercial Tower, Kenya
Project Schedule BIM Based 4D
Simulation from Contractor’s Schedule
prepared in Microsoft Project.
![Page 19: Dri Roof BIM Profile](https://reader031.vdocuments.site/reader031/viewer/2022020203/588792141a28ab5b1a8b53c3/html5/thumbnails/19.jpg)
Projects || 21 Storey Commercial Tower, Kenya
Keyboard & Mouse Driven Interactive
Photorealistic Walkthrough Simulation.
![Page 20: Dri Roof BIM Profile](https://reader031.vdocuments.site/reader031/viewer/2022020203/588792141a28ab5b1a8b53c3/html5/thumbnails/20.jpg)
Projects || Wipro IT, Pune
Development of highly detailed Clash Free MEP Model
![Page 21: Dri Roof BIM Profile](https://reader031.vdocuments.site/reader031/viewer/2022020203/588792141a28ab5b1a8b53c3/html5/thumbnails/21.jpg)
Projects || Dhirubhai Ambani International Convention Centre, BKC
Construction Finishing Simulation for
DEPA
![Page 22: Dri Roof BIM Profile](https://reader031.vdocuments.site/reader031/viewer/2022020203/588792141a28ab5b1a8b53c3/html5/thumbnails/22.jpg)
Projects || As Built BIM Development for a Retail Chain in UK
Retail Outlet with Site BIM
![Page 23: Dri Roof BIM Profile](https://reader031.vdocuments.site/reader031/viewer/2022020203/588792141a28ab5b1a8b53c3/html5/thumbnails/23.jpg)
Projects || As Built BIM Development for a Retail Chain in UK
With all the details embedded in the
model itself.
![Page 24: Dri Roof BIM Profile](https://reader031.vdocuments.site/reader031/viewer/2022020203/588792141a28ab5b1a8b53c3/html5/thumbnails/24.jpg)
Projects || As Built BIM Development for a Retail Chain in UK
A Section Cut in 3D