Transcript
Page 1: Daily scaffold check list

DAILY SCAFFOLD CHECK LIST

MONTH OF: YES No x N/A Contract No. 098-C58

Scaffold Check 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

BASE-SOLE BOARD, BASE PLATES VERTICAL STANDARD PLUM & PINNED STEEL MEMBERS IN GOOD CONDITION TOP RAIL AND MID RAIL INSTALLED DIAGONAL BRACING INSTALLED FULL WORKING PLATFORM, NO GAPS BOARDS INSTALLED SAFE ACCESS, ANGLE STAIR / LADDER LADDER SECURELY ATTACHED 1m above TIES / RAKERS IN PLACE SCAFFOLD WITH LOAD LIMIT CORRECT COLOR SCAFF TAG IN PLACE OUT RIGGER / RAKERS INSTALLED (MOBILE) CASTER WHEEL IN GOOD CONDITION

SCAFFOLD DESIGN IN PLACE

Initial of Inspector:

Unique Scaffold ID#:

Scaffold Location:

Scaffold Erected By:

Inspected By:

Comments:

Top Related