Construction Construction site inductionsite induction
• Welcome to the siteEast West Interconnector Project
EWIP
• Your site manager & Safety Rep is David Shelton – Project Construction Manager
(Wales)
• Other key personnel areMiles Crossley – Site Supervisor
construction
site induction
construction
site inductionEirGrid plc has been tasked with arranging the construction of a High Voltage Direct Current (HVDC) electricity interconnector with 500 MW transmission capacity linking the British and Irish Electricity markets
(the East West Interconnector Project [“EWIP”]).
The EWIP shall comprise a 185 km undersea cable and circa 45 km of land cable in Ireland and 30 km of land cable in Britain connecting two converter stations, one in Ireland and the other in Britain which convert the power from AC to DC and back again from DC to AC when landed on the receiving side.
construction
site induction
The Client (Employer)
The CDM Co-ordinator (UK)Planning Supervisor Design Phase (PSDP) (IR)The Employers Representative (Project Manager)
The Contractor (Principal Contractor)
ABBThe Sub-Contractor
construction
site inductionHealth and Safety Targets NO INJURIES
NO ILL HEALTH
NO DAMAGE
NO ENVIRONMENTAL INCIDENTS
Reporting and investigation of Near-Misses and Safety Observations
NO breaches of security at the work site.
Effective “Lessons Learnt” sessions are held and recorded in detail.
All formal meetings between Client, Principal Contractor, ‘Prime’ Contractors and sub Contractors (or any combination thereof) will commence with a Health, Safety and Environment Topic/H&S Continuous Improvement topic.
This Project is run according to Construction (Design and Management) regulations 2007 (CDM)
All actions must be carried out in accordance with all relevant UK regulations and the local laws and licences agreed for this project.
EGRID & ABB have further specific rules which must be observed
construction
site induction
construction
site induction
Woking Area
Prestatyn
Gwespyr
Ffynnonsroyw
Glan-y-Don
Llannerch-y-Mor
construction
site induction
Woking Area (cont)Greenfield
Bagillt
Flint
Oakenholt
Shotton
construction
site induction
You need to know where the following:
First Aid Kits/Post,
Fire Extinguishers,
Assembly Point,
Spill Kit Locations
As you will understand this part of the project is a selection of mobile sites along the length of its 30 kilometres, with Excavation, Duct Laying, Reinstatement gangs, Jointing and Cable pulling crews.
Each team will have an appointed competent Person dedicated to controlling the above
construction
site inductionSite Access
Routes to all Sites are agreed upon with local residents and/or local Council.
The main site compound and VolkerInfra site office is located at Bryn Thomas’s yard
Access/Egress to the site compound is via Bryn Thomas’s entrance gate located directly off the A548.
Please be aware that this is a shared yard and some very heavy equipment is operating on a daily basis. Make sure to make yourself known whilst travelling through the yard.
Due to the residential nature of the area, all truck deliveries to site must be coordinated with the Construction Site Manager, David Shelton to avoid busy times and school arrival/departure times.
construction
site induction
Site Access cont
When collecting/delivering materials to the site compound, please advise VolkerInfra staff who will record any material movement.
Designated parking areas are outside the site office for light vehicles and on the other side of the orange barriers for all work vehicles. Please ensure to reverse park in a safe and orderly fashion.
No vehicles are to park on the adjacent residential roads at any time.
Do not use un-authorized routes to access the Site.
Welfare arrangements can be found at the Main site office, & canteen within the site compound
Further mobile welfare units will be available along the route, their locations will be identified at the daily briefings
The site compound speed limit (is 5mph)
All other national speed limits along the route must be observed at all times
AS STATED NO ACCESS WILL BE ALLOWED ON ANY OF THE RESTRICTED ROADS
construction
site induction
First aid arrangement
At the VolkerInfra Site office & canteen
Also at all mobile welfare units and in each site works van
First Aider Dave Shelton 0796 9027006
First Aider Miles Crossley 0780 1617522
As well as the first aiders available in your gangs or the appointed person
See also the site emergency information posters around the site
construction
site induction
Fire prevention and fire fighting procedures
Extinguishers are placed at the Site office /canteen & welfare unit.
Fire extinguisher will also be placed at any hot work operations and in work shop containers.
Contact the Site Manager, Site Supervisor or your Site Appointed person who will contact the Fire Brigade.
Do not tackle a fire unless you have been trained to do so.
construction
site induction
construction
site induction
Accident Reporting
All accidents must be reported to the Construction Manager
Entered into the site First Aid Book
Any three day accident will be reportable under RIDDOR
Any accident will be reported to the Volker Wessels call centre.
Call centre 0800 169 6150
All accidents will be reported to the Client
Hazards specific to this site include the following activities being undertaken.
Excavations
Working on busy roads
Working near the General Public
The site will have more than One activity being carried out at any one time, look to see who is working in or adjacent to your work area.
All plant movements will carried out under the instruction of a Banksman.
construction
site induction
A representative from each department and from each subcontractor will be present at regular meetings along with the Construction Manager to openly discuss any concerns on an informal bases.
construction
site induction
Raising health, safety or welfare concerns
What are you on site to do?
Only carry out work that you have been trained for and are competent to carry out
What hazards are you bringing onto site?
Do not misuse any Plant and Equipment that you are
given to carry out your task,
Do not attend site under the influence ALCOHOL or DRUGS. A strict zero tolerance policy on Alcohol & Drugs is in place.
Anyone found to be under the influence of Alcohol & Drugs will be removed from site immediately.
construction
site induction
Follow the Method Statement or Task Plan that you are working too.
Follow the Risk assessments that relates to your task.
Carry out or ask for further Risk assessments to be carried out if think the existing one is inadequate or that the way you need to carry your task has changed.
Observe others, if you feel that they are not carrying a task safely please inform your supervisor so that we can avoid any accidents.
construction
site induction
General site rules
Please report any near misses to the Site Construction Manager or your Supervisor/Foreman, also through the Volker Wessles Call Centre 0800 169 6150
construction
site induction
More site rules…
The aim is not to reprimand any one, but understand why and how things happen/go wrong.
Your attention is drawn to the fact that neighbours are in close proximity to the site. As a result it is to be kept tidy AT ALL TIMES. No tools, keys to plant to be left onsite unattended. All keys and tools to be removed from the plant/vehicles and site outside Working Hours to deter any trespassers.
Follow ALL speed limits
Wear the correct PPE. (if you do not have it ask)
Follow the Method Statement, Task Plans and any Permits to work.
Do not get involved with horse play.
Do not work under the influence of DRINK or DRUGS.
Use the welfare facilities provided (do not urinate on the site)
Wash you hands before eating and only eat your food in the welfare units provided.
Sign in, in the site register each day.
construction
site inductionSite specifics EWIP
Do not use any Plant that you have not been trained on and carry the correct CPCS card for.
Do not use any tools unless you have been trained and are competent to use them.
Only use plant, tools & lifting equipment that carries the correct & current certification.
Do not forget to carry out or have a Risk assessment carried out, for, Lifting operations, Manual Handling, Working at Height, Excavations, ie any work task that carries a potential risk to you or others around you.
construction
site induction
HandlingEquipment
Good house keeping is the start to a happy site.
One it shows that we can control our working environment.
Two is makes for a better working environment.
And Thirdly is makes for a safer working environment.
Please use the skips provided for your rubbish, do not litter the site, the canteen or your working area.
If you see others dropping litter or working untidily tell them or your supervisor.
construction
site induction
Housekeeping and the environment
construction
site inductionSite Rules
Strict compliance with the conditions of the Principal Contractor’s and the VolkerInfra “Construction Phase Health and Safety Plan” is required at all times.
1. No unauthorised person shall be allowed access to the site. All visitors shall report to the Site Manager/Supervisor. All personnel shall carry some form of identification at all times, proof of identity will be required before allowing access to site.
2. All persons shall receive site safety induction training before being allowed onsite.
3. All persons shall record the time of their arrival and departure from site.
Site Rules
4 All site personnel & visitors to site shall wear:-
• safety helmets to EN 397, with chin strap if working at height
• lace-up type safety boots with toe and sole protection - EN 345 offering adequate ankle support, and mid-sole protection. Riggers boots will not be allowed.
• suitable eye protection –minimum EN166F,
• suitable hand protection – (Gloves) - EN 388 for the task being carried out. NB Gloves may be “carried” when not working
• Overalls coveralls or other suitable work wear must be worn that protect an operatives arms, body and legs .
• and yellow high visibility waistcoat or jacket – EN 471.
• The Banksman directing traffic or lifting operations shall wear an orange high visibility waistcoat or jacket.
construction
site induction
Site Rules
5 Site fencing shall be kept closed at all times except briefly to allow the passage of vehicles or personnel when they shall be supervised by a person authorised to do so.
6 Safety harnesses will be used –
a. where employees are working at a height where they could fall a distance that could result in injury ( unless “fall restraint” is being employed other means of preventing or mitigating the consequences of a fall must be employed)
b. in circumstances other than a & b above where there is a risk of falling a suitable and sufficient risk assessment shall be carried out and adequate controls established and implemented.
construction
site induction
Site Rules
7 Compliance with Principal Contractors Safety Rules as applicable is required at all times
8 The use of Cable Avoidance Tools (CAT) are mandatory, even though you may have used cable locators for many years, please have a look at the following.
9
construction
site induction
construction
site induction
construction
site induction
construction
site induction
construction
site induction
10 No smoking in any site buildings, cabins, the working area(s) or within 5 metres of any flammable products e.g. diesel fuel tanks .gas cylinders etc. Smoking materials shall only be discarded via the receptacles provided for that purpose. Disposal via any other means will not be tolerated. Smoking is only permitted in the designated smoking area(s)
11 The drinking of alcohol and drug abuse will not be permitted on the construction site.
12 No persons under the influence of alcohol or drugs shall attend or be allowed to enter the construction site.
13 Use of Welding and Flame Cutting equipment is not permitted, unless specifically agreed in advance by the Principal Contractor and only under a Hot Works Permit..
14 No waste shall be allowed to leave site without completion of a Waste Transfer Note (non hazardous waste) or a Waste Consignment Note (hazardous waste) Waste shall be placed in suitable receptacles. All waste leaving site must be entered into the Site Waste Management Plan (SWMP)
15 No plant, equipment lifting tackle etc. shall be put to work without current certification available on site.
16 Plant shall only be operated by trained and competent personnel authorised to do so.
construction
site induction
17 No work shall commence unless a Risk Assessment has been carried out and a Method Statement detailing the safe system of work to be adopted has been accepted by the Principal Contractor and explained to all persons engaged in the works.
18 No deviation from Method Statements, which have been accepted, will be tolerated. Any changes must be submitted to the Principal Contractor and must be agreed by all interested parties before being accepted by the Principal Contractor and implementation allowed to proceed.
19 Lifting Operations shall be planned by an “Appointed Person”. All lifting Operations shall be carried out by competent slingers & banksmen.
20 All personnel shall follow the designated routes giving safe access/egress to/from the work place and shall keep the site of their work clean, tidy and clear of obstructions. All floors and walkways shall be kept clear of materials, in order that a secure footing can be maintained.
construction
site induction
Site Rules
21 All personnel shall at all times ensure precautions are taken so as not to pollute the atmosphere, ground or waters.
22 The lighting of fires is strictly prohibited.
23 No excavation/ground penetration works shall be allowed without a permit to dig .
24 All Accidents/Incidents/Near misses shall be reported immediately to the Volker Wessels Call Centre 0800 169 6150
construction
site induction
Site Rules
25 The use of mobile telephones other than “company supplied” mobile telephones in the work area is prohibited. The use of any mobile telephone whilst operating any mobile plant or other equipment is strictly prohibited.
26 All vehicles using the car park area shall “reverse park”
27 All Traffic Management will follow specific procedures like the Safety at Street Works and Road Works (Red Book Code of Practice) the Captor 8 Regulations 2008 or any Traffic Management Plan that is approved by the local Highway Authority.
construction
site induction
Site Rules
28 Failure to comply with any site rules may result in expulsion from site.
29 The Site Rules shall be made available at all work sites. Minor violation (by act or omission) of Site Rules may be dealt with by caution (to include warning of exclusion in the event of future violation). Serious violation of Site Rules (by act or omission) will result in formal warning (and confirmation that repetition would result in immediate exclusion from site). Gross violation of Site Rules (by act or omission) will result in immediate exclusion from site. Flagrant breach of any Site Rule is liable to exclusion from the site. Any exclusion from site shall be permanent.
Each individual working area is covered by their own individual RAMS i.e. Method Statement, Task Plan and associated Risk Assessments. These will need to be read and understood by all site staff prior to works commencing onsite. You will all need to sign onto these documents. IF YOU DON’T UNDERSTAND ANYTHING, DO NOT HESITATE TO ASK AS NOT UNDERSTANDING LATER
WILL NOT BE A DEFENCE IN A COURT OF LAW.
construction
site induction
construction
site inductionSelf protection
Always wear the correct PPE for the task that you are carrying out.
If you don’t have it ask your Supervisor or the Site Manager.The minimum on this site is:• Hard Hat• Steel toe cap Boots• High Visibility vest/jacket/shirt*• Coveralls/overalls• Gloves
Other PPE that is available:• Eye Protection• Ear protection if an assessment demes it as a requirement• Fall arrest system• Dust masksPlease ask if you find the need for further information on the correct PPE/RPE for the task being carried out.
*Note for Banksman duties an orange hi vis is required
construction
site inductionBeware there could be unexploded ordinance
If you spot a bomb stop work and report it...
construction
site induction
ID: 007
AN OtherSite
Mr. Scott StoneProject Manager VI
Site Security
Some form of Id Card must worn and showed upon request
Environmental Systems
Help us comply with our ISO14001 Environmental Management systems and policies...
A copy of the policy statement and environmental details for site are held with the Project Manager
Environmental Rules
Standards onsiteEnvironmental standards will help us to comply with our
Environmental Policy. Standards identify the behavioural requirements necessary to prevent, or minimise, the consequences of an environmental incident. Violation of these site standards could be an important contributor towards pollution. Therefore, management considers the following standards appropriate. The following standards apply to all persons on site.
Environment
Standards/ Rules:• Use the facilities as they were designed • Ensure any waste is deposited in the correct bin • Where possible use the recycle bins provided • Ensure good housekeeping; operate a "clean-as-you-go"
house keeping policy • Ensure no burning of waste and no fires onsite • No hazardous materials to be used onsite unless
authorised
Environment
• No substances such as bentonite or fuel are discharged into the water
• Ensure all spillages are contained and reported • Ensure vehicles/ machinery/ engines are not left running and not
over revved • Where possible (and safe) turn off lighting • Where possible ensure heaters are turned off and ensure doors are
kept closed • Report potential pollution issues • Report all pollution incidents and near misses; ensure the incident is
recorded • Co-operate at all times with us to comply with environmental
legislation
Environment
Know the location of the spill kits Spill kits are provided at the point of use...
Spill kits need to be located at specific points around the site and are portable
Spill kits are kept at all site welfare units
Know how to use them
If in doubt ask...
Environment
Fix leaks
Environment
No fly tipping
Waste Management
Stick it in the right bin
Site induction register
Now that this site induction has come to an end we would ask that you complete the Site Induction Register to indicate that you have received and understood what is expected of you to carry out your work safely and correctly. You will also be issued a VolkerInfra induction label to put on your hard hat.
If you have any questions please ask.
construction
site induction
Thank you!Thank you!&&
Please do not put your lives or others at Risk on this or any other site that you are asked to work on
We intend to have an accident free site
construction
site induction