8/7/2019 Configuration-Management-Presentation
1/91
Company Confidential 1
Configuration ManagementGuidelines
Su pp ly Ch a in Manag em ent H andbook
Rev. Date: 11 June 2010
-
8/7/2019 Configuration-Management-Presentation
2/91
For ew or d
The guideline describes Configuration Management
functions and principles and defines ConfigurationManagement terminology for use with Aerospaceand Defense AS&D product line.
It is targeted at Small and Medium size companiesacting as subcontractors/suppliers either in a Buildto Print or a Build to Spec relationship.
The intention of these guidelines is to assistorganizations with understanding the concept andprocess of Configuration Management and is notintended to be a requirement, nor auditable.
2
-
8/7/2019 Configuration-Management-Presentation
3/91
-
8/7/2019 Configuration-Management-Presentation
4/91
When Configuration Management principles areapplied using effective practices, return oninvestment is maximized, product life cycle costsare reduced and the small investment in resourcesnecessary for effective Configuration Management
is returned many fold in cost avoidance.
These Guidelines provide the reader with the basicideas of the industry needs, the benefits to the
implementing organization and describesConfiguration Management functions andprinciples.
I n t r odu ct i on
4
-
8/7/2019 Configuration-Management-Presentation
5/91
Lis t o f Top ics
1. What is Configuration?
2. Why it is important to manage and controlconfiguration in AS&D
3. Applicable Terms and Definitions4. The objectives of Configuration Management
5. Benefits for an enterprise gained through applicationof CM6. CM and Documents control in 9100:20097. The Configuration Continuum8. CM functions
9. CM vs. Engineering Change10. CM Tools11. Summary12. Resources
5
-
8/7/2019 Configuration-Management-Presentation
6/91
Company Confidential 6
1 . W h at i s Con f ig u r a t ion ?
-
8/7/2019 Configuration-Management-Presentation
7/91
Functional and physical characteristics ofexisting or planned hardware, firmware,software or a combination thereof as setforth in technical documentation and
ultimately achieved in a product.
7
-
8/7/2019 Configuration-Management-Presentation
8/91Company Confidential 8
2 . W hy i s i t im po r t an t t o m anage and con t r o l con f i gu r a t i on i n Aerospace & Defense?
-
8/7/2019 Configuration-Management-Presentation
9/91
Proper CM implementation can positively impact
Product Quality, On time Product Delivery, anddecrease development and life cycle costs
Product configuration presents a particularlydifficult set of challenges for Aerospace & Defense
resulting from: Large products involving a highly complex set of parts
and systems
Complex set of environmental and safety regulations
Ability to respond effectively to customer demands
9
-
8/7/2019 Configuration-Management-Presentation
10/91
Aerospace and Defen se Fu nc t ion a l
Needs Managing massive bid activities requiring
product configuration knowledge
Managing massive design activities requiringproduct configuration knowledge for:
Program and project management
Work Breakdown Structures (WBS)
Managing manufacturing operations Many, many open work orders
Frequent engineering change
10
-
8/7/2019 Configuration-Management-Presentation
11/91
Hardware and software CM at all stages of theproduct life-cycle
Configuration identification and change control
Configuration tracking, product traceability andvisibility
Storage, retrieval and transfer of data from acommon data base
The capability to reproduce products/processes Manufacture and testing of products only from
released documents
Aerospace and Defen se Fu nc t ion a l
Needs ( con t )
11
-
8/7/2019 Configuration-Management-Presentation
12/91
Aero space an d Defense Spec i f i c
Cons t ra in t s Project oriented activities
Research & Development
Devices Procurement
Complex & Extensive Bills of Material
Constant engineering change process
Long (30+ years) product life cycles
Legacy mind-sets
Both Government/Customers and Contractors
Classification & Security aspects
12
-
8/7/2019 Configuration-Management-Presentation
13/91Company Confidential 13
3 . App l i cab le t e rm s and de f in i t i ons
-
8/7/2019 Configuration-Management-Presentation
14/91
Configuration Management (CM)
CM is a methodology which provides a technicaland administrative framework for managing thedevelopment, manufacturing and maintenance ofConfiguration Items.
CM is an integral part of the product life-cyclemanagement.
Activity for establishing and maintainingconsistent record of the performance parametersof a product and its functional and physicalcharacteristics compared to the product designand operational requirements.
14
-
8/7/2019 Configuration-Management-Presentation
15/91
Configuration Management (CM) ( c o n t d )
This discipline is applicable to hardware,software, processed materials, services, andrelated technical documentation throughout theentire lifecycle of the product (i.e. development,
production, deployment, operation,maintenance and disposal).
15
-
8/7/2019 Configuration-Management-Presentation
16/91
Configuration I tem (CI)
An aggregation of hardware, firmware,software or any of its discrete portions, whichsatisfies an end use function and is designatedby the developer or customer for separate
configuration management. Any item requiredfor logistic support and designated for separateprocurement is a CI.
Configuration I tem (CI) selection
CIs should be selected with the object ofmaximizing control and minimizing the effortrequired to achieve that control.
16
-
8/7/2019 Configuration-Management-Presentation
17/91
Configuration Baseline
Approved status of requirements and design of aproduct at key project milestone that serve asreference for activities throughout the life cycleof the product.
Baselines, plus approved changes, constitute the
current approved configuration.
There are three formal baselines designatedconfiguration baselines in the life cycle of aconfiguration item:
Functional Baseline (system specifications)
Allocated Baseline (subsystem specifications)
Product Baseline (complete technical datapackage for the CI)
17
-
8/7/2019 Configuration-Management-Presentation
18/91
Configuration Identification
Coordinated activities to establish rulesor configuration item selection, baseline contentdefinition, and product and document identifiers.Identification is provided in the approved
baseline technical documentation, as shown inspecifications, tests, drawings, associated lists,and reference documents.
18
-
8/7/2019 Configuration-Management-Presentation
19/91
Configuration I tem Identification Numbers
For each configuration item you need to knowat any time the technical description of theitem and the identification should be changedwhen the technical characteristics are changedand when the two items are notinterchangeable. Every item which is definedas a CI must be marked as agreed.
19
-
8/7/2019 Configuration-Management-Presentation
20/91
-
8/7/2019 Configuration-Management-Presentation
21/91
Configuration Control
Coordinated activities for controlling changeto configuration baseline. Configurationcontrol should be applied to establishedbaselines, configuration identifications and allreleased engineering data. Configurationcontrol system should screen, classify andprocess changes in a manner that providesfully coordinated, approved change packagesin compliance with the requirements or
contract.
21
-
8/7/2019 Configuration-Management-Presentation
22/91
Configuration Status Accounting (CSA)
A formal process of recording and reporting ofproduct configuration information, the status ofproposed changes and the implementationstatus of approved changes.
Configuration Audits (CA)
Performed before the acceptance of aconfiguration baseline to assure the productcomplies with its specified requirements and to
assure the product is accurately reflected by itsconfiguration documents.
22
-
8/7/2019 Configuration-Management-Presentation
23/91
Functional Configuration Audit (FCA)
A formal examination of functionalcharacteristics of a configuration item (finalproduct), to verify that the item has achievedthe performance specified in its configurationidentification.
Physical Configuration Audit (PCA)
A formal examination of the "as-built"configuration of a product or a CI against its
technical documentation, in order to establishconformance between the product and itscurrent configuration identification.
23
-
8/7/2019 Configuration-Management-Presentation
24/91
Company Confidential 24
4 . Th e Ob j ect iv es o f CM
-
8/7/2019 Configuration-Management-Presentation
25/91
CM represents a discipline which ensures that allparties to the acquisition of a product:
the buyer
the developer/designer
the manufacturer, and
the user (customer)
Have a common understanding about:
how the product looks (physical shape/ software code)
what the product is supposed to do (functionality,performance)
how the product can be operated (missionprofile/capabilities); and
how the product is maintained (supportability)
25
-
8/7/2019 Configuration-Management-Presentation
26/91
CM is the process or a set of requirements to be
included in every industrial process for establishingand maintaining a consistent record of a productsfunctional and physical characteristics compared toits design and operational requirements.
Configuration management is applied through-outthe entire life cycle of the product and allows one to:
know at any moment the technical description of asystem and its components, using approved
documentation
record and control effectively and continuouslyevolutions in the technical description and providetraceability of such evolutions throughout the life-cycleof the product
26
-
8/7/2019 Configuration-Management-Presentation
27/91
facilitate the consistency of the systems components(control of external interfaces) and the products that
make up these components (control of internalinterfaces)
verify that documentation is and remains the exactimage of the products it describes
identify the current configuration baseline and theas-built configuration of a product, to recorddiscrepancies detected during production, delivery oroperation and dispositioned for further use;
enable any user to know the operational capabilities
and limitations of each product item and, in case ofvariances or non conformances, to know which itemsare affected
CM accomplishes this through control of the productdefining technical data
27
-
8/7/2019 Configuration-Management-Presentation
28/91
Company Confidential 28
5 . Bene f i t s f o r an en t e rp r i se ga ined t h r oug h app l i ca t i on o f CM
-
8/7/2019 Configuration-Management-Presentation
29/91
Conclusive and current information, knowing at any timewhat the enterprise is;
developing
building
testing
delivering maintaining
Assured product consistency, being enabled to;
deliver identical items
repeat performance
support the delivered product remotely
modify the product without the need of reverseengineering
29
-
8/7/2019 Configuration-Management-Presentation
30/91
Control of cost, CM helps a project to stay withinthe authorized budget frame;
Product changes may involve high costconsiderations. The right processing of changes andanalysis of costs can keep expense per change at itslowest rate.
Unauthorized changes will be prevented.
Thorough identification of all affected documentationand product elements reduces cost of search andanalysis of effects.
Approved changes can be immediately
incorporated in the technical documentation, butreleased for implementation into the product inaccordance with an authorized budget schedule.
Proper identification and change control reduced costof maintenance and reuse.
30
-
8/7/2019 Configuration-Management-Presentation
31/91
Visibility in planning, CM helps project planning byensuring that;
any schedule effect of a proposed change isreviewed prior to disposition of the change
interface requirements are assessed for effect of thechange on other design organizations schedules
Compliance with requirements, CM ensures theintended configuration by;
supporting internal and formal design reviews
performing the functional and physical configurationverifications (audits)
maintaining traceability of software configurationsto functional requirements
controlling changes to the approved documentation
communicating change status to all involved parties
31
-
8/7/2019 Configuration-Management-Presentation
32/91
Company Confidential 32
6 . CM an d Docum en t Con t r o l in I AQG 9 1 0 0
-
8/7/2019 Configuration-Management-Presentation
33/91
FOREWORD
REVISION SUMMARY/RATIONALE
0 INTRODUCTION
1 QUALITY MANAGEMENT SYSTEMS REQUIREMENTS
2 NORMATIVE REFERENCES
3 TERMS AND DEFINITIONS
4 QUALITY MANAGEMENT SYSTEM4.2.3 Control of Documents4.2.4 Control of Records
5 MANAGEMENT RESPONSIBILITY
6 RESOURCE MANAGEMENT
33
A documented procedure shall beestablished to:
a) to approve documents foradequacy prior to issue,b) to review and update as necessaryand re-approvec) to ensure that changes and thecurrent revision status of documentsare identified,
d) to ensure that relevant versions ofapplicable documents are available atpoints of use,e) to ensure that documents remainlegible and readily identifiable,f) to ensure that documents ofexternal origin determined by theorganization to be necessary for the
planning and operation of the qualitymanagement system are identifiedand their distribution controlled, andg) to prevent the unintended use ofobsolete documents, and to applysuitable identification to them if theyare retained for any purpose.
-
8/7/2019 Configuration-Management-Presentation
34/91
7 PRODUCT REALIZATION7.1 Planning of Product Realization7.1.2 Risk Management7.1.3 Configuration Management7.1.4 Control of Work Transfers7.2 Customer-related processes7.2.1 Determination of Requirements Related to the
Product
7.2.2 Review of Requirements Related to the Product7.2.3 Customer Communication7.3 Design and Development7.3.1 Design and Development Planning7.3.2 Design and Development Inputs7.3.3 Design and Development Outputs
34
The organization shall define the data required to
allow the product to be identified, manufactured,inspected, used and maintained; including forexample
the drawings, part lists and specificationsnecessary to define the configuration and the designfeatures of the product, and
the material, process, manufacturing and assemblydata needed to ensure conformity of the product.
The organization shall establish, implement and
maintain a configuration management process thatincludes, as appropriate to the producta) configuration management planning,b) configuration identification,c) change control,d) configuration status accounting, ande) configuration audit.NOTE: See ISO 10007 for guidance.
The organization shall plan and develop theprocesses needed for product realization
In planning product realization, the organizationshall determine the following, as appropriate:.e) configuration management appropriate to theproduct;f) resources to support the use and maintenanceof the product
-
8/7/2019 Configuration-Management-Presentation
35/91
7.3.4 Design and Development Review7.3.5 Design and Development Verification7.3.6 Design and Development Validation7.3.6.1 Design and Development Verification and
Validation Testing7.3.6.2 Design and Development Verification and
Validation Documentation7.3.7 Control of Design and Development
Changes
35
Where tests are necessary for
verification and validation, thesetests shall be planned, controlled,reviewed and documented to ensureand prove the following:..c) the correct configuration of theproduct is submitted for the test,
Design and development changes shallbe identified and records maintained.The changes shall be reviewed, verifiedand validated, as appropriate, andapproved before implementation. Thereview of design and developmentchanges shall include evaluation of theeffect of the changes on constituent
parts and product already delivered.Records of the results of the review ofchanges and any necessary actions shallbe maintained (see 4.2.4).
Design and development changes shallbe controlled in accordance with theconfiguration management process (see7.1.3).
-
8/7/2019 Configuration-Management-Presentation
36/91
-
8/7/2019 Configuration-Management-Presentation
37/91
Company Confidential 37
7 . The Con f ig u r a t ion Con t inu u m
-
8/7/2019 Configuration-Management-Presentation
38/91
ContractReview/Planning
DesignProduction
38
Request forInformation/Proposal
Proposal ContractAward
As Quoted
Configuration
As Accepted
Configuration
As Planned
Configuration
As Designed
Configuration
As Built
Configuration
As Documented
Configuration
As Maintained
Configuration
Delivery Service
Pr o j ect Li fe Cyc le Con f ig ur a t ion Prog r ess
As Specified - Customer
Requirement Baseline
-
8/7/2019 Configuration-Management-Presentation
39/91
As Speci f i ed / Requ i r em ent Base l in e ( Requ est fo r I n f o r m a t ion / Pr oposa l
RFI / RFP)
As Specified/Requirement Baseline is thecustomer baseline. It is specified in the RFI/RFPand includes any allocated requirements,specifications, structure, configurationmanagement requirements, etc.
The customer expects to receive information/proposal from the supplier including supplier
attitude to the Requirement Baseline.
39
-
8/7/2019 Configuration-Management-Presentation
40/91
As Quo t ed Con f igu r a t i on ( by t he supp l i er )
Following the RFI/RFP from the customer, thesupplier prepares his response.
In the response the supplier presents hisattitude toward the implementation of customerrequirements.
The supplier proposes a configurationmanagement plan in response to the customer'sconfiguration management requirements.
In some cases the proposed/quotedconfiguration differs from the As Specifiedconfiguration and thus it is the As Quotedbaseline.
40
-
8/7/2019 Configuration-Management-Presentation
41/91
As Accept ed Conf igu r a t ion ( Con f ig u r a t ion a t Con t rac t Aw a rd )
This configuration includes the systemrequirements specification & the systeminterface specification as finally agreed by thecustomer and the supplier.
The method to manage configuration baselinesand changes is established at this stage.
The As Accepted configuration serves as a basisfor the next (planning/review) phase.
41
-
8/7/2019 Configuration-Management-Presentation
42/91
Proper management and control of customerdocuments is a condition essential to themaintenance of a well regulated productionprocess. The management and control of thecustomer's documents and drawings should bedone as specified by the contract.
The customer defines the configurationmanagement requirements for the project. Theserequirements are applicable to all the actors of theproject.
The purpose of the CM plan is to define theprocess & resources for managing theconfiguration of the product in a controlled &traceable manner throughout the project life cycle.
42
-
8/7/2019 Configuration-Management-Presentation
43/91
As Plann ed Conf igu r a t ion ( Con t r ac t / Rev iew P lann ing )
The As Accepted configuration is reviewed duringinitial stages of contract implementation.
Mutually acceptable revisions to the configurationare included.
As part of the allocated baseline the sub-systems requirements & interface specifications
are frozen towards the Preliminary DesignReview phase (As Planned).
43
-
8/7/2019 Configuration-Management-Presentation
44/91
As Des ign ed ( By Eng ineer ing )
The As Designed configuration may be accomplished
in a few stages (as applicable to the contractedproduct):
System Requirements Review and System Design Review(SRR & SDR)
Preliminary Design Review (PDR)
Critical Design Review (CDR)
The configuration at each stage should include blockdrawings, schematic drawings, design documents,design interfaces documents and Validation &
Verification V&V documents. At each stage theconfiguration should be frozen and change controlimplemented.
At As Designed configuration (after CDR) thosedocuments are frozen.
44
-
8/7/2019 Configuration-Management-Presentation
45/91
As Bu i l t ( By P roduc t i on )
The manufacturer must enable tracking fromthe finished product to the components andmaterials comprising it, in accordance with thetype of the product and the contractrequirements.
During procurement, storage, production,assembly, and test, details & identificationmarking will enable the follow-up of the historyof the item in all its stages.
The level of traceability shall be specified andupdated in accordance with contractualrequirements.
45
-
8/7/2019 Configuration-Management-Presentation
46/91
As Bu i l t ( By Pro d u c t i o n ) - ( co n t d )
The traceability process shall allow, whenrequired, the identification of all productsmanufactured from the same batch of rawmaterial or from the same production batch aswell as the delivery destination of all products
from that batch. In addition, the process shallallow identification of all parts and componentsof products/assemblies defined as requiringtracking.
46
-
8/7/2019 Configuration-Management-Presentation
47/91
As Docum en t ed ( in Del i ve ry Docum en t a t ion )
An individual file will be issued for each itemfor which all the conditions specified belowhave been met, unless otherwise specified bycontractual requirements:
Item have been tested according to their individualtest procedures.
Item have been identified by individual serialnumbers.
Item have been awarded a Serviceable tag uponcompletion of test.
47
-
8/7/2019 Configuration-Management-Presentation
48/91
As Ma in t a ined ( Serv ice Docum en t a t ion )
The maintenance contract should define themaintenance levels, and the infrastructure to beprepared.
Involvement in product maintenance is set
according to customer demands, which aredecided upon receiving the customers order.
In certain cases, the demand will be to apply aspecific maintenance policy in manufacturing andthe design of the product, including the definitionof needs in training, accompanying technicaldocumentation, maintenance contract with thecustomer and suggestion of spare parts for initialprovisioning.
48
-
8/7/2019 Configuration-Management-Presentation
49/91
Company Confidential 49
8 . Con f ig u r a t ion Managem ent Func t ions
CM P Fl
-
8/7/2019 Configuration-Management-Presentation
50/91
ConfigurationManagement
Hardware,software,
documentsnumberingmethods
Definition of
configuration
items
ConfigurationIdentification
ConfigurationReport
BaselineConfiguration
Producttrees
Document status
Hardwareproduction
Changemanagement
ConfigurationControl
SystemSpecification
Specifications + CD
Production Drawings+
Version DescriptionDocuments *
Changestatus
FunctionalBaseline
AllocatedBaseline
ProductBaseline
Waivers
MRB activity
CDR
PDR
ContractSRR
* Including assemblydraw ings, test and
integration documents
CM Pr ocess Flow
50
-
8/7/2019 Configuration-Management-Presentation
51/91
Conf igu r a t ion I den t i f i cat ion / Con f igu r a t ion Docum en t a t ion
Product File:
Provides the engineering documentation neededto build and test the product:
Hardware Software
Drawings and associated lists
Electronic media
Diagrams
Version Description Document (VDD)
Unique processes
Printed circuit card design
Acceptance test
51
-
8/7/2019 Configuration-Management-Presentation
52/91
Manufacturing File
Consists of the Product File, to which is addedmanufacturing operation sequences andprocesses.
Data File
Contractor Data Requirement List (CDRL)documentation required in addition to theproduct or manufacturing file includesspecifications, plans, analyses, tests, manuals,etc.
52
-
8/7/2019 Configuration-Management-Presentation
53/91
Con f ig ur a t ion Manag er s Task
Establishment of Configuration policy. Release and submittal of configuration
documentation in relation to program events.
Establishment of internal developmental
configuration and contractual baselines.
Establishment of configuration control boards.
Implementation of a status accounting
information and provision of reports.
53
-
8/7/2019 Configuration-Management-Presentation
54/91
Conf igu r a t ion Manager s Task ( con t d )
Account for and deliver Contractor DataRequirement List (CDRL) items.
Prevent duplication of data.
Apply change control.
Identify and maintain status of data received &submitted.
54
-
8/7/2019 Configuration-Management-Presentation
55/91
Conf igu r a t ion Con t ro l Board
Configuration Control Board (CCB) is a groupof technical and administrative experts withthe assigned authority and responsibility tomake decisions on the configuration and itsmanagement.
All proposed changes should be reviewed bythe CCB to evaluate the change against thecriteria and/or include as an alternate, notmaking the change.
In addition, it should evaluate all aspects of
the change to include design, performance,cost, schedule, operational effectiveness, andlogistics considerations.
55
-
8/7/2019 Configuration-Management-Presentation
56/91
Conf igu r a t ion Con t ro l
To maintain product control, no change may beimplemented without an approved change orderor approved deviation/waiver request.
The Configuration Manager and the CCB
members are responsible for the change controlprocess.
Configuration control is applied to establishedbaselines, identifications and releasedengineering data.
56
-
8/7/2019 Configuration-Management-Presentation
57/91
Con f igu r a t i on Con t ro l ( con t d )
Configuration control system should beestablished to provide for screening,classification and processes changes thatprovide fully coordinated, approved changepackages.
Configuration control should be applied toestablished baselines, identifications andreleased engineering data.
Configuration control should be implemented instages corresponding to the product life-cycle.
Before reviews and establishment of baselines,control may be maintained manually by thedevelopment engineer or by use of automatedtools as they are developed.
57
-
8/7/2019 Configuration-Management-Presentation
58/91
Upon freezing of the Bill Of Material (BOM) andthe order to procure components, changesshould be controlled by CCB.
Manufacturing release should includeimplementation of all approved internal
changes into the drawings.
Formal change control will commence withsuccessful completion of the production auditor with first delivery.
58
Con f igu r a t i on Con t ro l ( con t d )
-
8/7/2019 Configuration-Management-Presentation
59/91
Conf ig u r a t ion Repor t / Con f ig u r a t ion St a t us Accoun t ing
Upon initiation of component procurement,changes will be tracked in the database for eachdocument/drawing/list.
Each hardware delivery will generate an As
Planned/As Built Report reflecting the build ofeach unit.
Configuration Status Accounting Reports (CSAR):
The configuration manager maintains CSAR for the purposes ofinternal control to assure compatibility of the product and itsdocumentation, and producing the status accounting reportsnecessary for configuration visibility and traceability.
Feed-back from the As Planned/As Built Report providesconfirmation of the implementation of changes, deviations, etc.
59
-
8/7/2019 Configuration-Management-Presentation
60/91
The purpose of the Configuration audit is toverify that the configuration identification for aconfigured item is accurate, complete, and willmeet specified program needs.
There are two types of configuration audits:
Functional Configuration Audit (FCA) and
Physical Configuration Audit (PCA).
Both audits must be satisfactorily completed by
the project team members and the contractor asa prerequisite to establishing the productbaseline.
Con f igu r a t i on Aud i t
60
-
8/7/2019 Configuration-Management-Presentation
61/91
The results of the functional and physicalconfiguration audits should be documented,reviewed and verified.
Technical documentation and functionaldeficiencies detected during the audits will becorrected by change order.
Con f igu r a t i on Aud i t ( con t d )
61
-
8/7/2019 Configuration-Management-Presentation
62/91
Company Confidential
9 . CM v s . En g i n eer in g Ch an geCont ro l
62
-
8/7/2019 Configuration-Management-Presentation
63/91
63
-
8/7/2019 Configuration-Management-Presentation
64/91
I n t r odu ct i on
The aerospace and defense industries rely on thedevelopment and manufacture of complexproducts comprised of multiple systems,subsystems, and components each designed byindividual designers (design activities) at variouslevels within the supply chain (by the customer
or by any of the suppliers)
Each design activity controls various aspects ofthe configuration and specifications related to theproduct
64
-
8/7/2019 Configuration-Management-Presentation
65/91
I n t r od uc t i on ( con t d )
When a change to design information isrequested or required, the change has to beevaluated against the impacts to the higher levelsystem, as detailed in Notice of ChangeRequirements (AS9016).
A change request can be initiated by any of thestakeholders: customer, prime contractor,supplier, etc.
65
-
8/7/2019 Configuration-Management-Presentation
66/91
Ch an ge Con t r o l
Pr ocess Flo w
Change influence (retrofit,
Products in process, field)
Effectivity date
Additional tests
Initiating the ECP
(By any stakeholder)
Analyzing
(by initiator's management)
Initiation
Evaluation
by system engineer
CCB EvaluationRecording and
Submitting to additional
experts
Approval by
CCB
Change
Implementation
(Documents & Products)
Documents
Distribution
Rejecting
Change classification (I, II, III)
(Customer approval for class 1)
Cost
Rejecting
Approved
Work center A
Work center B
Subcontractor
/J.V'S
66
-
8/7/2019 Configuration-Management-Presentation
67/91
Design activities must meet the Quality System
Requirements and Customer Agreements beforeimplementation of changes as follows:
Changes that Require Customer AcceptancePrior to Implementation
Changes that May Require Acceptance Prior toImplementation
Changes Implemented Concurrent withNotification for Customer Acceptance
Non-Configuration changes
67
-
8/7/2019 Configuration-Management-Presentation
68/91
Design activities shall create a Notice of Change
(NoC) or Engineering Change Notice (ECN) andimplement the change. The design activity shalleither submit the NoC to the customer or makeall NoC records available for review, dependingon customer requirements.
The activities required are:
Approval of Design Activity to PerformChange Impact Assessments
Requirements for Data Submission of NoC
Record Retention
68
-
8/7/2019 Configuration-Management-Presentation
69/91
Changing the Product Structure (Bill Of Materials) Adding a part Deleting a part Changing the quantity per assembly
Changing the Part Itself Changing specifications New Part Number Changing approved sources?
Changing the Routing Changing the Process Changing the process sequence
W hat i s an En g in eer in g Chan ge?
69
-
8/7/2019 Configuration-Management-Presentation
70/91
The Engineering process have three mainmilestones to start an engineering change controlprocess:
Functional Baseline (FBL)
As part of the FBL, the following engineeringdocuments are released;
System Specification
System Requirements
System Interface Definition/Specification
Following the SDR & SRR, these documents are
frozen.
70
-
8/7/2019 Configuration-Management-Presentation
71/91
Allocated Baseline (ABL)
As part of the ABL, the following engineeringdocuments are released;
Sub-Systems Specifications
Sub-Systems Interface Specifications
Following the PDR, these documents are frozen
Product Baseline (PBL)
As part of the PBL, all engineering documentsare released;
Following the CDR, these documents are frozen
71
-
8/7/2019 Configuration-Management-Presentation
72/91
After all engineering documents are released &frozen (per the Baselines), changes need to bedone due to the following items:
Design
Performance
Reliability
Safety
Production
Drawings errors
As results of operation, maintenance
Change or new configurations (marketing)
As a result of a failure requiring Engineering Change
72
-
8/7/2019 Configuration-Management-Presentation
73/91
The Change Control Process is performed by a
Change Control Board (CCB). Engineering, Production, Purchasing, Customer,
Subcontractors are permitted to ask CCB to handleany change request
The Change Control Process includes two types ofchanges:
Major Change (Class 1 change)
Minor Change (Class 2 change)
73
-
8/7/2019 Configuration-Management-Presentation
74/91
-
8/7/2019 Configuration-Management-Presentation
75/91
W h at m u st an En g in eer in g Chan gePr opo sa l do? Tell us WHAT to change
Show us HOW to make the change
Tell us WHEN
Applicability (implementation) Tell us WHO
Define tasks and assign responsibilities
Show us WHERE
What documents, parts, purchasing
Tell us WHY
Really explain the reasons
75
-
8/7/2019 Configuration-Management-Presentation
76/91
The Engineering Change Proposal (ECP) should
present to the stake-holders all the data neededto approve or disapprove an Engineering Change
The approval procedure needs to refer to thefollowing:
Is the change justified?
Is the change a must ?
Can it be implemented ?
What could be the results if the ECP is notapproved?
76
-
8/7/2019 Configuration-Management-Presentation
77/91
-
8/7/2019 Configuration-Management-Presentation
78/91
Change Cost
Cost in engineering departments (design and drawingrevision)
Cost in production engineering (Route Cards, tools)
Purchasing & Manufacturing Cost
Cost of change implementing at the customer
Cost includes working hours and materials Change Validity
From which point in time a S/N change is implemented, andwhere (production line, storage, maintenance, ILS)
Change Priority
Change Priority is determined by Project Manager orCustomer
78
-
8/7/2019 Configuration-Management-Presentation
79/91
-
8/7/2019 Configuration-Management-Presentation
80/91
By Revision Letter Engineerings preference
By Dates
Do not use before, do not use after
Other methods (needs)
Use to depletion of old part
Lot (batch) Number
Project (contract) Number
Customer Number Purchase Order Number
Serial Number
Ef fec t i v i t y o f Chan ge
80
-
8/7/2019 Configuration-Management-Presentation
81/91
How should the ECN timing be dealt with?
If high priority: Stop work and fix The sun will not set before preliminary action is taken
Otherwise:
Define Effectivity and schedule into the manufacturing,
planning and execution process: Plan for least disruption and part obsolescence
No more than 2-3 working days until preliminaryrelease
Aggregate and hold for product upgrade
Batch release no less often than quarterly
81
-
8/7/2019 Configuration-Management-Presentation
82/91
Company Confidential 82
1 0 . Con f ig u r a t ion Man agem en t Tools
CM Systems Relationship
-
8/7/2019 Configuration-Management-Presentation
83/91
Ecad
PLM/PDM
SystemsItems
BOM
ECO'S
Logistic System
ERPInventory
Orders
Finance
Mcad
Docs
Software
PLM Product Lifecycle ManagementPDM Product Data ManagementERP- Enterprise Resources Plann ingEcad Electronics Computer Aided DesignMcad Mechanics Computer Aided Design
y p
83
-
8/7/2019 Configuration-Management-Presentation
84/91
Implementation of Configuration Management
requires use of a computerized system which canbe simple or comprehensive depending on the typeand size of organization.
Usually the CM should be accomplished usinginformation management systems.
Many organizations use ERP & PDM systems:
The ERP system manages logistic objects: stock,orders, human resources, finance... (examples:
Oracle Applications, SAP, Priority) The PDM system manages engineering objects:
Items, BOM, ECOs... (examples: Teamcenter, Agile,Enovia)
84
-
8/7/2019 Configuration-Management-Presentation
85/91
Ecad & Mcad systems usually have someconfiguration tools but in most of the organizations
the configuration management is managed in thePDM.
Usually there are interfaces between the systems.The ERP system has interfaces with the PDM in order
to transfer items & BOM. Ecad & Mcad systems have interfaces with the PDM
in order to transfer the documentation files.
Software configuration systems usually don't have
interfaces with other systems. Softwareconfiguration is managed using tools like Clearcase &Clearquest. The software files which are needed forproduction are transferred to the PDM system.
85
-
8/7/2019 Configuration-Management-Presentation
86/91
Company Confidential 86
1 1 . Su m m ar y
-
8/7/2019 Configuration-Management-Presentation
87/91
-
8/7/2019 Configuration-Management-Presentation
88/91
A disciplined CM process ensures that productsconform to their requirements and are identified and
documented in sufficient detail to support the productlife cycle.
CM assures accurate product configuration informationand enables product interchangeability and safeproduct operation and maintenance to be achieved.
CM implementation requires a balanced and consistentimplementation of CM functions, principles, andpractices throughout the product life cycle. CMfacilitates orderly identification of product attributes
and provides control of product information andproduct changes used to improve capabilities; correctdeficiencies; improve performance, reliability, ormaintainability; extend product life; or reduce cost,risk or liability.
88
-
8/7/2019 Configuration-Management-Presentation
89/91
-
8/7/2019 Configuration-Management-Presentation
90/91
Company Confidential 90
1 2 . Resou r ces
-
8/7/2019 Configuration-Management-Presentation
91/91
AAQG AS9016
Notice of Change (NOC) Requirements
ANSI/EAI 649
National Consensus Standard for Configuration Management
ECSS-M-ST-40
Space Project Management Configuration Management
IAQG 9100
Quality Management System
ISO 10007
Quality Management Guidelines for Configuration Management
MIL HDBK-61A
Configuration Management Guidance MIL-STD-973 (obsolete/but available)
Configuration Management