    Configuration ManagementGuidelines

    Su pp ly Ch a in Manag em ent H andbook

    Rev. Date: 11 June 2010

  • 8/7/2019 Configuration-Management-Presentation

    2/91

    For ew or d

    The guideline describes Configuration Management

    functions and principles and defines ConfigurationManagement terminology for use with Aerospaceand Defense AS&D product line.

    It is targeted at Small and Medium size companiesacting as subcontractors/suppliers either in a Buildto Print or a Build to Spec relationship.

    The intention of these guidelines is to assistorganizations with understanding the concept andprocess of Configuration Management and is notintended to be a requirement, nor auditable.

    2

  • 8/7/2019 Configuration-Management-Presentation

    3/91

  • 8/7/2019 Configuration-Management-Presentation

    4/91

    When Configuration Management principles areapplied using effective practices, return oninvestment is maximized, product life cycle costsare reduced and the small investment in resourcesnecessary for effective Configuration Management

    is returned many fold in cost avoidance.

    These Guidelines provide the reader with the basicideas of the industry needs, the benefits to the

    implementing organization and describesConfiguration Management functions andprinciples.

    I n t r odu ct i on

    4

  • 8/7/2019 Configuration-Management-Presentation

    5/91

    Lis t o f Top ics

    1. What is Configuration?

    2. Why it is important to manage and controlconfiguration in AS&D

    3. Applicable Terms and Definitions4. The objectives of Configuration Management

    5. Benefits for an enterprise gained through applicationof CM6. CM and Documents control in 9100:20097. The Configuration Continuum8. CM functions

    9. CM vs. Engineering Change10. CM Tools11. Summary12. Resources

    5

  • 8/7/2019 Configuration-Management-Presentation

    6/91

    Company Confidential 6

    1 . W h at i s Con f ig u r a t ion ?

  • 8/7/2019 Configuration-Management-Presentation

    7/91

    Functional and physical characteristics ofexisting or planned hardware, firmware,software or a combination thereof as setforth in technical documentation and

    ultimately achieved in a product.

    7

  • 8/7/2019 Configuration-Management-Presentation

    8/91Company Confidential 8

    2 . W hy i s i t im po r t an t t o m anage and con t r o l con f i gu r a t i on i n Aerospace & Defense?

  • 8/7/2019 Configuration-Management-Presentation

    9/91

    Proper CM implementation can positively impact

    Product Quality, On time Product Delivery, anddecrease development and life cycle costs

    Product configuration presents a particularlydifficult set of challenges for Aerospace & Defense

    resulting from: Large products involving a highly complex set of parts

    and systems

    Complex set of environmental and safety regulations

    Ability to respond effectively to customer demands

    9

  • 8/7/2019 Configuration-Management-Presentation

    10/91

    Aerospace and Defen se Fu nc t ion a l

    Needs Managing massive bid activities requiring

    product configuration knowledge

    Managing massive design activities requiringproduct configuration knowledge for:

    Program and project management

    Work Breakdown Structures (WBS)

    Managing manufacturing operations Many, many open work orders

    Frequent engineering change

    10

  • 8/7/2019 Configuration-Management-Presentation

    11/91

    Hardware and software CM at all stages of theproduct life-cycle

    Configuration identification and change control

    Configuration tracking, product traceability andvisibility

    Storage, retrieval and transfer of data from acommon data base

    The capability to reproduce products/processes Manufacture and testing of products only from

    released documents

    Aerospace and Defen se Fu nc t ion a l

    Needs ( con t )

    11

  • 8/7/2019 Configuration-Management-Presentation

    12/91

    Aero space an d Defense Spec i f i c

    Cons t ra in t s Project oriented activities

    Research & Development

    Devices Procurement

    Complex & Extensive Bills of Material

    Constant engineering change process

    Long (30+ years) product life cycles

    Legacy mind-sets

    Both Government/Customers and Contractors

    Classification & Security aspects

    12

  • 8/7/2019 Configuration-Management-Presentation

    13/91Company Confidential 13

    3 . App l i cab le t e rm s and de f in i t i ons

  • 8/7/2019 Configuration-Management-Presentation

    14/91

    Configuration Management (CM)

    CM is a methodology which provides a technicaland administrative framework for managing thedevelopment, manufacturing and maintenance ofConfiguration Items.

    CM is an integral part of the product life-cyclemanagement.

    Activity for establishing and maintainingconsistent record of the performance parametersof a product and its functional and physicalcharacteristics compared to the product designand operational requirements.

    14

  • 8/7/2019 Configuration-Management-Presentation

    15/91

    Configuration Management (CM) ( c o n t d )

    This discipline is applicable to hardware,software, processed materials, services, andrelated technical documentation throughout theentire lifecycle of the product (i.e. development,

    production, deployment, operation,maintenance and disposal).

    15

  • 8/7/2019 Configuration-Management-Presentation

    16/91

    Configuration I tem (CI)

    An aggregation of hardware, firmware,software or any of its discrete portions, whichsatisfies an end use function and is designatedby the developer or customer for separate

    configuration management. Any item requiredfor logistic support and designated for separateprocurement is a CI.

    Configuration I tem (CI) selection

    CIs should be selected with the object ofmaximizing control and minimizing the effortrequired to achieve that control.

    16

  • 8/7/2019 Configuration-Management-Presentation

    17/91

    Configuration Baseline

    Approved status of requirements and design of aproduct at key project milestone that serve asreference for activities throughout the life cycleof the product.

    Baselines, plus approved changes, constitute the

    current approved configuration.

    There are three formal baselines designatedconfiguration baselines in the life cycle of aconfiguration item:

    Functional Baseline (system specifications)

    Allocated Baseline (subsystem specifications)

    Product Baseline (complete technical datapackage for the CI)

    17

  • 8/7/2019 Configuration-Management-Presentation

    18/91

    Configuration Identification

    Coordinated activities to establish rulesor configuration item selection, baseline contentdefinition, and product and document identifiers.Identification is provided in the approved

    baseline technical documentation, as shown inspecifications, tests, drawings, associated lists,and reference documents.

    18

  • 8/7/2019 Configuration-Management-Presentation

    19/91

    Configuration I tem Identification Numbers

    For each configuration item you need to knowat any time the technical description of theitem and the identification should be changedwhen the technical characteristics are changedand when the two items are notinterchangeable. Every item which is definedas a CI must be marked as agreed.

    19

  • 8/7/2019 Configuration-Management-Presentation

    20/91

  • 8/7/2019 Configuration-Management-Presentation

    21/91

    Configuration Control

    Coordinated activities for controlling changeto configuration baseline. Configurationcontrol should be applied to establishedbaselines, configuration identifications and allreleased engineering data. Configurationcontrol system should screen, classify andprocess changes in a manner that providesfully coordinated, approved change packagesin compliance with the requirements or

    contract.

    21

  • 8/7/2019 Configuration-Management-Presentation

    22/91

    Configuration Status Accounting (CSA)

    A formal process of recording and reporting ofproduct configuration information, the status ofproposed changes and the implementationstatus of approved changes.

    Configuration Audits (CA)

    Performed before the acceptance of aconfiguration baseline to assure the productcomplies with its specified requirements and to

    assure the product is accurately reflected by itsconfiguration documents.

    22

  • 8/7/2019 Configuration-Management-Presentation

    23/91

    Functional Configuration Audit (FCA)

    A formal examination of functionalcharacteristics of a configuration item (finalproduct), to verify that the item has achievedthe performance specified in its configurationidentification.

    Physical Configuration Audit (PCA)

    A formal examination of the "as-built"configuration of a product or a CI against its

    technical documentation, in order to establishconformance between the product and itscurrent configuration identification.

    23

  • 8/7/2019 Configuration-Management-Presentation

    24/91

    Company Confidential 24

    4 . Th e Ob j ect iv es o f CM

  • 8/7/2019 Configuration-Management-Presentation

    25/91

    CM represents a discipline which ensures that allparties to the acquisition of a product:

    the buyer

    the developer/designer

    the manufacturer, and

    the user (customer)

    Have a common understanding about:

    how the product looks (physical shape/ software code)

    what the product is supposed to do (functionality,performance)

    how the product can be operated (missionprofile/capabilities); and

    how the product is maintained (supportability)

    25

  • 8/7/2019 Configuration-Management-Presentation

    26/91

    CM is the process or a set of requirements to be

    included in every industrial process for establishingand maintaining a consistent record of a productsfunctional and physical characteristics compared toits design and operational requirements.

    Configuration management is applied through-outthe entire life cycle of the product and allows one to:

    know at any moment the technical description of asystem and its components, using approved

    documentation

    record and control effectively and continuouslyevolutions in the technical description and providetraceability of such evolutions throughout the life-cycleof the product

    26

  • 8/7/2019 Configuration-Management-Presentation

    27/91

    facilitate the consistency of the systems components(control of external interfaces) and the products that

    make up these components (control of internalinterfaces)

    verify that documentation is and remains the exactimage of the products it describes

    identify the current configuration baseline and theas-built configuration of a product, to recorddiscrepancies detected during production, delivery oroperation and dispositioned for further use;

    enable any user to know the operational capabilities

    and limitations of each product item and, in case ofvariances or non conformances, to know which itemsare affected

    CM accomplishes this through control of the productdefining technical data

    27

  • 8/7/2019 Configuration-Management-Presentation

    28/91

    Company Confidential 28

    5 . Bene f i t s f o r an en t e rp r i se ga ined t h r oug h app l i ca t i on o f CM

  • 8/7/2019 Configuration-Management-Presentation

    29/91

    Conclusive and current information, knowing at any timewhat the enterprise is;

    developing

    building

    testing

    delivering maintaining

    Assured product consistency, being enabled to;

    deliver identical items

    repeat performance

    support the delivered product remotely

    modify the product without the need of reverseengineering

    29

  • 8/7/2019 Configuration-Management-Presentation

    30/91

    Control of cost, CM helps a project to stay withinthe authorized budget frame;

    Product changes may involve high costconsiderations. The right processing of changes andanalysis of costs can keep expense per change at itslowest rate.

    Unauthorized changes will be prevented.

    Thorough identification of all affected documentationand product elements reduces cost of search andanalysis of effects.

    Approved changes can be immediately

    incorporated in the technical documentation, butreleased for implementation into the product inaccordance with an authorized budget schedule.

    Proper identification and change control reduced costof maintenance and reuse.

    30

  • 8/7/2019 Configuration-Management-Presentation

    31/91

    Visibility in planning, CM helps project planning byensuring that;

    any schedule effect of a proposed change isreviewed prior to disposition of the change

    interface requirements are assessed for effect of thechange on other design organizations schedules

    Compliance with requirements, CM ensures theintended configuration by;

    supporting internal and formal design reviews

    performing the functional and physical configurationverifications (audits)

    maintaining traceability of software configurationsto functional requirements

    controlling changes to the approved documentation

    communicating change status to all involved parties

    31

  • 8/7/2019 Configuration-Management-Presentation

    32/91

    Company Confidential 32

    6 . CM an d Docum en t Con t r o l in I AQG 9 1 0 0

  • 8/7/2019 Configuration-Management-Presentation

    33/91

    FOREWORD

    REVISION SUMMARY/RATIONALE

    0 INTRODUCTION

    1 QUALITY MANAGEMENT SYSTEMS REQUIREMENTS

    2 NORMATIVE REFERENCES

    3 TERMS AND DEFINITIONS

    4 QUALITY MANAGEMENT SYSTEM4.2.3 Control of Documents4.2.4 Control of Records

    5 MANAGEMENT RESPONSIBILITY

    6 RESOURCE MANAGEMENT

    33

    A documented procedure shall beestablished to:

    a) to approve documents foradequacy prior to issue,b) to review and update as necessaryand re-approvec) to ensure that changes and thecurrent revision status of documentsare identified,

    d) to ensure that relevant versions ofapplicable documents are available atpoints of use,e) to ensure that documents remainlegible and readily identifiable,f) to ensure that documents ofexternal origin determined by theorganization to be necessary for the

    planning and operation of the qualitymanagement system are identifiedand their distribution controlled, andg) to prevent the unintended use ofobsolete documents, and to applysuitable identification to them if theyare retained for any purpose.

  • 8/7/2019 Configuration-Management-Presentation

    34/91

    7 PRODUCT REALIZATION7.1 Planning of Product Realization7.1.2 Risk Management7.1.3 Configuration Management7.1.4 Control of Work Transfers7.2 Customer-related processes7.2.1 Determination of Requirements Related to the

    Product

    7.2.2 Review of Requirements Related to the Product7.2.3 Customer Communication7.3 Design and Development7.3.1 Design and Development Planning7.3.2 Design and Development Inputs7.3.3 Design and Development Outputs

    34

    The organization shall define the data required to

    allow the product to be identified, manufactured,inspected, used and maintained; including forexample

    the drawings, part lists and specificationsnecessary to define the configuration and the designfeatures of the product, and

    the material, process, manufacturing and assemblydata needed to ensure conformity of the product.

    The organization shall establish, implement and

    maintain a configuration management process thatincludes, as appropriate to the producta) configuration management planning,b) configuration identification,c) change control,d) configuration status accounting, ande) configuration audit.NOTE: See ISO 10007 for guidance.

    The organization shall plan and develop theprocesses needed for product realization

    In planning product realization, the organizationshall determine the following, as appropriate:.e) configuration management appropriate to theproduct;f) resources to support the use and maintenanceof the product

  • 8/7/2019 Configuration-Management-Presentation

    35/91

    7.3.4 Design and Development Review7.3.5 Design and Development Verification7.3.6 Design and Development Validation7.3.6.1 Design and Development Verification and

    Validation Testing7.3.6.2 Design and Development Verification and

    Validation Documentation7.3.7 Control of Design and Development

    Changes

    35

    Where tests are necessary for

    verification and validation, thesetests shall be planned, controlled,reviewed and documented to ensureand prove the following:..c) the correct configuration of theproduct is submitted for the test,

    Design and development changes shallbe identified and records maintained.The changes shall be reviewed, verifiedand validated, as appropriate, andapproved before implementation. Thereview of design and developmentchanges shall include evaluation of theeffect of the changes on constituent

    parts and product already delivered.Records of the results of the review ofchanges and any necessary actions shallbe maintained (see 4.2.4).

    Design and development changes shallbe controlled in accordance with theconfiguration management process (see7.1.3).

  • 8/7/2019 Configuration-Management-Presentation

    36/91

  • 8/7/2019 Configuration-Management-Presentation

    37/91

    Company Confidential 37

    7 . The Con f ig u r a t ion Con t inu u m

  • 8/7/2019 Configuration-Management-Presentation

    38/91

    ContractReview/Planning

    DesignProduction

    38

    Request forInformation/Proposal

    Proposal ContractAward

    As Quoted

    Configuration

    As Accepted

    Configuration

    As Planned

    Configuration

    As Designed

    Configuration

    As Built

    Configuration

    As Documented

    Configuration

    As Maintained

    Configuration

    Delivery Service

    Pr o j ect Li fe Cyc le Con f ig ur a t ion Prog r ess

    As Specified - Customer

    Requirement Baseline

  • 8/7/2019 Configuration-Management-Presentation

    39/91

    As Speci f i ed / Requ i r em ent Base l in e ( Requ est fo r I n f o r m a t ion / Pr oposa l

    RFI / RFP)

    As Specified/Requirement Baseline is thecustomer baseline. It is specified in the RFI/RFPand includes any allocated requirements,specifications, structure, configurationmanagement requirements, etc.

    The customer expects to receive information/proposal from the supplier including supplier

    attitude to the Requirement Baseline.

    39

  • 8/7/2019 Configuration-Management-Presentation

    40/91

    As Quo t ed Con f igu r a t i on ( by t he supp l i er )

    Following the RFI/RFP from the customer, thesupplier prepares his response.

    In the response the supplier presents hisattitude toward the implementation of customerrequirements.

    The supplier proposes a configurationmanagement plan in response to the customer'sconfiguration management requirements.

    In some cases the proposed/quotedconfiguration differs from the As Specifiedconfiguration and thus it is the As Quotedbaseline.

    40

  • 8/7/2019 Configuration-Management-Presentation

    41/91

    As Accept ed Conf igu r a t ion ( Con f ig u r a t ion a t Con t rac t Aw a rd )

    This configuration includes the systemrequirements specification & the systeminterface specification as finally agreed by thecustomer and the supplier.

    The method to manage configuration baselinesand changes is established at this stage.

    The As Accepted configuration serves as a basisfor the next (planning/review) phase.

    41

  • 8/7/2019 Configuration-Management-Presentation

    42/91

    Proper management and control of customerdocuments is a condition essential to themaintenance of a well regulated productionprocess. The management and control of thecustomer's documents and drawings should bedone as specified by the contract.

    The customer defines the configurationmanagement requirements for the project. Theserequirements are applicable to all the actors of theproject.

    The purpose of the CM plan is to define theprocess & resources for managing theconfiguration of the product in a controlled &traceable manner throughout the project life cycle.

    42

  • 8/7/2019 Configuration-Management-Presentation

    43/91

    As Plann ed Conf igu r a t ion ( Con t r ac t / Rev iew P lann ing )

    The As Accepted configuration is reviewed duringinitial stages of contract implementation.

    Mutually acceptable revisions to the configurationare included.

    As part of the allocated baseline the sub-systems requirements & interface specifications

    are frozen towards the Preliminary DesignReview phase (As Planned).

    43

  • 8/7/2019 Configuration-Management-Presentation

    44/91

    As Des ign ed ( By Eng ineer ing )

    The As Designed configuration may be accomplished

    in a few stages (as applicable to the contractedproduct):

    System Requirements Review and System Design Review(SRR & SDR)

    Preliminary Design Review (PDR)

    Critical Design Review (CDR)

    The configuration at each stage should include blockdrawings, schematic drawings, design documents,design interfaces documents and Validation &

    Verification V&V documents. At each stage theconfiguration should be frozen and change controlimplemented.

    At As Designed configuration (after CDR) thosedocuments are frozen.

    44

  • 8/7/2019 Configuration-Management-Presentation

    45/91

    As Bu i l t ( By P roduc t i on )

    The manufacturer must enable tracking fromthe finished product to the components andmaterials comprising it, in accordance with thetype of the product and the contractrequirements.

    During procurement, storage, production,assembly, and test, details & identificationmarking will enable the follow-up of the historyof the item in all its stages.

    The level of traceability shall be specified andupdated in accordance with contractualrequirements.

    45

  • 8/7/2019 Configuration-Management-Presentation

    46/91

    As Bu i l t ( By Pro d u c t i o n ) - ( co n t d )

    The traceability process shall allow, whenrequired, the identification of all productsmanufactured from the same batch of rawmaterial or from the same production batch aswell as the delivery destination of all products

    from that batch. In addition, the process shallallow identification of all parts and componentsof products/assemblies defined as requiringtracking.

    46

  • 8/7/2019 Configuration-Management-Presentation

    47/91

    As Docum en t ed ( in Del i ve ry Docum en t a t ion )

    An individual file will be issued for each itemfor which all the conditions specified belowhave been met, unless otherwise specified bycontractual requirements:

    Item have been tested according to their individualtest procedures.

    Item have been identified by individual serialnumbers.

    Item have been awarded a Serviceable tag uponcompletion of test.

    47

  • 8/7/2019 Configuration-Management-Presentation

    48/91

    As Ma in t a ined ( Serv ice Docum en t a t ion )

    The maintenance contract should define themaintenance levels, and the infrastructure to beprepared.

    Involvement in product maintenance is set

    according to customer demands, which aredecided upon receiving the customers order.

    In certain cases, the demand will be to apply aspecific maintenance policy in manufacturing andthe design of the product, including the definitionof needs in training, accompanying technicaldocumentation, maintenance contract with thecustomer and suggestion of spare parts for initialprovisioning.

    48

  • 8/7/2019 Configuration-Management-Presentation

    49/91

    Company Confidential 49

    8 . Con f ig u r a t ion Managem ent Func t ions

    CM P Fl

  • 8/7/2019 Configuration-Management-Presentation

    50/91

    ConfigurationManagement

    Hardware,software,

    documentsnumberingmethods

    Definition of

    configuration

    items

    ConfigurationIdentification

    ConfigurationReport

    BaselineConfiguration

    Producttrees

    Document status

    Hardwareproduction

    Changemanagement

    ConfigurationControl

    SystemSpecification

    Specifications + CD

    Production Drawings+

    Version DescriptionDocuments *

    Changestatus

    FunctionalBaseline

    AllocatedBaseline

    ProductBaseline

    Waivers

    MRB activity

    CDR

    PDR

    ContractSRR

    * Including assemblydraw ings, test and

    integration documents

    CM Pr ocess Flow

    50

  • 8/7/2019 Configuration-Management-Presentation

    51/91

    Conf igu r a t ion I den t i f i cat ion / Con f igu r a t ion Docum en t a t ion

    Product File:

    Provides the engineering documentation neededto build and test the product:

    Hardware Software

    Drawings and associated lists

    Electronic media

    Diagrams

    Version Description Document (VDD)

    Unique processes

    Printed circuit card design

    Acceptance test

    51

  • 8/7/2019 Configuration-Management-Presentation

    52/91

    Manufacturing File

    Consists of the Product File, to which is addedmanufacturing operation sequences andprocesses.

    Data File

    Contractor Data Requirement List (CDRL)documentation required in addition to theproduct or manufacturing file includesspecifications, plans, analyses, tests, manuals,etc.

    52

  • 8/7/2019 Configuration-Management-Presentation

    53/91

    Con f ig ur a t ion Manag er s Task

    Establishment of Configuration policy. Release and submittal of configuration

    documentation in relation to program events.

    Establishment of internal developmental

    configuration and contractual baselines.

    Establishment of configuration control boards.

    Implementation of a status accounting

    information and provision of reports.

    53

  • 8/7/2019 Configuration-Management-Presentation

    54/91

    Conf igu r a t ion Manager s Task ( con t d )

    Account for and deliver Contractor DataRequirement List (CDRL) items.

    Prevent duplication of data.

    Apply change control.

    Identify and maintain status of data received &submitted.

    54

  • 8/7/2019 Configuration-Management-Presentation

    55/91

    Conf igu r a t ion Con t ro l Board

    Configuration Control Board (CCB) is a groupof technical and administrative experts withthe assigned authority and responsibility tomake decisions on the configuration and itsmanagement.

    All proposed changes should be reviewed bythe CCB to evaluate the change against thecriteria and/or include as an alternate, notmaking the change.

    In addition, it should evaluate all aspects of

    the change to include design, performance,cost, schedule, operational effectiveness, andlogistics considerations.

    55

  • 8/7/2019 Configuration-Management-Presentation

    56/91

    Conf igu r a t ion Con t ro l

    To maintain product control, no change may beimplemented without an approved change orderor approved deviation/waiver request.

    The Configuration Manager and the CCB

    members are responsible for the change controlprocess.

    Configuration control is applied to establishedbaselines, identifications and releasedengineering data.

    56

  • 8/7/2019 Configuration-Management-Presentation

    57/91

    Con f igu r a t i on Con t ro l ( con t d )

    Configuration control system should beestablished to provide for screening,classification and processes changes thatprovide fully coordinated, approved changepackages.

    Configuration control should be applied toestablished baselines, identifications andreleased engineering data.

    Configuration control should be implemented instages corresponding to the product life-cycle.

    Before reviews and establishment of baselines,control may be maintained manually by thedevelopment engineer or by use of automatedtools as they are developed.

    57

  • 8/7/2019 Configuration-Management-Presentation

    58/91

    Upon freezing of the Bill Of Material (BOM) andthe order to procure components, changesshould be controlled by CCB.

    Manufacturing release should includeimplementation of all approved internal

    changes into the drawings.

    Formal change control will commence withsuccessful completion of the production auditor with first delivery.

    58

    Con f igu r a t i on Con t ro l ( con t d )

  • 8/7/2019 Configuration-Management-Presentation

    59/91

    Conf ig u r a t ion Repor t / Con f ig u r a t ion St a t us Accoun t ing

    Upon initiation of component procurement,changes will be tracked in the database for eachdocument/drawing/list.

    Each hardware delivery will generate an As

    Planned/As Built Report reflecting the build ofeach unit.

    Configuration Status Accounting Reports (CSAR):

    The configuration manager maintains CSAR for the purposes ofinternal control to assure compatibility of the product and itsdocumentation, and producing the status accounting reportsnecessary for configuration visibility and traceability.

    Feed-back from the As Planned/As Built Report providesconfirmation of the implementation of changes, deviations, etc.

    59

  • 8/7/2019 Configuration-Management-Presentation

    60/91

    The purpose of the Configuration audit is toverify that the configuration identification for aconfigured item is accurate, complete, and willmeet specified program needs.

    There are two types of configuration audits:

    Functional Configuration Audit (FCA) and

    Physical Configuration Audit (PCA).

    Both audits must be satisfactorily completed by

    the project team members and the contractor asa prerequisite to establishing the productbaseline.

    Con f igu r a t i on Aud i t

    60

  • 8/7/2019 Configuration-Management-Presentation

    61/91

    The results of the functional and physicalconfiguration audits should be documented,reviewed and verified.

    Technical documentation and functionaldeficiencies detected during the audits will becorrected by change order.

    Con f igu r a t i on Aud i t ( con t d )

    61

  • 8/7/2019 Configuration-Management-Presentation

    62/91

    Company Confidential

    9 . CM v s . En g i n eer in g Ch an geCont ro l

    62

  • 8/7/2019 Configuration-Management-Presentation

    63/91

    63

  • 8/7/2019 Configuration-Management-Presentation

    64/91

    I n t r odu ct i on

    The aerospace and defense industries rely on thedevelopment and manufacture of complexproducts comprised of multiple systems,subsystems, and components each designed byindividual designers (design activities) at variouslevels within the supply chain (by the customer

    or by any of the suppliers)

    Each design activity controls various aspects ofthe configuration and specifications related to theproduct

    64

  • 8/7/2019 Configuration-Management-Presentation

    65/91

    I n t r od uc t i on ( con t d )

    When a change to design information isrequested or required, the change has to beevaluated against the impacts to the higher levelsystem, as detailed in Notice of ChangeRequirements (AS9016).

    A change request can be initiated by any of thestakeholders: customer, prime contractor,supplier, etc.

    65

  • 8/7/2019 Configuration-Management-Presentation

    66/91

    Ch an ge Con t r o l

    Pr ocess Flo w

    Change influence (retrofit,

    Products in process, field)

    Effectivity date

    Additional tests

    Initiating the ECP

    (By any stakeholder)

    Analyzing

    (by initiator's management)

    Initiation

    Evaluation

    by system engineer

    CCB EvaluationRecording and

    Submitting to additional

    experts

    Approval by

    CCB

    Change

    Implementation

    (Documents & Products)

    Documents

    Distribution

    Rejecting

    Change classification (I, II, III)

    (Customer approval for class 1)

    Cost

    Rejecting

    Approved

    Work center A

    Work center B

    Subcontractor

    /J.V'S

    66

  • 8/7/2019 Configuration-Management-Presentation

    67/91

    Design activities must meet the Quality System

    Requirements and Customer Agreements beforeimplementation of changes as follows:

    Changes that Require Customer AcceptancePrior to Implementation

    Changes that May Require Acceptance Prior toImplementation

    Changes Implemented Concurrent withNotification for Customer Acceptance

    Non-Configuration changes

    67

  • 8/7/2019 Configuration-Management-Presentation

    68/91

    Design activities shall create a Notice of Change

    (NoC) or Engineering Change Notice (ECN) andimplement the change. The design activity shalleither submit the NoC to the customer or makeall NoC records available for review, dependingon customer requirements.

    The activities required are:

    Approval of Design Activity to PerformChange Impact Assessments

    Requirements for Data Submission of NoC

    Record Retention

    68

  • 8/7/2019 Configuration-Management-Presentation

    69/91

    Changing the Product Structure (Bill Of Materials) Adding a part Deleting a part Changing the quantity per assembly

    Changing the Part Itself Changing specifications New Part Number Changing approved sources?

    Changing the Routing Changing the Process Changing the process sequence

    W hat i s an En g in eer in g Chan ge?

    69

  • 8/7/2019 Configuration-Management-Presentation

    70/91

    The Engineering process have three mainmilestones to start an engineering change controlprocess:

    Functional Baseline (FBL)

    As part of the FBL, the following engineeringdocuments are released;

    System Specification

    System Requirements

    System Interface Definition/Specification

    Following the SDR & SRR, these documents are

    frozen.

    70

  • 8/7/2019 Configuration-Management-Presentation

    71/91

    Allocated Baseline (ABL)

    As part of the ABL, the following engineeringdocuments are released;

    Sub-Systems Specifications

    Sub-Systems Interface Specifications

    Following the PDR, these documents are frozen

    Product Baseline (PBL)

    As part of the PBL, all engineering documentsare released;

    Following the CDR, these documents are frozen

    71

  • 8/7/2019 Configuration-Management-Presentation

    72/91

    After all engineering documents are released &frozen (per the Baselines), changes need to bedone due to the following items:

    Design

    Performance

    Reliability

    Safety

    Production

    Drawings errors

    As results of operation, maintenance

    Change or new configurations (marketing)

    As a result of a failure requiring Engineering Change

    72

  • 8/7/2019 Configuration-Management-Presentation

    73/91

    The Change Control Process is performed by a

    Change Control Board (CCB). Engineering, Production, Purchasing, Customer,

    Subcontractors are permitted to ask CCB to handleany change request

    The Change Control Process includes two types ofchanges:

    Major Change (Class 1 change)

    Minor Change (Class 2 change)

    73

  • 8/7/2019 Configuration-Management-Presentation

    74/91

  • 8/7/2019 Configuration-Management-Presentation

    75/91

    W h at m u st an En g in eer in g Chan gePr opo sa l do? Tell us WHAT to change

    Show us HOW to make the change

    Tell us WHEN

    Applicability (implementation) Tell us WHO

    Define tasks and assign responsibilities

    Show us WHERE

    What documents, parts, purchasing

    Tell us WHY

    Really explain the reasons

    75

  • 8/7/2019 Configuration-Management-Presentation

    76/91

    The Engineering Change Proposal (ECP) should

    present to the stake-holders all the data neededto approve or disapprove an Engineering Change

    The approval procedure needs to refer to thefollowing:

    Is the change justified?

    Is the change a must ?

    Can it be implemented ?

    What could be the results if the ECP is notapproved?

    76

  • 8/7/2019 Configuration-Management-Presentation

    77/91

  • 8/7/2019 Configuration-Management-Presentation

    78/91

    Change Cost

    Cost in engineering departments (design and drawingrevision)

    Cost in production engineering (Route Cards, tools)

    Purchasing & Manufacturing Cost

    Cost of change implementing at the customer

    Cost includes working hours and materials Change Validity

    From which point in time a S/N change is implemented, andwhere (production line, storage, maintenance, ILS)

    Change Priority

    Change Priority is determined by Project Manager orCustomer

    78

  • 8/7/2019 Configuration-Management-Presentation

    79/91

  • 8/7/2019 Configuration-Management-Presentation

    80/91

    By Revision Letter Engineerings preference

    By Dates

    Do not use before, do not use after

    Other methods (needs)

    Use to depletion of old part

    Lot (batch) Number

    Project (contract) Number

    Customer Number Purchase Order Number

    Serial Number

    Ef fec t i v i t y o f Chan ge

    80

  • 8/7/2019 Configuration-Management-Presentation

    81/91

    How should the ECN timing be dealt with?

    If high priority: Stop work and fix The sun will not set before preliminary action is taken

    Otherwise:

    Define Effectivity and schedule into the manufacturing,

    planning and execution process: Plan for least disruption and part obsolescence

    No more than 2-3 working days until preliminaryrelease

    Aggregate and hold for product upgrade

    Batch release no less often than quarterly

    81

  • 8/7/2019 Configuration-Management-Presentation

    82/91

    Company Confidential 82

    1 0 . Con f ig u r a t ion Man agem en t Tools

    CM Systems Relationship

  • 8/7/2019 Configuration-Management-Presentation

    83/91

    Ecad

    PLM/PDM

    SystemsItems

    BOM

    ECO'S

    Logistic System

    ERPInventory

    Orders

    Finance

    Mcad

    Docs

    Software

    PLM Product Lifecycle ManagementPDM Product Data ManagementERP- Enterprise Resources Plann ingEcad Electronics Computer Aided DesignMcad Mechanics Computer Aided Design

    y p

    83

  • 8/7/2019 Configuration-Management-Presentation

    84/91

    Implementation of Configuration Management

    requires use of a computerized system which canbe simple or comprehensive depending on the typeand size of organization.

    Usually the CM should be accomplished usinginformation management systems.

    Many organizations use ERP & PDM systems:

    The ERP system manages logistic objects: stock,orders, human resources, finance... (examples:

    Oracle Applications, SAP, Priority) The PDM system manages engineering objects:

    Items, BOM, ECOs... (examples: Teamcenter, Agile,Enovia)

    84

  • 8/7/2019 Configuration-Management-Presentation

    85/91

    Ecad & Mcad systems usually have someconfiguration tools but in most of the organizations

    the configuration management is managed in thePDM.

    Usually there are interfaces between the systems.The ERP system has interfaces with the PDM in order

    to transfer items & BOM. Ecad & Mcad systems have interfaces with the PDM

    in order to transfer the documentation files.

    Software configuration systems usually don't have

    interfaces with other systems. Softwareconfiguration is managed using tools like Clearcase &Clearquest. The software files which are needed forproduction are transferred to the PDM system.

    85

  • 8/7/2019 Configuration-Management-Presentation

    86/91

    Company Confidential 86

    1 1 . Su m m ar y

  • 8/7/2019 Configuration-Management-Presentation

    87/91

  • 8/7/2019 Configuration-Management-Presentation

    88/91

    A disciplined CM process ensures that productsconform to their requirements and are identified and

    documented in sufficient detail to support the productlife cycle.

    CM assures accurate product configuration informationand enables product interchangeability and safeproduct operation and maintenance to be achieved.

    CM implementation requires a balanced and consistentimplementation of CM functions, principles, andpractices throughout the product life cycle. CMfacilitates orderly identification of product attributes

    and provides control of product information andproduct changes used to improve capabilities; correctdeficiencies; improve performance, reliability, ormaintainability; extend product life; or reduce cost,risk or liability.

    88

  • 8/7/2019 Configuration-Management-Presentation

    89/91

  • 8/7/2019 Configuration-Management-Presentation

    90/91

    Company Confidential 90

    1 2 . Resou r ces

  • 8/7/2019 Configuration-Management-Presentation

    91/91

    AAQG AS9016

    Notice of Change (NOC) Requirements

    ANSI/EAI 649

    National Consensus Standard for Configuration Management

    ECSS-M-ST-40

    Space Project Management Configuration Management

    IAQG 9100

    Quality Management System

    ISO 10007

    Quality Management Guidelines for Configuration Management

    MIL HDBK-61A

    Configuration Management Guidance MIL-STD-973 (obsolete/but available)

    Configuration Management