LRR BOD Meeting
July 2005
-
8/9/2019 Bod Minutes July 2005
2/8
July 2005 BOD Agenda
Water source
Other maintenance activities
Barricades for nature trail Pavilion
Past Dues Collection
-
8/9/2019 Bod Minutes July 2005
3/8
Water Source
$9500 Aqua Water Cost for hydrant
Guarantee?/Warrantee?
What would LRR be responsible for?
Maintenance program?
President Dawson will contact AWater to inquire
Available estimated balance at end of year with
all forecasted expenses included is $29,884 Board voted affirmatively move forward if
AWater will provide maintenance coverage
-
8/9/2019 Bod Minutes July 2005
4/8
Other maintenance activities
N. Trail barricades
Materials list completed
BOD felt this item is not a priority and will table thisitem until outside temp cools down and thestructures can be erected via volunteerism
Estimated cost for materials is $1000
-
8/9/2019 Bod Minutes July 2005
5/8
Pavilion
Concrete slab
Stubbed out for electrical and plumbing Kitchen at south end and b.room at north end
relative to Corral Rd.
Composition shingle roof
Cedar and or pine posts
Designed to accomodate build out toenclosed building
-
8/9/2019 Bod Minutes July 2005
6/8
Preference is 3000 square feet if cost isreasonable
LRR BOD will obtain plans and obtaincompetitive bids
-
8/9/2019 Bod Minutes July 2005
7/8
Past Dues+Assessment
Continue sending overdue letter to delinquentaccounts
Number of unpaid accounts is 48
5 have not paid in three years or more
3 have paid a portion of their dues+assesment
36 are past due for 2005
-
8/9/2019 Bod Minutes July 2005
8/8
Misc Issues
No issues