![Page 1: Approximate delay analysis - Linköping University...Approximate delay analysis Stabilized slotted Aloha with pseudo-Bayesian algorithm Assuming arrival rate is known Probability of](https://reader030.vdocuments.site/reader030/viewer/2022040303/5e8f827c89aab106785579d7/html5/thumbnails/1.jpg)
Approximate delay analysis
Stabilized slotted Aloha with pseudo-Bayesianalgorithm
Assuming arrival rate λ is known
Probability of successful transmission Ps = 1/e ifbacklog n ≥ 2 and Ps = 1 if n = 1
Let Wi be the delay from arrival of ith packet untilbeginning of ith successful transmission
We can assume that the average of Wi over all i is theexpected queueing delay W
Let ni be number of backlogged packets at the instantbefore i’s arrival (not including any packet currentlybeing successfully transmitted)
Information Networks – p.1/22
![Page 2: Approximate delay analysis - Linköping University...Approximate delay analysis Stabilized slotted Aloha with pseudo-Bayesian algorithm Assuming arrival rate is known Probability of](https://reader030.vdocuments.site/reader030/viewer/2022040303/5e8f827c89aab106785579d7/html5/thumbnails/2.jpg)
Approximate delay analysis
Let Ri be the residual time to beginning of next slot andt1 the subsequent interval until next successfultransmission is completed. Similarly tj the interval fromthe end of the (j − 1) subsequent success to the end ofthe jth subsequent success.
After ni successful transmissions yi is the remaininginterval until the beginning of next successfultransmission, then
Wi = Ri +
ni∑
j=1
tj + yi
Information Networks – p.2/22
![Page 3: Approximate delay analysis - Linköping University...Approximate delay analysis Stabilized slotted Aloha with pseudo-Bayesian algorithm Assuming arrival rate is known Probability of](https://reader030.vdocuments.site/reader030/viewer/2022040303/5e8f827c89aab106785579d7/html5/thumbnails/3.jpg)
Approximate delay analysis
Wi = Ri +ni∑
j=1
tj + yi
For each interval tj the backlog is at least 2, thus eachslot is successful with probability 1/e and the expectedvalue of each tj is e
Little’s theorem gives E[ni] = λE[Wi] = λW
E[Ri] = 1/2, and we get
W = 1/2 + λWe + E[y]
Information Networks – p.3/22
![Page 4: Approximate delay analysis - Linköping University...Approximate delay analysis Stabilized slotted Aloha with pseudo-Bayesian algorithm Assuming arrival rate is known Probability of](https://reader030.vdocuments.site/reader030/viewer/2022040303/5e8f827c89aab106785579d7/html5/thumbnails/4.jpg)
Approximate delay analysis
Consider the first slot boundary at which both the(i − 1)st departure and the ith arrival have occurred
If backlog is 1 then yi = 0
If backlog n > 1, then E[yi] = e − 1
Let pn be steady state probability that backlog is n at aslot boundary
If state is 1 at beginning of a slot we always get asuccessful transmission, thus p1 is the fraction of slots inwhich state is 1 and a packet is successfully transmitted
Information Networks – p.4/22
![Page 5: Approximate delay analysis - Linköping University...Approximate delay analysis Stabilized slotted Aloha with pseudo-Bayesian algorithm Assuming arrival rate is known Probability of](https://reader030.vdocuments.site/reader030/viewer/2022040303/5e8f827c89aab106785579d7/html5/thumbnails/5.jpg)
Approximate delay analysis
Total fraction of slots with successful transmission is λ,thus p1/λ is the fraction of packets transmitted fromstate 1 and 1 − p1/λ is the fraction transmitted fromhigher numbered states, in total we get
E[y] = (e − 1)(1 − p1/λ) =(e − 1)(λ − p1)
λ
The rate of packets transmitted from state 1 is p1
The probability of state higher than 1 is (1− p0 − p1) andsuccessful transmission with probability 1/e give rate ofpackets transmitted from higher states as (1− p0 − p1)/e
Thus we get λ = p1 + (1 − p0 − p1)/e
Information Networks – p.5/22
![Page 6: Approximate delay analysis - Linköping University...Approximate delay analysis Stabilized slotted Aloha with pseudo-Bayesian algorithm Assuming arrival rate is known Probability of](https://reader030.vdocuments.site/reader030/viewer/2022040303/5e8f827c89aab106785579d7/html5/thumbnails/6.jpg)
Approximate delay analysis
State 0 entered only if no new arrivals occurred in theprevious slot and previous state was 0 or 1, thusp0 = (p0 + p1)e
−λ
λe = (e − 1)p1 + 1 − p0
p0 = (e − 1)p1 + 1 − λe
(e − 1)p1 + (1 − λe) = ((e − 1)p1 + (1 − λe) + p1)e−λ
(e − 1)eλp1 + (1 − λe)eλ = (e − 1)p1 + (1 − λe) + p1
(1 − λe)(eλ − 1) = p1((e − 1)(1 − eλ) + 1)
p1 =(1 − λe)(eλ − 1)
1 − (e − 1)(eλ − 1)
Information Networks – p.6/22
![Page 7: Approximate delay analysis - Linköping University...Approximate delay analysis Stabilized slotted Aloha with pseudo-Bayesian algorithm Assuming arrival rate is known Probability of](https://reader030.vdocuments.site/reader030/viewer/2022040303/5e8f827c89aab106785579d7/html5/thumbnails/7.jpg)
Approximate delay analysis
Now, combining our equations
W = 1/2 + λWe + E[y]
E[y] =(e − 1)(λ − p1)
λ
p1 =(1 − λe)(eλ − 1)
1 − (e − 1)(eλ − 1)
We get
W =e − 1/2
1 − λe−
(e − 1)(eλ − 1)
λ(1 − (e − 1)(eλ − 1))
Information Networks – p.7/22
![Page 8: Approximate delay analysis - Linköping University...Approximate delay analysis Stabilized slotted Aloha with pseudo-Bayesian algorithm Assuming arrival rate is known Probability of](https://reader030.vdocuments.site/reader030/viewer/2022040303/5e8f827c89aab106785579d7/html5/thumbnails/8.jpg)
Time division multiplex
For comparison, consider the delay in a time divisionmultiplex system with m traffic streams of equal lengthpackets arriving according to a Poisson process withrate λ/m each
Time axis divided into m-slot frames with one time slotdedicated to each traffic stream
This corresponds to m M/D/1 queueing systems, eachwith service rate µ = 1/m
According to M/D/1-formula for queueing delay (3.45)p. 187 the average queueing delay is Wq = ρ/(2µ(1− ρ))
where ρ = λ/m1/m = λ
Information Networks – p.8/22
![Page 9: Approximate delay analysis - Linköping University...Approximate delay analysis Stabilized slotted Aloha with pseudo-Bayesian algorithm Assuming arrival rate is known Probability of](https://reader030.vdocuments.site/reader030/viewer/2022040303/5e8f827c89aab106785579d7/html5/thumbnails/9.jpg)
Time division multiplex
Thus we get average queueing delay
Wq =mλ
2(1 − λ)
In addition to this we have an average delay of m/2waiting for the traffic slot for the traffic stream inquestion
Our total average delay from a packet arrival until itbegins transmission is
WTDM =m
2(1 − λ)
Information Networks – p.9/22
![Page 10: Approximate delay analysis - Linköping University...Approximate delay analysis Stabilized slotted Aloha with pseudo-Bayesian algorithm Assuming arrival rate is known Probability of](https://reader030.vdocuments.site/reader030/viewer/2022040303/5e8f827c89aab106785579d7/html5/thumbnails/10.jpg)
TDM vs Stabilized Slotted Aloha
0 0.1 0.2 0.3 0.4 0.5 0.6 0.70
2
4
6
8
10
12
14
16
18
20
Stabilized Slotted Aloha in solid line, TDM with m = 8 in
dotted line and with m = 16 in dash-dotted line.
Information Networks – p.10/22
![Page 11: Approximate delay analysis - Linköping University...Approximate delay analysis Stabilized slotted Aloha with pseudo-Bayesian algorithm Assuming arrival rate is known Probability of](https://reader030.vdocuments.site/reader030/viewer/2022040303/5e8f827c89aab106785579d7/html5/thumbnails/11.jpg)
Binary exponential backoff
For packet radio networks and some other multiaccesssituations the assumption of immediate (0,1,e) feedbackis unrealistic
In some systems a node only receives feedback aboutits own packets, no feedback in about slots in which itdoes not transmit
This limited feedback is insufficient for the backlogestimation of pseudo-Bayesian strategy
An alternative stabilization strategy is binaryexponential backoff used in Ethernet
If a packet has been transmitted unsuccessfully i timesthe transmission in successive slots is set to qr = 2−i
Information Networks – p.11/22
![Page 12: Approximate delay analysis - Linköping University...Approximate delay analysis Stabilized slotted Aloha with pseudo-Bayesian algorithm Assuming arrival rate is known Probability of](https://reader030.vdocuments.site/reader030/viewer/2022040303/5e8f827c89aab106785579d7/html5/thumbnails/12.jpg)
Binary exponential backoff
When a packet initially arrives it is transmittedimmediately in next slot, since the node knows nothingof the backlog this is reasonable
With successive collisions any reasonable estimate ofbacklog would increase which motivates the decreasein retransmission probability qr
When qr is reduced the node gets less feedback perslot about the backlog, to play safe it’s reasonable toincrease the backlog estimate by larger and largeramounts on each successive collision
In the limit as number of nodes approach infinity thisstrategy is unstable for every arrival rate λ > 0
Information Networks – p.12/22
![Page 13: Approximate delay analysis - Linköping University...Approximate delay analysis Stabilized slotted Aloha with pseudo-Bayesian algorithm Assuming arrival rate is known Probability of](https://reader030.vdocuments.site/reader030/viewer/2022040303/5e8f827c89aab106785579d7/html5/thumbnails/13.jpg)
Unslotted Aloha
The original Aloha protocol was unslotted, in thisstrategy each node, upon receiving a new packet,transmits it immediately rather than waiting for a slotboundary
We omit the slotted system assumption
If a packet is involved in a collision, it is retransmittedafter a random delay
We assume that if the transmission times for twopackets overlap at all those packets fail andretransmission will be required
We assume that each node, after a given propagationdelay, can determine whether or not its packets werecorrectly received
Information Networks – p.13/22
![Page 14: Approximate delay analysis - Linköping University...Approximate delay analysis Stabilized slotted Aloha with pseudo-Bayesian algorithm Assuming arrival rate is known Probability of](https://reader030.vdocuments.site/reader030/viewer/2022040303/5e8f827c89aab106785579d7/html5/thumbnails/14.jpg)
Unslotted Aloha
If one packet starts transmission at time t, and allpackets have unit length, any other transmissionstarting between t − 1 and t + 1 will cause a collision
Assume infinite number of nodes
A node is considered backlogged from the time it hasdetermined that its previously transmitted packet wasinvolved in a collision until the time that it attemptsretransmission
Number of backlogged nodes is n
Assume that period until attempted retransmission τ isexponentially distributed with probability density xe−xτ ,where x is interpreted as retransmission attempt rate
Information Networks – p.14/22
![Page 15: Approximate delay analysis - Linköping University...Approximate delay analysis Stabilized slotted Aloha with pseudo-Bayesian algorithm Assuming arrival rate is known Probability of](https://reader030.vdocuments.site/reader030/viewer/2022040303/5e8f827c89aab106785579d7/html5/thumbnails/15.jpg)
Unslotted Aloha
With an overall Poisson arrival rate λ, the times ofattempted retransmissions is a time-varying Poissonprocess with rate G(n) = λ + nx where n is the backlogat a given time
Let τi be the interval between the ith and (i + 1)thtransmission attempt, the ith attempt will be successfulif both τi and τi−1 exceed 1 (assuming all packets havelength 1)
The probability distribution for the interval τi isG(n)e−G(n)τi thus the probability that τi > 1 is e−G(n)
Assuming τi and τi−1 independent gives probability ofsuccessful transmission Ps = e−2G(n)
Information Networks – p.15/22
![Page 16: Approximate delay analysis - Linköping University...Approximate delay analysis Stabilized slotted Aloha with pseudo-Bayesian algorithm Assuming arrival rate is known Probability of](https://reader030.vdocuments.site/reader030/viewer/2022040303/5e8f827c89aab106785579d7/html5/thumbnails/16.jpg)
Unslotted Aloha
Attempted transmissions occur at rate G(n), theexpected number of successful transmissions per unittime, the throughput as a function of n is G(n)e−2G(n)
The situation is very similar to slotted Aloha, except themaximum throughput is 1/(2e) achieved whenG(n) = 1/2
We have assumed that backlog is same in intervalssurrounding a given transmission attempt, but whenevera backlogged packet initiates a transmission thebacklog decreases by 1 and whenever a collided packetis detected it increases by 1, for small x this error isrelatively small
Information Networks – p.16/22
![Page 17: Approximate delay analysis - Linköping University...Approximate delay analysis Stabilized slotted Aloha with pseudo-Bayesian algorithm Assuming arrival rate is known Probability of](https://reader030.vdocuments.site/reader030/viewer/2022040303/5e8f827c89aab106785579d7/html5/thumbnails/17.jpg)
Unslotted Aloha
We have the same stability problems as in slotted Aloha
With limited feedback stability is quite difficult to achieveor analyze
One advantage with unslotted Aloha is that it can beused with variable length packets, this compensates forsome of the inherent throughput loss and gives anadvantage in simplicity
As for unstabilized slotted Aloha, if we have very smallarrival rate λ and very large mean retransmission timethe system can be expected to run for a long timewithout major backlog buildup.
Information Networks – p.17/22
![Page 18: Approximate delay analysis - Linköping University...Approximate delay analysis Stabilized slotted Aloha with pseudo-Bayesian algorithm Assuming arrival rate is known Probability of](https://reader030.vdocuments.site/reader030/viewer/2022040303/5e8f827c89aab106785579d7/html5/thumbnails/18.jpg)
Aloha Summary
Assuming Poisson arrivals, collision or perfectreception, (0,1,e) feedback, retransmission of collisions,either no buffering or infinite set of nodes
Already simplistic analysis identifies maximumthroughput 1/e at attempt rate G = 1
More precise model using a Markov chain with state n,the number of backlogged nodes
We can compute steady state probability distribution fornumber of backlogged nodes, and thus expectednumber of backlogged nodes and (using Little’stheorem) average delay
Information Networks – p.18/22
![Page 19: Approximate delay analysis - Linköping University...Approximate delay analysis Stabilized slotted Aloha with pseudo-Bayesian algorithm Assuming arrival rate is known Probability of](https://reader030.vdocuments.site/reader030/viewer/2022040303/5e8f827c89aab106785579d7/html5/thumbnails/19.jpg)
Slotted Aloha Stationary Probabilities
0 5 10 15 20 25 30−0.2
0
0.2
0.4
0.6
0.8
1
p0, p
1, p
m and rejection probability as function of number of nodes m
Information Networks – p.19/22
![Page 20: Approximate delay analysis - Linköping University...Approximate delay analysis Stabilized slotted Aloha with pseudo-Bayesian algorithm Assuming arrival rate is known Probability of](https://reader030.vdocuments.site/reader030/viewer/2022040303/5e8f827c89aab106785579d7/html5/thumbnails/20.jpg)
Slotted Aloha Average Delay
0 5 10 15 20 25 30 35 400
20
40
60
80
100
120
140
packet delay as function of nr of nodes, qr=0.2,0.3,0.4,0.6
Information Networks – p.20/22
![Page 21: Approximate delay analysis - Linköping University...Approximate delay analysis Stabilized slotted Aloha with pseudo-Bayesian algorithm Assuming arrival rate is known Probability of](https://reader030.vdocuments.site/reader030/viewer/2022040303/5e8f827c89aab106785579d7/html5/thumbnails/21.jpg)
Slotted Aloha Average Delay
5 10 15 20 25 300
2
4
6
8
10
12
14
16
18
20
packet delay as function of nr of nodes qr=0.05,0.1,0.2,0.3
Information Networks – p.21/22
![Page 22: Approximate delay analysis - Linköping University...Approximate delay analysis Stabilized slotted Aloha with pseudo-Bayesian algorithm Assuming arrival rate is known Probability of](https://reader030.vdocuments.site/reader030/viewer/2022040303/5e8f827c89aab106785579d7/html5/thumbnails/22.jpg)
Aloha Summary
Steady-state shows strange behaviour due to instability
Analysis of the dynamics via the drift
Stabilizing with pseudo-Bayesian algorithm, learningfrom the analysis of the dynamics
Need to estimate number of backlogged nodes n, this isdone from the feedback according to Bayesian strategyfor idle/successful and approximate Bayesian strategyfor collisions
Waiting delay until successful transmission
W =e − 1/2
1 − λe−
(e − 1)(eλ − 1)
λ(1 − (e − 1)(eλ − 1))
Information Networks – p.22/22