Download - 5TPH Gold Project

Transcript
Page 1: 5TPH Gold Project

5TPH rock gold mining project

Jiangxi Hengcheng Mining Equipment Company www.oreshaker.net

Page 2: 5TPH Gold Project

What we could do for customer• mineral testing / analysis • process flowchart design • mining machines• ground construction drawing design & site

planning• machine installation & workers training• other related consumables--groove

steel,steel plates,water pipes,electric circuite system,repair tools,etc

• from start to finish, all we could do&supply for you.

Page 3: 5TPH Gold Project

1. chute feeder

model: 500*600mm capacity: 5-10 t/hpower: 4.0 kw

Page 4: 5TPH Gold Project

3. Hammer crusher

model: PC400*600capacity: 5-10 t/hpower: 22.0 kw

Page 5: 5TPH Gold Project

4. ball mill

model: GM1530 (Dia:1500mm * length:3000mm)capacity: 5-8.0 t/hpower: 80.0 kw

Page 6: 5TPH Gold Project

5. spiral classifier

model: FLG-10 (spiral Dia: 1000mm) power: 5.5 kw

Page 7: 5TPH Gold Project

6. centrifugal concentrator

model: STLB-60 capacity: 5-8.0 t/h power: 4.0kw

Page 8: 5TPH Gold Project

7. 6S shaking table

model: 6S (deck type: slime deck)power: 1.1 kw capacity: 0.5-0.8 t/h

Page 9: 5TPH Gold Project

6. belt conveyor

belt width:650mm * length:10 meters power: 4.0 kw

Page 10: 5TPH Gold Project

7. slurry pump

model: 65QV-SP flowrate: 40cbm/h + head: 20 meterspower: 5.5kw

Page 11: 5TPH Gold Project

8. water pump

model: IS100-80-125 flowrate: 60-80 cbm/h + head: 20 meterspower: 11.0 kw

Page 12: 5TPH Gold Project

9. small melting furnace

model: GP-25 power: 25 kw melting amount: 3-5 kgs / time

Page 13: 5TPH Gold Project

Engineer show -Mr Jason He

in Mali

in Togo mine site

in Indonesia mine site


Top Related