FIELD REPORT
Owner Field Report #: 080731-01
Architect Project: Beaumont Medical Center - Commerce
Consultant Project #: 07-624
Contractor Contract: CM Date: July 31, 2008 Temp. Range: 80 – 85 Time: 2:00 – 3:30 pm Est. % of Completion: 10% Weather: mostly sunny, breezy Conformance with Schedule: NA Items to Verify, Information or Action Required: Attached are photos and comments.
The foundations for the various retaining walls,
screen walls and canopies will be complete next
week. The site water, sanitary and storm
undergrounds have passed the required tests.
Rough site grading is mostly complete, including
the retention pond. There is still some work with
the berms to complete. Steel lay down areas will be
in various parking areas around the building and a
View northwest at a footing pour for MRI port screen
wall north of column line 13.
center bay thru the building will provide a base for
a crane or 2 for steel erection beginning August
18th
.
Signature:
David Downes Project Architect DD Copy to: Beaumont Commerce Team
View north showing compacting operations along
column line J at generator enclosure.
View east of layout for excavating for column footings
for the canopy at main north building entrance.
View north along west berm at storm outlet of retention
pond.
View northwest showing building pad and main drives
from berm along southeast of site.
View west along south stabilized berm at storm outlet of
retention pond.
Overall view south showing rough grading for a new
berm along the east side of the northeast parking area.
View east towards the free-standing sign showing the
access panel for replacing internal lamps.