Page 1: © Feasibility Study Of Hybrid Retrofits To An Isolated Off-Grid Diesel Power Plant Rehman, S; El-Amin, IM; Ahmad, F; Shaahid, SM; Al-Shehri, AM; Bakhashwain,

©

Feasibility Study Of Hybrid Retrofits To An Isolated Off-Grid

Diesel

Power Plant

Rehman, S; El-Amin, IM; Ahmad, F; Shaahid, SM; Al-Shehri, AM;

Bakhashwain, JM; Shash, A

PERGAMON-ELSEVIER SCIENCE LTD, RENEWABLE SUSTAINABLE ENERGY

REVIEWS; pp: 635-653; Vol: 11

King Fahd University of Petroleum & Minerals

http://www.kfupm.edu.sa

Summary

The green sources of energy are being encouraged to reduce the environmental

pollution and combat the global warming of the planet. A target of 12%(, usage Of

wind energy only has been agreed by the UNO Country members to achieve by 2020.

So. the power or the wind is being used to generate electricity both as grid connected

and isolated wind-diesel hybrid power plants. This paper performed a pre-feasibility

of wind penetration into an existing diesel plant of a village in north eastern part of

Saudi Arabia. For Simulation purpose, wind speed data from a near by airport and the

load data from the village have been used. The hybrid system design tool HOMER

has been used to perform the feasibility study. In the present scenario, for wind speed

less than 6.0 m/s the. the existing diesel power plant is the only feasible Solution Over

the range Of fuel prices used in the simulation. The wind diesel hybrid system

becomes feasible at a wind speed of 6.0 m/s or more and a fuel price of 0.1 $/L or

more. If the carbon tax is taken into consideration and Subsidy is abolished then it is

expected that the hybrid system become feasible. The maximum annual capacity

shortage did not have any effect on the cost of energy which may he accounted for

larger sizes of wind machines and diesel generators. It is recommended that the wind

data must be collected at the village Lit three different heights using a wind mast of

40m for a minimum of one complete year and then the hybrid system must be re-

designed. (c) 2006 Elsevier Ltd. All rights reserved.Copyright: King Fahd University of Petroleum & Minerals;

http://www.kfupm.edu.sa

Page 2: © Feasibility Study Of Hybrid Retrofits To An Isolated Off-Grid Diesel Power Plant Rehman, S; El-Amin, IM; Ahmad, F; Shaahid, SM; Al-Shehri, AM; Bakhashwain,

1.2.3.4.5.6.7.8.9.10.11.12.13.14.15.16.17.18.19.20.21.22.23.24.25.26.27.28.29.30.31.32.

©

References:AZMI BIN AWI WIND DI*DEWIND, PUBL D DEWIND, V448ANSARI J, 1986, SAUDI ARABIAN WIND E, P1BAGUL AD, 1996, SOL ENERGY, V56, P323BARLEY CD, 1988, FEASIBILITY HYBRID RBEYER HG, 1996, SOL ENERGY, V57, P277ELAMIN I, 2004, EUR WIND EN C EWEC 2FORTUNATO B, 1997, SOL ENERGY, V60, P347HONG PN, 1996, SEAFDEC ASIAN AQUACU, V18, P6KHAN MJ, 2005, RENEW ENERG, V31, P835LIU W, TECHNOECONOMIC ASSESLUNDSAGER P, 1994, RENEW ENERGY 1, V5, P626MANWELL JF, 2004, RENEW ENERG, V29, P1707, DOI10.1016/j.renene.2004.02.003MARKVART T, 1996, SOL ENERGY, V57, P277MOHANDES MA, 1998, RENEW ENERG, V13, P345MOHANDES MA, 2004, RENEW ENERG, V29, P939, DOI10.1016/j.renene.2003.11.009PROTOGEROPOULOS C, 1994, P 12 EUR COMM PHOT S, P721REHMAN S, 1994, RENEW ENERG, V4, P949REHMAN S, 1994, SOL ENERGY, V53, P473REHMAN S, 2000, RENEWABLE ENERGY EDREHMAN S, 2003, 4 INT WORKSH LARG SCREHMAN S, 2003, RENEW ENERG, V28, P573REHMAN S, 2004, ASSESSMENT WIND ENER, V2, P906REHMAN S, 2004, ENERG CONVERS MANAGE, V45, P2019, DOI10.1016/j.enconman.2003.11.009REHMAN S, 2004, ENERGY, V29, P1105, DOI 10.1016/j.energy.2004.02.026REHMAN S, 2004, P 2 BSME ASME INT C, V2, P900REHMAN S, 2004, RENEW ENERG, V30, P447SHEN DC, APPL SMALL SIZE WINDSIDDIQUI AH, 2001, P 1 SAUD SCI C KING, V3, P3

For pre-prints please write to: [email protected]

Copyright: King Fahd University of Petroleum & Minerals;http://www.kfupm.edu.sa


Top Related