Doran Street and Broadway/Brazil Safety and Access Project Doran Street Interim Improvements March 28, 2016

Upload: others

Post on 03-Oct-2020

13 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Doran Street Interim Improvements - Metromedia.metro.net/.../regionalrail/presentation_doranstreet_2016-0328.… · Doran Street and Broadway/Brazil . Safety and Access Project

Doran Street and Broadway/Brazil Safety and Access Project Doran Street Interim Improvements

March 28, 2016

Page 2: Doran Street Interim Improvements - Metromedia.metro.net/.../regionalrail/presentation_doranstreet_2016-0328.… · Doran Street and Broadway/Brazil . Safety and Access Project

Doran Street At-Grade Crossing

• Several attempts by the CPUC to close this crossing

• Crossing deemed one of the most hazardous in L.A. County

2

Page 3: Doran Street Interim Improvements - Metromedia.metro.net/.../regionalrail/presentation_doranstreet_2016-0328.… · Doran Street and Broadway/Brazil . Safety and Access Project

Doran Street Area Overview

Doran StreetAt-Grade Crossing

Broadway/Brazil At-Grade Crossing

Existing Passenger and Freight Rail Corridor

• Fully developed area with industrial and commercial land uses

• Broadway/Brazil crossing is in close proximity

• Recent interim safety improvements at Broadway/Brazil

3

Page 4: Doran Street Interim Improvements - Metromedia.metro.net/.../regionalrail/presentation_doranstreet_2016-0328.… · Doran Street and Broadway/Brazil . Safety and Access Project

Doran Street Interim Improvements

• Main features:– Meets CPUC

requirements– Provides

emergency vehicle access

– Improves pedestrian safety

– Cul-de-sac for truck turn-around area

Page 5: Doran Street Interim Improvements - Metromedia.metro.net/.../regionalrail/presentation_doranstreet_2016-0328.… · Doran Street and Broadway/Brazil . Safety and Access Project

• Public Outreach:– 3/28/16

• Design Documents:– In Progress

• Construction:– Winter 2016 -

Summer 2017

Doran Street Interim Improvements:Timeline

Page 6: Doran Street Interim Improvements - Metromedia.metro.net/.../regionalrail/presentation_doranstreet_2016-0328.… · Doran Street and Broadway/Brazil . Safety and Access Project

Contact Information

• Mail: Mark DierkingCommunity & Municipal AffairsMetroOne Gateway Plaza, 99-13-1Los Angeles, CA 90012

• E-mail: [email protected]

• Phone: 213.922.2426

• Website: metro.net/regionalrail

• Social Media: facebook.com/doranstreet@DoranStreet