Doran Street and Broadway/Brazil Safety and Access Project Doran Street Interim Improvements
March 28, 2016
Doran Street At-Grade Crossing
• Several attempts by the CPUC to close this crossing
• Crossing deemed one of the most hazardous in L.A. County
2
Doran Street Area Overview
Doran StreetAt-Grade Crossing
Broadway/Brazil At-Grade Crossing
Existing Passenger and Freight Rail Corridor
• Fully developed area with industrial and commercial land uses
• Broadway/Brazil crossing is in close proximity
• Recent interim safety improvements at Broadway/Brazil
3
Doran Street Interim Improvements
• Main features:– Meets CPUC
requirements– Provides
emergency vehicle access
– Improves pedestrian safety
– Cul-de-sac for truck turn-around area
• Public Outreach:– 3/28/16
• Design Documents:– In Progress
• Construction:– Winter 2016 -
Summer 2017
Doran Street Interim Improvements:Timeline
Contact Information
• Mail: Mark DierkingCommunity & Municipal AffairsMetroOne Gateway Plaza, 99-13-1Los Angeles, CA 90012
• E-mail: [email protected]
• Phone: 213.922.2426
• Website: metro.net/regionalrail
• Social Media: facebook.com/doranstreet@DoranStreet