    PAKSBAB - Pakistan Straw Bale and Appropriate Building

    A project of Builders Without Borders

    Surkhab Khan, C.O.O.

    Darcey Donovan, P.E., C.T.O.

    www.paksbab.org

  • 8/13/2019 Donovan Paksbab Isbc

    2/30

    Kashmir Earthquake Oct. 8, 2005

    Mw = 7.6

    86,000 lives lost

    100,000 seriously injured

    3,500,000 people homeless

    780,000 buildings destroyed

  • 8/13/2019 Donovan Paksbab Isbc

    3/30

    How it all started (simplified version):

    Darcey volunteers to help advise a straw bale pilot project with Dosti

    Welfare Organization in northern Pakistan

    Surkhab is Assistant Program Officer and facilitates project

  • 8/13/2019 Donovan Paksbab Isbc

    4/30

    PAKSBABs mission:

    To apply straw bale and other appropriate building solutions to

    protect and improve the lives of the poor, especially in seismic and

    severe temperature regions of the developing world.

  • 8/13/2019 Donovan Paksbab Isbc

    5/30

    What makes PAKSBABs straw bale

    system unique?

    Earthquake resistant AND affordable Simple load bearing design

  • 8/13/2019 Donovan Paksbab Isbc

    6/30

    Straw bales are made with locally fabricated compression

    moulds and manually operated farm jacks

  • 8/13/2019 Donovan Paksbab Isbc

    7/30

    Foundation construction with fishing net for seismic reinforcement.

    Tops and sides of rock foundation are plastered with soil cement.

  • 8/13/2019 Donovan Paksbab Isbc

    8/30

    Straw bales are placed in a running bond with bamboo pins for

    out-of-plane support. Trusses are connected to top plates.

  • 8/13/2019 Donovan Paksbab Isbc

    9/30

    Ceiling is insulated with light straw clay. Slip is applied to walls, then

    base plaster coat. Fishing net is spread and attached to framing.

  • 8/13/2019 Donovan Paksbab Isbc

    10/30

    Second and final plaster coats are applied

    and finished with clay paint or lime wash

  • 8/13/2019 Donovan Paksbab Isbc

    11/30

    Jabori Womens Community

    Center, 2006

  • 8/13/2019 Donovan Paksbab Isbc

    12/30

    Hillkot Residence, 2006-2007

  • 8/13/2019 Donovan Paksbab Isbc

    13/30

    One-room 3-house project,

    Mansehra & Shinkiari, 2007

  • 8/13/2019 Donovan Paksbab Isbc

    14/30

    Community Development Program

    Gul Khan / Ghoria Bibi

    Qalandarabad, 2008

  • 8/13/2019 Donovan Paksbab Isbc

    15/30

    Bach Christian Hospital

    Employee Housing, 2009

  • 8/13/2019 Donovan Paksbab Isbc

    16/30

    Wheelchair accessible homes

    for SCIPPER patients, 2011-12

  • 8/13/2019 Donovan Paksbab Isbc

    17/30

    Engineers Without Borders Denmark

    10-House Project, 2012

  • 8/13/2019 Donovan Paksbab Isbc

    18/30

    PAKSBAB Seismic Research Project

    2008-2009

    A NEES Shared Use Project

    @ the University of Nevada, Reno

    Sponsored by the Earthquake Engineering

    Research Institute (EERI)

    In-plane cyclic tests of 4 straw bale wall assemblies 8 shake table tests of full scale 14x14x 10 house

  • 8/13/2019 Donovan Paksbab Isbc

    19/30

    Straw bale wall specimen construction

  • 8/13/2019 Donovan Paksbab Isbc

    20/30

    In-plane cyclic test

    4 foot wall with light detailing (no reinforcement)

    In-Plane Cyclic Test Protocol

  • 8/13/2019 Donovan Paksbab Isbc

    21/30

    In-plane cyclic test

    4 foot wall with medium detailing (#9 fishing net reinforcement)

  • 8/13/2019 Donovan Paksbab Isbc

    22/30

    In-plane cyclic test

    4 foot wall with heavy detailing (#12 fishing net reinforcement)

  • 8/13/2019 Donovan Paksbab Isbc

    23/30

    In-plane cyclic test

    8 foot wall with heavy detailing (#12 fishing net reinforcement)

  • 8/13/2019 Donovan Paksbab Isbc

    24/30

    Wall Test 4 Load vs. Displacement

    -2500

    -2000

    -1500

    -1000

    -500

    0

    500

    1000

    1500

    2000

    2500

    -6 -4 -2 0 2 4 6

    Displacement (in.)

    Load(

    lb)

    Wall Test 3 Load vs. Displacement

    -1000

    -800

    -600

    -400

    -200

    0

    200

    400

    600

    800

    -10 -8 -6 -4 -2 0 2 4 6

    Displacement (in.)

    Load(

    lb)

    PAKSBAB Wall Test 1

    -600

    -400

    -200

    0

    200

    400

    600

    -4 -3 -2 -1 0 1 2 3 4

    Lateral Wall Displacement (inches)

    Lateral

    allCap

    acity(lbs

    PAKSBAB Wall Test 2

    -800

    -600

    -400

    -200

    0

    200

    400

    600

    800

    -10 -8 -6 -4 -2 0 2 4 6

    Lateral Wall Displacement (inches)

    Lateral

    allCap

    acity(lbs

  • 8/13/2019 Donovan Paksbab Isbc

    25/30

    Straw bale house construction on portable platform /

    lifting onto shake table

  • 8/13/2019 Donovan Paksbab Isbc

    26/30

    House survived 8 increasing levels of earthquakes / 0.8g acceleration -

    larger than 0.3-0.6g estimates of the Kashmir Earthquake

  • 8/13/2019 Donovan Paksbab Isbc

    27/30

    To view a video of PAKSBABs shake table tests -

    http://nees.unr.edu/projects/straw_bale_house.html

  • 8/13/2019 Donovan Paksbab Isbc

    28/30

    Whats next: Global Social Benefit Incubator at Santa

    Clara University / Jawad Aslam, C.E.O.

    Ansaar Management Company

    Bari Imam Accessible Group Home

    Rural Permaculture Pilot Project

    Low-income Housing Development Pilot

    Project

  • 8/13/2019 Donovan Paksbab Isbc

    29/30

    Thoughts:

    Organization/company building and SBbuilding co-emphasis

    Systems (permaculture) approach

    Non-profit versus for-profit social enterprise

    Microfinance mortgages need to be

    investigated

    Carbon project certification / offsets subsidize

    micro-income clients

  • 8/13/2019 Donovan Paksbab Isbc

    30/30

    Providing appropriate building solutions

    for people, planet and peace

    www.paksbab.org