dong fang history
DESCRIPTION
historyTRANSCRIPT
-
Warmly
Welcome
-
PRESENTATION ON DEC2007
-
1. Brief Introduction of DEC
2. Project Implementation
3. Manufacture Capabilities
-
Location of DEC: Chengdu, Sichuan, China
Chengdu, Sichuan Province
India
-
1.1 General of DEC
1. One of the Largest Companies in China
Specializing in Electric Power Equipment
Manufacture and Power Project Contracting.
2. Own and operate several major large-scale
manufacturing undertaking:
Dongfang Boiler Group Co. Ltd. (DBC),
Dongfang Steam Turbine Works (DFSTW),
Dongfang Electrical Machinery Co., Ltd. (DFEM),
Sichuan Dongfeng Electric Machinery Co., Ltd.
(DFEMW),
Zhongzhou Steam Turbine Works,
Over twenty operating subsidiaries.
1. Brief Introduction of DEC
-
Electrical Machinery Workshop Overview
-
Generator Manufacture Facilities -1
-
Generator Manufacture Facilities -2
-
Dongfang Steam Turbine Works
-
Blades Manufacture Facilities
in Turbine Workshop
-
Manufacture Facilities
in Turbine Workshop
-
Boiler Workshop
-
DEC Heavy-duty Machinery LTD
in Guangzhou
Manufacture Nuclear Power
Equipment and Gas-turbine
Products
-
1.2 Support from Central Government
Specified by Chinese Central Government as one
of 53 top prime enterprises relating national
security and economy.
1. Directly controlled by State-owned Assets
Supervision and Administration Commission of the
State Council (SASAC)
2. Attention from High Authorities: Hu Jintao, Jiang
Zemin, Li Peng, Zhu Rongji have inspected DEC.
3. Direct support to DEC for Project Finance (inside
and outside of China).
-
Former President
Jiang Zemin
Inspected DEC
President Hu Jintao
Inspected DEC
-
Premier Mr. Premier Mr. WenWen JiabaoJiabao visited DECvisited DEC
-
Former Premier Li Peng
Inspected DEC in 1994
Former Premier Zhu Rongji
Inspected DEC in 1996
-
2.1 Active Worldwide Power Projects Contractor
The ranking among the Top 225 International Contractors by
the ENR (Engineering News-Record) - International Directory
of Contractors of U.S.A. during the last five years.
Ranked 74 as of 2003
Ranked 76 as of 2002
Ranked 76 as of 2001
Ranked 109 as of 2000
Ranked 90 as of 1999
2. Project Implementation
-
2.2 Quality Assurance
Quality assurance will follow the QA programs for
DEC and its Subcontractors.
The audit and registration of
certification of ISO9001.
ISO9001ISO9001
-
Boiler:
Certificate of
ASME UU2
S Qualification
Turbine:
Certificate of ASME
U Qualification
U and S Certificate for Boiler and Turbine
-
24 hours
service
spirit
lifelong
service for
plant
Customer
DEC
Emergency
Service
Residential
Representative to
Plant
Spare Parts
supply
DEC
International
Training
And
Routine Service
2.3 Service
-
2.4 Typical Thermal Projects
Thermal Project 1
Guang An Thermal Power Plant
Capacity: 4x300MW+2x600MW
Fuel: High Ash Coal
Location: Sichuan, China
-
Thermal Project 2 Zhouxian Thermal Power Plant
Capacity: 2X1000MW
Fuel: Coal
Capacity: 2X600MW
Fuel: Coal
-
Thermal Project - 3
Shalingzi Thermal Power Plant, 8x300MW in Operation
-
Capacity: 2X50MW
Location: Kuching, Malaysia
Thermal Project - 4
Kuching Power Plant
-
The largest unit & total capacity,
the most advanced power plant
equipment exported from China
Capacity: 4x325MW
Location: Arak, Iran
Arak 4x325MW Power Plant
Thermal Project 5.1
-
Thermal Project 5.2
Arak 4x325MW Power Plant
-
Thermal Project 6
Capacity: 4x123.4MW
Fuel: Crude Oil &Natural gas
Location: Baghdad, Iraq
Contract Basis: EPC
AL-QUDIS Gas Turbine
Power PlantUnder UN Oil-for-Food Program
Two units in operation from 2002,
The remaining two units restarted
upon the request of UN after the
Iraq war
-
Thermal Projects In India
-
New Thermal Projects-1: in India
Amarkantak (1+1)x300MW Project
-
Vietnam Hai Phong 2x300MW Anthracite Coal Fired Power
Plant Turn-key EPC Contract
New Thermal Projects-2: in Vietnam
-
New Thermal Projects-3: in Vietnam
Vietnam Hai Phong phase II 2x300MW Anthracite Coal
Fired Power Plant Turn-key EPC Contract
-
New Thermal Projects-4: in Indonesia
Indonesia Batam 2x55MW Coal Fired Power Plant
Turn-key EPC Contract
-
2.5 Typical Hydro Projects
Hydro Project - 1
Gazi-Barotha Hydro Power Project
The largest Power Project In Pakistan
-
Hydro Project - 2
4x400MW for Lijiaxia Power Plant, Francis Turbine
H=122M RPM=125 Operation in 1997
-
Hydro Project - 3
Kaplan Type
H=18.6M
RPM=64.6
D=11.3M
Largest one in the World
2x170MW for
Gezhouba No.1
Power Plant
-
3.1 Manufacture Capabilities in Brief
CAPACITY THERMAL
POWER
HYDRO
POWER
NUCLEAR
POWER
Wind Power Gas Turbine
ANNUAL 26000MW 5000MW
AGGREGATE
10s sets of
1000MW
100s Sets of
600/660MW
More than 100
Sets of
300MW~350MW
More than 100
Sets of
200/210MW
Hundreds of
200MW below
Over 100 Sets
from 320KW
to 700MW
4 sets of
1000MW
Unit Capacity
1. 5MW
400 Sets
16 Sets of
701F
(270MW)
3. Manufacture Capabilities
-
3.2 Main Technology Background - Boiler
1. Over 30 years of development on
small size, 100~135MW, 200/210MW
and 300~350MW, 600/660MW and
1000MW;
2. 300MW technology transferred from
CE, U.S.A;
3. Design and manufacture for
300~600MW Double Arch Boiler for
anthracite, CFB Boiler, under
License of Foster Wheeler, USA;
4. Technology transfer for design and
manufacture of 300MW CFB Boiler
From Alstom.
5. Technology transfer from Hitachi
Babcock for 600~1000MW
supercritical boiler.
-
600MW Boiler Drum600MW Boiler Drum
-
300MW Double Arch Boiler for Shangan Thermal Power Plant
Oct. 1997 in Operation
-
3.3 Main Technology Background - T/G
1. Over 40 years of development on small size, 100~150MW,
200/210MW, 300~350MW,600/660MW and 1000MW;
2. 300 MW technology transferred from Westinghouse, USA;
3. Co-design and Co-manufacture 300~350MW, 600/660MW,
1000MW T/G with Hitachi , Japan;
4. 270MW Gas Turbine with Mitsubishi, Japan.
-
Client: Zhouxian Thermal Power Plant
1000MW Steam Turbine1000MW Steam Turbine
-
600MW Steam Turbine and Generator
-
Unit Capacity 270MW
Efficiency 38.2%
Combine Cycle 400MW
Efficiency of CC 58.3%
3.4 Gas-turbine
M701F Heavy-duty Gas-turbine
-
Huizhou 3x400MW Combine Cycle Power Plant
Fuel: Gas
-
3.5 1000MW Nuclear Power Plant Equipment
Lingao Nuclear Power Plant,
Guangdong China
Delivery
-
Nuclear Projects
-
Contract Signing for Nuclear Power Project
-
3.6 Hydro Power Equipment
700MW
with VGS for
Sanxia (Three Gorges) Power Plant
H=80.6M
RPM=75
Hydro Equipment Up To 700MW
-
Three Gorge Hydropower Plant
The largest Hydro project in the world
First Unit in Operation
from July, 2003
-
3.7 Wind Power Equipment
1.5 MW Wind Turbine
Generator
-
Pooling of
Talented Technicians
Pooling of
Talented Technicians
Worldwide Technology
Cooperation
Worldwide Technology
Cooperation
Strategic
Priority
Strategic
Priority
Well-Equipped
Facilities
Well-Equipped
Facilities
Professional
Experiences
Professional
Experiences
DEC
R&D System
DEC
R&D System
40% human resources are
engineers and specialists
Meet Clients
Requirement
Meet Clients
Requirement
Products
Improvement
Products
Improvement
New Products
Development
New Products
Development
Model Project
Development
Model Project
Development
Manufacture
Technology
Development
Manufacture
Technology
Development
3.8 Research & Development
China State Postdoctoral Study
Center for Power Generating
Equipment (BTG)
-
THANK YOU