  • Warmly

    Welcome

  • PRESENTATION ON DEC2007

  • 1. Brief Introduction of DEC

    2. Project Implementation

    3. Manufacture Capabilities

  • Location of DEC: Chengdu, Sichuan, China

    Chengdu, Sichuan Province

    India

  • 1.1 General of DEC

    1. One of the Largest Companies in China

    Specializing in Electric Power Equipment

    Manufacture and Power Project Contracting.

    2. Own and operate several major large-scale

    manufacturing undertaking:

    Dongfang Boiler Group Co. Ltd. (DBC),

    Dongfang Steam Turbine Works (DFSTW),

    Dongfang Electrical Machinery Co., Ltd. (DFEM),

    Sichuan Dongfeng Electric Machinery Co., Ltd.

    (DFEMW),

    Zhongzhou Steam Turbine Works,

    Over twenty operating subsidiaries.

    1. Brief Introduction of DEC

  • Electrical Machinery Workshop Overview

  • Generator Manufacture Facilities -1

  • Generator Manufacture Facilities -2

  • Dongfang Steam Turbine Works

  • Blades Manufacture Facilities

    in Turbine Workshop

  • Manufacture Facilities

    in Turbine Workshop

  • Boiler Workshop

  • DEC Heavy-duty Machinery LTD

    in Guangzhou

    Manufacture Nuclear Power

    Equipment and Gas-turbine

    Products

  • 1.2 Support from Central Government

    Specified by Chinese Central Government as one

    of 53 top prime enterprises relating national

    security and economy.

    1. Directly controlled by State-owned Assets

    Supervision and Administration Commission of the

    State Council (SASAC)

    2. Attention from High Authorities: Hu Jintao, Jiang

    Zemin, Li Peng, Zhu Rongji have inspected DEC.

    3. Direct support to DEC for Project Finance (inside

    and outside of China).

  • Former President

    Jiang Zemin

    Inspected DEC

    President Hu Jintao

    Inspected DEC

  • Premier Mr. Premier Mr. WenWen JiabaoJiabao visited DECvisited DEC

  • Former Premier Li Peng

    Inspected DEC in 1994

    Former Premier Zhu Rongji

    Inspected DEC in 1996

  • 2.1 Active Worldwide Power Projects Contractor

    The ranking among the Top 225 International Contractors by

    the ENR (Engineering News-Record) - International Directory

    of Contractors of U.S.A. during the last five years.

    Ranked 74 as of 2003

    Ranked 76 as of 2002

    Ranked 76 as of 2001

    Ranked 109 as of 2000

    Ranked 90 as of 1999

    2. Project Implementation

  • 2.2 Quality Assurance

    Quality assurance will follow the QA programs for

    DEC and its Subcontractors.

    The audit and registration of

    certification of ISO9001.

    ISO9001ISO9001

  • Boiler:

    Certificate of

    ASME UU2

    S Qualification

    Turbine:

    Certificate of ASME

    U Qualification

    U and S Certificate for Boiler and Turbine

  • 24 hours

    service

    spirit

    lifelong

    service for

    plant

    Customer

    DEC

    Emergency

    Service

    Residential

    Representative to

    Plant

    Spare Parts

    supply

    DEC

    International

    Training

    And

    Routine Service

    2.3 Service

  • 2.4 Typical Thermal Projects

    Thermal Project 1

    Guang An Thermal Power Plant

    Capacity: 4x300MW+2x600MW

    Fuel: High Ash Coal

    Location: Sichuan, China

  • Thermal Project 2 Zhouxian Thermal Power Plant

    Capacity: 2X1000MW

    Fuel: Coal

    Capacity: 2X600MW

    Fuel: Coal

  • Thermal Project - 3

    Shalingzi Thermal Power Plant, 8x300MW in Operation

  • Capacity: 2X50MW

    Location: Kuching, Malaysia

    Thermal Project - 4

    Kuching Power Plant

  • The largest unit & total capacity,

    the most advanced power plant

    equipment exported from China

    Capacity: 4x325MW

    Location: Arak, Iran

    Arak 4x325MW Power Plant

    Thermal Project 5.1

  • Thermal Project 5.2

    Arak 4x325MW Power Plant

  • Thermal Project 6

    Capacity: 4x123.4MW

    Fuel: Crude Oil &Natural gas

    Location: Baghdad, Iraq

    Contract Basis: EPC

    AL-QUDIS Gas Turbine

    Power PlantUnder UN Oil-for-Food Program

    Two units in operation from 2002,

    The remaining two units restarted

    upon the request of UN after the

    Iraq war

  • Thermal Projects In India

  • New Thermal Projects-1: in India

    Amarkantak (1+1)x300MW Project

  • Vietnam Hai Phong 2x300MW Anthracite Coal Fired Power

    Plant Turn-key EPC Contract

    New Thermal Projects-2: in Vietnam

  • New Thermal Projects-3: in Vietnam

    Vietnam Hai Phong phase II 2x300MW Anthracite Coal

    Fired Power Plant Turn-key EPC Contract

  • New Thermal Projects-4: in Indonesia

    Indonesia Batam 2x55MW Coal Fired Power Plant

    Turn-key EPC Contract

  • 2.5 Typical Hydro Projects

    Hydro Project - 1

    Gazi-Barotha Hydro Power Project

    The largest Power Project In Pakistan

  • Hydro Project - 2

    4x400MW for Lijiaxia Power Plant, Francis Turbine

    H=122M RPM=125 Operation in 1997

  • Hydro Project - 3

    Kaplan Type

    H=18.6M

    RPM=64.6

    D=11.3M

    Largest one in the World

    2x170MW for

    Gezhouba No.1

    Power Plant

  • 3.1 Manufacture Capabilities in Brief

    CAPACITY THERMAL

    POWER

    HYDRO

    POWER

    NUCLEAR

    POWER

    Wind Power Gas Turbine

    ANNUAL 26000MW 5000MW

    AGGREGATE

    10s sets of

    1000MW

    100s Sets of

    600/660MW

    More than 100

    Sets of

    300MW~350MW

    More than 100

    Sets of

    200/210MW

    Hundreds of

    200MW below

    Over 100 Sets

    from 320KW

    to 700MW

    4 sets of

    1000MW

    Unit Capacity

    1. 5MW

    400 Sets

    16 Sets of

    701F

    (270MW)

    3. Manufacture Capabilities

  • 3.2 Main Technology Background - Boiler

    1. Over 30 years of development on

    small size, 100~135MW, 200/210MW

    and 300~350MW, 600/660MW and

    1000MW;

    2. 300MW technology transferred from

    CE, U.S.A;

    3. Design and manufacture for

    300~600MW Double Arch Boiler for

    anthracite, CFB Boiler, under

    License of Foster Wheeler, USA;

    4. Technology transfer for design and

    manufacture of 300MW CFB Boiler

    From Alstom.

    5. Technology transfer from Hitachi

    Babcock for 600~1000MW

    supercritical boiler.

  • 600MW Boiler Drum600MW Boiler Drum

  • 300MW Double Arch Boiler for Shangan Thermal Power Plant

    Oct. 1997 in Operation

  • 3.3 Main Technology Background - T/G

    1. Over 40 years of development on small size, 100~150MW,

    200/210MW, 300~350MW,600/660MW and 1000MW;

    2. 300 MW technology transferred from Westinghouse, USA;

    3. Co-design and Co-manufacture 300~350MW, 600/660MW,

    1000MW T/G with Hitachi , Japan;

    4. 270MW Gas Turbine with Mitsubishi, Japan.

  • Client: Zhouxian Thermal Power Plant

    1000MW Steam Turbine1000MW Steam Turbine

  • 600MW Steam Turbine and Generator

  • Unit Capacity 270MW

    Efficiency 38.2%

    Combine Cycle 400MW

    Efficiency of CC 58.3%

    3.4 Gas-turbine

    M701F Heavy-duty Gas-turbine

  • Huizhou 3x400MW Combine Cycle Power Plant

    Fuel: Gas

  • 3.5 1000MW Nuclear Power Plant Equipment

    Lingao Nuclear Power Plant,

    Guangdong China

    Delivery

  • Nuclear Projects

  • Contract Signing for Nuclear Power Project

  • 3.6 Hydro Power Equipment

    700MW

    with VGS for

    Sanxia (Three Gorges) Power Plant

    H=80.6M

    RPM=75

    Hydro Equipment Up To 700MW

  • Three Gorge Hydropower Plant

    The largest Hydro project in the world

    First Unit in Operation

    from July, 2003

  • 3.7 Wind Power Equipment

    1.5 MW Wind Turbine

    Generator

  • Pooling of

    Talented Technicians

    Pooling of

    Talented Technicians

    Worldwide Technology

    Cooperation

    Worldwide Technology

    Cooperation

    Strategic

    Priority

    Strategic

    Priority

    Well-Equipped

    Facilities

    Well-Equipped

    Facilities

    Professional

    Experiences

    Professional

    Experiences

    DEC

    R&D System

    DEC

    R&D System

    40% human resources are

    engineers and specialists

    Meet Clients

    Requirement

    Meet Clients

    Requirement

    Products

    Improvement

    Products

    Improvement

    New Products

    Development

    New Products

    Development

    Model Project

    Development

    Model Project

    Development

    Manufacture

    Technology

    Development

    Manufacture

    Technology

    Development

    3.8 Research & Development

    China State Postdoctoral Study

    Center for Power Generating

    Equipment (BTG)

  • THANK YOU