Dominion Energy
Questar Pipeline, LLC Introduction and Overview
1
Dominion Energy – Core Values
2
Our highest priority is keeping our
employees and communities safe
Doing right and doing well are
inseparable
Best in class ESG performance helps
drive long-term value creation
Innovative culture drives approach to clean energy and
workforce opportunities
Sustainable performance
depends on how well we support
one another
3
Power Delivery
Power Generation Gas Infrastructure Southeast
Energy
Historic Dominion Energy operating segments have delivered best-in-class operational performance but more than a decade of repositioning has changed the composition of our company
Dominion Energy Company Profile
3
Dominion Energy Emission Targets
4
Dominion Energy West - transports and stores natural gas in the “heart of the Rockies” with 2,638 miles of pipe and 54 Bcf storage (working gas)
Dominion Energy West – Hub of the Rockies
5
WRH
Northwest Pipeline
Ruby Pipeline
Kern River
Rockies Express TransColorado
Northwest Pipeline Wyoming Interstate Colorado Interstate
DEOP
Kern River
Ruby Northwest
REX Colorado Interstate
Kern River Pipeline
GREEN RIVER BASIN
UINTA BASIN PICEANCE
BASIN
DEQP
White River Hub (WRH) - 2,540 Mdth/d (Firm Contracted Capacity)
Clay Basin - 54 Bcf of working gas
Northwest Pipeline
Dominion Energy Questar Pipeline (DEQP) - 1,907 Mdth/d
Dominion Energy Overthrust Pipeline (DEOP) - 1,636 Mdth/d
Kern River Pipeline
Dominion Energy Questar Pipeline
Dominion Energy Overthrust Pipeline
CLAY BASIN
WHITE RIVER HUB DEQP
Rockies Exp. Northwest
T-Colorado WIC CIG
OPAL DEQP DEOP
Kern River
Ruby CIG
Northwest WAMSUTTER
DEQP CIG
Rockies Exp. WIC
GOSHEN DEQP Kern River
Regional Information Description
Natural Gas Storage
(BCF)
Clay Basin (54 BCF): FSS, ISS, PAL Ryckman Creek (35 BCF): Firm Storage, PAL
Potential Magnum Gas Storage
Interconnect Capacity
(Dth/d)
OTPL to Kern: 1,200,000 Dth/d (Hams Fork, Roberson, Painter)
Kern/QPC @ Goshen: 492,000 Dth/d
Regional Processing Plant Capacity
(Dth/d)
Iron Horse (310,000), Red Wash (140,000), Chipeta (970,000), Enterprise (1,500,000),
Vermillion (43,000), Granger (300,000), Blacks Fork (835,000), Opal (1,400,000), Pioneer
(525,000) Patrick Draw (125,000), Echo Springs (700,000), Willow Creek (450,000)
Major Interconnects
6
Demand Driven Customer Mix
Production 25%
LDC/Industrial 68%
Demand Driven Customer Mix • DEQP is uniquely positioned to
provide transportation service to large end users (LDC’s and Industrials)
• Demand Driven capacity provides more consistent opportunities for re-contracting and growth
• DEOP is designed for delivery to eastern and western markets providing clients with multiple markets.
7
DEQP Transportation Contracts
LCD/Industrial 68%
Marketing 7%
Production 25%
DEOP Transportation Contracts
Pipelines 41%
Marketing 35%
Production 23%
Getting Started
Step 1: Customer Access
• Complete online request for new customer access to Questline®
• Print out completed forms, sign, and return to DEQP
• Contracting Department Hotline Number: 801-324-5200
Step 2: Credit
• Credit analysis will be performed to determine creditworthiness compliance as described in DEQP’s FERC Gas Tariff. Parties may be required to post letter of credit or collateral, depending on credit review.
8
DEQP Transportation Services
9
Currently EffectiveT-1 Rates • Monthly RDC: $5.28804/Dth
• Authorized Overrun (AO): $0.17652/Dth
• Unauthorized Overrun (UAO): $10.00000/Dth
• UAO, Non-Critical: $0.0013/Dth
Currently Effective SSXP Rates • Monthly RDC: $7.82712/Dth
• AO: $0.26000/Dth
• UAO: $10.00000/Dth
• UAO, Non-Critical: $0.52000/Dth
Other Currently Effective Rates • FP: Monthly Charge $2.64402/Dth
• NNT: Max Monthly $0.86753/Dth
• T-2: Daily Charge $0.17652/Dth
• Fuel: Postage Stamp – Paid in kind 1.57%
• ACA: Updated in October $0.00130/Dth
• Usage: $0.00267/Dth
• Imbalance: OBA’s and Transport 5%
10
DEQP Storage Services Currently Effective PKS Rates
• Monthly RDC $2.87375/Dth
• Injection: $0.03872/Dth
• Withdrawal: $0.03872/Dth
Currently Effective SSXP Rates • Monthly Deliverability: $2.85338/Dth
• Capacity $0.02378/Dth
• Injection $0.01049/Dth
• Withdrawal $0.01781/Dth
• AO $0.20215/Dth
Other Currently Effective Rates • ISS: Inventory $0.05927/Dth
Injection $0.01049/Dth
Withdrawal $0.01781/Dth
• Fuel: Utility Updates Monthly
Operational Fuel & Shrinkage Updates Monthly
Stipulation Reimbursement Factor 0.3%
• PAL1: Delivery $0.30315/Dth
Daily Charge $0.02830/Dth
Fuel (0.2% Utility, 1.8% Compressor) 2%
• PAL2: Initiation $0.20846/Dth
Inventory $0.17570/Dth
DEOP Transportation Services
11
Currently Effective FT Rates • Monthly RDC: $1.62000/Dth
• AO: $0.05690/Dth
• UAO, Maximum: $10.00000/Dth
Other Currently Effective Rates • IT: Daily Rate $0.05690/Dth
• Usage: Applies to IT & FT $0.00167/Dth
• ACA: Updates Every October $0.00130/Dth
• Fuel: Path Specific Updates Monthly
• Imbalance: OBA’s and Transport 10%
WRH Transportation Services
12
Currently Effective FT Rates • Monthly RDC: $0.31183/Dth
• AO: $0.01025/Dth
• UAO: $10.00000/Dth
• UAO, Non-Critical: $0.01025/Dth
Currently Effective RGS Rates • Monthly RDC: $0.31183/Dth
• AO $0.01025/Dth
• UAO $10.00000/Dth
• UAO, Non-Critical $0.01025/Dth
Other Currently Effective Rates • IT: Daily Charge $0.17652/Dth $0.01025/Dth
• Fuel: Updates Monthly
• Usage: N/A
• ACA: Updated in October $0.00130
• Imbalance: OBA’s and Transport 5%
WRH & STP Capacity Bidding Process
Qualifications for Bidding
• Satisfy creditworthiness provision and Questline access requirements
Bid Period
• Held on 8th Business Day prior to the end of the month
Competing Bids
• If no competing bids, the bid period will close at 1:00 p.m.
• If competing bids are received, parties who submitted bids will have an opportunity to post an updated bid
Sale of Capacity following Bid Periods
• Capacity remaining after close of bid period may be acquired on a first-come, first-served basis
13
Notice of Available Capacity On or about the 1st day of each month, WRH and STP will post a notice of any available capacity
• Effective December 1, 2017 DEQP and February 1, 2019 for DEOP, new tariff procedures for capacity and amendments went into effect.
• Changes:
• All capacity that is posted is available for first come first served requests
• Ability to arrange prearranged deals
• Ability to hold bid periods of one to three days for capacity
- Shortened and changed terms if a compete round occurs
• Available Firm Capacity Amendments occur on 4th to last business day of each month
DEQP & DEOP Capacity Sale Process
14
Opportunities - Fidlar Compression Expansion
15
DEOP
DEQP
GOSHEN
PRICE/FERRON FIDLAR (Additional
Compression)
WHITE RIVER HUB
Opportunities - Fidlar Compression Expansion
16
Incremental Capacity (Dth/d)
80,000
Receipts • White River Hub • Cryo plants near Fidlar into ML 104 • Other DEQP points as available
Delivery • Kern at Goshen • MAP 164 Wasatch Front City Gate (Payson)
Term 15 Years
Rate (Dth/d) $0.17652
Why Do Business with Us?
• System Flexibility
• Bi-Directional Pipeline
• Balancing: 5 % DEQP, 10 % DEOP
• Access to Rocky Mountain Supply and large end use markets via connects with Kern River, Ruby,
NWP, WIC, and REX
• Balanced Mix of Customers
• Competitive Rates
• Top 10 Regional Pipeline Customer Service (Mastio Survey Results)
17
Contact Information: Please Contact Your Marketing or BD Rep for Assistance
18
Name Phone E-mail
Joseph Hulse – Manager, Marketing 801-324-5138 [email protected]
Daniel Gardner 801-324-2753 [email protected]
Tom Myrberg 801-324-2978 [email protected]
Mike Molenaar 801-324-5562 [email protected]
Jack Czapiga 801-324-5070 [email protected]