doc.: 11-09-0720-02 submission july 2009 d. stanley (aruba), b.kraemer (marvell) slide 1 p802.11v...

10
July 20 09 D. St anley (Aru Slide 1 doc.: 11-09-0720-02 Submission P802.11v Report to EC on Conditional Approval to go to Sponsor Ballot Date: 2009-07-16 N am e C om pany A ddress Phone em ail Dorothy Stanley A ruba N etw orks 1322 Crossm an A ve Sunnyvale, CA 94089 +1 (630) 363 1389 dstanley@ arubanetworks. com Bruce K raem er M arvell 5488 M arvellLane, Santa Clara, CA 95054 +1 (321) 427-4098 bkraemer@ marvell.com Authors:

Upload: gregory-cummings

Post on 18-Jan-2018

217 views

Category:

Documents


0 download

DESCRIPTION

doc.: Submission July 2009 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 3 TGv draft text stability Jan-07Jul-07Jan-08Jul-08Jan-09Jul-09 # pages AP MIB added 6.0

TRANSCRIPT

Page 1: Doc.: 11-09-0720-02 Submission July 2009 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11v Report to EC on Conditional Approval to go to Sponsor

July 2009

D. Stanley (Aruba), B.Kraemer (Marvell)

Slide 1

doc.: 11-09-0720-02

Submission

P802.11v Report to EC on Conditional Approval to go to Sponsor Ballot

Date: 2009-07-16

Name Company Address Phone email Dorothy Stanley Aruba Networks 1322 Crossman Ave

Sunnyvale, CA 94089 +1 (630) 363 1389

[email protected]

Bruce Kraemer Marvell 5488 Marvell Lane, Santa Clara, CA 95054

+1 (321) 427-4098 [email protected]

Authors:

Page 2: Doc.: 11-09-0720-02 Submission July 2009 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11v Report to EC on Conditional Approval to go to Sponsor

July 2009

D. Stanley (Aruba), B.Kraemer (Marvell)

Slide 2

doc.: 11-09-0720-02

Submission

Introduction

• This document contains the report to the IEEE 802 Executive Committee in support of a request for conditional approval to send IEEE P802.11v to Sponsor Ballot.

• This document (11-09/0720r1) was approved during the closing plenary session of the 802.11 working group on July 17, 2009.– Passed in the Task Group 8-0-3– Passed in the Working Group <result>

Page 3: Doc.: 11-09-0720-02 Submission July 2009 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11v Report to EC on Conditional Approval to go to Sponsor

July 2009

D. Stanley (Aruba), B.Kraemer (Marvell)

Slide 3

doc.: 11-09-0720-02

Submission

TGv draft text stability

0

200

225

250

275

300

325

350

375

Jan-07 Jul-07 Jan-08 Jul-08 Jan-09 Jul-09

# pa

ges

1.02.0

3.0

4.0 5.0

AP MIB added

6.0

Page 4: Doc.: 11-09-0720-02 Submission July 2009 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11v Report to EC on Conditional Approval to go to Sponsor

July 2009

D. Stanley (Aruba), B.Kraemer (Marvell)

Slide 4

doc.: 11-09-0720-02

Submission

802.11 WG Letter Ballot Results – P802.11vBallot

ID

Ballot Close Date

Title Ballot Type Pool Return %Return Abstain % Abstain

Approve

Disapprove

%Approve

140 19 Dec 2008

Technical Letter Ballot for Task Group-v Draft 4.0

Technical 254 225 88.58 40 17.78 149 36 80.54

146 4 Apr 2009

Recirculation Letter Ballot for Task Group-v Draft 5.0

Recirculation

254 228 89.76 41 17.98 155 32 82.88

150 12 Jun 2009

Second Recirculation Ballot for Task Group-v Draft 6.0

Recirculation

254 230 90.55 38 16.10 172 20 89.58

150.1

15Jul 09

Second Recirculation Ballot for Draft 6.0 Post ballot results

Recirculation

254 230 90.55 38 16.10 174 18 90.6

Page 5: Doc.: 11-09-0720-02 Submission July 2009 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11v Report to EC on Conditional Approval to go to Sponsor

July 2009

D. Stanley (Aruba), B.Kraemer (Marvell)

Slide 5

doc.: 11-09-0720-02

Submission

802.11 WG Letter Ballot Comments – P802.11v

Ballot ID Ballot Close Date Title Ballot Type Number of

Comments received

140 19 Dec 2008 Technical Letter Ballot for Task Group-v Draft 4.0

Technical 586 (418T, 168E)

146 4 Apr 2009 Recirculation Letter Ballot for Task Group-v Draft 5.0

Recirculation 321 (225T, 96E)

150 12 Jun 2009 Second Recirculation Ballot for Task Group-v Draft 6.0

Recirculation 140 (93T, 47E)

Page 6: Doc.: 11-09-0720-02 Submission July 2009 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11v Report to EC on Conditional Approval to go to Sponsor

July 2009

D. Stanley (Aruba), B.Kraemer (Marvell)

Slide 6

doc.: 11-09-0720-02

Submission

Unsatisfied comments by commenterVoter LB140 LB146 LB150 Total

Joe Epstein 3 3

Lusheng Ji 1 1

David Bagby 1 1

William Marshall 8 8

Henry Ptasinski 4 2 6

Robert Miller 1 1

Mark Hamilton 1 1

Harry Worstell 1 1

Richard Roy 4 4 8

Qi Wang 1 1

Gabor Bajko 3 3

Matthew Fischer 2 2

Darwin Engwer 1 1 2

Graham Smith 2 2

Total 25 10 5 40

Page 7: Doc.: 11-09-0720-02 Submission July 2009 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11v Report to EC on Conditional Approval to go to Sponsor

July 2009

D. Stanley (Aruba), B.Kraemer (Marvell)

Slide 7

doc.: 11-09-0720-02

Submission

Unsatisfied Comments – TopicsTopic #CommentsDiagnostics, Event, and STA Statistics 5

Directed Multicast and Flexible Multicast Service 5

Location 8

Time Advertisement 1

Timing Measurement 1

AP Collaboration 4

Patents 1

Multiple BSSID 6

QOS Traffic Capability 2

Scope 6

Optional/Mandatory 1

Total 40

Page 8: Doc.: 11-09-0720-02 Submission July 2009 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11v Report to EC on Conditional Approval to go to Sponsor

July 2009

D. Stanley (Aruba), B.Kraemer (Marvell)

Slide 8

doc.: 11-09-0720-02

Submission

Unsatisfied comments

• The composite of all unsatisfied comments and the resolutions approved during working group ballot may be found in document: 11-09-0676-06, a copy of this is attached. – Double click on the icon to the right to open this.

• A copy of the unsatisfied comments presented using MyBallot access database report format is attached. – Double click on the icon to the right to open this.

TGv Unresolved Comments for Conditional

MyBallot-version-TGv-d6-unsatisfied-comm

Page 9: Doc.: 11-09-0720-02 Submission July 2009 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11v Report to EC on Conditional Approval to go to Sponsor

July 2009

D. Stanley (Aruba), B.Kraemer (Marvell)

Slide 9

doc.: 11-09-0720-02

Submission

TGv Timeline

Third recirculation (TGv draft 7.0)Open

24-Jul-09Close

8-Aug-09

Clean recirculation (TGv draft 7.0) 25-Sep-09 10-Oct-09

Pool formation 15-Aug-09 29-Sep-09

First sponsor ballot 19-Oct-09 18-Nov-09

Second sponsor ballot 3-Feb-10 18-Feb-10

Third sponsor ballot 30-Mar-10 15-Apr-10

Fourth sponsor ballot 15-May-10 30-May-10

EC to RevComMar-10 (cond.) or

Jul-10

RevCom to SB Jun-10 or Sep-10

Page 10: Doc.: 11-09-0720-02 Submission July 2009 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11v Report to EC on Conditional Approval to go to Sponsor

July 2009

D. Stanley (Aruba), B.Kraemer (Marvell)

Slide 10

doc.: 11-09-0720-02

Submission

802.11 EC Motion – <agenda item#> Conditional Approval to send P802.11v to Sponsor Ballot

• Grant conditional approval, under Clause 13 to forward P802.11v to Sponsor Ballot.

• P802.11v had a 89.58% approval on the last WG Recirculation Ballot.

• Working Group 11 vote on the Motion Passed: <for> y, <against> n, <abstain> a

• Moved: Bruce Kraemer 2nd: <name>– Yes No Abstain