dmc sparkle water refilling

24
FEASIBILITY STUDY FEASIBILITY STUDY On On DMC Sparkle DMC Sparkle WATER REFILLING WATER REFILLING STATION STATION

Upload: raul-nocete

Post on 08-Nov-2014

262 views

Category:

Documents


3 download

DESCRIPTION

Feasibility Study on Student-Facilitated Water REfilling Station

TRANSCRIPT

Page 1: DMC Sparkle Water Refilling

FEASIBILITY STUDYFEASIBILITY STUDY

OnOn

DMC SparkleDMC Sparkle

WATER REFILLINGWATER REFILLING

STATIONSTATION

Page 2: DMC Sparkle Water Refilling

INTRODUCTION

The demand at the water refilling stations – water stores that sell purified water – is

now increasing. The quality of purified water conforms to the national standards for drinking

water and is even better than the quality of water produced by traditional water supply

systems in terms of removed impurities.

Over the years, as the demand for cleaner water becomes higher, the price of

household water purifiers and bottled water has become prohibitive. Water refilling stations

managed by private entrepreneurs offer a cheaper and more convenient solution to the

public’s drinking water needs than bottled water or the use of household filters.

At present, about 15 water refilling stations have proliferated in Dipolog City. They sell

purified water of comparable quality with bottled water at a lower price. For example, the

current price per gallon of refilled purified water in Dipolog City ranges from P 20 to P 3 per

5-gallon container when bought on store site, while prices ranges between 25 to 35 when

delivered within Dipolog City..

In Dipolog City, most of the water refilling stations is connected to the pipes of Dipolog

City Water District for their source of raw water while in other areas they opt to use private

deep wells. The “potable water” supplied by the providers is then further purified by utilizing a

combination of water treatment equipment, such as sediment filters, carbon filters, water

softeners, reverse osmosis membranes, ultra-violet lamps, and ozone generators. Typical

water refilling stations can produce 3,000 to 12,000 liters of purified water per day. In

previous years, most of the people were bringing containers to a water refilling station to buy

purified water.

Nowadays, because of convenience on the part of the consumers, purified water in 5-

gallon (22.7 liters) containers is delivered by the station directly to the people’s home.

Page 3: DMC Sparkle Water Refilling

Proponent:

DMC- COLLEGE FOUNDATION – SCHOOL OF BUSINESS STUDENTS

Proposed Location:

DMC – College Foundation CampusFr. Patangan Road, Mibang, Dipolog City

Objectives:

A. Provide a potable drinking water for the community.B. Service the drinking water needs of DMCCF students, and Concha Croup of

Companies employees and their familiesC. Empower students taking up Business and Accountancy to develop their

entrepreneurial skills and expose them to an actual business venture.

Nature of the Business

The School of Business and Accountancy focuses on real industry based learning, thus, the department always explore ways to develop the knowledge and skills of its students when it comes to business incubation, launching and operation. Empowering its students through actual exposure to existing business operation will develop their entrepreneurial spirit and gain confidence to venture into business, that will propel them to financial success in the future.

The water refilling station; “DMC Sparkle” will provide DMCCF staff and students, clear, sparkling, clean drinking water at very affordable prices. The DMC Sparkle Water will be available is various refillable sizes of containers to cater to the needs of different demographics and market. .

“DMC Sparkle” will also offer additional services like free delivery and the product can also be availed on credit for DMC-College Foundation faculty and staff and all employees of the Concha Group of Companies, wherein payment arrangement will facilitated through salary deduction from their paychecks among their respective offices.

Page 4: DMC Sparkle Water Refilling

MARKETING ASPECTMARKETING ASPECT

Target Market

Students, Faculty and Staff of DMC-College Foundation, Dipolog Medical Center, Mennen’s Gift Mart Corporation, Zanorte Industries, Concha Construction, Zanorte General Services and Rizal Rural Bank.

Local Residents of Dipolog City

Demand

The Concha Group of Companies, including the DMC-College Foundation has a total employees of more than 500, and students living within the vicinity of the DMC Campus is about 300, while during classes most students prefer drinking from purified water and on any given day, DMC has more than 1,200 students in its campus.

The area within the DMC campus, where DMC Sparkle Water Refilling Station will be located, has a population of more than 1,500 households on the two barangays namely Sta. Isabel and Sta. Filomena. And with only one existing refilling station situated in the area.

On the average, a family of four members consumes three (3) 5-gallon purified water every week or 12 containers a month. Students were surveyed and revealed that they consume one (1) 5 gallon container a week Using this data the projected demand for water refilling station in the specified area is:

Target Market PopulationEstimated Weekly Consumption (in 5 gallon containers)

Estimated Monthly Consumption (in 5 gallon containers)

DMCConcha Group of

Companies500 1500 6,000

Local Households 1500 4500 18,000Students 300 300 1200

TOTAL2,300 6,300 25,200

Demand in Gallons31,500 126,000

Table 1 Demand Chart

Page 5: DMC Sparkle Water Refilling

Market Share

It is assumed that since the targeted market is members of the Concha Group of

Companies and DMC Hospital; and DMC-College Foundaiton, 50% of the member will opt to

buy from “DMC Sparkle” (and since this can be acquired through credit, and subject to salary

deduction). Since DMC Sparkle is located within DMC, students can readily access the

products and a assumption of 80% is valid. While considering the accessibility factor, 10% of

the local residents are also going to consider getting their purified water supply from the

store.

Target Market

Estimated Weekly

Consumption (in 5 gallon containers)

Market Share

Estimated Monthly

Consumption (in 5 gallon

containers)

Market Share

DMCConcha Group of

Companies1500 750 6,000 3000

Local Households 4500 450 18,000 1800Students 300 240 1200 960

TOTAL6,300 1440 25,200 5,760

in Gallons31,500 7,200 126,000 28,800

Table 2 Market Share

Proposed Marketing Strategy

Product Strategy – Refilling Station will be constructed with transparent glass and according to prescribed standards so that the customers will be able to see how carefully and cleanly the products are being processed. Excellent quality will be maintained by giving the workers training and guidance on good manufacturing practices.

Distribution Strategy – A delivery vehicle will be purchased to shorten waiting time of customers. Customers can order thru phone call or text and 20 minutes waiting time

Page 6: DMC Sparkle Water Refilling

will be observed. It will also be assured that products will be handled properly and will maintain its quality during delivery.

Promotion Strategy – Information dissemination will be done so that target market will be aware of the existence of the water refilling station. Target markets will be informed of the benefits and importance of drinking clean water and the added benefits of buying it DMC Sparkle, that offers salary deduction options for employees of the Concha Group, including DMCCF and DMC Hospital.

Pricing Strategy – Being a new entrant, “Aqua Kabayan” will offer an affordable price of 25.00 per container, free of delivery charge

SALES PROJECTIONS

  YEAR 1 YEAR 2 YEAR 3

in units of 5 gal containers 69,120 76,032 83,635

Selling Price 25 25 25

Total Sales 1,728,000.00

1,900,800.00

2,090,875.00

Table 3 Three Year Sales Projection

MARKETING BUDGET

Delivery Vehicle

There is a need to purchase a delivery vehicle to ensure the fast and timely

delivery of products. Consumers prefer to buy products that are readily available and

with minimal waiting time. Water is a basic need and there should be no delays in the

delivery. Estimated cost of a delivery vehicle is at Php 75,000.00. Estimated Useful

Life is five (5) years.

Fuel Consumption in the delivery of goods is estimated at 500.00 per day.

Information Dissemination

The awareness campaign will entail costs of printing flyers (for distribution) and

tarpaulins (to be placed at strategic locations). Cost of these materials is estimated at Php

10,000.00.

Page 7: DMC Sparkle Water Refilling

Packaging and Labeling

Initially, 100 units of containers (5 gal) will be purchased. Since most of the

consumers already have containers, the said containers will be replaced every

delivery. Empty containers will be refilled and delivered to other customers so that

consumers will only have to pay for the contents and not the containers.

All containers should have labels, bearing the name of Aqua Kabayan and all

containers should all be sealed to ensure that the product reaches the end consumer

with utmost quality. Fifteen thousand pieces of labels and seals will be printed on a

quarterly basis. Estimated cost is Php 3.00 per container.

Manpower

There will be 2 persons handling the delivery, both of which should know how to drive

the delivery vehicle so that they can work alternately on the tasks to be assigned to them.

They are going to receive salaries of Php 4,500 a month or Php 150.00 daily.

Account Title Amount in Pesos

Delivery Vehicle 75,000.00

Fuel and Lubricants 15,000.00

Promotions 10,000.00

Packaging (containers) 15,000.00

Materials and Supplies (stickers) and

seals (quarterly)45,000.00

Salaries and Wages 9,000.00

TOTAL 169,000.00

Page 8: DMC Sparkle Water Refilling

Table 4 Marketing Budget

MARKETING EXPENSES

Account Title YEAR 1 YEAR 2 YEAR 3

Delivery Vehicle ( Amount of Depreciation)

15,000.00

15,000.00

15,000.00

Fuel & Lubricants 180,000.00

198,000.00

217,800.00

Promotions 10,000.00

10,000.00

10,000.00

Packaging (containers) 5,000.00

5,000.00

5,000.00

Materials and Supplies (stickers) and seals (quarterly)

180,000.00

198,000.00

217,800.00

Salaries and Wages 108,000.00

118,800.00

130,680.00

TOTAL 498,000.00

544,800.00

596,280.00

Table 5 Marketing Expenses (three years)

Page 9: DMC Sparkle Water Refilling

PRODUCTION ASPECTPRODUCTION ASPECT

Production Process (water filtration & purification system)

1st unit Multimedia sediment process

Stage 1The water first passes through the 1st stage which makes up of a course gravel that traps solid particles of about 100 micron

Stage 2 Consists of sand filters that removes sediment of 50 micron ratings

Stage 3 Consists of fine sand that eliminates solid particles of 25 micron

Stage 4 Consists of fine clear slit that eliminates solid particles down to 5 micron

2nd unit Multi media carbon process

Stage 5 Makes use of a lignite carbon that removes foul taste and odor

Stage 6Makes use of bituminous carbon that eliminates yellowish and brownish discoloration brought by inorganic contaminants

Stage 7Makes use of granular activated carbon (GAC) as the last multi media carbon stage. This stage is where the water undergoes longer contact time with the carbon to eliminate other contaminants that might cause foul smell or taste

3rd unit Water conditioning and softening process

Page 10: DMC Sparkle Water Refilling

Stage 8Makes use of resin beads that attract mineral contents that convert hard water to soft water

Stage 9Makes use of ion exchange beads to condition water by extracting the organic and inorganic chemicals present in the water

Stage 10Makes use of another carbon that eliminates any ferrous iron (dissolved iron) in water

Stage 11Makes use of fine gravel that serves as a sieve which eliminates any residue that might come out during regeneration time. This is a cleansing agent.

4th unit Ultra micron process

Stage 12

Consists of a one (1) big blue housing that includes 1 micron cartridge that eliminates any microscopic residue that might go to the reverse osmosis membrane. This stage stands as a protection for the membrane against premature clogging

5th unit Reverse osmosis

Stage 13

It is the most important system in any water filtration and purification process. This makes use of reverse osmosis equipment which has semi-permeable membrane that only allows pure water to pass through and pushes the unpure water out of the system to the reverse side or the reject drain line.

6th unit Polishing process

Stage 14Includes one (1) big blue housing that consists of a carbon cartridge that serves as a polishing stage to make the water crystal clear and shiny

7th unit Anti-microbial process

Stage 15

This stage eliminates cyst micro organism that has a micron rating of 1 and has a very thick cell wall where UV light sometimes cannot penetrate; however a micron rating of 0.5 will eliminate such kind of micro organisms. Cyst causes diarrhea and gastro enteritis.

8th unit Water sterilization process

Stage 16

This last and final stage is the second most important system in a water filtration and purification system. This is the stage that kills all microorganisms and other diseases causing bacteria from infiltrating into the product water, thereby assuring safe and pure water.

Table 5 Production Process

Fixed Assets Required:

Item Amount Useful Life in Years Annual Depreciation

Land 50,000.00

Machineries & Equipment 300,000.00 15 20,000.00

Building (25 sq meters) 150,000.00 20 7,500.00

TOTAL 500,000.00 27,500.00

***Repairs and maintenance of equipment is assumed at 2.00 per month.

Page 11: DMC Sparkle Water Refilling

Table 6 Schedule of fixed Assets Required

FACTORY LOCATION AND LAY OUT

Page 12: DMC Sparkle Water Refilling

COST OF LABOR

There will be 2 workers tasked in refilling and cleaning of containers. The

cooperative manager will be the one to oversee the production and help in the

operation whenever it is needed. The two workers will be receiving Php 4,500 a

month.

MATERIALS AND SUPPLIES

Materials and Supplies are estimated at Php 6,000.00 monthly (water is the

major raw materials needed).

FACTORY OVERHEAD

Overhead expenses are composed of Utilities, Telephone Bills and

Depreciation. Electric consumption is assumed at Php 7,500.00 monthly and

telephone bills are at Php 1,000.00 per month. Please refer to Depreciation table

for depreciation expenses.

PRODUCTION COST

Account Title YEAR 1 YEAR 2 YEAR 3

Direct Labor 108,000.00

118,800.00

130,680.00

Materials & Supplies 72,000.00

79,200.00

87,120.00

Depreciation (Building) 7,500.00

7,500.00

7,500.00

Page 13: DMC Sparkle Water Refilling

Depreciation (Machineries & Equipment

20,000.00

20,000.00

20,000.00

Utilities 102,000.00

112,200.00

123,420.00

TOTAL 309,500.00

337,700.00

368,720.00

Table 7 Production Cost (three years)

PRODUCTION COST PER UNIT

  YEAR 1 YEAR 2 YEAR 3

TOTAL PRODUCTION COST 309,500.00

337,700.00

368,720.00

MARKETING EXPENSES 498,000.00

544,800.00

596,280.00

Units Produced 69,120 76,032 83,635

PC PER UNIT 11.68 11.60 11.58

Table 8 Production Cost per unit (three years)

Page 14: DMC Sparkle Water Refilling

ORGANIZATION AND MANAGEMENT ASPECT

1. Form of Business

Corporation

2. Business name

DMC Sparkle Water Refilling Station

3. Organizational Chart

4. Key Personnel and Responsibilities

Board of Directors

General Manager

Worker 1 Worker 2 Worker 3 Worker 4

AccountingStudents

Page 15: DMC Sparkle Water Refilling

General Manager – In charge of the overall operation of the business. Acts as the marketing officer and represents the business in all external concerns. The manager will oversee the entire operation of the business and collects cash sales for remittance to the cooperative treasurer.

Accounting Students – will monitor daily sales and operation cost and will handle weekly audits.

Worker 1 & Worker 2 – will handle the plant operation. They will be in charge of cleaning and refilling containers. They will also observe proper sanitation of the plant and maintain excellent quality of the product.

Worker 3 and Worker 4 – will be tasked in the delivery and distribution of the products. They will ensure that all deliveries are done at the shortest possible time. They will also handle collection of payments and issuance of receipts during delivery.

FINANCIAL ASPECTFINANCIAL ASPECT

TOTAL CAPITAL REQUIREMENTS

Account Title Amount

Fixed Assets:  

Land 50,000.00

Machineries & Equipment 300,000.00

Building (25 sq meters) 150,000.00

Delivery Vehicle 75,000.00

Total Fixed Assets Required 575,000.00

Workling Capital:  

Salaries & Wages 54,000.00

Returnable Containers 15,000.00

Materials & Supplies 45,000.00

Fuel, Gas & Lubricants 45,000.00

Page 16: DMC Sparkle Water Refilling

Promotions 10,000.00

Raw Material Supply (Water) 18,000.00

Utilities 25,500.00

Total Working Capital (first 3 months of operation) 212,500.00

TOTAL CAPITAL REQUIREMENTS 787,500.00

Table 9 Total Capital Requirements

INCOME STATEMENTYear 1 Year 2 Year 3

Sales 1,728,000.00 1,900,800.00 2,090,875.00

Less: Cost of Sales

Direct Labor 108,000.00

118,800.00

130,680.00

Materials & Supplies 72,000.00

79,200.00

87,120.00

Factory Overhead Expenses Depreciation Expense (Building)

7,500.00

7,500.00

7,500.00

Depreciation Expense (M & E) 20,000.00

20,000.00

20,000.00

Utilities 102,000.00

112,200.00

123,420.00

Total FOE 129,500.00

139,700.00

150,920.00

Cost of Goods Available for Sale 309,500.00

337,700.00

368,720.00

Gross Profit on Sales 1,418,500.00

1,563,100.00

1,722,155.00

Less: Operating Expenses

Marketing Expenses

Fuel, Gas & Lubricants 180,000.00

198,000.00

217,800.00

Promotions 10,000.00

10,000.00

10,000.00

Page 17: DMC Sparkle Water Refilling

Packaging (containers) 5,000.00

5,000.00

5,000.00

Materials & supplies 180,000.00

198,000.00

217,800.00

Salaries & Wages 108,000.00

118,800.00

130,680.00

Depreciation Expense Delivery Vehicle

15,000.00

15,000.00

15,000.00

Total Marketing Expenses 498,000.00

544,800.00

596,280.00

Net Operating Profit 920,500.00

1,018,300.00

1,125,875.00

Table 10 Income Statement

CASH FLOW STATEMENT

Cash Inflows Year 1 Year 2 Year 3

Initial Capital 787,500.0

0    

Sales 1,728,000.00 1,900,800.00 2,090,875.00

Total Cash Inflows 2,515,500.0

0 1,900,800.00 2,090,875.00

Cash Outflows      

Purchase Land 50,000.0

0     Purchase & Installation of Machineries & Equipment

300,000.00    

Construction of Building 150,000.0

0    

Purchase of Delivery Vehicle 75,000.0

0     Purchase Returnable Containers

15,000.00    

Purchase of Labels & Stickers 180,000.0

0 198,000.0

0 217,800.0

0

Fuel, Gas & Lubricants 180,000.0

0 198,000.0

0 217,800.0

0

Payment of Salaries & Wages 216,000.0

0 237,600.0

0 261,360.0

0

Promotions Expense 10,000.0

0 10,000.0

0 10,000.0

0 Payment of Raw Material Supply

72,000.00

79,200.00

87,120.00

Page 18: DMC Sparkle Water Refilling

Payment of Utilities 102,000.0

0 112,200.0

0 123,420.0

0

Total Cash Outflows 1,350,000.0

0 835,000.0

0 917,500.0

0

Net Cash Inflows 1,165,500.0

0 1,065,800.0

0 1,173,375.0

0

Add: Cash Balance Beg.   1,165,500.0

0 2,231,300.0

0

Cash Balance, end 1,165,500.0

0 2,231,300.0

0 3,404,675.0

0

Table 11 Cash Flow Statement

BALANCE SHEET

Year 1 Year 2 Year 3

Assets

Cash 1,165,500.00 2,231,300.00 3,404,675.00

Land 50,000.00 50,000.00 50,000.00

Building 142,500.00 135,000.00 127,500.00

Machineries & Equipment 280,000.00 260,000.00 240,000.00

Delivery Vehicle 60,000.00 45,000.00 30,000.00

Returnable Containers 10,000.00 5,000.00 -

Total Assets 1,708,000.00 2,726,300.00 3,852,175.00

Liabilities & Capital

DMC Sparkle Investments 787,500.00 1,708,000.00 2,726,300.00

Add: Net Income from Operation 920,500.00 1,018,300.00 1,125,875.00

Total Liabilities & Capital 1,708,000.00 2,726,300.00 3,852,175.00

Table 12 Balance Sheet

Page 19: DMC Sparkle Water Refilling

FINANCIAL RATIO NALYSIS

PROFITABILITY RATIOS

1)Return on Assets

(ROA)

Net Income=

920,500.00

= 0.5

4 Total Assets

1,708,000.00

2)Return on Equity (ROE)

Net Income=

920,500.00

= 0.5

4 Owner's Equity

1,774,000.00

3)Net Profit Margin

Net Income=

920,500.00

= 0.5

3 Sales

1,728,000.00

Table 13 Financial Ratio Analysis

Page 20: DMC Sparkle Water Refilling

Prepared by:

RAUL T. NOCETE

COORDINATOR

SCHOOL OF BUSINESS AND ACCOUNTACY

DMC – COLLEGE FOUNDATION