Opening of the Diverging Diamond Interchange Interstate 66/Route 15 in Prince William County Public Information Meeting Christiana Briganti-Dunn, PE, CCM Design-Build Program Manager Virginia Department of Transportation Jan A. Sherman Design-Build Project Manager The Lane Construction Corporation December 7 and 13, 2016

Upload: vdot-northern-virginia

Post on 17-Feb-2017

326 views

Category:

Government & Nonprofit


1 download

TRANSCRIPT

Page 1: Diverging Diamond Interchange: I-66 and Route 15

Opening of the Diverging Diamond InterchangeInterstate 66/Route 15 in Prince William County

Public Information Meeting

Christiana Briganti-Dunn, PE, CCMDesign-Build Program ManagerVirginia Department of Transportation

Jan A. ShermanDesign-Build Project Manager The Lane Construction Corporation

December 7 and 13, 2016

Page 2: Diverging Diamond Interchange: I-66 and Route 15

Tonight’s Meeting

• Project Status• Opening the Diverging Diamond Interchange• Detour for One Night• How to Navigate through the New DDI• Project Schedule and Cost Updates• Stations Around the Room:

• Simulation Videos• FHWA Alternative Intersections Video• Interactive Exhibit

2

Page 3: Diverging Diamond Interchange: I-66 and Route 15

3

Project Status(Items in Orange are Complete, Blue are Ongoing)

• Reconstruct I-66/Route 15 interchange as a Diverging Diamond Interchange (DDI)

• Replace Route 15 bridges over I-66• Retaining walls, shared-use path, partial interchange

lighting, fencing, and architectural treatments• Geometric and access management improvements to

ramps, intersections, Route 55, and frontage road• Provide drainage and stormwater management facilities • Replace/modify traffic signals, signs and sign structures,

and guardrail/barrier• Construct a sound barrier Wall• Landscaping (will be completed under separate contract)

Page 4: Diverging Diamond Interchange: I-66 and Route 15

Opening the DDI Configuration

• Close interchange and detour traffic starting 8 p.m. Friday, Jan. 6 (or Jan. 13, weather depending), to place final pavement markings• Route 15 closed from south of Heathcote Blvd to north

of Route 55/Washington St• Ramps to and from I-66 will also be closed• Local traffic will be detoured to Old Carolina Rd/

Jefferson St• Interstate traffic use Route 29 in Gainesville

• Open DDI to traffic by 9 a.m. Saturday, Jan. 7 (or Jan. 14)• All ramps to and from the Interstate 66• Two lanes in each direction on Route 15

4

Page 5: Diverging Diamond Interchange: I-66 and Route 15

Detour – Night of Jan. 6 (or Jan. 13)

5

Page 6: Diverging Diamond Interchange: I-66 and Route 15

6

Diverging Diamond InterchangeTraffic Flow

Page 7: Diverging Diamond Interchange: I-66 and Route 15

7

Diverging Diamond InterchangeTraffic Flow

Page 8: Diverging Diamond Interchange: I-66 and Route 15

8

Project Schedule

Contract awarded May 2014

Public information meeting October 2014

Began right-of-way acquisition Winter 2014

Began construction Spring Fall 2015*

Open DDI configuration January 2017

Project completion Fall Summer 2017

* Project construction is approximately 70% complete.

Page 9: Diverging Diamond Interchange: I-66 and Route 15

9

Project Costs

Preliminary engineering: $3 Million

Right-of-way acquisition andrelocation assistance: $8 Million

Design/Build contract (final design,utility relocation, and construction),Contingency and VDOT oversight: $48 Million

Total cost: $59 Million

The above estimate has remain unchanged since October 2014.The project is fully funded by state and federal funds.

Page 10: Diverging Diamond Interchange: I-66 and Route 15

Stations Around the Room• VISSIM simulation videos

• Based on actual design for DDI in Haymarket• Shows future 2036 traffic volumes, AM and PM peaks

• FHWA Alternative Intersections Video – “As easy as 1-2-3”: • To Turn Left – Stay to the Left • To Turn Right – Stay to the Right• No Turns at Crossover Intersections – Go “Straight”

• Interactive exhibit• Attendees are invited to “walk” through the DDI exhibit

the way they would drive through one

10

Page 11: Diverging Diamond Interchange: I-66 and Route 15

11

Page 12: Diverging Diamond Interchange: I-66 and Route 15

12

For More Information…http://www.virginiadot.org/projects/northernvirginia/i-66_and_route_15_interchange.asp

OR:• Visit www.virginiadot.org

• Click on “Projects and Studies” in the orange bar• Click on the “Northern Virginia” portion of the map• Scroll to “Under Construction” and look for “I-66 and

Route 15 Interchange Reconstruction” link

Project Manager: Christiana Briganti-Dunn, P.E., CCMPhone: 703-259-2960E-mail: [email protected]

Page 13: Diverging Diamond Interchange: I-66 and Route 15

Traffic Comparison to VDOT’s 1st DDI

180 270 1200

120

450 310

300 90

700 180

600

160

Zion Crossroads DDI

1500670

1110720

I-64 WBOff-Ramp

I-64 WBOn-Ramp

I-64 EBOn-Ramp

I-64 EBOff-Ramp

US Route 15

I-64

2010 AM Peak

40 1160 3200

200

40 600

580 780

510 810

1300

100

Haymarket DDI

5701520

1010

2880

I-66 WBOff-Ramp

I-66 WBOn-Ramp

I-66 EBOn-Ramp

I-66 EBOff-Ramp

US Route 15

I-66

2011 AM Peak

Page 14: Diverging Diamond Interchange: I-66 and Route 15

80 530 1400

140

150 480

550 120

440 150

1900

350

Zion Crossroads DDI

10701720

11201450

I-64 WBOff-Ramp

I-64 WBOn-Ramp

I-64 EBOn-Ramp

I-64 EBOff-Ramp

US Route 15

I-64

2010 PM Peak

110 1010 7400

880

140 580

1510 380

680 310

400

50

Haymarket DDI

1130740

25001340

I-66 WBOff-Ramp

I-66 WBOn-Ramp

I-66 EBOn-Ramp

I-66 EBOff-Ramp

US Route 15

I-66

2011 PM Peak

Traffic Comparison to VDOT’s 1st DDI

Page 15: Diverging Diamond Interchange: I-66 and Route 15

How Haymarket DDI differs from Zion Crossroads DDI

15

Triple Left

Dual Left

3 Lanes NB/SB

SingleRight

Spur Ramp to H