district irrigation plan, south west garo hills districtdistrict irrigation plan, south west garo...

145
District Irrigation Plan, South West Garo Hills district 1 | Page DISTRICT IRRIGATION PLAN SOUTH WEST GARO HILLS, MEGHALAYA

Upload: others

Post on 05-Feb-2020

19 views

Category:

Documents


0 download

TRANSCRIPT

District Irrigation Plan, South West Garo Hills district

1 | P a g e

DISTRICT IRRIGATION PLAN

SOUTH WEST GARO HILLS, MEGHALAYA

District Irrigation Plan, South West Garo Hills district

2 | P a g e

District Irrigation Plan, 2016-2020

South West Garo Hills, Meghalaya

NABARD CONSULTANCY SERVICES PVT. LTD.

Corporate Office : 24, Rajendra Place, NABARD Building, New Delhi – 110125

Reg. Office : Plot No. C24, G Taluka, 3rd Floor, NABARD Building

Bandra Kurla Complex, Bandra East, Mumbai-400051

District Irrigation Plan, South West Garo Hills district

3 | P a g e

FOREWORD

Pradhan Mantri Krishi Sinchai Yojana (PMKSY) is a national mission to improve farm

productivity and ensure better utilization of the resources in the country. The primary

objectives of PMKSY are to attract investment in irrigation system at field level, develop and

expand cultivable land in the country enhance rain water use in order to minimize wastage of

water, enhance crop per drop by implementing water – saving technologies and precision

irrigation. The plan additionally calls for bringing ministries, offices, organizations, research

and financial institutions occupied with creation and recycling of water under one platform so

that an exhaustive and holistic outlook of the whole water cycle is considered. The goal is to

open the doors for optimal water budgeting in all the sectors.

In order to achieve the objectives, the District Irrigation Plan of South West Garo Hills

district, Meghalaya is prepared by District level Implementation Committee consisting of

various Departments and NABCONS after thoroughly studying the scenario of the district. I

wish to thank all the members of DLIC, NABCONS and all other officers/ officials of all the

line departments for preparation of District Irrigation Plan and wish them good luck for its

better implementation.

Place: South West Garo Hills Deputy Commissioner,

Date: South West Garo Hills

District Irrigation Plan, South West Garo Hills district

4 | P a g e

ACKNOWLEDGEMENT

It is my sincere privilege to express my deep sense of gratitude and heartfelt thanks to the

Ministry of Agriculture and Farmers’ Welfare and other concerned departments of

Government of India for providing an opportunity to prepare an exhaustive irrigation plan

covering all the components of PMKSY for the benefit of major farming community in the

district.

I am also highly thankful to the Deputy Commissioner, South West Garo Hills who is also

the Chairman of this District Level Implementation Committee (DLIC) for his extensive

support and guidance towards the preparation of this District Irrigation Plan and making it

possible to present the same in an implementable manner. I also thank all the members of the

DLIC for providing the desired data/ programme to be taken up in the Plan.

District Agriculture Officer

South West Garo Hills

District Irrigation Plan, South West Garo Hills district

5 | P a g e

DISTRICT LEVEL IMPLEMENTING COMMITTEE

1 Deputy Commissioner Chairman

2 Project Director DRDA Member

3 District Agriculture Officer Member Secretary

4 District Horticulture Officer Member

5 Divisional Soil and Water Conservation Officer Member

6 Executive Engineer PHE Member

7 Executive Engineer Water Resources Member

8 Project Director ATMA Member

9 Lead Band Officer Member

10 Leading NGO (to be nominated by DC) Member

11 Two Representing Farmers (to be nominated by DC for one

year at a time) Member

12 Representative from ICAR/KVK Member

District Irrigation Plan, South West Garo Hills district

6 | P a g e

Table of Contents List of Tables ........................................................................................................................................... 8

List of Figures .......................................................................................................................................... 8

List of Maps ............................................................................................................................................. 8

Executive Summary ................................................................................................................................. 9

Introduction .......................................................................................................................................... 13

Background ....................................................................................................................................... 13

Vision ................................................................................................................................................. 19

Objective ........................................................................................................................................... 19

Strategy/approach ............................................................................................................................ 20

Programme Components .................................................................................................................. 20

Rationale/ Justification ..................................................................................................................... 22

Methodology ..................................................................................................................................... 23

Chapter 1 : General Information of the District .................................................................................... 24

1.1 District Profile ............................................................................................................................. 24

Administrative Set-up of South West Garo Hills ........................................................................... 25

1.2 District Demography ................................................................................................................... 25

1.3 Biomass and Livestock ................................................................................................................ 26

1.4 Agro-Ecology, Climate, Hydrology and Topography ................................................................... 26

1.5 Soil Profile ................................................................................................................................... 27

1.6 Land Use pattern ......................................................................................................................... 28

Chapter 2 : District Water Profile .......................................................................................................... 29

2.1 Area wise, Crop wise, irrigation Status ....................................................................................... 29

2.2 Production and Productivity of Major crops ............................................................................... 30

2.3 Irrigation based classification ..................................................................................................... 32

Chapter 3 : Water Availability in South West Garo Hills ....................................................................... 33

3.1 Status of Water Availability......................................................................................................... 33

3.2 Status of Ground Water Availability ........................................................................................... 34

3.3 Status of Command Area ............................................................................................................ 34

3.4 Existing type of Irrigation ............................................................................................................ 35

Chapter 4 : Water Requirement/Demand ............................................................................................ 36

4.1 Domestic Water Demand ............................................................................................................ 36

4.2 Crop water demand .................................................................................................................... 37

4.3 Livestock water demand ............................................................................................................. 38

District Irrigation Plan, South West Garo Hills district

7 | P a g e

4.4 Industrial water demand ............................................................................................................. 38

4.5 Water demand for Power Generation ........................................................................................ 39

4.6 Total water demand of the district for various sectors .............................................................. 39

4.7 Water Budget .............................................................................................................................. 40

Chapter 5 : Strategic Action Plan for Irrigation in District under PMKSY .............................................. 41

5.1 Department wise, year wise plan ............................................................................................... 41

5.2 Component wise, year wise plan ................................................................................................ 42

5.3 Block wise, year wise plan .......................................................................................................... 43

5.4 Suggestions ................................................................................................................................. 43

5.5 Period of Implementation ........................................................................................................... 44

5.6 Monitoring and Evaluation ......................................................................................................... 44

5.7 Expected Outcome and Output .................................................................................................. 45

5.8 Conclusion ................................................................................................................................... 45

Annexure I : Strategic Action Plan by Water Resources Department ................................................. 47

Betasing Block ................................................................................................................................... 47

Zikzak Block ....................................................................................................................................... 86

Dalu Block ....................................................................................................................................... 114

Annexure II : Strategic Action Plan by Soil Conservation Department ............................................. 117

Betasing Block ................................................................................................................................. 117

Zikzak Block ..................................................................................................................................... 123

Annexure III : Strategic Action Plan by Agriculture Department ........................................................ 129

Annexure IV : Strategic Action Plan by Horticulture Department ...................................................... 144

District Irrigation Plan, South West Garo Hills district

8 | P a g e

List of Tables Table 1-1: District Profile ...................................................................................................................... 24

Table 1-2: Demography of South West Garo Hills ................................................................................ 26

Table 1-3: Population of Small and Milch or Meat Animals in South West Garo Hills ......................... 26

Table 1-4: Population of Large and Draft Animals in South West Garo Hills ........................................ 26

Table 1-5: Agro-ecology and Topography of South West Garo Hills district ........................................ 27

Table 1-6: Climate and Elevation of South West Garo Hills district ...................................................... 27

Table 1-7: Soil Type and Land slope classification of South West Garo Hills district ............................ 28

Table 1-8: Land use pattern in South West Garo Hills district .............................................................. 28

Table 2-1: Area wise, Crop wise, irrigation Status ................................................................................ 29

Table 2-2: Production and productivity of major crops in South West Garo Hills district.................... 31

Table 2-3: Block-wise irrigation based classification ............................................................................ 32

Table 3-1: Water availability in South West Garo Hills district (in MCM) ............................................. 33

Table 3-2: Status of Ground Water Availability (in MCM) in South West Garo Hills district ................ 34

Table 3-3: Status of command area in South West Garo Hills district .................................................. 34

Table 3-4: Existing types of Irrigation in South West Garo Hills district ............................................... 35

Table 4-1: Domestic water demand (MCM) ......................................................................................... 36

Table 4-2: Crop water requirement (MCM) .......................................................................................... 37

Table 4-3: Livestock water demand (MCM) .......................................................................................... 38

Table 4-4: Industrial Water Demand (MCM) ........................................................................................ 38

Table 4-5: Water Demand for Power Generation (MCM) .................................................................... 39

Table 4-6: Present Water Demand of the district for various sectors .................................................. 39

Table 4-7: Total Water Demand of the district for various sectors (Projected for 2020) ..................... 39

Table 4-8: Water Budget (Volume in MCM) ......................................................................................... 40

Table 5-1: Department wise plan .......................................................................................................... 41

Table 5-2: Component wise plan .......................................................................................................... 42

Table 5-3: Block wise plan ..................................................................................................................... 43

Table 5-4: Department wise proposed command area (in Ha.) ........................................................... 45

List of Figures Figure 5-1: Department wise plan ........................................................................................................ 41

Figure 5-2: Component wise plan ......................................................................................................... 42

Figure 5-3: Block wise plan ................................................................................................................... 43

List of Maps Map 1-1: Location of South West Garo Hills district in Meghalaya ...................................................... 24

District Irrigation Plan, South West Garo Hills district

9 | P a g e

Executive Summary

In an agrarian economy like India, agriculture utilizes the major share of country’s

exploitable water resources. Though the sector utilizes the maximum share of exploitable

water resources, availability of the same at different locations to different extent makes it

vital to adopt effective utilization of water through storage, channelizing and judicial use. At

some places like Punjab and Haryana, the environmental and socio-economic rationale for

this capture by the sector is now being questioned. Accordingly, it is needed to challenge and

change the fundamentals of the prevailing view of water resources exploitation. A new and

more suitable approach to water resources allocation is necessary if the population is to be

adequately fed, without further degradation and destruction of the critical ecosystem services.

Water productivity needs to be enhanced considerably, and economic cost-benefit analysis

and pricing regimes can play a significant role in such a process. However, these economic

measures will not be sufficient on their own. They will need to be buttressed by technological

innovation and institutional changes in order to encourage a more equitable distribution of

resources and to mitigate potential international conflicts across 'shared' water basins.

Water has unique characteristics that determine both its allocation and use as a resource by

agriculture. Agricultural use of water for irrigation is itself contingent on land resources. In a

situation of growing water scarcity and rising demands for non-agricultural (household and

industrial) use of water, reassessment of sectoral allocations of water are inevitable. In

developing countries, irrigated agriculture plays a vital role in contributing towards domestic

food security and poverty alleviation. Therefore, achievement of these objectives is

dependent on adequate allocations of water to agriculture. Justification of such allocations

requires that irrigated agriculture be a cost-effective means of achieving stated political or

social objectives, such as food security or poverty alleviation, and that all externalities be

taken into account in the pricing mechanism. Improved allocation of irrigation water is

required within the agriculture sectors in order to achieve greater efficiency in the use of

irrigation water and existing irrigation infrastructure. Reallocation is also required in order to

reduce waterlogging and salinization of irrigated land, to decrease the negative environmental

impacts and other externalities of irrigation (caused by over extraction of groundwater and

depletion and pollution of surface water).

Government of India launched Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) to

address the constraints in providing assured irrigation as well as increasing efficiency and

District Irrigation Plan, South West Garo Hills district

10 | P a g e

productivity of current water use to bring more prosperity to the rural areas. Priorities of

Government of India were reflected in the Hon’ble President’s address to the joint Session of

the Parliament of 16th Lok Sabha where he indicated that “Each drop of water is precious.

Government is committed to giving high priority to water security. It will complete the long

pending irrigation projects on priority and launch the ‘Pradhan Mantri Krishi Sinchayee

Yojana’ with the motto of ‘Har Khet Ko Pani’. There is a need for seriously considering all

options including linking of rivers, where feasible; for ensuring optimal use of our water

resources to prevent the recurrence of floods and drought. By harnessing rain water through

‘Jal Sanchay’ and ‘Jal Sinchan’, we will nurture water conservation and ground water

recharge. Micro irrigation will be popularised to ensure ‘Per drop-More crop”.

PMKSY has been approved with an indicative outlay of Rs.50,000 crore over a period of five

years from 2015-16 to 2019-20. The programme is an amalgamation of on-going schemes of

Ministry of Water Resources, River Development and Ganga Rejuvenation, Ministry of

Agriculture & Cooperation and Ministry of Rural Development. The existing schemes AIBP,

CADWM, MI, SWMA, Watershed & Convergence with MGNREGA were brought together

under the umbrella program of PMKSY. Further the scheme seeks convergence with scheme

like Mahatma Gandhi National Rural Employment Guarantee Scheme (MGNRES), Rashtriya

Krishi Vikas Yojana (RKVY), Jawaharlal Nehru National Solar Mission and Rural

Electrification programmes (JLNNSM & REP), Rural Infrastructure Development Fund

(RIDF), Members of Parliament Local Area Development Scheme (MPLAD), Members of

Legislative Assembly Local Area Development Fund (MLALAD), Local Body Funds (LBF),

Working Plan of State Forest Department (WPSFD) etc. The PMKSY will be implemented in

an area development mode only by adopting a decentralized state level planning and

projectised execution structure that will allow the state to draw up their own irrigation

development plans based on DIPs and SIPs with a horizon of 5-7 years. The program will be

supervised and coordinated utilizing the existing mechanism and structure available under

Rashtriya Krishi Vikas Yojana (RKVY) program with state agriculture department acting as

the State Nodal Agency for implementation of PMKSY. However, the implementing

departments for the four components like AIBP, PMKSY HKKP (Har Khet Ko Pani),

PMKSY PDMC (Per drop more crop) and PMKSY (watershed development) will be decided

by the respective program ministry/department.

The five chapters along with introduction chapter, explains the profile of district, its water

requirement for agriculture and allied sector, water availability, assessment of water

District Irrigation Plan, South West Garo Hills district

11 | P a g e

requirement for various sectors and strategic action plan for augmentation and effective

management of available water resources.

District Demography:

As per 2011 census, the population of the district is 1,72,495 which is 5.81% of the state’s

population. With a population density of 209 person per square kilometer, South West Garo

Hills is relatively denser compared to the population density of the state (132 person per

square kilometer). The number of males and females in the district are 87,135 and 85,360

respectively forming a sex ratio of 980 female per 1000 male. There are 33,863 households in

the district. The literacy rate of the District is 56.7% as per 2011 Census.

Agriculture in South West Garo Hills:

92.5% of the total population of this district are hilly tribal and they practice agriculture along

with poultry and piggery mostly for subsistence level. Total geographical area of the district

is 82200 Ha and of which 27076 Ha is only cultivable land. Gross irrigated area 9381 Ha.

Out of total gross irrigated area, rice is the most dominant crop which enjoys enough

irrigation through surface mode. The soils are acidic and prone to erosion but very rich in

organic matter indicating potential to go for organic farming under proper management

practices. Other than rice and maize, horticultural crops like ginger and turmeric, Arcenaut,

Pine apple and other seasonal vegetables have tremendous production potentials and their

qualities can compete with world class standards. As those are grown mostly on the hill

slopes, they need irrigation support during the critical stages to ensure optimum quality and

productivity to meet the demand locally as well as outside the state.

Demand for water and the gap:

The water budget of the district for is prepared for the district for 2015-16 to 2020-21. The

present water availability/demand and also for 2020-21 are worked out and the water gap is

found out. The water budget clearly shows the water gap of -559.69 MCM in present and of -

529.17 MCM in future between the water availability and requirement. The negative gap

indicates that there is sufficient water resources for irrigation, domestic and the industrial

uses without creating any deficit in our water potential.

District Irrigation Plan, South West Garo Hills district

12 | P a g e

PMKSY Financial Proposal:

Total plan of South West Garo Hills district for four years works out to be Rs. 259990.26

lakh. Maximum share of Rs. 245264.33 lakhs is for Water Resources department followed by

Soil Conservation department, Agriculture department & Horticulture department with Rs.

8359.25 lakhs, Rs. 4190.68 lakhs & Rs. 2176 lakhs respectively. The total plan of four years

is divided in to 4 years i.e. 2016-17, 2017-18, 2018-19 and 2019-20.

District Irrigation Plan, South West Garo Hills district

13 | P a g e

Introduction

Background

Preparation of decentralized area specific district planning process visualized in various plans

took concrete shape through the years and initiatives like specific guidelines on

methodologies and processes for preparation of district plans; framework for preparation of

perspective plan, medium term and annual plans by then planning commission in 1969 and

the 73rd and 74th constitutional amendments conferring constitutional status to Panchayats at

district and sub district level; local self-government in urban areas; constitution of district

planning committee to consolidate the plans prepared at Panchayats and municipalities and

prepare a draft development plan for the whole district.

The decentralized planning process was further strengthened through emphasis by planning

commission on preparation of district level plans and making it an integral part of the process

of preparation of the states 11th five year plan. The Planning commission issued guidelines in

August 2006 for preparation of the district plans. The guidelines define the District Planning

as ‘the process of preparing an integrated plan for the local government sector in a district

taking into account the resources (natural, human and financial) available and covering the

sectoral activities and schemes assigned to the district level and below and those

implemented through local governments in a state. The document that embodies this

statement of resources and their allocation for various purposes is known as the District

Plan”.

Government of India through a resolution in National Development Council on 29th May

2007 conceived a special Additional Central Assistance Scheme (ACAS) to address the slow

growth of agriculture and allied sectors by incentivizing states to draw up plans for their

agriculture sectors more comprehensively. The NDC resolution states "GoI will introduce a

new Additional Central Assistance Scheme to incentivize states to draw up plans for their

agriculture sector more comprehensively, taking agro-climatic conditions, natural resource

issues and technology into account, and integrating livestock, poultry and fisheries, etc. This

will involve a new scheme for Additional Central Assistance (ACA) to State Plans,

administered by the Union Ministry of Agriculture over and above its existing Centrally

Sponsored Schemes, to supplement the State-specific strategies including special schemes for

beneficiaries of land reforms. The newly created National Rainfed Area Authority will, on

District Irrigation Plan, South West Garo Hills district

14 | P a g e

request, assist States in planning for rainfed areas".

The NDC in its resolution advised the states to prepare a comprehensive district agriculture

plans (C-DAP) that will fully utilize available resources and will include allied agriculture

sectors. Further, GOI issued a manual on preparation of comprehensive district agriculture

plans to help the states prepare C-DAP. As per these guidelines, the objective of district

planning is ‘to design an integrated and participatory action plan for the development of local

area in general and agriculture and allied sectors in particular’. The objectives of

Comprehensive District Agriculture Plan (C-DAP) are:

To prepare a Comprehensive District Agriculture Plan (C-DAP) through participatory

process involving various organizations and stakeholders.

To enable optimum utilization of scarce natural, physical & financial resources.

To assess and plan for the infrastructure required to support the agriculture

development.

To establish linkages with the required institutional support services, like credit,

technology transfer, ICT, research etc.

To evolve an action plan for achieving sustainable agricultural growth with food

security and cropping system that will improve farmers’ income.

The guidelines required the state/district authorities to (i) ensure that the agricultural plans are

prepared for the district and then integrated into the agricultural plans of the State based on

the agro-climatic conditions, availability of technology, trained manpower and natural

resources; (ii) local needs / crops / feed and fodder / animal husbandry / dairying / fisheries /

priorities are reflected in the plan; (iii) productivity gaps for important crops and livestock

and fisheries are reduced; and (iv) the returns to the farmers from these are maximized.

The latest move in the process of strengthening of decentralized planning process was the

Government of India guidelines issued in 2015 in the form of a template for the preparation

of District Irrigation Plan (DIP) and State Irrigation Plan (SIP) as part of the Pradhan Mantri

Krishi Sinchayee Yojana (PMKSY) program and made the preparation of DIP and SIP

mandatory for the states to receive funds from the program. The present report is a product of

these long drawn efforts of Government of India to strengthen the decentralized planning

process in the country focusing on the vital resource i.e., water.

Water is of vital importance for human & animal life, maintenance of ecological balance and

promotion of developmental activities. Considering its vital importance and ever increasing

District Irrigation Plan, South West Garo Hills district

15 | P a g e

demand for water, in the face of population growth, urbanization & industrialization and

considerations of climatic change, making water, an increasingly a scarce resource, available

to multiple uses, planning and management of this vital resources, utilization of water

economically, optimally and equitably assumes greater importance.

According to the 12th Five year Plan the water budget estimates of India by Ministry of Water

Resources suggests an availability of 1123 billion cubic meters (BCM) against a current

estimated demand of 710 BCM. The Standing Committee of the Ministry of Water Resources

estimates that this water demand will rise to 1093 BCM by 2025. Though the existing water

availability in the immediate future seems to be adequate, with the near constant supply of

water resources in the face of increasing demand on account of population growth,

urbanization and industrialization will strain the water supply-demand balance.

The per capita water availability which stood at 5,177 cubic meters in 1951 was reduced to

1820 cubic meters in 2001 while the international prescribed limit is 1800 cubic meters. The

projected per capita availability of water is 1341 cubic meters in 2025 and 1140 cubic meters

in 2050 suggesting shortage of water in the medium term1. Further, the all India water

balance estimates does not reflect the variations in water balance across time and space-

certain areas having a positive water balance and the others facing acute shortage. The

problem is further accentuated by water quality related issues.

With the abundant surface and ground water supply in the first five decades since

independence, more than 80 percent of the total available water resources were allocated for

irrigation purposes and the rest meeting the domestic and industrial demands. In a recent

study2on the demand for water from agriculture, domestic and industrial uses in 2000, 2025

and 2050 seems to suggest that domestic demand (34 BCM in 2000, 66 BCM in 2025 and

101 BCM in 2050) and industrial demand (42 BCM in 2000, 92 BCM in 2025 and 161 BCM

in 2050) for water will utilize the total balance water available while agriculture demand for

water will be (605 BCM in 2000, 675 BCM in 2025 and 637 BCM in 2050). This change is

partly because of the changing sectoral contributions of India’s GDP and also partly because

of dynamics of irrigation development in the country where the initial expansion in area

under irrigation is propelled by the availability of abundant water resources and availability

1Ministry of Water Resources (2011), Strategic Plan for Ministry of Water Resources, GoI, New Delhi 2Amarasinghe, U.A., Shah T., Turral, H. and Anand, B.K. 2007. India’s water future to 2025-

2050:Business-as-usual scenario and deviations. Research Report 123, International Water

Management Institute, Colombo.

District Irrigation Plan, South West Garo Hills district

16 | P a g e

of good quality land. This is no longer the case in many of the states where the availability of

land and water are serious constraints for further expansion of irrigation. Further, as per the

erstwhile planning commission up to March 2012 out of 141 million hectares of net sown

area in the country 114 (or 81%) million hectares is Irrigation Potential Created (IPC) and 88

(or 62%) million hectares is Irrigation Potential Utilized (IPU) leaving almost 20% of

irrigated potential unutilized. This leaves 40 percent of the net sown area in the country

dependent on rainfall which makes farming a high risk and less productive.

The competing demands for water resources and the emerging issues and concerns were to be

addressed through certain basic principles and commonality in approaches in dealing with

planning, development and management of water resources3 under an Integrated Water

Resource Management framework. The main objectives of water resource management as

delineated in National Water Policy 2012 are:

a) Planning, development and management of water resources need to be governed by

common integrated perspective considering local, regional, State and national context,

having an environmentally sound basis, keeping in view the human, social and

economic needs.

b) Principle of equity and social justice must inform use and allocation of water.

c) Good governance through transparent informed decision making is crucial to the

objectives of equity, social justice and sustainability. Meaningful intensive

participation, transparency and accountability should guide decision making and

regulation of water resources.

d) Water needs to be managed as a common pool community resource held, by the state,

under public trust doctrine to achieve food security, support livelihood, and ensure

equitable and sustainable development for all.

e) Water is essential for sustenance of eco-system, and therefore, minimum ecological

needs should be given due consideration.

f) Safe Water for drinking and sanitation should be considered as pre-emptive needs,

followed by high priority allocation for other basic domestic needs (including needs

of animals), achieving food security, supporting sustenance agriculture and minimum

eco-system needs. Available water, after meeting the above needs, should be allocated

in a manner to promote its conservation and efficient use.

3Ministry of Water Resources, National Water Policy, 2012, GoI, New Delhi.

District Irrigation Plan, South West Garo Hills district

17 | P a g e

g) All the elements of the water cycle, i.e., evapo-transpiration, precipitation, runoff,

river, lakes, soil moisture, and ground water, sea, etc., are interdependent and the

basic hydrological unit is the river basin, which should be considered as the basic

hydrological unit for planning.

h) Given the limits on enhancing the availability of utilizable water resources and

increased variability in supplies due to climate change, meeting the future needs will

depend more on demand management, and hence, this needs to be given priority,

especially through (a) evolving an agricultural system which economizes on water use

and maximizes value from water, and (b) bringing in maximum efficiency in use of

water and avoiding wastages.

i) Water quality and quantity are interlinked and need to be managed in an integrated

manner, consistent with broader environmental management approaches inter-alia

including the use of economic incentives and penalties to reduce pollution and

wastage.

j) The impact of climate change on water resources availability must be factored into

water management related decisions. Water using activities need to be regulated

keeping in mind the local geo climatic and hydrological situation.

Government of India launched Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) to

address the constraints in providing assured irrigation as well as increasing efficiency and

productivity of current water use to bring more prosperity to the rural areas. Priorities of

Government of India were reflected in the Hon’ble President’s address to the joint Session of

the Parliament of 16th Lok Sabha where he indicated that “Each drop of water is precious.

Government is committed to giving high priority to water security. It will complete the long

pending irrigation projects on priority and launch the ‘Pradhan Mantri Krishi Sinchayee

Yojana’ with the motto of ‘Har Khet Ko Pani’. There is a need for seriously considering all

options including linking of rivers, where feasible; for ensuring optimal use of our water

resources to prevent the recurrence of floods and drought. By harnessing rain water

through ‘Jal Sanchay’ and ‘Jal Sinchan’, we will nurture water conservation and ground

water recharge. Micro irrigation will be popularised to ensure ‘Per drop-More crop”.

PMKSY has been approved with an indicative outlay of Rs.50,000 crore over a period of five

years from 2015-16 to 2019-20. The programme is an amalgamation of on-going schemes of

Ministry of Water Resources, River Development and Ganga Rejuvenation, Ministry of

District Irrigation Plan, South West Garo Hills district

18 | P a g e

Agriculture & Cooperation and Ministry of Rural Development. The existing schemes AIBP,

CADWM, MI, SWMA, Watershed and Convergence with MGNREGA were brought

together under the umbrella program of PMKSY. Further the scheme seeks convergence with

scheme likeMahatma Gandhi National Rural Employment Guarantee Scheme (MGNRES),

Rashtriya Krishi Vikas Yojana (RKVY), Jawaharlal Nehru National Solar Mission and Rural

Electrification programmes (JLNNSM & REP), Rural Infrastructure Development Fund

(RIDF), Members of Parliament Local Area Development Scheme (MPLAD), Members of

Legislative Assembly Local Area Development Fund (MLALAD), Local Body Funds (LBF),

Working Plan of State Forest Department (WPSFD) etc. The PMKSY will be implemented in

an area development mode only by adopting a decentralized state level planning and

projectised execution structure that will allow the state to draw up their own irrigation

development plans based on DIPs and SIPs with a horizon of 5-7 years. The program will be

implemented as part of Rashtriya Krishi Vikas Yojana (RKVY) with state agriculture

department acting as the State Nodal Agency. However, the implementing departments for

the four components like AIBP, PMKSY (Har Khet Ko Pani), PMKSY (Per drop more crop)

and PMKSY (watershed development) will be decided by the respective program

ministry/department.

The funds under this program would be provided to the states as per the pattern of assistance

of Centrally Sponsored Schemes (CSS) decided by the Ministry of Finance and NITI Aayog.

During 2015-16 the existing pattern of assistance of ongoing scheme was continued. An

outlay of Rs. 50,000 crore has been approved for 2015-20. The financial assistance provided

to the state governments from this centrally sponsored scheme is subject to fulfilment of

certain conditions. Firstly, a state will become eligible to access PMKSY fund only if it has

prepared the District Irrigation Plans (DIP) and State Irrigation Plan (SIP), excepting for the

initial year, and the expenditure in water resource development for agriculture sector in the

year under consideration is not less than the baseline expenditure, which is defined as the

average of the expenditure in irrigation sector irrespective of the department in the state plan

in three years prior to the year under consideration. Secondly, States will be given additional

weightage for levying charges on water and electricity for irrigation purposes, so as to ensure

sustainability of the programme. Thirdly, interstate allocation of PMKSY fund will be

decided based on

District Irrigation Plan, South West Garo Hills district

19 | P a g e

Share of percentage of unirrigated area in the state vis-à-vis national average

including prominence of areas classified under Desert Development Programme

(DDP) and Drought Prone Area Development Programme (DPAP)

Increase in percentage share of expenditure on water resource development for

agriculture sector in State Plan expenditure in the previous year over three years prior

to it and

Improvement in irrigation efficiency in the state.

Vision

The overreaching vision of Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) will be to

ensure access to some means of protective irrigation to all agricultural farms in the country,

to produce ‘per drop more crop’, thus bringing much desired rural prosperity.

Objective

The objectives of the PMKSY are to:

a) Achieve convergence of investments in irrigation at the field level (preparation of

district level and, if required, sub district level water use plans).

b) Enhance the physical access of water on the farm and expand cultivable area under

assured irrigation (Har Khet ko Pani),

c) Integration of water source, distribution and its efficient use, to make best use of

water through appropriate technologies and practices.

d) Improve on-farm water use efficiency to reduce wastage and increase availability both

in duration and extent,

e) Enhance the adoption of precision-irrigation and other water saving technologies

(More crop per drop).

f) Enhance recharge of aquifers and introduce sustainable water conservation practices

g) Ensure the integrated development of rainfed areas using the watershed approach

towards soil and water conservation, regeneration of ground water, arresting runoff,

providing livelihood options and other NRM activities.

h) Promote extension activities relating to water harvesting, water management and crop

alignment for farmers and grass root level field functionaries.

District Irrigation Plan, South West Garo Hills district

20 | P a g e

i) Explore the feasibility of reusing treated municipal waste water for peri-urban

agriculture, and

j) Attract greater private investments in irrigation.

Strategy/approach

To achieve these objectives PMKSY adopted strategies that include

a) Creation of new water sources; repair, restoration and renovation of defunct water

sources; construction of water harvesting structures, secondary & micro storage,

groundwater development, enhancing potentials of traditional water bodies at village

level like Jal Mandir (Gujarat); Khatri, Kuhl (H.P.); Zabo (Nagaland); Eri, Ooranis

(T.N.); Dongs (Assam); Katas, Bandhas (Odisha and M.P.) etc.

b) Developing/augmenting distribution network where irrigation sources (both assured

and protective) are available or created;

c) Promotion of scientific moisture conservation and run off control measures to

improve ground water recharge so as to create opportunities for farmers to access

recharged water through shallow tube/dug wells;

d) Promoting efficient water conveyance and field application devices within the farm

viz, underground piping system, Drip & Sprinklers, pivots, rain-guns and other

application devices etc.;

e) Encouraging community irrigation through registered user groups/farmer producers’

organizations/NGOs; and

f) Farmer oriented activities like capacity building, training and exposure visits,

demonstrations, farm schools, skill development in efficient water and crop

management practices (crop alignment) including large scale awareness on more crop

per drop of water through mass media campaign, exhibitions, field days, and

extension activities through short animation films etc.

Programme Components

PMKSY has following four components:

1. Accelerated Irrigation Benefit Programme (AIBP) to focus on faster completion of

ongoing Major and Medium Irrigation including National Projects.

2. PMKSY (Har Khet ko Pani): This component focuses on-

District Irrigation Plan, South West Garo Hills district

21 | P a g e

a) Creation of new water sources through Minor Irrigation (both surface and ground

water)

b) Repair, restoration and renovation of water bodies; strengthening carrying capacity of

traditional water sources, construction rain water harvesting structures (Jal Sanchay);

c) Command area development, strengthening and creation of distribution network from

source to the farm;

d) Ground water development in the areas where it is abundant, so that sink is created to

store runoff/ flood water during peak rainy season.

e) Improvement in water management and distribution system for water bodies to take

advantage of the available source which is not tapped to its fullest capacity (deriving

benefits from low hanging fruits). At least 10% of the command area to be covered

under micro/precision irrigation.

f) Diversion of water from source of different location where it is plenty to nearby water

scarce areas, lift irrigation from water bodies/rivers at lower elevation to supplement

requirements beyond IWMP and MGNREGS irrespective of irrigation command.

g) Creating and rejuvenating traditional water storage systems like Khatri, Kuhl etc. at

feasible locations.

3. PMKSY (Per Drop More Crop)

a) Programme management, preparation of State/District Irrigation Plan, approval of

annual action plan, Monitoring etc.

b) Promoting efficient water conveyance and precision water application devices like

drips, sprinklers, pivots, rain-guns in the farm (Jal Sinchan);

c) Topping up of input cost particularly under civil construction beyond permissible

limit (40%), under MGNREGS for activities like lining inlet, outlet, silt traps,

distribution system etc.

d) Construction of micro irrigation structures to supplement source creation activities

including tube wells and dug wells (in areas where ground water is available and not

under semi critical/ critical/ over exploited category of development) which are not

supported under AIBP, PMKSY (Har Khet ko Pani), PMKSY (Watershed) and

MGNREGS as per Taluka/district irrigation plan.

District Irrigation Plan, South West Garo Hills district

22 | P a g e

e) Secondary storage structures at tail end of canal system to store water when available

in abundance (rainy season) or from perennial sources like streams for use during dry

periods through effective on-farm water management;

f) Water lifting devices like diesel/ electric/ solar pump sets including water carriage

pipes, underground piping system.

g) Extension activities for promotion of scientific moisture conservation and agronomic

measures including cropping alignment to maximize use of available water including

rainfall and minimize irrigation requirement (Jal Sarankchan);

h) Capacity building, training and awareness campaign including low cost publications,

use of pico projectors and low cost films for encouraging potential use water source

through technological, agronomic and management practices including community

irrigation.

i) The extension workers will be empowered to disseminate relevant technologies under

PMKSY only after requisite training is provided to them especially in the area of

promotion of scientific moisture conservation and agronomic measures, improved/

innovative distribution system like pipe and box outlet system, etc. Appropriate

Domain Experts will act as Master Trainers.

j) Information Communication Technology (ICT) interventions through NeGP-A to be

made use in the field of water use efficiency, precision irrigation technologies, on

farm water management, crop alignment etc. and also to do intensive monitoring of

the Scheme.

4. PMKSY (Watershed Development)

a) Effective management of runoff water and improved soil & moisture conservation

activities such as ridge area treatment, drainage line treatment, rain water harvesting,

in-situ moisture conservation and other allied activities on watershed basis.

b) Converging with MGNREGS for creation of water source to full potential in

identified backward rainfed Talukas including renovation of traditional water bodies

Rationale/ Justification

In reference to the status and need of irrigation, the water resource management including

irrigation related priorities was identified for South West Garo Hills district by the peoples’

representatives of district with support from administration and technical experts. For

District Irrigation Plan, South West Garo Hills district

23 | P a g e

instance the reports of Strategic Research and Extension Plan (SREP) prepared under ATMA

program, Comprehensive District Agriculture Plan (C-DAP) prepared as part of Rashtriya

Krishi Vikas Yojana (RKVY), Potential Linked Credit Plans (PLP) of NABARD and the

Integrated District Development Plan etc. identified number of irrigation related issues for

South West Garo Hills district including (i) creating irrigation potential through water

harvesting structure, Nalla and Check Bundh, Percolation and Recharge tanks (ii) promoting

water use efficiency through sprinkler and drip irrigation; (iii) promoting protected polyhouse

cultivation to minimize risk factors and enhance quality and productivity; (iv) Improvement

of on-farm water delivery and efficiency of existing irrigation systems; (v) promotion of soil

conservation of arable & non-arable land through engineering measures; (vi) increase the

forest cover in the district and (vii) land improvement measures.

Methodology

During the course of preparation of District Irrigation Plan (DIP) the team visited South West

Garo Hills district to collect data and have interaction with all the stakeholders. Methodology

adopted to prepare DIP is outlined in brief as under:

a) Collection of primary and secondary data from field from various sources including

published documents and websites.

b) Various meetings were held to obtain ground level realities and data from key

personnel/stakeholders through structured, unstructured interviews, focused group

discussions etc.

c) Meetings with various State Government departments and related institutions were held

d) Meeting was also held with State Level authorities.

e) GIS maps of the areas/clusters were studied to understand the land morphology,

topography of the district.

f) Focused group discussions and interaction with agriculture officers, horticulture officers,

soil conservation officers, extension officers, rural development department, animal

husbandry department, irrigation officers both at Talukas and district level for identifying

the key issues and focus areas of the region.

g) Discussion with NABARD officer of the district was also held during the visit.

On the basis of detailed discussion and analysis of data, the team arrived at the projections of

various components of PMKSY and Department wise plan for four years from 2016-17 to

2019-20 as detailed in the plan.

District Irrigation Plan, South West Garo Hills district

24 | P a g e

Chapter 1 : General Information of the District

1.1 District Profile

Meghalaya Chief Minister Dr Mukul Sangma In the interest of general public inaugurated the

South West Garo Hills on 7th of August 2012 at its headquarters, Ampati. With the

inaguration of South West Garo Hills District the number of districts in the state has gone up

to 11(eleven). It is located at the Latitude of 25º27.505 and Longitude of 89º56.456 and is 52

km away from the district headquarter Tura of West Garo Hills District. South-West Garo

Hills is carved out of the present West Garo Hills district.

Map 1-1: Location of South West Garo Hills district in Meghalaya

Table 1-1: District Profile

Name of the District District Code Latitude Longitude

South West Garo Hills 293 25º27.505 North 89º56.456 East

Source: Census of India 2011, West Garo Hills

The District is bounded on the north by Selsella and Rongram Community & Rural

Development Block; on the south by Sherpur and Jamalpur District of Bangladesh and Dalu

and Gambegre Community & Rural Development Blocks, on the east by Dalu and Gambegre

Community & Rural Development Blocks and on the west by Dhubri and Kurigram District

District Irrigation Plan, South West Garo Hills district

25 | P a g e

of Assam and Bangladesh respectively. As a natural boundary the District has the river Kalu

(also known as Ganol) on the north and providing a long demarcation line to Dhubri district

and Selsella while the river Jinjiram flows along the Western boundary of the District.

Physically the area of the District extends upto the 11 kilometers short of Tura on the east;

Mankachar on the north. The District has approximately 35 kilometers of international

boundary with Bangladesh on the south and western side. Nearly one third of the total

number of villages of the sub-division is declared as border villages by the Border Area

Development Department.

Administrative Set-up of South West Garo Hills

South West Garo Hills District comprises all the villages falling under the two Community

and Rural Development Blocks, viz. Betasing and Zikzak Community and Rural

Development Blocks, including 33 (thirty-three) villages under Mukdangra Gram Sevak (GS)

Circle and Garobadha Gram Sevak Circle of Selsella Community & Rural Development

Block, 24 (twenty-four) villages under Okkapara Songma Gram Sevak Circle and

Chengkuregre Gram Sevak Circle of Gambeggre Community & Rural Development Block,

13 (thirteen) villages under Jarangkona Gram Sevak Circle of Dalu Community & Rural

Development Block and Anggalgre village of Rongkhongre Gram Sevak Circle of Rongram

Community & Rural Development Block.

Reorganized Gram Sevak Circle

After the reorganization of the Gram Sevak Circle all the villages annexed from other

Community and Rural Development Blocks falls under Betasing Community and Rural

Development Block, except for Jarangkona Gram Sevak Circle of Dalu Community & Rural

Development Block which falls under Zikzak Community and Rural Development Block.

1.2 District Demography

As per 2011 census, the population of the district is 1,72,495 which is 5.81% of the state’s

population. With a population density of 209 person per square kilometer, South West Garo

Hills is relatively denser compared to the population density of the state (132 person per

square kilometer). The number of males and females in the district are 87,135 and 85,360

respectively forming a sex ratio of 980 female per 1000 male. There are 33,863 households in

the district. The literacy rate of the District is 56.7% as per 2011 Census.

District Irrigation Plan, South West Garo Hills district

26 | P a g e

Table 1-2: Demography of South West Garo Hills

Name of the

blocks

Population SC ST Total

M* F CH SC

NHH

SC

NM

ST

NHH

ST

NM NHH NM

ZikZak 39339 38138 12918 377 1703 9586 49862 15621 77477

Betasing 47796 47222 12486 55 305 12468 65776 18242 95018

Total 87135 85360 25404 432 2008 22054 115638 33863 172495

Source: Census of India 2011, West Garo Hills

*M- Male, F- Female, CH- Children 0-14 years, NHH- No. of households, NM- No. of members, T-

Total, R-Rural, U-Urban

1.3 Biomass and Livestock

Next to Agriculture and Horticulture, Livestock rearing is an important enterprise of the

district. Cows, buffaloes, draft animals, goats, pigs, poultry are main commodities of

livestock enterprise. Cross breed cows, improved breed buffaloes and upgraded pigs in small

numbers are also reared in almost all the blocks of the district. Mostly the local breeds are

common. The population of the Large, Small, Milch or meat animals including the draft

animals (Buffalos/yak/bulls etc) are given in Table no. 1-3 and 1-4.

Table 1-3: Population of Small and Milch or Meat Animals in South West Garo Hills

Blocks

Small Animals Any other Milch or

Meat Animal (Nos.) Poultry

(Nos.)

Ducks

(Nos.)

Pigs

(Nos.)

Goats

(Nos.)

Sheeps

(Nos.)

ZikZak 30077 - 9337 38437 1162 -

Betasing 78120 - 10175 11141 199 -

Total 108197 - 19512 49578 1361 -

Source: District Veterinary Officer, South West Garo Hills

Table 1-4: Population of Large and Draft Animals in South West Garo Hills

Blocks

Large Animals

Draft Animal

(Buffalo/yak/bulls/any other (Nos.)

Indigenous

Cow

(Nos.)

Hybrid

Cow

(Nos.)

In

descriptive

Buffalo

(Nos.)

Hybrid

Buffalo

(Nos.)

ZikZak 23374 - 2703 - 2

Betasing 47672 - 2132 - 1

Total 71046 - 4835 - 3

Source: District Veterinary Officer, South West Garo Hills

1.4 Agro-Ecology, Climate, Hydrology and Topography

In general, the district has a mildly tropical climate. The climate of the district is largely

controlled by southwest monsoon and seasonal winds. The average rainfall is 3400 mm, of

which more than two-thirds occur during the monsoon, with winter being practically dry. The

district has mostly dense tropical mixed forest. There are four seasons in the district namely

summer, monsoon or rainy, autumn and winter. The summer season extends from the end of

March to mid-May, which is characterized by relatively high temperature. Rainy season

District Irrigation Plan, South West Garo Hills district

27 | P a g e

commences with the onset of southwest monsoon in April and lasts up to October. This is

followed by short autumn from mid-October to November. This season indicates the slow

retreating of monsoon with clear and sunny sky. Winter season extends from December to the

end of March. This is the coldest season of the year with sharp decline in the temperature.

Winter is basically dry with lower diurnal range of temperature in the northern and southern

foothills, whereas central upland portion experiences temperate climate and the places of

medium altitude of the northern, southern and western part of the district experiences sub-

tropical climate. The district receives a fairly high rainfall throughout the year. Most of the

precipitation occurs during the rainy season i.e. between April and October due to southwest

monsoon.

Table 1-5: Agro-ecology and Topography of South West Garo Hills district

Agro

Ecological

Zone

Type

Type of

Terrain

Area

(Ha)

Normal

Annual

Rainfall

(mm)

Average

Monthly

Rainfall

(mm)

No of

Rainy

Days

Maximum Rainfall

Intensity (mm)

Up to

15 min

Beyond

15 but

upto 30

min

Beyond

30 but

upto 60

min

ACZ V Partly Hilly 82200 3400 283 112 25 20 8

Source: KVK Tura, Department of Agriculture, Ampati

Table 1-6: Climate and Elevation of South West Garo Hills district

Average Weekly Temperature (0C) Elevation (m)

Period

Min Max Mean Summer (Apr-May) Winter (Oct- Mar) Rainy (Jun-Sep)

Min Max Mean Min Max Mean Min Max Mean

19.5 35.9 27.7 8.04 35.92 21.98 22.56 36.81 29.69 14 288 151

Source: KVK Tura, Department of Agriculture, Ampati

1.5 Soil Profile

Nearly one third of the total area is said to be covered with hills. While the rest is, literally a

plain region dotted with small hillocks here and there. A large and continuous strip of plain

land stretches from Garobadha towards Mankachar extending upto Mahendraganj and

Gopinath Killa along the border of Dhubri District of Assam and Bangladesh. The hill

regions, on the other hand, begin from 11 kilometer short of Tura on the east and cover

Damalgiri, Okkapara, Mellim and Salmanpara areas on the south. These hills and hills ranges

occur in the east and southern parts of the District and gradually slope down towards north

and west and ultimately converge with the bigger plain region. Major soil class in the district

is Sandy Loam Clay Loam for which area and land slope is given in the table below.

District Irrigation Plan, South West Garo Hills district

28 | P a g e

Table 1-7: Soil Type and Land slope classification of South West Garo Hills district

Soil Type Land Slope

Major Soil Class Area (Ha) 0-3% (ha) 3-8 % (ha) 8-25 % (ha) >25 % (ha)

Sandy Loam Clay Loam 70600 0 15532 48714 6354

Source: Divisional Soil & Water Conservation Department, Ampati, South West Garo Hills

1.6 Land Use pattern

Agriculture and forests are the two important units of land utilization and they occupy about

50231 hectares (61.10% of total geographical area of the district). The gross cropped area in

the district is 27076 ha (33%). The net area sown is 20412 ha, which is 24.5% of total

geographical area of the district. Land put to non-agricultural use is 30821 ha which is

37.49% and area sown more than once is very low i.e. 6664 ha while Barren & un-cultivable

land occupy 1148 ha (0.80%) and cultivable wasteland is about 1050 ha (0.23%). While

permanent pastures and other grazing land under miscellaneous, tree, crops and grooves are

not included in net area sown of the total geographical area of the district. The following

table gives the block wise information on land use pattern.

Table 1-8: Land use pattern in South West Garo Hills district

Blocks TGA*

Area Under Agriculture Area

under

Forest

(Ha)

Area

under

Wasteland

(Ha)

Area

under

other use

(Ha)

GCA NSA AST CI (%)

ZikZak 45526 14493 11139 3354 130.11 13395 688 16950

Betasing 36674 12583 9273 3310 135.70 9760 460 13871

Total 82200 27076 20412 6664 132.65 23155 1148 30821

Source: Department of Agriculture & Horticulture, Ampati

*TGA- Total Geographical Area, GCA- Gross Cropped Area, NSA- Net Sown Area, AST- Area

Sown more than once, CI- Cropping Intensity

District Irrigation Plan, South West Garo Hills district

29 | P a g e

Chapter 2 : District Water Profile

Water is vital for survival of both plants and animals. It is the central component of the planet

Earth controlling the weather, climate, plant and animal kingdom. It supports agriculture,

forestry, navigation, industries and hydroelectricity generation and other uses such as for

recreation, water sports activities etc. The importance of water has been recognized all over

the world. Water resource development and management practices are given top priorities all

over the world to avoid the water crisis in future. This chapter outlines the different type of

crops, productivity and irrigation status of the South West Garo Hills district.

2.1 Area wise, Crop wise, irrigation Status

The economy of the district centres on agriculture and piggery and paddy is the predominant

commodity that is cultivated. The district receives around 3400 mm rainfall annually, with a

major share during the four months of monsoon (June-September). Total potential

harvestable rainwater in the district is 0.111779 BCM, annually. However, due to lack of

proper and sufficient water harvesting structures, the crops grown under different seasons has

to rely on the mercy of rain to realize a good harvest. The crop wise irrigated and rainfed area

sown in different seasons like Kharif, Rabi and Summer in the district for each block is given

in the table below.

Table 2-1: Area wise, Crop wise, irrigation Status

Name of the district: South West Garo Hills

Name of the Block : Zikzak Development Block

Crop Type

Kharif

(Area in ha)

Rabi

(Area in ha)

Summer Crop

(Area in ha)

Total

(Area in ha)

I R T I R T I R T I R T

A. Cereal (Rice) --- 2948 2948 893 --- 893 1740 --- 1740 2633 2948 5581

B. Coarse cereal

(Rice) --- --- --- --- --- --- --- --- --- --- --- ---

C. Pulses (Pea &

Cowpea) --- --- --- 152 --- 152 --- --- --- 152 --- 152

D. Oil seed

(Soyabeans, Rape

Mustard, Castor)

---

1028 --- 1028 --- --- --- 1028 --- 1028

E. Fibre (Jute) --- 515 515 --- --- --- --- --- --- --- 515 515

F. Fibre (Cotton) --- 125 125 --- --- --- --- --- --- --- 125 125

G. Maize --- 768 768 --- --- --- --- --- --- --- 768 768

H. Lentil --- --- --- 37 --- 37 --- --- --- 37 --- 37

I. Any other crop * --- --- --- --- --- --- --- --- --- --- --- ---

Name of the Block : Betasing Development Block

Crop Type

Kharif

(Area in ha)

Rabi

(Area in ha)

Summer Crop

(Area in ha)

Total

(Area in ha)

I R T I R T I R T I R T

A. Cereal (Rice) --- 4400 4400 1442 --- 1442 2900 --- 2900 4342 4400 8742

B. Coarse cereal

(Rice) --- --- --- --- --- --- --- --- --- --- --- ---

District Irrigation Plan, South West Garo Hills district

30 | P a g e

C. Pulses (Pea &

Cowpea) --- --- --- 147 --- 147 --- --- --- 147 --- 147

D. Oil seed

(Soyabeans, Rape

Mustard, Castor)

--- 37 37 1007 --- 1007 --- --- --- 1007 37 1044

E. Fibre (Jute) --- 510 510 --- --- --- --- --- --- --- 510 510

F. Fibre (Cotton) --- 210 210 --- --- --- --- --- --- --- 210 210

G. Maize --- 648 648 --- --- --- --- --- --- --- 648 648

H. Lentil --- --- --- 35 --- 35 --- --- --- 35 --- 35

I. Any other crop * --- --- --- --- --- --- --- --- --- --- --- ---

Source: Department of Agriculture & Horticulture, Ampati

I: Irrigated Area (Ha), R: Rainfed Area (Ha) and T: Total Area (Ha)

2.2 Production and Productivity of Major crops

92.5% of the total population of this district are hilly tribal and they practice agriculture along

with poultry and piggery mostly for subsistence level. Total geographical area of the district

is 82200 Ha and of which 27076 Ha is only cultivable land. Gross irrigated area 9381 Ha.

Out of total gross irrigated area, rice is the most dominant crop which enjoys enough

irrigation through surface mode. The soils are acidic and prone to erosion but very rich in

organic matter indicating potential to go for organic farming under proper management

practices. Other than rice and maize, horticultural crops like ginger and turmeric, Arcenaut,

Pine apple and other seasonal vegetables have tremendous production potentials and their

qualities can compete with world class standards. As those are grown mostly on the hill

slopes, they need irrigation support during the critical stages to ensure optimum quality and

productivity to meet the demand locally as well as outside the state. The crop-wise

production and productivity of different types of crops are given in the table below.

District Irrigation Plan, South West Garo Hills district

31 | P a g e

Table 2-2: Production and productivity of major crops in South West Garo Hills district

Name of the district: South West Garo Hills

Name of the Block : Betasing Development Block

Season

Crop Swon Rainfed Irrigated Total

Cereals Coarse

Cereal Pulses Oil seeds

Fibre

crops

Any

other

crop

P Y C P Y C P Y C

Kharif

Rice (Sali) --- --- --- --- --- 10072 2.289 --- --- --- --- 10072 2289 ---

Rice

(Boro) --- --- --- --- --- ---

--- 12992 4.48 --- 12992 4480 ---

Rice

(autumn) --- --- --- --- --- ---

--- 2567 1.78 --- 2567 1780 ---

--- Maize --- --- --- --- 1050 1.62 --- --- --- --- 1050 1620 ---

--- --- --- Soyabeans --- --- 14 0.778 --- --- --- --- 14 778 ---

--- --- ---

Jute --- 4788 1.69 --- --- --- --- 4788 1690 ---

--- --- ---

Cotton --- 80 0.129 --- --- --- --- 80 129 ---

Rabi

--- --- Lentil

--- --- --- --- --- 29 0.835 --- 29 835 ---

--- --- --- Rape &

mustard --- --- --- --- --- 692 0.687 --- 692 687 ---

Total 16004 6.506 --- 16280 7.782 --- 32284 14288 ---

Name of the Block : Zikzak Development Block

Season

Crop Swon Rainfed Irrigated Total

Cereals Coarse

Cereal Pulses Oil seeds

Fibre

crops

Any

other

crop

P Y C P Y C P Y C

Kharif

Rice (Sali) --- --- --- --- --- 5483 1.86 --- --- --- --- 5483 1860 ---

Rice

(Boro) --- --- --- --- --- ---

--- 7341 4.219 --- 7341 4219 ---

Rice

(autumn) --- --- --- --- --- ---

--- 1544 1.725 --- 1544 1725 ---

--- Maize --- --- --- --- 1229 1.6 --- --- --- --- 1229 1600 ---

--- --- --- Soyabeans --- --- 14 0.7778 --- --- --- --- 14 778 ---

--- --- ---

Jute --- 4933 1.724 --- --- --- --- 4933 1724 ---

--- --- ---

Cotton --- 101 0.138 --- --- --- --- 101 138 ---

Rabi

--- --- Lentil

--- --- --- --- --- 25 0.832 --- 25 832 ---

--- --- --- Rape &

mustard --- --- --- --- --- 692 0.687 --- 692 687 ---

Total 11760 6.0998 --- 9602 7.463 --- 21362 13563 ---

Source: Department of Agriculture & Horticulture, Ampati

P: Production (MT/Yr), Y: Productivity or yield (MT/Ha) and C: Cost of cultivation (Rs/Ha.)

District Irrigation Plan, South West Garo Hills district

32 | P a g e

2.3 Irrigation based classification

As shown in the table below, the Gross Irrigated area and Net Irrigated Area in South West

Garo Hills district is 9381 hectares (34.64% of the gross cropped area) and 5010 hectares

(53.40% of the gross irrigated area) respectively while un-irrigated or Totally Rainfed area in

the district is 17695 hectares (65.36% of the gross cropped area).

Table 2-3: Block-wise irrigation based classification

Blocks

Irrigated (Area in Ha) Rainfed (Area in Ha)

Gross Irrigated

Area

Net Irrigated

Area

Partially

Irrigated/Protective

Irrigation

Un-Irrigated or

Totally Rainfed

ZikZak 3850 2110 - 10643

Betasing 5531 2900 - 7052

Total 9381 5010 - 17695

Source: Department of Agriculture & Horticulture, Ampati

District Irrigation Plan, South West Garo Hills district

33 | P a g e

Chapter 3 : Water Availability in South West Garo Hills

Water availability is an important issue for ascertaining the demand of water for domestic,

livestock, irrigation, industrial and power generation projects. The water availability depends

on topography, climatic conditions, rainfall, soil profile, infiltration rate, run off and human

activities over the catchment area. The changes in the water levels of the surface source are

mainly because of the variations in the inflow from the upper catchments. The fluctuations

constitute a sensitive indicator of past and present climate and human activities at a local and

regional scale. In the hydrological point of view, the entire South West Garo Hills district

falls under the Brahmaputra basin.

3.1 Status of Water Availability

For creating access to water source either assured or protective to each farmer will require a

demand and supply assessment of crop water requirements, effective rainfall and potential

source of existing and new water sources considering the geo-hydrological and agro

ecological scenario of the block. The master plan will include information on all sources of

available water, distribution network, defunct water bodies, new potential water sources both

surface and sub surface system, application to conveyance provisions, crops and cropping

system aligned to available/designed quantity of water and suitability to local agro ecology.

All activities pertaining to water harvesting, water augmentation from surface ad sub surface

sources, distribution and application of water including repair, renovation and restoration of

water bodies, major, medium and minor irrigation works, command area development etc. are

to be taken up within the frame work of this muster plan. Emphasis is to be given for deriving

the potential benefit from low hanging fruits like extending the reach/coverage of water

source through effective distribution and application mechanism, reducing the gap between

potential created and utilized through more focus on command area development and

precision irrigation. Proper integration of creation of diversion head work and water

harvesting structures, distribution system like canals and command area development works

and precision farming is to be made for best possible use of water resources.

Table 3-1: Water availability in South West Garo Hills district (in MCM)

Sl. No. Sources Kharif Rabi Summer Total

1 Surface Irrigation

(i) Canal (Major & medium irrigation) - - - -

(ii) Minor Irrigation tanks 132.09 - - 132.09

(iii) Lift Irrigation/ Diversion - - - -

(iv) Various water bodies including Rain Water

Harvesting 101.61 - - 101.61

District Irrigation Plan, South West Garo Hills district

34 | P a g e

(v) Treated Effluent Received from STP - - - -

(vi) Untreated Effluent - - - -

(vii) Perennial sources of water 111.77 - - 111.77

2 Ground Water

(i) Open Well

508.09

- -

508.09 (ii) Deep Tube Well - -

(iii) Medium Tube Well - -

(iv) Shallow Tube Wells - -

Total 853.57 - - 853.57

Source: Department of Water Resources, Ampati

3.2 Status of Ground Water Availability

India has largest irrigated agriculture with 65 million ha Net irrigated area (21 million ha

through surface and 44 million ha through ground water). Methodology adopted for ground

water resource estimation of the district is as per GEC 1997 Report, i.e. Ground Water Level

Fluctuation and Rainfall infiltration factor Method. Assessment unit can be categorized into 4

categories as SAFE, SEMI-CRITICAL, CRITICAL, and OVER-EXPLOITED. As long-term

water level trend does not show any major change so the whole district may be considered as

SAFE. The detailed status of ground water, draft, recharge and gaps for the district is given

separately in table below.

Table 3-2: Status of Ground Water Availability (in MCM) in South West Garo Hills district

Name of the district Critical Semi-

Critical Safe Draft Recharge Gap

South West Garo Hills - - 0.59 % Safe

Category 0.0015 2.88 2.88

Source: Technical Report Series D No. 46/2011 – 12 CGWB

3.3 Status of Command Area

Information regarding the other services command area which are based on minor irrigation

scheme is given in the table below while the information regarding canal command area for

major and medium irrigation is not available. For total area of 3745.95 hectares, total

developed area is 550 hectares while total undeveloped area is 3195.95 hectares.

Table 3-3: Status of command area in South West Garo Hills district

Name of the

Block

Information of Canal

Command (Major &

Medium Irrigation)

Information on the other

Services Command (Minor

Irrigation Scheme)

Total Area

TA DA UA TA DA UA DA UA

Total -- -- -- 3745.95 550 3195.95 550 3195.95

Source: Department of Water Resources, Ampati

*TA: Total Area, DA: Developed Area and UA: Undeveloped Area Area in Ha.

District Irrigation Plan, South West Garo Hills district

35 | P a g e

3.4 Existing type of Irrigation

As shown in the table below, in the district, for surface water, total of 3616 hectares of area is

covered under government canals and 249 hectares is covered by 34 number of

tanks/ponds/dams while for ground water, 109.95 hectares is covered by government

tubewells and 600 hectares is covered by private tubewells. 35 hectares is covered by other

traditional water harvesting structures. There are 400 diesel pumps available in the district.

Table 3-4: Existing types of Irrigation in South West Garo Hills district

Source of

irrigation

Surface

Irrigation Ground Water

Other

Sources

including

Traditional

WHS

Water Extraction

Devices/ Lift Total

Govt.

Canal

Tanks/

Ponds/

dams

Govt.

Tube

Wells

Pvt.

Tube

Wells

Bore

Wells Diesel Pump

Irrigation

Sources

Water

Extracting

units

No. - 34 - - - - 400 34 434

Command

Area (Ha) 3616 249 109.95 600 - 35 - 4609.95 -

Source: Department of Water Resources, Ampati

District Irrigation Plan, South West Garo Hills district

36 | P a g e

Chapter 4 : Water Requirement/Demand

Whenever an engineer is given the duty to design a water supply scheme for a particular use

of the community, it becomes imperative upon him, to first of all, evaluate the amount of

water available and the amount of water required/ demanded by the public. In fact, the first

study is to consider the demand, and then the second requirement is to find sources to fulfil

that demand. Many a times a compromise is sought between the two. It is very difficult to

precisely assess the quantity of water demanded by the public since there are many variable

factors affecting water consumption. The various type of water demands for a district may be

as follows.

4.1 Domestic Water Demand

This includes the water requirement in private buildings for drinking, cooking, bathing, lawn

sprinkling, gardening, sanitary purposes etc. The amount of domestic water consumption per

person shall vary according to the living conditions of the consumers. On an average, this

domestic consumption under normal conditions in Indian city is expected to be around 135

litres/day/person as per IS: 1172-1971. In a developed and an effluent country like USA, this

figure goes as high as 340 litres/day/person. This is because more water is consumed in rich

living, air cooling/conditioning, automatic household appliances, car washing etc. The total

domestic consumption generally amounts to 55% to 60% of the total water consumption.

The total domestic water demand shall be equal to the total design population multiplied by

the per capita domestic consumption i.e. 140 litre/day. As the last population census was

made in 2011, the actual population of the district in 2015 is not readily available.

Considering the population of the South West Garo Hills district as per Census, 2011 the

projected population in 2020 is worked out assuming the last decadal growth of 26.8% and

annual exponential growth rate of 2.68% to apply for the period 2011-2020 (9 years). The

domestic water demand is given in the table below.

Table 4-1: Domestic water demand (MCM)

Blocks

Population

as per 2011

census

Population in

2015

Water

demand

(MCM)

Projected

Population in

2020

Gross Water

Demand

(MCM)

ZikZak 77477 85783 4.38 87859 4.49

Betasing 95018 105204 5.38 107750 5.51

Total 172495 190986 9.76 195609 10.00

District Irrigation Plan, South West Garo Hills district

37 | P a g e

4.2 Crop water demand

Water requirement of a crop means the total quantity and the way in which a crop requires

water, from the time it is sawn to the time it is harvested (crop period). Different crops will

have different water requirements and the same crop may have different water requirements

at different places of the same country depending upon the climate, type of soil, method of

cultivation and useful rainfall etc. The total quantity of water required by the crop for its full

growth may be expressed in Hectare-m or in Million Cubic meter or simply as a depth to

which the total supplied irrigation water would stand above the surface without percolation or

evaporation. This depth is known as delta for the crop. On the other hand duty is defined as

the area irrigated per cumec of discharge running for the base period. The duty helps us in

designing the efficient canal irrigation system. If we know the crops area required to be

irrigated and their duties, we can work out the discharge required for designing the canal.

Consumptive use for a particular crop may be defined as the total amount of water used by

the plant in transpiration (building of plant tissues etc.) and evaporation from adjacent soils or

from plant leaves, in any specified time. Therefore, crop water requirements are defined as

“the depth of water needed to meet the water loss through evapo-transpiration of a disease

free crop, growing in large fields under non restricting soil conditions including soil water

and fertility and achieving full production under the given growing environment.

Consumptive use for a particular crop may be defined as the total amount of water used by

the plant in transpiration (building of plant tissues etc.) and evaporation from adjacent soils or

from plant leaves, in any specified time. Thus crop water requirement is nothing but the

consumptive use itself, but exclusive of effective precipitation, stored soil moisture or ground

water. Consumptive use or evapotranspiration depends upon all those factors on which

evaporation and transpiration depend such as, temperature, sunlight, wind movement etc. The

crop water requirement of different bocks in the South West Garo Hills district has been

worked out and a statement is prepared as shown in table below which outlines the required

and available water potential in the district.

Table 4-2: Crop water requirement (MCM)

Block

Area

sown

(ha)

Irrigated

area (ha)

Crop

Water

Demand

(MCM)

Water

potential

required

(MCM)

Existing

Water

potential

(MCM)

Water

potential to

be created

(MCM)

ZikZak 14493 3850 144.93 144.93 38.5 106.43

Betasing 12583 5531 125.83 125.83 55.31 70.52

Total 27076 9381 270.76 270.76 93.81 176.95

District Irrigation Plan, South West Garo Hills district

38 | P a g e

4.3 Livestock water demand

The livestock water demand of the district is determined by multiplying the total livestock

population in the district by the per capita water requirement (litres/day/No) for each category

of the population. As per livestock census of 2003 & 2007, there was a population growth of

24% in four years. With the existing population recorded for a base year, the total projected

livestock population in 2020 may be worked out and accordingly the livestock water demand

is worked out. The livestock water demand is given in the table below.

Table 4-3: Livestock water demand (MCM)

Block

Total

number of

livestock

Present

Water

demand

(MCM)

Water

demand in

2020

(MCM)

Existing

Water

potential

(MCM)

Water

potential to

be created

(MCM)

ZikZak 105092 1.53 1.99 1.53 0.46

Betasing 149440 2.18 2.84 2.18 0.65

Total 254532 3.72 4.83 3.72 1.11

4.4 Industrial water demand

This includes the quantity of water required to be supplied to offices, factories, different

industries, hostels, hospitals etc. This quantity will vary considerably with the nature of city

and with the type of industries and commercial establishments present in it. On an average, a

provision of 20-25% of the total water consumption is generally made in the design for these

uses. In small residential communities, the industrial use may be as low as 45 /litre/day, but

in industrial cities, it may be as high as 450 litres/day. Some of the industries may develop

their own supplies and may place little or no demand on municipal system. Zoning of the city

affects the location of the industries and may help in estimating future industrial demands.

The industrial water demand for South West Garo Hills district is given in table below.

Table 4-4: Industrial Water Demand (MCM)

Name of the

Blocks

Name of the

industry

Present

Water

Demand

(MCM)

Water

Demand in

2020

(MCM)

Existing

Water

Potential

(MCM)

Water

Potential to

be created

(MCM)

ZikZak &

Betasing

Textile 3.15 3.30 3.15 0.16

Food processing 1.61 1.69 1.61 0.08

Bottled water 1.41 1.48 1.41 0.07

Paper 1.81 1.90 1.81 0.09

Hotel industry 1.62 1.70 1.62 0.08

Micro steel industry 0.06 0.06 0.06 0.00

Total 9.64 10.12 9.64 0.48

Source: District Commerce & Industry Centre, Ampati

District Irrigation Plan, South West Garo Hills district

39 | P a g e

4.5 Water demand for Power Generation

Presently there is no any power plant in the South West Garo Hills district; however in the

years to come i.e. up to the year 2020, there are plans to tap water resources for power

generation. Hence water demand for power generation is taken as nil for present but the same

for 2020 is as shown in the table below.

Table 4-5: Water Demand for Power Generation (MCM)

Name of

the district

Power

Requirement

(MW)

15% of the

requirement

is proposed

to be

produced in

the district

(Micro

Hydel)

Water

Demand

(MCM)

Water

Demand in

2020

(MCM)

Existing

Water

Potential

(MCM)

Water

Potential

to be

created

(MCM)

South West

Garo Hills 1.609 MW 0.241 MW 0 28.69 0 28.69

Source: Department of Water Resources, Ampati Ref: Hydraulic & Fluid Mechanic by E. H. Lewitt

4.6 Total water demand of the district for various sectors

The total water demand of the district for all the sectors described in 4.1 to 4.5 are given in

the are assessed by summing up all the values of water demand for domestic uses, livestock,

power and industrial/commercial uses etc. The current water demand has been indicated in

Table 4-5 and the projected water demand has been depicted in Table 4-6. Total present water

requirement for the district is 293.88 MCM while the total future water requirement for the

district is 324.40 MCM. In present, water demand for Zikzak block is 160.49 MCM while the

same for Betasing block which is 133.39 MCM. For future, water demand for Zikzak block is

190.23 MCM while the same for Betasing block which is 134.17 MCM.

Table 4-6: Present Water Demand of the district for various sectors

Block

Demand from Components (MCM) Total

MCM Domestic Crop Livestock Industrial Power

generation

ZikZak 4.38 144.93 1.53 9.64 0

160.49

Betasing 5.38 125.83 2.18 133.39

Total 9.76 270.76 3.72 9.64 0 293.88

Table 4-7: Total Water Demand of the district for various sectors (Projected for 2020)

Block

Demand from Components (MCM) Total

MCM Domestic Crop Livestock Industrial Power

generation

ZikZak 4.49 144.93 1.99 10.12 28.69

190.23

Betasing 5.51 125.83 2.84 134.17

Total 10.00 270.76 4.83 10.12 28.69 324.40

District Irrigation Plan, South West Garo Hills district

40 | P a g e

4.7 Water Budget

The water budget of the district for the base year 2015-16 and 2020-21 as per water

availability and demand is given in the table below. The present water availability/demand

and also for 2020 are worked out as explained above and the water gap is found out. The

water budget clearly shows the water gap of -559.69 MCM in present and of -529.17 MCM

in future between the water availability and requirement. The negative gap indicates that

there is sufficient water resources for irrigation, domestic and the industrial uses without

creating any deficit in our water potential.

Table 4-8: Water Budget (Volume in MCM)

District

Existing Water

Availability (MCM) Total

(MCM)

Water Demand

(MCM) Water Gap (MCM)

Surface

water

Ground

water Present

Projected

(2020) Present

Projected

(2020)

South West

Garo Hills 345.47 508.09 853.57 293.88 324.40 -559.69 -529.17

District Irrigation Plan, South West Garo Hills district

41 | P a g e

Chapter 5 : Strategic Action Plan for Irrigation in District under

PMKSY

The present DIP for South West Garo Hills District is prepared duly considering all the data

collected from the line department and converging data of all departments in each block and

thus a realistic Action Plan is assured as prevented in the format for the years. The total

required of this comprehensive DIP is coming for Rs. 259990.26 lakhs for 4 years.

5.1 Department wise, year wise plan

Total plan of South West Garo Hills district for four years works out to be Rs. 259990.26

lakh (Table 5-1). Maximum share of Rs. 245264.33 lakhs is for Water Resources department

followed by Soil Conservation department, Agriculture department & Horticulture

department with Rs. 8359.25 lakhs, Rs. 4190.68 lakhs & Rs. 2176 lakhs respectively. The

total plan of four years is divided in to 4 years i.e. 2016-17, 2017-18, 2018-19 and 2019-20.

Table 5-1: Department wise plan

Departments Years Estimated Cost

(in Rs. Lacs) 2016-17 2017-18 2018-19 2019-20

Soil Conservation 1978.43 2812.63 2197.85 1370.34 8359.25

Water Resources 6836.00 57299.21 110026.72 60940.43 245264.33

Agriculture 1086.68 1055.00 1055.00 994.00 4190.68

Horticulture 544.00 544.00 544.00 544.00 2176.00

Total 10445.12 61710.84 113823.57 63848.77 259990.26

Figure 5-1: Department wise plan

Soil Conservation

3%

Water Resources

94%

Agriculture2%

Horticulture1%

District Irrigation Plan, South West Garo Hills district

42 | P a g e

5.2 Component wise, year wise plan

As discussed above about various components of PMKSY, the plan is prepared accordingly.

Table 5-2 shows component wise plan for 4 years starting from 2016-17 to 2019-20. AIBP

component has a total proposal of Rs. 26100 lakhs. This component will be mainly executed

by Water Resources department. Har Khet Ko Pani (HKKP) component is of Rs. 194028.13

lakhs, which will be executed mainly by Water Resources and Soil Conservation

departments. Per Drop More Crop (PDMC) components is of Rs. 23500.46 lakhs, which will

be executed mainly by Agriculture, Horticulture and Water Resources departments.

Watershed component has a total proposal of Rs. 3509.48 lakhs which will be implemented

by Soil Conservation department. Convergence with MGNREGA is proposed for Rs.

12660.54 lakhs by Water Resources department. All the stakeholders need to have

coordination among themselves to have the maximum irrigation efficiency and to avoid

duplicity.

Table 5-2: Component wise plan

Components Years Total Estimated Cost (in

Rs. Lacs.) 2016-17 2017-18 2018-19 2019-20

AIBP 0.00 7830.00 7830.00 10440.00 26100.00

HKKP 8446.45 46541.21 89416.05 43088.86 194028.13

PDMC 1277.87 5085.59 11036.56 5980.77 23500.46

Watershed 196.44 636.00 1342.15 1334.89 3509.48

Convergence 39.90 78.60 37.70 35.45 12660.54

Total 10445.12 61710.84 113823.57 63848.77 259990.26

Figure 5-2: Component wise plan

AIBP10%

Har Khet ko Pani75%

PDMC9%

Watershed1%

Convergence with MGNREGA

5%

District Irrigation Plan, South West Garo Hills district

43 | P a g e

5.3 Block wise, year wise plan

Block wise, year wise plan is shown in the table below. The amount proposed for Betasing

block is Rs. 172930.31 lakhs while the amount proposed for Zikzak block is Rs. 79614.74

lakhs. Water Resources department has proposed Rs. 7445.21 lakhs for the villages which

were in Dalu block before the creation of South West Garo Hills district. As of now, these

villages come under South West Garo Hills district.

Table 5-3: Block wise plan

Blocks Years Total Estimated

Cost (in Rs. lakhs) 2016-17 2017-18 2018-19 2019-20

Betasing 6238.52 41364.70 74860.38 42822.71 172930.31

Dalu 286.00 1201.73 2996.10 2649.28 7445.21

Zikzak 3920.60 19144.41 35967.09 18376.78 79614.74

Grand Total 10445.12 61710.84 113823.57 63848.77 259990.26

Figure 5-3: Block wise plan

5.4 Suggestions

For successful implementation of PMKSY plan it is suggested that:

All the stakeholders should convene meeting of concerned Gram Panchayat and then

finalize the village plan and prepare DPR.

All the structures planned should be geo tagged and marked on map, so that social

auditing of the projects can be conducted. This will also avoid duplicity and wastage of

resources.

The Departments should supplement each other so that the maximum irrigation efficiency

is achieved.

Betasing66%

Dalu3%

Zikzak31%

District Irrigation Plan, South West Garo Hills district

44 | P a g e

Priority should be given to projects to minimize the gap in potential created and potential

utilized.

Execution of the schemes should be properly planned to avoid time and cost overrun.

There should be smooth fund flow for timely completion of the project and to avoid cost

escalation.

5.5 Period of Implementation

It is proposed that the planned activities and outlay will be spent in a period of 4 years. Some

of the activities relating to extension, small irrigation works etc., are recurring and hence will

have a period of implementation less than a year. Through these activities PMKSY program

is expected to increase the water availability meeting the water demand from multiple

sources. A total of Rs. 259990.26 Lakhs will be spent during the next 4 years covering

55791.55 hectares.

5.6 Monitoring and Evaluation

The Strategic Action Plan of PMKSY will be monitored by the respective departments

through the regular reporting system and component wise progress will be monitored by the

District Level Irrigation Committee. Further, the activities, outputs and outcomes will be

reported in web based MIS of PMKSY for review at state and national level. Some of the key

indicators that will be used to monitor and evaluate the progress of PMKSY include:

1. Annual irrigation water supply per unit irrigated area measured as the ratio of total

volume of irrigation water supplied at intake divided by total area irrigated in all seasons

2. Potential created and utilized measured as the ratio of total potential utilized (measured

crop area) to irrigation potential created

3. Output (agricultural production) per unit irrigated area measured as the ratio of total value

of agriculture production divided by the total irrigated area

4. Output (agricultural production) per unit irrigation water supply measured as the ratio of

total value of agriculture production divided by the total volume of irrigated water

supplied

5. Total Operations & Maintenance (O&M) cost per unit irrigated area measured as the total

Management, Operation and Maintenance (MOM) costs for the system divided by total

area irrigated (potential utilized)

District Irrigation Plan, South West Garo Hills district

45 | P a g e

6. Total Operations & Maintenance (O&M) cost per unit volume of water supplied

measured as total Management, Operation and Maintenance (MOM) costs for the system

divided Total volume of water supplied (all uses)

7. Equity performance measured as actual area irrigated in head, middle and tail divided by

Command area in head, middle and tail

5.7 Expected Outcome and Output

Table below represents the department wise target proposed by various department to bring

additional land under irrigated cultivation through PMKSY. Total of 55791.55 hectares area

will be brought under irrigation.

Table 5-4: Department wise proposed command area (in Ha.)

Departments Command Area (Ha.)

Soil Conservation Department 5630.14

Water Resources Department 47301.41

Agriculture Department 1892.00

Horticulture Department 968.00

Total 55791.55

5.8 Conclusion

The PMKYS District Irrigation Plan was prepared at Block level & District level. The total

cropped area of South West Garo Hills district is 47706 ha. Though, this whole area was

under agriculture most of the area 60% was utilized for Kharif crops. Through PMKSY, DIP

is envisaging to increase irrigation potential in the district. Under AIBP, 299 Minor irrigation

projects are proposed in the plan which shall increase the irrigation potential in 3005 ha. The

model irrigation plan envisages educating the farmers to adhere to the scientific practices in

the command area .This will increase the crop production per unit area of agriculture land.

Under Har Khet Ko Pani, Minor and Lift irrigation projects proposed shall enable to provide

irrigation access to the hill district favouring second cropping during the Rabi season. As

such majority of the agriculture in South West Garo Hills is rainfed and the aforementioned

minor irrigation projects will facilitate better availability of water. A lot of Water Harvesting

and conservation structures, like Farm Ponds Check Dams, Nalah bunds are proposed which

shall enhance the Net Irrigated Area. This shall be undertaken in convergence with

MGNREGS and Integrated Watershed Management Programme. On the other hand, no

ground water is used in South West Garo Hills district. The ground water potential is yet to

be estimated for the use of drinking and irrigation to the non-command areas. This shall

favour micro irrigation activities in the region mainly drip and sprinkler irrigation. This will

District Irrigation Plan, South West Garo Hills district

46 | P a g e

also spur a change in cropping patterns and farmers will show interests towards vegetable and

other horticultural crops. This can be boost commercial precision agriculture fostering local

economy. There is high potential for micro irrigation in South West Garo Hills and the plan

has been proposed for maximum utilization of the same. Nearly 15% of the total cropped area

can be brought under micro-irrigation system. Target of “More Crop per Drop” will be

achieved. New Structures shall provide more surface water opportunities and shall act as

support for the livestock. This is one of the major water needs that go unnoticed. The plan

aims for cattle troughs and village ponds that favour cattle and other livestock. Increased

Water Availability shall spur many Agro-based industries in the region providing

employment generation. The holistic irrigation plan was prepared at Block level & District

level. PMKSY DIP will fulfil the resource gap in the irrigation chain. Irrigation to every farm

will be achieved through completion of surface minor projects proposed under AIBP. Under

Per Drop More crop, we will achieve enhance cropping & productivity which leads to rural

prosperity. The cost of the DIP is about Rs. 259990.26 lakhs. This will enhance total use

efficiency management for higher yield in the district.

District Irrigation Plan, South West Garo Hills district

47 | P a g e

Annexure I : Strategic Action Plan by Water Resources Department

Betasing Block

Sl.

No

.

Name

of

Block

Name of

village

Concerened

Ministry/

Department

Component Activity

Total in Nos.

/Capacity (in

Cum)

Total

comman

d area

(in Ha.)

Total

fund (in

Rs.

Lakhs)

16 -

17

Are

a

16 -

17

Cost

17 -

18

Are

a

17 - 18

Cost

18 -

19

Area

18 - 19

Cost

19 -

20

Area

19 - 20

Cost

1 Betasin

g Damalgre MoWR AIBP Medium irrigation 1 No 0.00350 2400 Ha

Rs.2610

0

-----

- ------

-----

-

Rs.783

0

960

Ha

Rs.783

0

1440

Ha

Rs.1044

0

2 Betasin

g Kokilla MoWR HKKP Surface minor irrigation 1 No 0.00239 182 Ha

Rs.228.0

0

228

Ha Rs.46

-----

- ------ ------ ------ ------ ------

3 Betasin

g

Daru

Anangpara MoWR HKKP Surface minor irrigation 1 No 0.00405 1400 Ha Rs.3500

-----

-

Rs.70

0

560

Ha

Rs.140

0

560

Ha

Rs.140

0 ------ ------

4 Betasin

g Jiljil MoWR HKKP Surface minor irrigation 1 No 0.00236 85 Ha Rs.159

-----

- Rs.32

68

Ha

Rs.53.0

0 ------ ------ ------ ------

5 Betasin

g Bainapara MoWR HKKP Surface minor irrigation 1 No 0.00262 115 Ha

Rs.287.5

0

-----

- ------

-----

- Rs.58

115

Ha

Rs.229.

5 ------ ------

6 Betasin

g Bando Raja MoWR HKKP Surface minor irrigation 1 No 0.00381 840 Ha Rs.2010

-----

-

Rs.40

2

336

Ha Rs.804

504

Ha Rs.804 ------ ------

7 Betasin

g Bolchugre MoWR HKKP Surface minor irrigation 1 No 0.00407 80 Ha

Rs.375.0

0

-----

- ------

-----

- Rs.75 80 Ha Rs.300 ------ ------

8 Betasin

g Domdoma MoWR HKKP Surface minor irrigation 1 No 0.00425 90 Ha

Rs.400.0

0

-----

- ------

-----

- Rs.120 90 Ha Rs.280 ------ ------

9 Betasin

g Dalbotpara MoWR HKKP Surface minor irrigation 1 No 0.00252 50 Ha

Rs.187.5

0

-----

- ------

-----

- Rs.56 50 Ha Rs.132 ------ ------

10 Betasin

g Balladingre MoWR HKKP Surface minor irrigation 1 No 0.00363 60 Ha

Rs.225.0

0

-----

- ------

-----

- Rs.68 60 Ha Rs.157 ------ ------

11 Betasin

g Chiringpara MoWR HKKP Surface minor irrigation 1 No 0.00238 80 Ha

Rs.275.0

0

-----

- ------

-----

- Rs.83 80 Ha Rs.192 ------ ------

12 Betasin

g Sonamitte MoWR HKKP Surface minor irrigation 1 No 0.00288 75 Ha

Rs.300.0

0

-----

- ------

-----

- ------ ------ ------ ------ Rs.90

13 Betasin

g Bokmagre MoWR HKKP Surface minor irrigation 1 No 0.00264 60 Ha

Rs.275.0

0

-----

- ------

-----

- ------ ------ Rs.55 60 Ha Rs.220

14 Betasin

g Anteka MoWR HKKP Surface minor irrigation 1 No 0.00210 70 Ha

Rs.387.5

0

-----

- ------

-----

- ------ ------ Rs.116 70 Ha Rs.272

15 Betasin

g Samati MoWR HKKP Surface minor irrigation 1 No 0.00216 65 Ha

Rs.250.0

0

-----

- ------

-----

- Rs.75 65 Ha Rs.175 ------ ------

16 Betasin

g Sawbhanga MoWR HKKP Surface minor irrigation 1 No 0.00191 50 Ha

Rs.225.0

0

-----

- ------

-----

- ------ ------ Rs.68 50 Ha Rs.157

17 Betasin

g Tokonchi MoWR HKKP Surface minor irrigation 1 No 0.00202 45 Ha

Rs.175.0

0

-----

- Rs.35

28

Ha Rs.140 42 Ha ------ ------ ------

District Irrigation Plan, South West Garo Hills district

48 | P a g e

18 Betasin

g Chidipa MoWR HKKP Surface minor irrigation 1 No 0.00256 35 Ha

Rs.162.5

0

-----

- ------

-----

- Rs.49 65 Ha Rs.114 ------ ------

19 Betasin

g Kentrikona MoWR HKKP Surface minor irrigation 1 No 0.00132 112 Ha

Rs.280.0

0

-----

- Rs.84

34

Ha Rs.196 78 Ha ------ ------ ------

20 Betasin

g Tangabari MoWR HKKP Surface minor irrigation 1 No 0.00233 200 Ha

Rs.500.0

0

-----

-

Rs.15

0

60

Ha Rs.350

140

Ha ------ ------ ------

21 Betasin

g Makbil Chring MoWR HKKP Surface minor irrigation 1 No 0.00197 90 Ha

Rs.225.0

0

-----

- ------

-----

- ------ ------ ------ ------ Rs.68

22 Betasin

g A.palgre MoWR HKKP Surface minor irrigation 1 No 0.00239 110 Ha

Rs.275.0

0

-----

- ------

-----

- Rs.83

110

Ha Rs.192 ------ ------

23 Betasin

g Dak MoWR HKKP Surface minor irrigation 1 No 0.00196 200 Ha

Rs.500.0

0

-----

- ------

-----

- ------ ------ Rs.150

200

Ha Rs.350

24 Betasin

g Skagre MoWR HKKP Surface minor irrigation 1 No 0.00173 80 Ha

Rs.200.0

0

-----

- ------

-----

- Rs.60 80 Ha Rs.140 ------ ------

25 Betasin

g Garobadha MoWR HKKP Surface minor irrigation 1 No 0.00160 125 Ha

Rs.312.5

0

-----

- ------

-----

- ------ ------ ------ ------ Rs.94

26 Betasin

g Kalaichar MoWR HKKP Surface minor irrigation 1 No 0.00246 150 Ha

Rs.375.0

0

-----

- ------

-----

- ------ ------ ------ ------ Rs.113

27 Betasin

g Malchapara MoWR HKKP Surface minor irrigation 1 No 0.00256 125 Ha

Rs.500.0

0

-----

- ------

-----

- Rs.150

125

Ha Rs.350 ------ ------

28 Betasin

g Bangkapara MoWR HKKP Surface minor irrigation 1 No 0.00224 110 Ha

Rs.275.0

0

-----

- Rs.55

44

Ha Rs.220 66 Ha ------ ------ ------

29 Betasin

g Chisegre MoWR HKKP Surface minor irrigation 1 No 0.00238 45 Ha Rs.225

-----

- ------

-----

- ------ ------ Rs.68 90 Ha Rs.157

30 Betasin

g Bagidela MoWR HKKP Surface minor irrigation 1 No 0.00258 85 Ha Rs.213

-----

- ------

-----

- ------ ------ Rs.64 85 Ha Rs.149

31 Betasin

g Darugre MoWR HKKP Surface minor irrigation 1 No 0.00170 90 Ha Rs.275

-----

- ------

-----

- ------ ------ Rs.83

110

Ha Rs.192

32 Betasin

g Nagraskhet MoWR HKKP Surface minor irrigation 1 No 0.00202 50 Ha Rs.375

-----

- ------

-----

- Rs.113 50 Ha Rs.262 ------ ------

33 Betasin

g Chisimokgre MoWR HKKP Surface minor irrigation 1 No 0.00181 60 Ha Rs.1250

-----

- ------

-----

- Rs.375 60 Ha Rs.875 ------ ------

34 Betasin

g Josipara MoWR HKKP Surface minor irrigation 1 No 0.00209 45 Ha Rs.225

-----

- ------

-----

- Rs.68 90 Ha Rs.157 ------ ------

35 Betasin

g Jongdikgre MoWR HKKP Surface minor irrigation 1 No 0.00315 50 Ha Rs.275

-----

- ------

-----

- ------ ------ Rs.83

110

Ha Rs.192

36 Betasin

g Betasing MoWR HKKP Surface minor irrigation 1 No 0.00184 75 Ha Rs.375

-----

- ------

-----

- ------ ------ ------ ------ Rs.113

37 Betasin

g Koidol MoWR HKKP Surface minor irrigation 1 No 0.00233 90 Ha Rs.142

-----

- Rs.28

56

Ha Rs.114 84 Ha ------ ------ ------

38 Betasin

g Kokatola MoWR HKKP Surface minor irrigation 1 No 0.00353 100 Ha Rs.338

-----

- ------

-----

- Rs.101

100

Ha Rs.237 ------ ------

39 Betasin Hajongpara MoWR HKKP Surface minor irrigation 1 No 0.00239 200 Ha Rs.2000 ----- ------ ----- Rs.600 200 Rs.140 ------ ------

District Irrigation Plan, South West Garo Hills district

49 | P a g e

g (Dilni) - - Ha 0

40 Betasin

g Matalagre MoWR HKKP Surface minor irrigation 2 No 0.00198 90 Ha Rs.490

-----

- Rs.98

36

Ha Rs.392 54 Ha ------ ------ ------

41 Betasin

g Belbari MoWR HKKP Surface minor irrigation 3 No 0.00227 80 Ha Rs.250

-----

- Rs.50

32

Ha Rs.200 48 Ha ------ ------ ------

42 Betasin

g Garobaha MoWR HKKP Lift irrigation

150

Nos 0.0002 75 Ha Rs.135

-----

- ------

23

Ha

Rs.40.5

0 23 Ha

Rs.41.0

0 29 Ha

Rs.53.5

0

43 Betasin

g Betasing MoWR HKKP Lift irrigation

150

Nos 0.0002 75 Ha Rs.135

-----

- ------

23

Ha

Rs.40.5

0 23 Ha

Rs.41.0

0 29 Ha

Rs.53.5

0

44 Betasin

g Ampati MoWR HKKP Lift irrigation

150

Nos 0.0002 75 Ha Rs.135

-----

- ------

23

Ha

Rs.40.5

0 23 Ha

Rs.41.0

0 29 Ha

Rs.53.5

0

45 Betasin

g Rangsakona MoWR HKKP Lift irrigation

150

Nos 0.0002 75 Ha Rs.99

-----

- ------

23

Ha

Rs.29.7

0 23 Ha

Rs.30.0

0 29 Ha

Rs.39.3

0

46 Betasin

g Damalgre MoWR HKKP Lift irrigation

150

Nos 0.0002 75 Ha Rs.68

-----

- ------

23

Ha

Rs.20.4

0 23 Ha

Rs.20.0

0 29 Ha

Rs.27.6

0

47 Betasin

g Garodobha MoWR HKKP Lift irrigation

150

Nos 0.0002 75 Ha Rs.113

-----

- ------

23

Ha

Rs.33.9

0 23 Ha

Rs.34.0

0 29 Ha

Rs.45.1

0

48 Betasin

g Monabari MoWR HKKP Lift irrigation

75

Nos 0.0002 38 Ha Rs.45

-----

- ------

11

Ha

Rs.13.5

0 11 Ha

Rs.14.0

0 16 Ha

Rs.17.5

0

49 Betasin

g Bandalkona MoWR HKKP Lift irrigation

75

Nos 0.0002 38 Ha Rs.34

-----

- ------

11

Ha

Rs.10.2

0 11 Ha

Rs.10.0

0 16 Ha

Rs.13.8

0

50 Betasin

g Hathisi MoWR HKKP Lift irrigation

75

Nos 0.0002 38 Ha Rs.34

-----

- ------

11

Ha

Rs.10.2

0 11 Ha

Rs.10.0

0 16 Ha

Rs.13.8

0

51 Betasin

g Samati MoWR HKKP Lift irrigation

50

Nos 0.0002 25 Ha Rs.23

-----

- ------

8

Ha Rs.6.90 8 Ha Rs.7.00 9 Ha Rs.9.10

52 Betasin

g Melim MoWR HKKP Lift irrigation

50

Nos 0.0002 25 Ha Rs.27

-----

- ------

8

Ha Rs.8.10 8 Ha Rs.8.00 9 Ha

Rs.10.9

0

53 Betasin

g Grenggandhi MoWR HKKP Lift irrigation

50

Nos 0.0002 25 Ha Rs.23

-----

- ------

8

Ha Rs.6.90 8 Ha Rs.7.00 9 Ha Rs.9.10

54 Betasin

g Jelbongpara MoWR HKKP Lift irrigation

25

Nos 0.0002 13 Ha Rs.18

-----

- ------

4

Ha Rs.5.40 4 Ha Rs.5.00 5 Ha Rs.7.60

55 Betasin

g Jolgaon MoWR HKKP Lift irrigation

25

Nos 0.0002 13 Ha Rs.23

-----

- ------

4

Ha Rs.6.90 4 Ha Rs.7.00 5 Ha Rs.9.10

56 Betasin

g Borkona MoWR HKKP Lift irrigation

25

Nos 0.0002 13 Ha Rs.23

-----

- ------

4

Ha Rs.6.90 4 Ha Rs.7.00 5 Ha Rs.9.10

57 Betasin

g Ichaguri MoWR HKKP Lift irrigation

25

Nos 0.0002 13 Ha Rs.18

-----

- ------

4

Ha Rs.5.40 4 Ha Rs.5.00 5 Ha Rs.7.60

58 Betasin

g Jewilgre MoWR HKKP Lift irrigation

25

Nos 0.0002 13 Ha Rs.14

-----

- ------

4

Ha Rs.4.20 4 Ha Rs.4.00 5 Ha Rs.5.80

59 Betasin

g Mukdangra MoWR HKKP Lift irrigation

100

Nos 0.0002 50 Ha Rs.54

-----

- ------

15

Ha

Rs.16.2

0 15 Ha

Rs.16.0

0 20 Ha

Rs.21.8

0

60 Betasin

g Dorambok MoWR HKKP Lift irrigation

100

Nos 0.0002 50 Ha Rs.68

-----

- ------

15

Ha

Rs.20.4

0 15 Ha

Rs.20.0

0 20 Ha

Rs.27.6

0

District Irrigation Plan, South West Garo Hills district

50 | P a g e

61 Betasin

g Chisigre MoWR HKKP Lift irrigation

25

Nos 0.0002 13 Ha Rs.23

-----

- ------

4

Ha Rs.6.90 4 Ha Rs.7.00 5 Ha Rs.9.10

62 Betasin

g Nogapara MoWR HKKP Lift irrigation

50

Nos 0.0002 25 Ha Rs.45

-----

- ------

8

Ha

Rs.13.5

0 8 Ha

Rs.14.0

0 9 Ha

Rs.17.5

0

63 Betasin

g Aderkhona MoWR HKKP Lift irrigation

50

Nos 0.0002 25 Ha Rs.23.00

-----

- ------

8

Ha Rs.6.90 8 Ha Rs.7.00 9 Ha Rs.9.10

64 Betasin

g Baghmara MoWR HKKP Lift irrigation

50

Nos 0.0002 25 Ha Rs.23.00

-----

- ------

8

Ha Rs.6.90 8 Ha Rs.7.00 9 Ha Rs.9.10

65 Betasin

g

Rongchadengg

re MoWR HKKP Lift irrigation

35

Nos 0.0002 18 Ha Rs.16.00

-----

- ------

5

Ha Rs.4.80 5 Ha Rs.5.00 8 Ha Rs.6.20

66 Betasin

g

Rongsang

A.bagre MoWR HKKP Lift irrigation

25

Nos 0.0002 13 Ha Rs.11.00

-----

- ------

4

Ha Rs.3.30 4 Ha Rs.3.00 5 Ha Rs.4.70

67 Betasin

g Naragre MoWR HKKP Lift irrigation

20

Nos 0.0002 10 Ha Rs.9.00

-----

- ------

3

Ha Rs.2.70 3 Ha Rs.3.00 4 Ha Rs.3.30

68 Betasin

g Melim MoWR HKKP Lift irrigation

50

Nos 0.0002 25 Ha Rs.45.00

-----

- ------

8

Ha

Rs.13.5

0 8 Ha

Rs.14.0

0 9 Ha

Rs.17.5

0

69 Betasin

g Dengnakpara MoWR HKKP Lift irrigation

50

Nos 0.0002 25 Ha Rs.32.00

-----

- ------

8

Ha Rs.9.60 8 Ha

Rs.10.0

0 9 Ha

Rs.12.4

0

70 Betasin

g Goragre' MoWR HKKP Lift irrigation

25

Nos 0.0002 13 Ha Rs.23.00

-----

- ------

4

Ha Rs.6.90 4 Ha Rs.7.00 5 Ha Rs.9.10

71 Betasin

g Matchallang MoWR HKKP Lift irrigation

25

Nos 0.0002 13 Ha Rs.23.00

-----

- ------

4

Ha Rs.6.90 4 Ha Rs.7.00 5 Ha Rs.9.10

72 Betasin

g Rongsong MoWR HKKP Lift irrigation

25

Nos 0.0002 13 Ha Rs.14.00

-----

- ------

4

Ha Rs.4.20 4 Ha Rs.4.00 5 Ha Rs.5.80

73 Betasin

g Rangatary MoWR HKKP Lift irrigation

25

Nos 0.0002 13 Ha Rs.14.00

-----

- ------

4

Ha Rs.4.20 4 Ha Rs.4.00 5 Ha Rs.5.80

74 Betasin

g Skagre MoWR HKKP Lift irrigation

20

Nos 0.0002 10 Ha Rs.9.00

-----

- ------

3

Ha Rs.2.70 3 Ha Rs.3.00 4 Ha Rs.3.30

75 Betasin

g Bashbari MoWR HKKP Lift irrigation

25

Nos 0.0002 13 Ha Rs.54.00

-----

- ------

4

Ha

Rs.16.2

0 4 Ha

Rs.16.0

0 5 Ha

Rs.21.8

0

76 Betasin

g Chondonpara MoWR HKKP Lift irrigation

25

Nos 0.0002 13 Ha Rs.14.00

-----

- ------

4

Ha Rs.4.20 4 Ha Rs.4.00 5 Ha Rs.5.80

77 Betasin

g

Chondon

Nokat MoWR HKKP Lift irrigation

25

Nos 0.0002 13 Ha Rs.23.00

-----

- ------

4

Ha Rs.6.90 4 Ha Rs.7.00 5 Ha Rs.9.10

78 Betasin

g Rongramgre MoWR HKKP Lift irrigation

25

Nos 0.0002 13 Ha Rs.45.00

-----

- ------

4

Ha

Rs.13.5

0 4 Ha

Rs.14.0

0 5 Ha

Rs.17.5

0

79 Betasin

g Belbari MoWR HKKP Lift irrigation

25

Nos 0.0002 13 Ha Rs.23.00

-----

- ------

4

Ha Rs.6.90 4 Ha Rs.7.00 5 Ha Rs.9.10

80 Betasin

g Kasra MoWR HKKP Lift irrigation

25

Nos 0.0002 13 Ha Rs.45.00

-----

- ------

4

Ha

Rs.13.5

0 4 Ha

Rs.14.0

0 5 Ha

Rs.17.5

0

81 Betasin

g

Betasing

Bazaar MoWR HKKP Lift irrigation

25

Nos 0.0002 13 Ha Rs.23.00

-----

- ------

4

Ha Rs.6.90 4 Ha Rs.7.00 5 Ha Rs.9.10

82 Betasin Bainapara MoWR HKKP Lift irrigation 25 0.0002 13 Ha Rs.68.00 ----- ------ 4 Rs.20.4 4 Ha Rs.20.0 5 Ha Rs.27.6

District Irrigation Plan, South West Garo Hills district

51 | P a g e

g Nos - Ha 0 0 0

83 Betasin

g Chringpara MoWR HKKP Lift irrigation

25

Nos 0.0002 13 Ha Rs.45.00

-----

- ------

4

Ha

Rs.13.5

0 4 Ha

Rs.14.0

0 5 Ha

Rs.17.5

0

84 Betasin

g Borkona MoWR HKKP

Ground water

development 2 Nos 0.0006 60 Ha

Rs.243.0

0

-----

- ------

-----

-

Rs.72.9

0 60 Ha Rs.146 ------ ------

85 Betasin

g Kasra MoWR HKKP

Ground water

development 3 Nos 0.0006 90 Ha

Rs.297.0

0

-----

- ------

-----

-

Rs.89.1

0 90 Ha Rs.178 ------ ------

86 Betasin

g Jolgaon MoWR HKKP

Ground water

development 5 Nos 0.0006 150 Ha

Rs.486.0

0

-----

- ------

-----

-

Rs.145.

8

150

Ha Rs.292 ------ ------

87 Betasin

g Batazor MoWR HKKP

Ground water

development 2 Nos 0.0006 60 Ha

Rs.216.0

0

-----

- ------

-----

-

Rs.64.8

0 60 Ha Rs.130 ------ ------

88 Betasin

g Ichaguri MoWR HKKP

Ground water

development 2 Nos 0.0006 60 Ha

Rs.189.0

0

-----

- ------

-----

-

Rs.56.7

0 60 Ha Rs.113 ------ ------

89 Betasin

g Rangatary MoWR HKKP

Ground water

development 2 Nos 0.0006 60 Ha

Rs.256.5

0

-----

- ------

-----

-

Rs.76.9

5 60 Ha Rs.154 ------ ------

90 Betasin

g Kumligaon MoWR HKKP

Ground water

development 3 Nos 0.0006 90 Ha

Rs.351.0

0

-----

- ------

-----

-

Rs.105.

3 90 Ha Rs.211 ------ ------

91 Betasin

g Kuligaon MoWR HKKP

Ground water

development 3 Nos 0.0006 90 Ha

Rs.270.0

0

-----

- ------

-----

-

Rs.81.0

0 90 Ha Rs.162 ------ ------

92 Betasin

g Katuligaon MoWR HKKP

Ground water

development 2 Nos 0.0006 60 Ha

Rs.243.0

0

-----

- ------

-----

- ------ ------ Rs.73 60 Ha Rs.170

93 Betasin

g Jewilgre MoWR HKKP

Ground water

development 2 Nos 0.0006 60 Ha

Rs.256.5

0

-----

- ------

-----

- ------ ------ Rs.77 60 Ha Rs.180

94 Betasin

g Bandalkona MoWR HKKP

Ground water

development 3 Nos 0.0006 90 Ha

Rs.270.0

0

-----

- ------

-----

- ------ ------ Rs.81 90 Ha Rs.189

95 Betasin

g Samati MoWR HKKP

Ground water

development 3 Nos 0.0006 90 Ha

Rs.275.4

0

-----

- ------

-----

- ------ ------ Rs.83 90 Ha Rs.192

96 Betasin

g Gasura MoWR HKKP

Ground water

development 3 Nos 0.0006 90 Ha

Rs.286.2

0

-----

- ------

-----

- ------ ------ Rs.86 90 Ha Rs.200

97 Betasin

g Monabari MoWR HKKP

Ground water

development 4 Nos 0.0006 120 Ha

Rs.432.0

0

-----

- ------

-----

- ------ ------ Rs.130

120

Ha Rs.302

98 Betasin

g Bansali MoWR HKKP

Ground water

development 3 Nos 0.0006 90 Ha

Rs.351.0

0

-----

- ------

-----

- ------ ------ Rs.105 90 Ha Rs.246

99 Betasin

g Gandhipara MoWR HKKP R.R.R of water bodies 1 No 0.0054 300 Ha

Rs.129.6

9

30

Ha

Rs.

130 ----- ------ ------ ------ ------ ------

10

0

Betasin

g Sonamitte MoWR HKKP R.R.R of water bodies 1 No 0.0068 60 Ha

Rs.493.5

0

-----

- ------

-----

- ------ ------ Rs.197

235

Ha Rs.297

10

1

Betasin

g Damalgre MoWR HKKP R.R.R of water bodies 1 No 0.002 75 Ha

Rs.241.5

0

-----

- ------

-----

- Rs.72.5 75 Ha Rs.145 ------ ------

10

2

Betasin

g Dolbari MoWR HKKP R.R.R of water bodies 1 No 0.0007 70 Ha

Rs.150.0

0

-----

- Rs.15

7

Ha Rs.55 63 Ha ------ ------ ------

10

3

Betasin

g Dengnakpara MoWR HKKP R.R.R of water bodies 1 No 0.0126 100 Ha

Rs.850.0

0

-----

- ------

-----

- Rs.70.0

100

Ha Rs.510 ------ ------

District Irrigation Plan, South West Garo Hills district

52 | P a g e

10

4

Betasin

g Muji A.galgre MoWR HKKP R.R.R of water bodies 1 No 0.0047 150 Ha

Rs.600.0

0

-----

- ------

-----

- ------ ------ Rs.360

150

Ha Rs.240

10

5

Betasin

g Nogorpara MoWR HKKP R.R.R of water bodies 1 No 0.0039 60 Ha

Rs.315.0

0

-----

- ------

-----

- ------ ------ Rs.189 60 Ha Rs.126

10

6

Betasin

g Masudi MoWR HKKP R.R.R of water bodies 1 No 0.0008 45 Ha

Rs.180.0

0

-----

- ------

-----

- Rs.54.0 45 Ha Rs.108 ------ ------

10

7

Betasin

g Matchallang MoWR HKKP R.R.R of water bodies 1 No 0.0008 60 Ha

Rs.262.5

0

-----

- ------

-----

- Rs.78.8 60 Ha Rs.158 ------ ------

10

8

Betasin

g Grenggandhi MoWR HKKP R.R.R of water bodies 1 No 0.0008 80 Ha

Rs.115.0

0

-----

- Rs.23

32

Ha Rs.92

-12

Ha ------ ------ ------

10

9

Betasin

g Baghmara MoWR HKKP R.R.R of water bodies 1 No 0.0012 75 Ha

Rs.525.0

0

-----

- ------

-----

- ------ ------ Rs.210 75 Ha Rs.315

11

0

Betasin

g Andherkona MoWR HKKP R.R.R of water bodies 1 No 0.0018 70 Ha

Rs.375.0

0

-----

- ------

-----

-

Rs.112.

5 70 Ha Rs.225 ------ ------

11

1

Betasin

g Tallangre MoWR HKKP R.R.R of water bodies 1 No 0.0018 97 Ha

Rs.255.0

0

-----

- ------

-----

- Rs.76.5 97 Ha Rs.153 ------ ------

11

2

Betasin

g

Daru

Ananagpara MoWR HKKP R.R.R of water bodies 1 No 0.0054 150 Ha Rs.1960

-----

- ------

-----

- ------ ------ ------ ------ Rs.588

11

3

Betasin

g Jiljil MoWR HKKP R.R.R of water bodies 1 No 0.0016 80 Ha

Rs.172.5

0

-----

- ------

-----

- ------ ------ ------ ------ Rs.52

11

4

Betasin

g Gopijhora MoWR HKKP R.R.R of water bodies 1 No 0.0008 100 Ha

Rs.225.0

0

-----

- ------

-----

- Rs.67.5

100

Ha Rs.135 ------ ------

11

5

Betasin

g Kokilla MoWR HKKP R.R.R of water bodies 1 No 0.0036 80 Ha

Rs.255.0

0

-----

- ------

-----

- ------ ------ Rs.102 80 Ha Rs.153

11

6

Betasin

g Bashbari MoWR HKKP R.R.R of water bodies 1 No 0.0072 150 Ha

Rs.825.0

0

-----

- ------

-----

-

Rs.247.

5

150

Ha Rs.495 ------ ------

11

7

Betasin

g Rongsong MoWR HKKP R.R.R of water bodies 1 No 0.0020 50 Ha

Rs.142.5

0

-----

- ------

-----

- ------ ------ Rs.86 50 Ha Rs.57

11

8

Betasin

g Ringdee MoWR HKKP R.R.R of water bodies 1 No 0.0084 150 Ha

Rs.450.0

0

-----

- ------

-----

- ------ ------ Rs.270

150

Ha Rs.180

11

9

Betasin

g Naragre MoWR HKKP Lined field channel 1 No 0.0006 50 Ha

Rs.127.5

0

-----

- ------

-----

- Rs.38.3 50 Ha Rs.77 ------ ------

12

0

Betasin

g Dolbari MoWR HKKP Lined field channel 1 No 0.0017 90 Ha Rs.340

-----

- ------

-----

-

Rs.102.

0 90 Ha Rs.204 ------ ------

12

1

Betasin

g Grenggandhi MoWR HKKP Lined field channel 1 No 0.000 75 Ha Rs.238

-----

- Rs.48

30

Ha Rs.190 45 Ha ------ ------ ------

12

2

Betasin

g Masudi MoWR HKKP Lined field channel 1 No 0.0010 50 Ha Rs.170

-----

- Rs.34

20

Ha Rs.136 30 Ha ------ ------ ------

12

3

Betasin

g Matchallang MoWR HKKP Lined field channel 1 No 0.0007 45 Ha Rs.190

-----

- Rs.38

18

Ha Rs.152 27 Ha ------ ------ ------

12

4

Betasin

g Rongsong MoWR HKKP Lined field channel 1 No 0.0007 45 Ha Rs.200

-----

- ------

-----

- Rs.60.0 45 Ha Rs.120 ------ ------

12 Betasin Dabella MoWR HKKP Lined field channel 1 No 0.0008 40 Ha Rs.127.5 ----- ------ ----- Rs.38.3 40 Ha Rs.77 ------ ------

District Irrigation Plan, South West Garo Hills district

53 | P a g e

5 g 0 - -

12

6

Betasin

g Badupara MoWR HKKP Lined field channel 1 No 0.001 50 Ha

Rs.127.5

0

-----

- ------

-----

- Rs.38.3 50 Ha Rs.77 ------ ------

12

7

Betasin

g Dengnakpara MoWR HKKP Lined field channel 1 No 0.0033 75 Ha

Rs.510.0

0

-----

- ------

-----

-

Rs.153.

0 75 Ha Rs.306 ------ ------

12

8

Betasin

g Goragre MoWR HKKP Lined field channel 1 No 0.0024 50 Ha Rs.93.50

-----

- ------

-----

- ------ 20 Ha Rs.28 30 Ha Rs.66

12

9

Betasin

g Bashbari MoWR HKKP Lined field channel 1 No 0.0029 75 Ha

Rs.510.0

0

-----

- ------

-----

- ------ 30 Ha Rs.153 45 Ha Rs.357

13

0

Betasin

g Thallang MoWR HKKP Lined field channel 1 No 0.0027 90 Ha

Rs.193.0

0

-----

- Rs.39

36

Ha Rs.154 54 Ha ------ ------ ------

13

1

Betasin

g Muji A.gal MoWR HKKP Lined field channel 1 No 0.002 70 Ha

Rs.160.0

0

-----

- Rs.32

28

Ha Rs.128 42 Ha ------ ------ ------

13

2

Betasin

g Kokilla MoWR HKKP Lined field channel 1 No 0.0020 80 Ha

Rs.255.0

0

-----

- ------

-----

- ------ 32 Ha Rs.77 48 Ha Rs.178

13

3

Betasin

g Gopijhora MoWR HKKP Lined field channel 1 No 0.0021 90 Ha

Rs.259.0

0

-----

- ------

-----

- Rs.77.7 90 Ha Rs.155 ------ ------

13

4

Betasin

g Marakapara MoWR HKKP Lined field channel 1 No 0.0023 80 Ha

Rs.510.0

0

-----

- ------

-----

- ------ ------ ------ ------ Rs.153

13

5

Betasin

g Chisrigre MoWR HKKP Lined field channel 1 No 0.0005 38 Ha Rs.68.00

-----

- ------

-----

- ------ 15 Ha Rs.20 23 Ha Rs.48

13

6

Betasin

g Sangkarigre MoWR HKKP Lined field channel 1 No 0.000 43 Ha Rs.76.50

-----

- ------

-----

- ------ 17 Ha Rs.23 26 Ha Rs.54

13

7

Betasin

g Baghmara MoWR HKKP Lined field channel 1 No 0.0009 90 Ha

Rs.340.0

0

-----

- ------

-----

-

Rs.102.

0 90 Ha Rs.204 ------ ------

13

8

Betasin

g Andherkona MoWR HKKP Lined field channel 1 No 0.0013 100 Ha

Rs.425.0

0

-----

- ------

-----

-

Rs.127.

5

100

Ha Rs.255 ------ ------

13

9

Betasin

g Gandhipara MoWR HKKP Lined field channel 1 No 0.0020 90 Ha

Rs.255.0

0

-----

- ------

-----

- ------ 36 Ha Rs.77 54 Ha Rs.178

14

0

Betasin

g Daru MoWR HKKP Lined field channel 1 No 0.0028 65 Ha

Rs.680.0

0

-----

- ------

-----

- ------ ------ ------ ------ Rs.204

14

1

Betasin

g Jiljil MoWR HKKP Lined field channel 1 No 0.001 50 Ha

Rs.127.5

0

-----

- ------

-----

- ------ 20 Ha Rs.38 30 Ha Rs.90

14

2

Betasin

g Tangabari MoWR HKKP Lined field channel 1 No 0.0017 45 Ha

Rs.212.5

0

-----

- ------

-----

- ------ ------ ------ ------ Rs.64

14

3

Betasin

g Kentrikona MoWR HKKP Lined field channel 1 No 0.0015 50 Ha

Rs.178.5

0

-----

- ------

-----

- ------ ------ ------ ------ Rs.54

14

4

Betasin

g Jolgaon MoWR HKKP Lined field channel 1 No 0.0016 45 Ha

Rs.212.5

0

-----

- ------

-----

- ------ ------ ------ ------ Rs.64

14

5

Betasin

g Adugre 1 MoWR HKKP Unlined field channel 1 No 0.0001 4.7 Ha Rs.9.45

-----

- ------

-----

- ------ 1 Ha Rs.3.00 3 Ha Rs.6.45

14

6

Betasin

g Adugre 2 MoWR HKKP Unlined field channel 1 No 0.0002 5.4 Ha Rs.10.80

-----

- ------

-----

- ------ 2 Ha Rs.3.00 4 Ha Rs.7.80

District Irrigation Plan, South West Garo Hills district

54 | P a g e

14

7

Betasin

g Bollanggre 1 MoWR HKKP Unlined field channel 1 No 0.0003 3.4 Ha Rs.6.75

-----

- ------

-----

- ------ 1 Ha Rs.2.00 2 Ha Rs.4.75

14

8

Betasin

g Bollanggre 2 MoWR HKKP Unlined field channel 1 No 0.0001 4.1 Ha Rs.8.10

-----

- ------

-----

- ------ 1 Ha Rs.2.00 3 Ha Rs.6.10

14

9

Betasin

g Chibongbong MoWR HKKP Unlined field channel 1 No 0.0001 6.5 Ha Rs.12.96

-----

- ------

-----

- ------ 2 Ha Rs.4.00 5 Ha Rs.8.96

15

0

Betasin

g Chiringpara 1 MoWR HKKP Unlined field channel 1 No 0.0002 4.1 Ha Rs.8.10

-----

- ------

-----

- ------ 1 Ha Rs.2.00 3 Ha Rs.6.10

15

1

Betasin

g Dorombok MoWR HKKP Unlined field channel 1 No 0.0001 4.2 Ha Rs.8.37

-----

- ------

-----

- ------ 1 Ha Rs.3.00 3 Ha Rs.5.37

15

2

Betasin

g Apalgre MoWR HKKP Unlined field channel 1 No 0.0001 4.1 Ha Rs.8.10

-----

- ------

-----

- ------ 1 Ha Rs.2.00 3 Ha Rs.6.10

15

3

Betasin

g Grenggandhi MoWR HKKP Unlined field channel 1 No 0.0002 4.7 Ha Rs.9.45

-----

- ------

-----

- ------ 1 Ha Rs.3.00 3 Ha Rs.6.45

15

4

Betasin

g Jongdikgre MoWR HKKP Unlined field channel 1 No 0.0001 4.1 Ha Rs.8.10

-----

- ------

-----

- ------ 1 Ha Rs.2.00 3 Ha Rs.6.10

15

5

Betasin

g Masal MoWR HKKP Unlined field channel 1 No 0.0001 3.8 Ha Rs.7.56

-----

- ------

-----

- ------ 1 Ha Rs.2.00 3 Ha Rs.5.56

15

6

Betasin

g Sonamite MoWR HKKP Unlined field channel 1 No 0.0001 3.5 Ha Rs.7.02

-----

- ------

-----

- ------ 1 Ha Rs.2.00 2 Ha Rs.5.02

15

7

Betasin

g Batajol MoWR HKKP Unlined field channel 1 No 0.0001 4.7 Ha Rs.9.45

-----

- ------

-----

- ------ 1 Ha Rs.3.00 3 Ha Rs.6.45

15

8

Betasin

g Latri MoWR HKKP Unlined field channel 1 No 0.0002 6.1 Ha Rs.12.15

-----

- ------

-----

- ------ 2 Ha Rs.4.00 4 Ha Rs.8.15

15

9

Betasin

g Chiringpara 2 MoWR HKKP Unlined field channel 1 No 0.0002 4.7 Ha Rs.9.45

-----

- ------

-----

- ------ 1 Ha Rs.3.00 3 Ha Rs.6.45

16

0

Betasin

g Abagre MoWR HKKP Unlined field channel 1 No 0.0001 4.1 Ha Rs.8.10

-----

- ------

-----

- ------ 1 Ha Rs.2.00 3 Ha Rs.6.10

16

1

Betasin

g Agigre MoWR HKKP Unlined field channel 1 No 0.0002 4.2 Ha Rs.8.37

-----

- ------

-----

- ------ 1 Ha Rs.3.00 3 Ha Rs.5.37

16

2

Betasin

g Malchapara MoWR HKKP Unlined field channel 1 No 0.0010 70.0 Ha Rs.90.00

-----

- ------

28

Ha

Rs.27.0

0 42 Ha

Rs.63.0

0 ------ ------

16

3

Betasin

g Gopa MoWR HKKP Unlined field channel 1 No 0.0004 4.3 Ha Rs.8.64

-----

- ------

2

Ha Rs.3.00 2 Ha Rs.5.64 ------ ------

16

4

Betasin

g Skagre MoWR HKKP Unlined field channel 1 No 0.0005 25.0 Ha Rs.75.00

-----

- ------

10

Ha

Rs.23.0

0 15 Ha

Rs.52.0

0 ------ ------

16

5

Betasin

g Belbari MoWR HKKP Unlined field channel 1 No 0.0012 40.0 Ha

Rs.222.0

0

-----

- ------

16

Ha

Rs.67.0

0 24 Ha

Rs.155.

0 ------ ------

16

6

Betasin

g

Chondon

Nokat MoWR HKKP Unlined field channel 1 No 0.0009 35.0 Ha Rs.74.00

-----

- ------

14

Ha

Rs.22.0

0 21 Ha

Rs.52.0

0 ------ ------

16

7

Betasin

g Rangsagre MoWR HKKP Unlined field channel 1 No 0.0001 7.0 Ha Rs.27.00

-----

- ------

3

Ha Rs.8.00 4 Ha

Rs.19.0

0 ------ ------

16 Betasin Moulcheng MoWR HKKP Unlined field channel 1 No 0.0001 5.0 Ha Rs.5.40 ----- ------ 2 Rs.2.00 3 Ha Rs.3.40 ------ ------

District Irrigation Plan, South West Garo Hills district

55 | P a g e

8 g - Ha

16

9

Betasin

g Chamaguri' MoWR HKKP Unlined field channel 1 No 0.0002 8.0 Ha Rs.9.45

-----

- ------

3

Ha Rs.3.00 5 Ha Rs.6.45 ------ ------

17

0

Betasin

g Bolslagre MoWR HKKP Unlined field channel 1 No 0.0003 6.0 Ha Rs.10.80

-----

- ------

2

Ha Rs.3.00 4 Ha Rs.7.80 ------ ------

17

1

Betasin

g Berupra MoWR HKKP Unlined field channel 1 No 0.0001 9.0 Ha Rs.10.26

-----

- ------

4

Ha Rs.3.00 5 Ha Rs.7.26 ------ ------

17

2

Betasin

g Benabazar MoWR HKKP Unlined field channel 1 No 0.0001 8.0 Ha Rs.8.10

-----

- ------

-----

- ------

3.1

Ha Rs.2.00

4.9

Ha Rs.6.10

17

3

Betasin

g Dipkaipara MoWR HKKP Unlined field channel 1 No 0.0002 8.0 Ha Rs.10.80

-----

- ------

-----

- ------

3.2

Ha Rs.3.00

4.9

Ha Rs.7.80

17

4

Betasin

g Dapguri MoWR HKKP Unlined field channel 1 No 0.0001 7.0 Ha Rs.7.56

-----

- ------

-----

- ------

3.2

Ha Rs.2.00

3.8

Ha Rs.5.56

17

5

Betasin

g Chengjhora MoWR HKKP Unlined field channel 1 No 0.0001 11.5 Ha Rs.6.75

-----

- ------

-----

- ------

3.5

Ha Rs.2.00

8.1

Ha Rs.4.75

17

6

Betasin

g Nogapara MoWR HKKP Unlined field channel 1 No 0.0001 12.3 Ha Rs.10.80

-----

- ------

4

Ha Rs.3

8.6

Ha Rs.7.80 ------ ------

17

7

Betasin

g Chokonggre MoWR HKKP Unlined field channel 1 No 0.0001 9.5 Ha Rs.12.15

-----

- ------

3

Ha Rs.4

6.7

Ha Rs.8.15 ------ ------

17

8

Betasin

g Gonglangre MoWR HKKP Unlined field channel 1 No 0.0001 9.8 Ha Rs.10.80

-----

- ------

3

Ha Rs.3

6.9

Ha Rs.7.80 ------ ------

17

9

Betasin

g Modupara MoWR HKKP Unlined field channel 1 No 0.0001 10.9 Ha Rs.12.15

-----

- ------

3

Ha Rs.4.00 8 Ha Rs.8.15 ------ ------

18

0

Betasin

g Garobdha MoWR HKKP Unlined field channel 1 No 0.0001 10.4 Ha Rs.13.50

-----

- ------

3

Ha Rs.4.00 7 Ha Rs.9.50 ------ ------

18

1

Betasin

g Sangkaregre MoWR HKKP Unlined field channel 1 No 0.0002 10.3 Ha Rs.13.50

-----

- ------

3

Ha Rs.4.00 7 Ha Rs.9.50 ------ ------

18

2

Betasin

g Nunmati MoWR HKKP Unlined field channel 1 No 0.0002 11.0 Ha Rs.10.80

-----

- ------

3

Ha Rs.3.00 8 Ha Rs.7.80 ------ ------

18

3

Betasin

g Koritola MoWR HKKP Unlined field channel 1 No 0.0001 11.2 Ha Rs.12.96

-----

- ------

3

Ha Rs.4.00 8 Ha Rs.8.96 ------ ------

18

4

Betasin

g Rongrekgre MoWR HKKP Unlined field channel 1 No 0.0002 10.1 Ha Rs.13.50

-----

- ------

3

Ha Rs.4.00 7 Ha Rs.9.50 ------ ------

18

5

Betasin

g Baghmara MoWR HKKP Unlined field channel 1 No 0.0001 10.1 Ha Rs.13.50

-----

- ------

3

Ha Rs.4.00 7 Ha Rs.9.50 ------ ------

18

6

Betasin

g Kanchikona MoWR HKKP Unlined field channel 1 No 0.0001 11.2 Ha Rs.13.50

-----

- ------

3

Ha Rs.4.00 8 Ha Rs.9.50 ------ ------

18

7

Betasin

g Sisimokgre MoWR HKKP Unlined field channel 1 No 0.0002 12.1 Ha Rs.13.50

-----

- ------

4

Ha Rs.4.00 8 Ha Rs.9.50 ------ ------

18

8

Betasin

g Dopatchigre MoWR HKKP Unlined field channel 1 No 0.0001 10.3 Ha Rs.13.50

-----

- ------

3

Ha Rs.4.00 7 Ha Rs.9.50 ------ ------

18

9

Betasin

g Andherkona MoWR HKKP Unlined field channel 1 No 0.0001 11.6 Ha Rs.13.50

-----

- ------

-----

- ------ 3 Ha Rs.4.00 8 Ha Rs.9.50

District Irrigation Plan, South West Garo Hills district

56 | P a g e

19

0

Betasin

g Harigon MoWR HKKP Unlined field channel 1 No 0.0002 9.8 Ha Rs.13.50

-----

- ------

-----

- ------ 3 Ha Rs.4.00 7 Ha Rs.9.50

19

1

Betasin

g Nokatgre MoWR HKKP Unlined field channel 1 No 0.0001 8.9 Ha Rs.13.50

-----

- ------

-----

- ------ 3 Ha Rs.4.00 6 Ha Rs.9.50

19

2

Betasin

g Mukdangra MoWR HKKP Unlined field channel 1 No 0.0001 8.0 Ha Rs.12.15

-----

- ------

-----

- ------ 2 Ha Rs.4.00 6 Ha Rs.8.15

19

3

Betasin

g Dengasi MoWR HKKP Unlined field channel 1 No 0.0001 9.0 Ha Rs.15.66

-----

- ------

3

Ha Rs.5.00 6 Ha

Rs.10.6

6 ------ ------

19

4

Betasin

g Apalgre MoWR HKKP Unlined field channel 1 No 0.0001 8.6 Ha Rs.16.20

-----

- ------

3

Ha Rs.5.00 6 Ha

Rs.11.2

0 ------ ------

19

5

Betasin

g Asimgre MoWR HKKP Unlined field channel 1 No 0.0001 12.5 Ha Rs.12.15

-----

- ------

4

Ha Rs.4.00 9 Ha Rs.8.15 ------ ------

19

6

Betasin

g Bansali MoWR HKKP Unlined field channel 1 No 0.0001 8.8 Ha Rs.13.50

-----

- ------

-----

- ------ 3 Ha Rs.4.00 6 Ha Rs.9.50

19

7

Betasin

g

Chondon

Nokat MoWR HKKP Unlined field channel 1 No 0.0002 11.2 Ha Rs.11.34

-----

- ------

-----

- ------ 3 Ha Rs.3.00 8 Ha Rs.8.34

19

8

Betasin

g Borkona MoWR HKKP Unlined field channel 1 No 0.0002 9.7 Ha Rs.14.04

-----

- ------

-----

- ------ 3 Ha Rs.4.00 7 Ha

Rs.10.0

4

19

9

Betasin

g Joyfar MoWR HKKP Unlined field channel 1 No 0.0001 13.0 Ha Rs.13.50

-----

- ------

-----

- ------ 4 Ha Rs.4.00 9 Ha Rs.9.50

20

0

Betasin

g Kasra MoWR HKKP Unlined field channel 1 No 0.0002 8.8 Ha Rs.12.42

-----

- ------

-----

- ------ 3 Ha Rs.4.00 6 Ha Rs.8.42

20

1

Betasin

g Kasra Hajong MoWR HKKP Unlined field channel 1 No 0.0001 8.8 Ha Rs.13.50

-----

- ------

-----

- ------ 3 Ha Rs.4.00 6 Ha Rs.9.50

20

2

Betasin

g Belbari MoWR HKKP Unlined field channel 1 No 0.0002 9.5 Ha Rs.12.15

-----

- ------

-----

- ------ 3 Ha Rs.4.00 7 Ha Rs.8.15

20

3

Betasin

g Badagre MoWR HKKP Unlined field channel 1 No 0.0001 6.9 Ha Rs.13.50

-----

- ------

-----

- ------ 2 Ha Rs.4.00 5 Ha Rs.9.50

20

4

Betasin

g Brojopara MoWR HKKP Unlined field channel 1 No 0.0001 11.0 Ha Rs.12.42

-----

- ------

-----

- ------ 3 Ha Rs.4.00 8 Ha Rs.8.42

20

5

Betasin

g Hajonggre MoWR HKKP Unlined field channel 1 No 0.0002 8.0 Ha Rs.13.50

-----

- ------

-----

- ------ 2 Ha Rs.4.00 6 Ha Rs.9.50

20

6

Betasin

g Monabari MoWR HKKP Unlined field channel 1 No 0.0001 7.0 Ha Rs.14.85

-----

- ------

-----

- ------ 2 Ha Rs.4.00 5 Ha

Rs.10.8

5

20

7

Betasin

g Talbari MoWR HKKP Unlined field channel 1 No 0.0001 8.0 Ha Rs.14.04

-----

- ------

-----

- ------ 2 Ha Rs.4.00 6 Ha

Rs.10.0

4

20

8

Betasin

g Galmara MoWR HKKP Unlined field channel 1 No 0.0001 11.1 Ha Rs.14.85

-----

- ------

3

Ha Rs.4.00 8 Ha

Rs.10.8

5 ------ ------

20

9

Betasin

g Rongramgre MoWR HKKP Unlined field channel 1 No 0.0001 8.5 Ha Rs.13.50

-----

- ------

3

Ha Rs.4.00 6 Ha Rs.9.50 ------ ------

21

0

Betasin

g Rangapani MoWR HKKP Unlined field channel 1 No 0.0001 9.5 Ha Rs.12.42

-----

- ------

3

Ha Rs.4.00 7 Ha Rs.8.42 ------ ------

21 Betasin Ishaguri MoWR HKKP Unlined field channel 1 No 0.0002 11.6 Ha Rs.13.77 ----- ------ 3 Rs.4.00 8 Ha Rs.9.77 ------ ------

District Irrigation Plan, South West Garo Hills district

57 | P a g e

1 g - Ha

21

2

Betasin

g Takunbari MoWR HKKP Unlined field channel 1 No 0.0001 8.0 Ha Rs.13.50

-----

- ------

2

Ha Rs.4.00 6 Ha Rs.9.50 ------ ------

21

3

Betasin

g Teporpara MoWR HKKP Unlined field channel 1 No 0.0001 11.3 Ha Rs.14.85

-----

- ------

3

Ha Rs.4.00 8 Ha

Rs.10.8

5 ------ ------

21

4

Betasin

g

Upper

Teporpara MoWR HKKP Unlined field channel 1 No 0.0002 7.0 Ha Rs.16.20

-----

- ------

2

Ha Rs.5.00 5 Ha

Rs.11.2

0 ------ ------

21

5

Betasin

g Jongdikgre MoWR HKKP Unlined field channel 1 No 0.0001 8.1 Ha Rs.12.42

-----

- ------

2

Ha Rs.4.00 6 Ha Rs.8.42 ------ ------

21

6

Betasin

g Tangabari MoWR HKKP Unlined field channel 1 No 0.0001 9.3 Ha Rs.12.96

-----

- ------

3

Ha Rs.4.00 7 Ha Rs.8.96 ------ ------

21

7

Betasin

g Masal MoWR HKKP Unlined field channel 1 No 0.0001 8.8 Ha Rs.14.85

-----

- ------

3

Ha Rs.4.00 6 Ha

Rs.10.8

5 ------ ------

21

8

Betasin

g Gandipara MoWR HKKP Unlined field channel 1 No 0.0002 8.0 Ha Rs.16.20

-----

- ------

2

Ha Rs.5.00 6 Ha

Rs.11.2

0 ------ ------

21

9

Betasin

g Boiragipara MoWR HKKP Unlined field channel 1 No 0.0001 11.5 Ha Rs.17.55

-----

- ------

3

Ha Rs.5.00 8 Ha

Rs.12.5

5 ------ ------

22

0

Betasin

g Ambari MoWR HKKP Unlined field channel 1 No 0.0001 7.7 Ha Rs.14.85

-----

- ------

2

Ha Rs.4.00 5 Ha

Rs.10.8

5 ------ ------

22

1

Betasin

g

Gandipara

Hajong MoWR HKKP Unlined field channel 1 No 0.0001 6.8 Ha Rs.13.23

-----

- ------

2

Ha Rs.4.00 5 Ha Rs.9.23 ------ ------

22

2

Betasin

g Putimari MoWR HKKP Unlined field channel 1 No 0.0001 9.5 Ha Rs.12.96

-----

- ------

3

Ha Rs.4.00 7 Ha Rs.8.96 ------ ------

22

3

Betasin

g Tiksali MoWR HKKP Unlined field channel 1 No 0.0001 11.1 Ha Rs.14.85

-----

- ------

-----

- ------ 3 Ha Rs.4.00 8 Ha

Rs.10.8

5

22

4

Betasin

g

Gandipara

Garo MoWR HKKP Unlined field channel 1 No 0.0002 7.7 Ha Rs.12.42

-----

- ------

-----

- ------ 2 Ha Rs.4.00 5 Ha Rs.8.42

22

5

Betasin

g Rangatari MoWR HKKP Unlined field channel 1 No 0.0001 8.0 Ha Rs.14.85

-----

- ------

-----

- ------ 2 Ha Rs.4.00 6 Ha

Rs.10.8

5

22

6

Betasin

g Balapara MoWR HKKP Unlined field channel 1 No 0.0001 7.0 Ha Rs.14.04

-----

- ------

-----

- ------ 2 Ha Rs.4.00 5 Ha

Rs.10.0

4

22

7

Betasin

g Garodoba MoWR HKKP Unlined field channel 1 No 0.0002 8.0 Ha Rs.10.80

-----

- ------

-----

- ------ 2 Ha Rs.3.00 6 Ha Rs.7.80

22

8

Betasin

g Baishpara MoWR HKKP Unlined field channel 1 No 0.0001 8.7 Ha Rs.13.77

-----

- ------

-----

- ------ 3 Ha Rs.4.00 6 Ha Rs.9.77

22

9

Betasin

g Dunnigaon MoWR HKKP Unlined field channel 1 No 0.0001 8.5 Ha Rs.13.77

-----

- ------

-----

- ------ 3 Ha Rs.4.00 6 Ha Rs.9.77

23

0

Betasin

g Golagre MoWR HKKP Unlined field channel 1 No 0.0001 9.5 Ha Rs.15.12

-----

- ------

-----

- ------ 3 Ha Rs.5.00 7 Ha

Rs.10.1

2

23

1

Betasin

g Grenggandi MoWR HKKP Unlined field channel 1 No 0.0002 7.0 Ha Rs.13.50

-----

- ------

-----

- ------ 2 Ha Rs.4.00 5 Ha Rs.9.50

23

2

Betasin

g Ransakona MoWR HKKP Unlined field channel 1 No 0.0001 8.0 Ha Rs.16.20

-----

- ------

-----

- ------ 2 Ha Rs.5.00 6 Ha

Rs.11.2

0

District Irrigation Plan, South West Garo Hills district

58 | P a g e

23

3

Betasin

g Rangsagre MoWR HKKP Unlined field channel 1 No 0.0001 6.3 Ha Rs.17.55

-----

- ------

-----

- ------ 2 Ha Rs.5.00 4 Ha

Rs.12.5

5

23

4

Betasin

g Anchengge MoWR HKKP Unlined field channel 1 No 0.0001 7.7 Ha Rs.16.47

-----

- ------

-----

- ------ 2 Ha Rs.5.00 5 Ha

Rs.11.4

7

23

5

Betasin

g Matchokpara MoWR HKKP Unlined field channel 1 No 0.0002 6.8 Ha Rs.16.20

-----

- ------

2

Ha Rs.5.00 5 Ha

Rs.11.2

0 ------ ------

23

6

Betasin

g Akinpara MoWR HKKP Unlined field channel 1 No 0.0001 9.5 Ha Rs.13.50

-----

- ------

3

Ha Rs.4.00 7 Ha Rs.9.50 ------ ------

23

7

Betasin

g Jaluagre MoWR HKKP Unlined field channel 1 No 0.0001 6.9 Ha Rs.13.77

-----

- ------

2

Ha Rs.4.00 5 Ha Rs.9.77 ------ ------

23

8

Betasin

g Tallangre MoWR HKKP Unlined field channel 1 No 0.0002 7.7 Ha Rs.14.85

-----

- ------

2

Ha Rs.4.00 5 Ha

Rs.10.8

5 ------ ------

23

9

Betasin

g Manggagre MoWR HKKP Unlined field channel 1 No 0.0001 8.0 Ha Rs.15.12

-----

- ------

2

Ha Rs.5.00 6 Ha

Rs.10.1

2 ------ ------

24

0

Betasin

g Bisindagre MoWR HKKP Unlined field channel 1 No 0.0001 7.0 Ha Rs.14.04

-----

- ------

-----

- ------ 2 Ha Rs.4.00 5 Ha

Rs.10.0

4

24

1

Betasin

g Hajonpara MoWR HKKP Unlined field channel 1 No 0.0001 8.0 Ha Rs.13.77

-----

- ------

-----

- ------ 2 Ha Rs.4.00 6 Ha Rs.9.77

24

2

Betasin

g Gondugre MoWR HKKP Unlined field channel 1 No 0.0001 6.9 Ha Rs.13.50

-----

- ------

-----

- ------ 2 Ha Rs.4.00 5 Ha Rs.9.50

24

3

Betasin

g Chigitchakgre MoWR HKKP Unlined field channel 1 No 0.0002 8.5 Ha Rs.13.50

-----

- ------

-----

- ------ 3 Ha Rs.4.00 6 Ha Rs.9.50

24

4

Betasin

g Dolbari MoWR HKKP Unlined field channel 1 No 0.0001 9.5 Ha Rs.13.77

-----

- ------

-----

- ------ 3 Ha Rs.4.00 7 Ha Rs.9.77

24

5

Betasin

g Melim MoWR HKKP Unlined field channel 1 No 0.0001 7.0 Ha Rs.13.77

-----

- ------

-----

- ------ 2 Ha Rs.4.00 5 Ha Rs.9.77

24

6

Betasin

g Goragre MoWR HKKP Unlined field channel 1 No 0.0001 8.9 Ha Rs.13.50

-----

- ------

-----

- ------ 3 Ha Rs.4.00 6 Ha Rs.9.50

24

7

Betasin

g

Rongchadengg

re MoWR HKKP Unlined field channel 1 No 0.0001 9.3 Ha Rs.15.12

-----

- ------

3

Ha Rs.5.00 7 Ha

Rs.10.1

2 ------ ------

24

8

Betasin

g Rangsakona MoWR HKKP Unlined field channel 1 No 0.0001 9.2 Ha Rs.14.85

-----

- ------

3

Ha Rs.4.00 6 Ha

Rs.10.8

5 ------ ------

24

9

Betasin

g Rongsanggre MoWR HKKP Unlined field channel 1 No 0.0002 10.2 Ha Rs.14.85

-----

- ------

3

Ha Rs.4.00 7 Ha

Rs.10.8

5 ------ ------

25

0

Betasin

g Rongramgre MoWR HKKP Unlined field channel 1 No 0.0001 11.2 Ha Rs.15.12

-----

- ------

3

Ha Rs.5.00 8 Ha

Rs.10.1

2 ------ ------

25

1

Betasin

g Chidekgre MoWR HKKP Unlined field channel 1 No 0.0001 9.6 Ha Rs.14.85

-----

- ------

3

Ha Rs.4.00 7 Ha

Rs.10.8

5 ------ ------

25

2

Betasin

g Doreng Jasi MoWR HKKP Unlined field channel 1 No 0.0002 9.4 Ha Rs.14.85

-----

- ------

3

Ha Rs.4.00 7 Ha

Rs.10.8

5 ------ ------

25

3

Betasin

g Lutubari MoWR HKKP Unlined field channel 1 No 0.0001 10.6 Ha Rs.13.50

-----

- ------

3

Ha Rs.4.00 7 Ha Rs.9.50 ------ ------

25 Betasin rangatary MoWR HKKP Unlined field channel 1 No 0.0001 9.4 Ha Rs.13.50 ----- ------ 3 Rs.4.00 7 Ha Rs.9.50 ------ ------

District Irrigation Plan, South West Garo Hills district

59 | P a g e

4 g - Ha

25

5

Betasin

g galmara MoWR HKKP Unlined field channel 1 No 0.0001 12.3 Ha Rs.15.66

-----

- ------

4

Ha Rs.5.00 9 Ha

Rs.10.6

6 ------ ------

25

6

Betasin

g Mukdangra MoWR HKKP Unlined field channel 1 No 0.0002 9.8 Ha Rs.14.85

-----

- ------

3

Ha Rs.4.00 7 Ha

Rs.10.8

5 ------ ------

25

7

Betasin

g Se.el MoWR HKKP Unlined field channel 1 No 0.0001 10.5 Ha Rs.16.20

-----

- ------

3

Ha Rs.5.00 7 Ha

Rs.11.2

0 ------ ------

25

8

Betasin

g Skagre MoWR HKKP Unlined field channel 1 No 0.0001 11.2 Ha Rs.15.66

-----

- ------

3

Ha Rs.5.00 8 Ha

Rs.10.6

6 ------ ------

25

9

Betasin

g Rangsakona MoWR HKKP Unlined field channel 1 No 0.0001 9.8 Ha Rs.14.85

-----

- ------

3

Ha Rs.4.00 7 Ha

Rs.10.8

5 ------ ------

26

0

Betasin

g Garodoba MoWR HKKP Unlined field channel 1 No 0.0002 8.9 Ha Rs.15.66

-----

- ------

3

Ha Rs.5.00 6 Ha

Rs.10.6

6 ------ ------

26

1

Betasin

g Malchapara MoWR HKKP Unlined field channel 1 No 0.0001 9.3 Ha Rs.15.39

-----

- ------

3

Ha Rs.5.00 7 Ha

Rs.10.3

9 ------ ------

26

2

Betasin

g Chiringpara MoWR HKKP Unlined field channel 1 No 0.0001 7.2 Ha Rs.16.20

-----

- ------

2

Ha Rs.5.00 5 Ha

Rs.11.2

0 ------ ------

26

3

Betasin

g

Chondon

Nokat MoWR HKKP Unlined field channel 1 No 0.0002 8.6 Ha Rs.15.66

-----

- ------

3

Ha Rs.5.00 6 Ha

Rs.10.6

6 ------ ------

26

4

Betasin

g Nagrakhet MoWR HKKP Unlined field channel 1 No 0.0001 7.6 Ha Rs.16.20

-----

- ------

2

Ha Rs.5.00 5 Ha

Rs.11.2

0 ------ ------

26

5

Betasin

g Ampatigre MoWR HKKP Unlined field channel 1 No 0.0001 8.8 Ha Rs.23.76

-----

- ------

3

Ha Rs.7.00 6 Ha

Rs.16.7

6 ------ ------

26

6

Betasin

g Nirghini MoWR HKKP Unlined field channel 1 No 0.0002 12.2 Ha Rs.14.04

-----

- ------

4

Ha Rs.4.00 9 Ha

Rs.10.0

4 ------ ------

26

7

Betasin

g Moulcheng MoWR HKKP Micro irrigation 1 No 0.0001 9.00 Ha Rs.28.60

-----

- ------

11

Ha

Rs.28.6

0 ------ ------ ------ ------

26

8

Betasin

g Chamaguri' MoWR HKKP Micro irrigation 1 No 0.0002 7.00 Ha Rs.28.60

-----

- ------

11

Ha

Rs.28.6

0 ------ ------ ------ ------

26

9

Betasin

g Bolslagre MoWR HKKP Micro irrigation 1 No 0.0003 6.00 Ha Rs.31.46

-----

- ------

12

Ha

Rs.31.4

6 ------ ------ ------ ------

27

0

Betasin

g Berupra MoWR HKKP Micro irrigation 1 No 0.0001 7.00 Ha Rs.29.12

-----

- ------

11

Ha

Rs.29.1

2 ------ ------ ------ ------

27

1

Betasin

g benabazar MoWR HKKP Micro irrigation 1 No 0.0001 8.00 Ha Rs.26.52

-----

- ------

10

Ha

Rs.26.5

2 ------ ------ ------ ------

27

2

Betasin

g Dipkaipara MoWR HKKP Micro irrigation 1 No 0.0002 5.00 Ha Rs.27.30

-----

- ------

11

Ha

Rs.27.3

0 ------ ------ ------ ------

27

3

Betasin

g Dapguri MoWR HKKP Micro irrigation 1 No 0.0001 4.00 Ha Rs.27.56

-----

- ------

11

Ha

Rs.27.5

6 ------ ------ ------ ------

27

4

Betasin

g Chengjhora MoWR HKKP Micro irrigation 1 No 0.0001 7.00 Ha Rs.29.90

-----

- ------

12

Ha

Rs.29.9

0 ------ ------ ------ ------

27

5

Betasin

g Nogapara MoWR HKKP Micro irrigation 1 No 0.0001 6.00 Ha Rs.31.98

-----

- ------

12

Ha

Rs.31.9

8 ------ ------ ------ ------

District Irrigation Plan, South West Garo Hills district

60 | P a g e

27

6

Betasin

g Chokonggre MoWR HKKP Micro irrigation 1 No 0.0001 5.00 Ha Rs.24.70

-----

- ------

10

Ha

Rs.24.7

0 ------ ------ ------ ------

27

7

Betasin

g Gonglangre MoWR HKKP Micro irrigation 1 No 0.0001 7.00 Ha Rs.25.48

-----

- ------

10

Ha

Rs.25.4

8 ------ ------ ------ ------

27

8

Betasin

g Modupara MoWR HKKP Micro irrigation 1 No 0.0001 6.00 Ha Rs.28.34

-----

- ------

11

Ha

Rs.28.3

4 ------ ------ ------ ------

27

9

Betasin

g Garobdha MoWR HKKP Micro irrigation 1 No 0.0001 5.00 Ha Rs.27.04

-----

- ------

10

Ha

Rs.27.0

4 ------ ------ ------ ------

28

0

Betasin

g Sangkaregre MoWR HKKP Micro irrigation 1 No 0.0002 4.00 Ha Rs.26.78

-----

- ------

10

Ha

Rs.26.7

8 ------ ------ ------ ------

28

1

Betasin

g Nunmati MoWR HKKP Micro irrigation 1 No 0.0002 3.00 Ha Rs.28.60

-----

- ------

11

Ha

Rs.28.6

0 ------ ------ ------ ------

28

2

Betasin

g Koritola MoWR HKKP Micro irrigation 1 No 0.0001 7.00 Ha Rs.29.12

-----

- ------

11

Ha

Rs.29.1

2 ------ ------ ------ ------

28

3

Betasin

g Rongrekgre MoWR HKKP Micro irrigation 1 No 0.0002 6.00 Ha Rs.26.33

-----

- ------

10

Ha

Rs.26.3

3 ------ ------ ------ ------

28

4

Betasin

g Baghmara MoWR HKKP Micro irrigation 1 No 0.0001 5.00 Ha Rs.26.14

-----

- ------

10

Ha

Rs.26.1

4 ------ ------ ------ ------

28

5

Betasin

g Kanchikona MoWR HKKP Micro irrigation 1 No 0.0001 7.00 Ha Rs.29.12

-----

- ------

11

Ha

Rs.29.1

2 ------ ------ ------ ------

28

6

Betasin

g Sisimokgre MoWR HKKP Micro irrigation 1 No 0.0002 6.00 Ha Rs.31.46

-----

- ------

12

Ha

Rs.31.4

6 ------ ------ ------ ------

28

7

Betasin

g Dopatchigre MoWR HKKP Micro irrigation 1 No 0.0001 5.00 Ha Rs.26.78

-----

- ------

10

Ha

Rs.26.7

8 ------ ------ ------ ------

28

8

Betasin

g Andherkona MoWR HKKP Micro irrigation 1 No 0.0001 4.00 Ha Rs.30.16

-----

- ------

12

Ha

Rs.30.1

6 ------ ------ ------ ------

28

9

Betasin

g Harigon MoWR HKKP Micro irrigation 1 No 0.0002 7.00 Ha Rs.25.48

-----

- ------

10

Ha

Rs.25.4

8 ------ ------ ------ ------

29

0

Betasin

g Nokatgre MoWR HKKP Micro irrigation 1 No 0.0001 6.00 Ha Rs.23.14

-----

- ------

9

Ha

Rs.23.1

4 ------ ------ ------ ------

29

1

Betasin

g Mukdangra MoWR HKKP Micro irrigation 1 No 0.0001 4.00 Ha Rs.20.80

-----

- ------

8

Ha

Rs.20.8

0 ------ ------ ------ ------

29

2

Betasin

g Dengasi MoWR HKKP Micro irrigation 1 No 0.0001 6.00 Ha Rs.23.40

-----

- ------

9

Ha

Rs.23.4

0 ------ ------ ------ ------

29

3

Betasin

g Apalgre MoWR HKKP Micro irrigation 1 No 0.0001 7.00 Ha Rs.22.36

-----

- ------

9

Ha

Rs.22.3

6 ------ ------ ------ ------

29

4

Betasin

g Asimgre MoWR HKKP Micro irrigation 1 No 0.0001 6.00 Ha Rs.32.50

-----

- ------

13

Ha

Rs.32.5

0 ------ ------ ------ ------

29

5

Betasin

g Bansali MoWR HKKP Micro irrigation 1 No 0.0001 5.00 Ha Rs.22.88

-----

- ------

9

Ha

Rs.22.8

8 ------ ------ ------ ------

29

6

Betasin

g

Chondon

Nokat MoWR HKKP Micro irrigation 1 No 0.0002 4.00 Ha Rs.29.12

-----

- ------

11

Ha

Rs.29.1

2 ------ ------ ------ ------

29 Betasin Borkona MoWR HKKP Micro irrigation 1 No 0.0002 5.00 Ha Rs.25.22 ----- ------ 10 Rs.25.2 ------ ------ ------ ------

District Irrigation Plan, South West Garo Hills district

61 | P a g e

7 g - Ha 2

29

8

Betasin

g Joyfar MoWR HKKP Micro irrigation 1 No 0.0001 6.00 Ha Rs.33.80

-----

- ------

13

Ha

Rs.33.8

0 ------ ------ ------ ------

29

9

Betasin

g Kasra MoWR HKKP Micro irrigation 1 No 0.0002 4.00 Ha Rs.22.88

-----

- ------

9

Ha

Rs.22.8

8 ------ ------ ------ ------

30

0

Betasin

g Kasra Hajong MoWR HKKP Micro irrigation 1 No 0.0001 5.00 Ha Rs.22.88

-----

- ------

9

Ha

Rs.22.8

8 ------ ------ ------ ------

30

1

Betasin

g Belbari MoWR HKKP Micro irrigation 1 No 0.0002 6.00 Ha Rs.24.70

-----

- ------

-----

- ------ 10 Ha

Rs.24.7

0 ------ ------

30

2

Betasin

g Badagre MoWR HKKP Micro irrigation 1 No 0.0001 5.00 Ha Rs.17.94

-----

- ------

-----

- ------ 7 Ha

Rs.17.9

4 ------ ------

30

3

Betasin

g Brojopara MoWR HKKP Micro irrigation 1 No 0.0001 4.00 Ha Rs.28.60

-----

- ------

-----

- ------ 11 Ha

Rs.28.6

0 ------ ------

30

4

Betasin

g Hajonggre MoWR HKKP Micro irrigation 1 No 0.0002 5.00 Ha Rs.20.80

-----

- ------

-----

- ------ 8 Ha

Rs.20.8

0 ------ ------

30

5

Betasin

g Monabari MoWR HKKP Micro irrigation 1 No 0.0001 4.00 Ha Rs.18.20

-----

- ------

-----

- ------ 7 Ha

Rs.18.2

0 ------ ------

30

6

Betasin

g Talbari MoWR HKKP Micro irrigation 1 No 0.0001 7.00 Ha Rs.20.80

-----

- ------

-----

- ------ 8 Ha

Rs.20.8

0 ------ ------

30

7

Betasin

g Galmara MoWR HKKP Micro irrigation 1 No 0.0001 6.00 Ha Rs.28.86

-----

- ------

-----

- ------ 11 Ha

Rs.28.8

6 ------ ------

30

8

Betasin

g Rongramgre MoWR HKKP Micro irrigation 1 No 0.0001 5.00 Ha Rs.22.10

-----

- ------

-----

- ------ 9 Ha

Rs.22.1

0 ------ ------

30

9

Betasin

g Rangapani MoWR HKKP Micro irrigation 1 No 0.0001 4.50 Ha Rs.24.70

-----

- ------

-----

- ------ 10 Ha

Rs.24.7

0 ------ ------

31

0

Betasin

g Ishaguri MoWR HKKP Micro irrigation 1 No 0.0002 5.00 Ha Rs.30.16

-----

- ------

-----

- ------ 12 Ha

Rs.30.1

6 ------ ------

31

1

Betasin

g Takunbari MoWR HKKP Micro irrigation 1 No 0.0001 6.00 Ha Rs.20.80

-----

- ------

-----

- ------ 8 Ha

Rs.20.8

0 ------ ------

31

2

Betasin

g Teporpara MoWR HKKP Micro irrigation 1 No 0.0001 5.00 Ha Rs.29.38

-----

- ------

-----

- ------ 11 Ha

Rs.29.3

8 ------ ------

31

3

Betasin

g

Upper

Teporpara MoWR HKKP Micro irrigation 1 No 0.0002 5.50 Ha Rs.18.20

-----

- ------

-----

- ------ 7 Ha

Rs.18.2

0 ------ ------

31

4

Betasin

g Jongdikgre MoWR HKKP Micro irrigation 1 No 0.0001 6.00 Ha Rs.21.06

-----

- ------

-----

- ------ 8 Ha

Rs.21.0

6 ------ ------

31

5

Betasin

g Tangabari MoWR HKKP Micro irrigation 1 No 0.0001 4.00 Ha Rs.24.18

-----

- ------

-----

- ------ 9 Ha

Rs.24.1

8 ------ ------

31

6

Betasin

g Masal MoWR HKKP Micro irrigation 1 No 0.0001 6.00 Ha Rs.22.88

-----

- ------

-----

- ------ 9 Ha

Rs.22.8

8 ------ ------

31

7

Betasin

g Gandipara MoWR HKKP Micro irrigation 1 No 0.0002 8.00 Ha Rs.20.80

-----

- ------

-----

- ------ 8 Ha

Rs.20.8

0 ------ ------

31

8

Betasin

g Boiragipara MoWR HKKP Micro irrigation 1 No 0.0001 5.00 Ha Rs.29.90

-----

- ------

-----

- ------ 12 Ha

Rs.29.9

0 ------ ------

District Irrigation Plan, South West Garo Hills district

62 | P a g e

31

9

Betasin

g Ambari MoWR HKKP Micro irrigation 1 No 0.0001 4.00 Ha Rs.20.02

-----

- ------

-----

- ------ 8 Ha

Rs.20.0

2 ------ ------

32

0

Betasin

g

Gandipara

Hajong MoWR HKKP Micro irrigation 1 No 0.0001 6.00 Ha Rs.17.68

-----

- ------

-----

- ------ 7 Ha

Rs.17.6

8 ------ ------

32

1

Betasin

g Putimari MoWR HKKP Micro irrigation 1 No 0.0001 7.00 Ha Rs.24.70

-----

- ------

-----

- ------ 10 Ha

Rs.24.7

0 ------ ------

32

2

Betasin

g Tiksali MoWR HKKP Micro irrigation 1 No 0.0001 5.00 Ha Rs.28.86

-----

- ------

-----

- ------ 11 Ha

Rs.28.8

6 ------ ------

32

3

Betasin

g

Gandipara

Garo MoWR HKKP Micro irrigation 1 No 0.0002 4.00 Ha Rs.20.02

-----

- ------

-----

- ------ 8 Ha

Rs.20.0

2 ------ ------

32

4

Betasin

g Rangatari MoWR HKKP Micro irrigation 1 No 0.0001 4.00 Ha Rs.20.80

-----

- ------

-----

- ------ 8 Ha

Rs.20.8

0 ------ ------

32

5

Betasin

g Balapara MoWR HKKP Micro irrigation 1 No 0.0001 3.00 Ha Rs.18.20

-----

- ------

-----

- ------ 7 Ha

Rs.18.2

0 ------ ------

32

6

Betasin

g Garodoba MoWR HKKP Micro irrigation 1 No 0.0002 5.00 Ha Rs.20.80

-----

- ------

-----

- ------ 8 Ha

Rs.20.8

0 ------ ------

32

7

Betasin

g Baishpara MoWR HKKP Micro irrigation 1 No 0.0001 6.00 Ha Rs.22.62

-----

- ------

-----

- ------ 9 Ha

Rs.22.6

2 ------ ------

32

8

Betasin

g Dunnigaon MoWR HKKP Micro irrigation 1 No 0.0001 4.00 Ha Rs.22.10

-----

- ------

-----

- ------ 9 Ha

Rs.22.1

0 ------ ------

32

9

Betasin

g Golagre MoWR HKKP Micro irrigation 1 No 0.0001 7.00 Ha Rs.24.70

-----

- ------

-----

- ------ 10 Ha

Rs.24.7

0 ------ ------

33

0

Betasin

g Grenggandi MoWR HKKP Micro irrigation 1 No 0.0002 5.00 Ha Rs.18.20

-----

- ------

-----

- ------ 7 Ha

Rs.18.2

0 ------ ------

33

1

Betasin

g Ransakona MoWR HKKP Micro irrigation 1 No 0.0001 4.00 Ha Rs.20.80

-----

- ------

-----

- ------ 8 Ha

Rs.20.8

0 ------ ------

33

2

Betasin

g Rangsagre MoWR HKKP Micro irrigation 1 No 0.0001 3.00 Ha Rs.16.38

-----

- ------

-----

- ------ 6 Ha

Rs.16.3

8 ------ ------

33

3

Betasin

g Anchengge MoWR HKKP Micro irrigation 1 No 0.0001 6.00 Ha Rs.20.02

-----

- ------

-----

- ------ 8 Ha

Rs.20.0

2 ------ ------

33

4

Betasin

g Matchokpara MoWR HKKP Micro irrigation 1 No 0.0002 5.00 Ha Rs.17.68

-----

- ------

-----

- ------ ------ ------ 7 Ha

Rs.17.6

8

33

5

Betasin

g Akinpara MoWR HKKP Micro irrigation 1 No 0.0001 4.00 Ha Rs.24.70

-----

- ------

-----

- ------ ------ ------ 10 Ha

Rs.24.7

0

33

6

Betasin

g Jaluagre MoWR HKKP Micro irrigation 1 No 0.0001 7.00 Ha Rs.17.94

-----

- ------

-----

- ------ ------ ------ 7 Ha

Rs.17.9

4

33

7

Betasin

g Tallangre MoWR HKKP Micro irrigation 1 No 0.0002 6.00 Ha Rs.20.02

-----

- ------

-----

- ------ ------ ------ 8 Ha

Rs.20.0

2

33

8

Betasin

g Manggagre MoWR HKKP Micro irrigation 1 No 0.0001 5.00 Ha Rs.20.80

-----

- ------

-----

- ------ ------ ------ 8 Ha

Rs.20.8

0

33

9

Betasin

g Bisindagre MoWR HKKP Micro irrigation 1 No 0.0001 4.00 Ha Rs.18.20

-----

- ------

-----

- ------ ------ ------ 7 Ha

Rs.18.2

0

34 Betasin Hajonpara MoWR HKKP Micro irrigation 1 No 0.0001 3.00 Ha Rs.20.80 ----- ------ ----- ------ ------ ------ 8 Ha Rs.20.8

District Irrigation Plan, South West Garo Hills district

63 | P a g e

0 g - - 0

34

1

Betasin

g Gondugre MoWR HKKP Micro irrigation 1 No 0.0001 6.00 Ha Rs.17.94

-----

- ------

-----

- ------ ------ ------ 7 Ha

Rs.17.9

4

34

2

Betasin

g Chigitchakgre MoWR HKKP Micro irrigation 1 No 0.0002 7.00 Ha Rs.22.10

-----

- ------

-----

- ------ ------ ------ 9 Ha

Rs.22.1

0

34

3

Betasin

g Dolbari MoWR HKKP Micro irrigation 1 No 0.0001 5.00 Ha Rs.24.70

-----

- ------

-----

- ------ ------ ------ 10 Ha

Rs.24.7

0

34

4

Betasin

g Melim MoWR HKKP Micro irrigation 1 No 0.0001 4.00 Ha Rs.18.20

-----

- ------

-----

- ------ ------ ------ 7 Ha

Rs.18.2

0

34

5

Betasin

g Goragre MoWR HKKP Micro irrigation 1 No 0.0001 7.00 Ha Rs.23.14

-----

- ------

-----

- ------ ------ ------ 9 Ha

Rs.23.1

4

34

6

Betasin

g

Rongchadengg

re MoWR HKKP Micro irrigation 1 No 0.0001 4.00 Ha Rs.22.87

-----

- ------

-----

- ------ ------ ------ 9 Ha

Rs.22.8

7

34

7

Betasin

g Rangsakona MoWR HKKP Micro irrigation 1 No 0.0001 5.00 Ha Rs.22.58

-----

- ------

-----

- ------ ------ ------ 9 Ha

Rs.22.5

8

34

8

Betasin

g Rongsanggre MoWR HKKP Micro irrigation 1 No 0.0002 4.00 Ha Rs.25.00

-----

- ------

-----

- ------ ------ ------ 10 Ha

Rs.25.0

0

34

9

Betasin

g Rongramgre MoWR HKKP Micro irrigation 1 No 0.0001 6.00 Ha Rs.27.43

-----

- ------

-----

- ------ ------ ------ 11 Ha

Rs.27.4

3

35

0

Betasin

g Chidekgre MoWR HKKP Micro irrigation 1 No 0.0001 5.00 Ha Rs.23.51

-----

- ------

-----

- ------ ------ ------ 10 Ha

Rs.23.5

1

35

1

Betasin

g Doreng Jasi MoWR HKKP Micro irrigation 1 No 0.0002 3.00 Ha Rs.22.90

-----

- ------

-----

- ------ ------ ------ 9 Ha

Rs.22.9

0

35

2

Betasin

g Lutubari MoWR HKKP Micro irrigation 1 No 0.0001 4.00 Ha Rs.25.96

-----

- ------

-----

- ------ ------ ------ 11 Ha

Rs.25.9

6

35

3

Betasin

g Rangatary MoWR HKKP Micro irrigation 1 No 0.0001 5.00 Ha Rs.22.90

-----

- ------

-----

- ------ ------ ------ 9 Ha

Rs.22.9

0

35

4

Betasin

g Galmara MoWR HKKP Micro irrigation 1 No 0.0001 6.00 Ha Rs.30.20

-----

- ------

-----

- ------ ------ ------ 12 Ha

Rs.30.2

0

35

5

Betasin

g Mukdangra MoWR HKKP Micro irrigation 1 No 0.0002 4.00 Ha Rs.23.93

-----

- ------

-----

- ------ ------ ------ 10 Ha

Rs.23.9

3

35

6

Betasin

g Se.el MoWR HKKP Micro irrigation 1 No 0.0001 7.00 Ha Rs.25.74

-----

- ------

-----

- ------ ------ ------ 11 Ha

Rs.25.7

4

35

7

Betasin

g Skagre MoWR HKKP Micro irrigation 1 No 0.0001 4.00 Ha Rs.27.43

-----

- ------

-----

- ------ ------ ------ 11 Ha

Rs.27.4

3

35

8

Betasin

g Rangsakona MoWR HKKP Micro irrigation 1 No 0.0001 3.00 Ha Rs.24.00

-----

- ------

-----

- ------ ------ ------ 10 Ha

Rs.24.0

0

35

9

Betasin

g Garodoba MoWR HKKP Micro irrigation 1 No 0.0002 7.00 Ha Rs.21.80

-----

- ------

-----

- ------ ------ ------ 9 Ha

Rs.21.8

0

36

0

Betasin

g Malchapara MoWR HKKP Micro irrigation 1 No 0.0001 6.00 Ha Rs.22.78

-----

- ------

-----

- ------ ------ ------ 9 Ha

Rs.22.7

8

36

1

Betasin

g Chiringpara MoWR HKKP Micro irrigation 1 No 0.0001 4.00 Ha Rs.17.63

-----

- ------

-----

- ------ ------ ------ 7 Ha

Rs.17.6

3

District Irrigation Plan, South West Garo Hills district

64 | P a g e

36

2

Betasin

g

Chondon

Nokat MoWR HKKP Micro irrigation 1 No 0.0002 4.00 Ha Rs.21.06

-----

- ------

-----

- ------ ------ ------ 9 Ha

Rs.21.0

6

36

3

Betasin

g Nagrakhet MoWR HKKP Micro irrigation 1 No 0.0001 3.00 Ha Rs.18.49

-----

- ------

-----

- ------ ------ ------ 8 Ha

Rs.18.4

9

36

4

Betasin

g Ampatigre MoWR HKKP Micro irrigation 1 No 0.0001 5.00 Ha Rs.21.55

-----

- ------

-----

- ------ ------ ------ 9 Ha

Rs.21.5

5

36

5

Betasin

g Nirghini MoWR HKKP Micro irrigation 1 No 0.0002 7.00 Ha Rs.29.88

-----

- ------

-----

- ------ ------ ------ 12 Ha

Rs.29.8

8

36

6

Betasin

g Darugre

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 1 No 0.0040 80 Ha

Rs.724.5

0

-----

- ------

-----

- ------ ------

Rs.217.

4 80 Ha Rs.507

36

7

Betasin

g Jongchetpara

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 1 No 0.0048 85 Ha Rs.1575

-----

- ------

-----

-

Rs.472.

5 85 Ha

Rs.110

3 ------ ------

36

8

Betasin

g Bandalkona

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 1 No 0.0052 50 Ha

Rs.945.0

0

-----

- ------

-----

- ------ ------

Rs.283.

5 50 Ha Rs.662

36

9

Betasin

g Kolkatola

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 1 No 0.0051 70 Ha

Rs.976.5

0

-----

- ------

-----

- ------ ------

Rs.293.

0 70 Ha Rs.684

37

0

Betasin

g Latri

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 1 No 0.0056 90 Ha

Rs.630.0

0

-----

- ------

-----

-

Rs.189.

0 90 Ha Rs.441 ------ ------

37

1

Betasin

g Muri Kati

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 1 No 0.0053 80 Ha

Rs.976.5

0

-----

- ------

-----

-

Rs.293.

0 80 Ha Rs.684 ------ ------

37

2

Betasin

g Baladinggre

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 1 No 0.0053 65 Ha

Rs.630.0

0

-----

- ------

-----

- ------

Rs.18

9 65 Ha

Rs.44

1 ------

37

3

Betasin

g Chgitchakgre

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 1 No 0.0050 75 Ha

Rs.834.7

5

-----

- ------

-----

-

Rs.250.

4 75 Ha Rs.584 ------ ------

37

4

Betasin

g Mukdangra

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 5 No 0.0062 60 Ha Rs.2520

-----

- ------

-----

-

Rs.756.

0 60 Ha

Rs.176

4 ------ ------

37

5

Betasin

g Teporpara

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 1 No 0.0058 50 Ha

Rs.976.5

0

-----

- ------

-----

-

Rs.293.

0 50 Ha Rs.684 ------ ------

37

6

Betasin

g Rongkhon

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 1 No 0.0062 75 Ha

Rs.819.0

0

-----

- ------

-----

- ------ ------

Rs.245.

7 75 Ha Rs.573

37

7

Betasin

g Okapara

MoA & FW

DAC -& PDMC

Secondry storage

structure 1 No 0.0058 60 Ha Rs.1103

-----

- ------

-----

- ------ ------

Rs.330.

8 60 Ha Rs.772

District Irrigation Plan, South West Garo Hills district

65 | P a g e

FW

37

8

Betasin

g Dolbari

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 1 No 0.0057 75 Ha Rs.1166

-----

- ------

-----

- ------ ------

Rs.349.

7 75 Ha Rs.816

37

9

Betasin

g Jebongpara

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 1 No 0.0052 50 Ha

Rs.540.0

0

-----

- ------

-----

-

Rs.162.

0 50 Ha Rs.378 ------ ------

38

0

Betasin

g Rangsagre

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 1 No 0.0001 8 Ha Rs.19.50

8

Ha Rs.19

-----

- ------ ------ ------ ------ ------

38

1

Betasin

g Rongramgre

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 1 No 0.0001 9 Ha Rs.13.76

9

Ha Rs.14

-----

- ------ ------ ------ ------ ------

38

2

Betasin

g

Jebongpara

Songma

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 1 No 0.0001 7 Ha Rs.30.51

7

Ha Rs.31

-----

- ------ ------ ------ ------ ------

38

3

Betasin

g Rangsakona

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 1 No 0.0001 5 Ha Rs.30.51

5

Ha Rs.31

-----

- ------ ------ ------ ------ ------

38

4

Betasin

g Rongsanggre

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 1 No 0.0002 8 Ha Rs.30.51

8

Ha Rs.31

-----

- ------ ------ ------ ------ ------

38

5

Betasin

g Adugre

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 3 No 0.0001 7 Ha Rs.91.53

-----

- ------

7

Ha

Rs.91.5

3 ------ ------ ------ ------

38

6

Betasin

g Mukdangra

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 1 No 0.0001 8 Ha Rs.29.70

-----

- ------

8

Ha

Rs.29.7

0 ------ ------ ------ ------

38

7

Betasin

g Okapara

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 1 No 0.0001 9 Ha Rs.35.10

-----

- ------

9

Ha

Rs.35.1

0 ------ ------ ------ ------

38

8

Betasin

g Rangatari

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 1 No 0.0001 5 Ha Rs.32.40

-----

- ------

5

Ha

Rs.32.4

0 ------ ------ ------ ------

38

9

Betasin

g Monabari

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 1 No 0.0001 4 Ha Rs.29.70

-----

- ------

4

Ha

Rs.29.7

0 ------ ------ ------ ------

39

0

Betasin

g Kasra

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 1 No 0.0001 9 Ha Rs.37.80

-----

- ------

9

Ha

Rs.37.8

0 ------ ------ ------ ------

39

1

Betasin

g Chondonpara

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 1 No 0.0001 7 Ha Rs.35.10

-----

- ------

7

Ha

Rs.35.1

0 ------ ------ ------ ------

District Irrigation Plan, South West Garo Hills district

66 | P a g e

39

2

Betasin

g Salbari

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 1 No 0.0001 9 Ha Rs.32.40

9

Ha Rs.32

-----

- ------ ------ ------ ------ ------

39

3

Betasin

g Garobadha

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 1 No 0.0001 7 Ha Rs.35.10

-----

- ------

7

Ha

Rs.35.1

0 ------ ------ ------ ------

39

4

Betasin

g Tangabari

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 1 No 0.0002 8 Ha Rs.27.00

-----

- ------

8

Ha

Rs.27.0

0 ------ ------ ------ ------

39

5

Betasin

g Mujai Agal

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 1 No 0.0002 8 Ha Rs.29.70

8

Ha Rs.30

-----

- ------ ------ ------ ------ ------

39

6

Betasin

g

Monabari

Songma

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 1 No 0.0001 9 Ha Rs.37.80

9

Ha Rs.38

-----

- ------ ------ ------ ------ ------

39

7

Betasin

g Balonggre

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 1 No 0.0002 6 Ha Rs.35.10

6

Ha Rs.35

-----

- ------ ------ ------ ------ ------

39

8

Betasin

g Rongsanggre

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 1 No 0.0054 9 Ha Rs.37.80

9

Ha Rs.38

-----

- ------ ------ ------ ------ ------

39

9

Betasin

g Nagarsket

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 1 No 0.0054 8 Ha Rs.44.10

8

Ha Rs.44

-----

- ------ ------ ------ ------ ------

40

0

Betasin

g Gingbang

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 1 No 0.0054 7 Ha Rs.40.95

7

Ha Rs.41

-----

- ------ ------ ------ ------ ------

40

1

Betasin

g

Jebongpara

Nokat

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 1 No 0.0054 6 Ha Rs.36.23

6

Ha Rs.36

-----

- ------ ------ ------ ------ ------

40

2

Betasin

g Malchapara

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 5 No 0.0054 45 Ha

Rs.177.9

8

-----

- ------

45

Ha

Rs.91.5

3 ------ ------ ------ ------

40

3

Betasin

g Chringpara

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 1 No 0.0054 9 Ha Rs.34.65

-----

- ------

9

Ha Rs.34.7 ------ ------ ------ ------

40

4

Betasin

g Jongdikgre

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 1 No 0.0054 8 Ha Rs.40.95

-----

- ------

8

Ha Rs.41.0 ------ ------ ------ ------

40

5

Betasin

g Masalgre

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 1 No 0.0054 7 Ha Rs.37.80

-----

- ------

7

Ha Rs.37.8 ------ ------ ------ ------

40 Betasin Jamanggre MoA & FW PDMC Secondry storage 1 No 0.0054 6 Ha Rs.31.50 ----- ------ 6 Rs.31.5 ------ ------ ------ ------

District Irrigation Plan, South West Garo Hills district

67 | P a g e

6 g DAC -&

FW

structure - Ha

40

7

Betasin

g Dorambok

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 3 No 0.0054 8 Ha

Rs.105.8

4

-----

- ------

8

Ha

Rs.105.

8 ------ ------ ------ ------

40

8

Betasin

g Sisimokgre

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 4 No 0.0054 7 Ha

Rs.142.3

8

-----

- ------

-----

- ------ ------ ------ 7 Ha Rs.142

40

9

Betasin

g Dolbari

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 3 No 0.0054 5 Ha

Rs.106.7

9

-----

- ------

-----

- ------ ------ ------ 5 Ha Rs.107

41

0

Betasin

g Harigaon

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 2 No 0.0054 7 Ha Rs.71.19

-----

- ------

-----

- ------ ------ ------ 7 Ha Rs.71

41

1

Betasin

g Gengendhi

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 4 No 0.0054 6 Ha

Rs.142.3

8

-----

- ------

-----

- ------ ------ ------ 6 Ha Rs.142

41

2

Betasin

g Matchalang

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 1 No 0.0054 5 Ha Rs.40.95

-----

- ------

-----

- ------ ------ ------ 5 Ha Rs.41

41

3

Betasin

g Masudi

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 2 No 0.0054 8 Ha Rs.71.19

-----

- ------

-----

- ------ ------ ------ 8 Ha Rs.71

41

4

Betasin

g Anteka

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 1 No 0.0054 6 Ha Rs.31.50

-----

- ------

-----

- ------ 10 Ha Rs.31.5 ------ ------

41

5

Betasin

g Godalgre

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 1 No 0.0054 8 Ha Rs.35.60

-----

- ------

-----

- ------ 11 Ha Rs.35.6 ------ ------

41

6

Betasin

g Bashbari

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 4 No 0.0054 7 Ha

Rs.142.3

8

-----

- ------

-----

- ------ 45 Ha

Rs.142.

4 ------ ------

41

7

Betasin

g Watregre

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 4 No 0.0054 16 Ha

Rs.142.3

8

-----

- ------

-----

- ------ 45 Ha

Rs.142.

4 ------ ------

41

8

Betasin

g Dengnakpara

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 3 No 0.0054 22 Ha

Rs.106.7

9

-----

- ------

-----

- ------ 34 Ha

Rs.106.

8 ------ ------

41

9

Betasin

g Golagre

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 3 No 0.0054 20 Ha

Rs.106.7

9

-----

- ------

-----

- ------ 34 Ha

Rs.106.

8 ------ ------

42

0

Betasin

g Abegre

MoA & FW

DAC -& PDMC

Secondry storage

structure 1 No 0.0054 12 Ha Rs.37.80

-----

- ------

12

Ha Rs.37.8 ------ ------ ------ ------

District Irrigation Plan, South West Garo Hills district

68 | P a g e

FW

42

1

Betasin

g Dak

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 2 No 0.0054 20 Ha Rs.71.19

-----

- ------

20

Ha Rs.71.2 ------ ------ ------ ------

42

2

Betasin

g Andherkona

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 3 No 0.0054 15 Ha

Rs.106.7

9

-----

- ------

15

Ha

Rs.106.

8 ------ ------ ------ ------

42

3

Betasin

g Baghmara

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 4 No 0.0054 35 Ha

Rs.142.3

8

-----

- ------

14

Ha

Rs.142.

4 21 Ha

Rs.142.

4 ------ ------

42

4

Betasin

g Betasing

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 10 No 0.0054 40 Ha

Rs.391.5

5

-----

- ------

-----

- ------ 40 Ha

Rs.391.

6 ------ ------

42

5

Betasin

g Thalanggre

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 3 No 0.0054 25 Ha

Rs.106.7

9

-----

- ------

25

Ha

Rs.106.

8 ------ ------ ------ ------

42

6

Betasin

g Chiringpara

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 5 No 0.0054 40 Ha

Rs.177.9

8

-----

- ------

16

Ha

Rs.178.

0 24 Ha

Rs.178.

0 ------ ------

42

7

Betasin

g Chondonpara

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 4 No 0.0054 36 Ha

Rs.142.3

8

-----

- ------

36

Ha

Rs.142.

4 ------ ------ ------ ------

42

8

Betasin

g

Chondon

Nokat

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 4 No 0.0054 30 Ha

Rs.142.3

8

-----

- ------

-----

- ------ 45 Ha

Rs.142.

4 ------ ------

42

9

Betasin

g Joyfar

MoA & FW

DAC -&

FW

PDMC Secondry storage

structure 3 No 0.0054 20 Ha

Rs.106.7

9

-----

- ------

-----

- ------ ------ ------ 20 Ha Rs.107

43

0

Betasin

g Damalgre

DoLR -

MoRD

Convergenc

e Land Development 1 No ------ 20 Ha Rs.1500

-----

- ------

-----

- ------ 10 Ha Rs.750 10 Ha Rs.750

43

1

Betasin

g Kokilla

DoLR -

MoRD

Convergenc

e Land Development 1 No ------ 15 Ha

Rs.131.2

5

-----

- ------

15

Ha Rs.131 ------ ------ ------ ------

43

2

Betasin

g

Daru

Anangpara

DoLR -

MoRD

Convergenc

e Land Development 1 No ------ 10 Ha

Rs.375.0

0

-----

- ------

5

Ha Rs.188 5 Ha Rs.187 ------ ------

43

3

Betasin

g Bainapara

DoLR -

MoRD

Convergenc

e Land Development 1 No ------ 9 Ha Rs.56.25

-----

- ------

-----

- ------ 9 Ha Rs.56.3 ------ ------

43

4

Betasin

g Bando Raja

DoLR -

MoRD

Convergenc

e Land Development 1 No ------ 15 Ha

Rs.225.0

0

-----

- ------

-----

- ------ ------ ------ 15 Ha Rs.225

43

5

Betasin

g Bolchugre

DoLR -

MoRD

Convergenc

e Land Development 1 No ------ 10 Ha Rs.37.50

-----

- ------

-----

- ------ ------ ------ 10 Ha Rs.38

43

6

Betasin

g Domdoma

DoLR -

MoRD

Convergenc

e Land Development 1 No ------ 5 Ha Rs.22.50

-----

- ------

-----

- ------ 5 Ha Rs.22.5 ------ ------

43 Betasin Dalbotpara DoLR - Convergenc Land Development 1 No ------ 6 Ha Rs.11.25 ----- ------ ----- ------ 6 Ha Rs.11.3 ------ ------

District Irrigation Plan, South West Garo Hills district

69 | P a g e

7 g MoRD e - -

43

8

Betasin

g Balladingre

DoLR -

MoRD

Convergenc

e Land Development 1 No ------ 7 Ha Rs.20.25

-----

- ------

-----

- ------ ------ ------ 7 Ha Rs.20

43

9

Betasin

g Chiringpara

DoLR -

MoRD

Convergenc

e Land Development 1 No ------ 9 Ha Rs.36.75

-----

- ------

-----

- ------ ------ ------ 9 Ha Rs.37

44

0

Betasin

g Sonamitte

DoLR -

MoRD

Convergenc

e Land Development 1 No ------ 7 Ha Rs.35.25

-----

- ------

-----

- ------ ------ ------ 7 Ha Rs.35

44

1

Betasin

g Bokmagre

DoLR -

MoRD

Convergenc

e Land Development 1 No ------ 8 Ha Rs.43.50

-----

- ------

-----

- ------ ------ ------ 8 Ha Rs.44

44

2

Betasin

g Anteka

DoLR -

MoRD

Convergenc

e Land Development 1 No ------ 5 Ha Rs.36.00

-----

- ------

-----

- ------ 5 Ha Rs.36.0 ------ ------

44

3

Betasin

g Samati

DoLR -

MoRD

Convergenc

e Land Development 1 No ------ 3 Ha Rs.26.25

-----

- ------

-----

- ------ 3 Ha Rs.26.3 ------ ------

44

4

Betasin

g Sawbhanga

DoLR -

MoRD

Convergenc

e Land Development 1 No ------ 4 Ha Rs.27.75

-----

- ------

4

Ha Rs.28 ------ ------ ------ ------

44

5

Betasin

g Tkonchi

DoLR -

MoRD

Convergenc

e Land Development 1 No ------ 7 Ha Rs.50.25

-----

- ------

-----

- ------ 7 Ha Rs.50.3 ------ ------

44

6

Betasin

g Chidipa

DoLR -

MoRD

Convergenc

e Land Development 1 No ------ 6 Ha Rs.31.50

-----

- ------

6

Ha Rs.32 ------ ------ ------ ------

44

7

Betasin

g Anchenggre

DoLR -

MoRD

Convergenc

e Land Development 1 No ------ 8 Ha Rs.42.75

-----

- ------

8

Ha Rs.43 ------ ------ ------ ------

44

8

Betasin

g Kentrikona

DoLR -

MoRD

Convergenc

e Land Development 1 No ------ 7 Ha Rs.84.00

-----

- ------

7

Ha Rs.84 ------ ------ ------ ------

44

9

Betasin

g Tangabari

DoLR -

MoRD

Convergenc

e Land Development 1 No ------ 5 Ha Rs.90.00

-----

- ------

-----

- ------ 60 Ha Rs.90.0 ------ ------

45

0

Betasin

g Makbil Chring

DoLR -

MoRD

Convergenc

e Land Development 1 No ------ 6 Ha Rs.29.25

-----

- ------

6

Ha Rs.29 ------ ------ ------ ------

45

1

Betasin

g A.palgre

DoLR -

MoRD

Convergenc

e Land Development 1 No ------ 7 Ha Rs.67.50

-----

- ------

7

Ha Rs.68 ------ ------ ------ ------

45

2

Betasin

g Dak

DoLR -

MoRD

Convergenc

e Land Development 1 No ------ 8 Ha Rs.75.00

-----

- ------

-----

- ------ 8 Ha Rs.75.0 ------ ------

45

3

Betasin

g Jewilgre

DoLR -

MoRD

Convergenc

e Land Development 1 No ------ 7 Ha Rs.33.75

-----

- ------

7

Ha Rs.34 ------ ------ ------ ------

45

4

Betasin

g Skagre

DoLR -

MoRD

Convergenc

e Land Development 1 No ------ 5 Ha Rs.44.25

-----

- ------

-----

- ------ 5 Ha Rs.44.3 ------ ------

45

5

Betasin

g Jongdikgre

DoLR -

MoRD

Convergenc

e Land Development 1 No ------ 7 Ha Rs.45.75

-----

- ------

-----

- ------ 7 Ha Rs.45.8 ------ ------

45

6

Betasin

g Betasing

DoLR -

MoRD

Convergenc

e Land Development 1 No ------ 6 Ha Rs.86.25

-----

- ------

-----

- ------ 6 Ha Rs.86.3 ------ ------

45

7

Betasin

g Chisimokgre

DoLR -

MoRD

Convergenc

e Land Development 1 No ------ 9 Ha

Rs.112.5

0

-----

- ------

-----

- ------ 9 Ha

Rs.112.

5 ------ ------

45

8

Betasin

g Josipara

DoLR -

MoRD

Convergenc

e Land Development 1 No ------ 6 Ha Rs.26.25

-----

- ------

-----

- ------ 6 Ha Rs.26.3 ------ ------

District Irrigation Plan, South West Garo Hills district

70 | P a g e

45

9

Betasin

g Garobadha

DoLR -

MoRD

Convergenc

e Land Development 1 No ------ 9 Ha

Rs.225.0

0

-----

- ------

5

Ha

Rs.112.

5

-104

Ha

Rs.112.

5 ------ ------

46

0

Betasin

g Kalaichar

DoLR -

MoRD

Convergenc

e Land Development 1 No ------ 8 Ha

Rs.112.5

0

-----

- ------

4

Ha Rs.56.3

-48

Ha Rs.56.3 ------ ------

46

1

Betasin

g Chisegre

DoLR -

MoRD

Convergenc

e Land Development 1 No ------ 7 Ha Rs.51.75

-----

- ------

-7

Ha Rs.52 ------ ------ ------ ------

46

2

Betasin

g Bagidela

DoLR -

MoRD

Convergenc

e Land Development 1 No ------ 9 Ha Rs.56.25

-----

- ------

-----

- ------ 9 Ha Rs.56.3 ------ ------

46

3

Betasin

g Darugre

DoLR -

MoRD

Convergenc

e Land Development 1 No ------ 6 Ha Rs.68.25

-----

- ------

-----

- ------ 6 Ha Rs.68.3 ------ ------

46

4

Betasin

g Nagraskhet

DoLR -

MoRD

Convergenc

e Land Development 1 No ------ 6 Ha Rs.82.50

-----

- ------

6

Ha Rs.83 ------ ------ ------ ------

46

5

Betasin

g Naragre

DoLR -

MoRD

Convergenc

e

Renovation of &

maintaince of irrigation

canals & drains

1 No ------ 30 Ha Rs.48.00 8

Ha

Rs.12.

0

8

Ha Rs.9.60 8 Ha Rs.7.7 6 Ha Rs.6.14

46

6

Betasin

g Baghama

DoLR -

MoRD

Convergenc

e

Renovation of &

maintaince of irrigation

canals & drains

1 No ------ 50 Ha Rs.132.0

0

13

Ha

Rs.33.

0

13

Ha

Rs.26.4

0 13 Ha Rs.21.1 11 Ha

Rs.16.9

0

46

7

Betasin

g Goragre

DoLR -

MoRD

Convergenc

e

Renovation of &

maintaince of irrigation

canals & drains

1 No ------ 45 Ha Rs.48.00 11

Ha

Rs.12.

0

11

Ha Rs.9.60 11 Ha Rs.7.7 12 Ha Rs.6.14

46

8

Betasin

g Matchallang

DoLR -

MoRD

Convergenc

e

Renovation of &

maintaince of irrigation

canals & drains

1 No ------ 30 Ha Rs.24.00 8

Ha Rs.6.0

8

Ha Rs.4.80 8 Ha Rs.3.8 6 Ha Rs.3.07

46

9

Betasin

g Masudi

DoLR -

MoRD

Convergenc

e

Renovation of &

maintaince of irrigation

canals & drains

1 No ------ 25 Ha Rs.26.00 6

Ha Rs.6.5

6

Ha Rs.5.20 6 Ha Rs.4.2 7 Ha Rs.3.33

47

0

Betasin

g Rongsong

DoLR -

MoRD

Convergenc

e

Renovation of &

maintaince of irrigation

canals & drains

1 No ------ 30 Ha Rs.24.00 8

Ha Rs.6.0

8

Ha Rs.4.80 8 Ha Rs.3.8 6 Ha Rs.3.07

47

1

Betasin

g Badupara

DoLR -

MoRD

Convergenc

e

Renovation of &

maintaince of irrigation

canals & drains

1 No ------ 25 Ha Rs.44.00 6

Ha

Rs.11.

0

6

Ha Rs.8.80 6 Ha Rs.7.0 7 Ha Rs.5.63

47

2

Betasin

g Chondonpara

DoLR -

MoRD

Convergenc

e

Renovation of &

maintaince of irrigation

canals & drains

1 No ------ 30 Ha Rs.18.00 8

Ha Rs.4.5

8

Ha Rs.3.60 8 Ha Rs.2.9 6 Ha Rs.2.30

47

3

Betasin

g Mokpara

DoLR -

MoRD

Convergenc

e

Renovation of &

maintaince of irrigation

canals & drains

1 No ------ 35 Ha Rs.16.00 9

Ha Rs.4.0

9

Ha Rs.3.20 9 Ha Rs.2.6 8 Ha Rs.2.05

47

4

Betasin

g Marakapara

DoLR -

MoRD

Convergenc

e

Renovation of &

maintaince of irrigation

canals & drains

1 No ------ 70 Ha Rs.128.0

0

18

Ha

Rs.32.

0

18

Ha

Rs.25.6

0 18 Ha Rs.20.5 16 Ha

Rs.16.3

8

47 Betasin Dolbari DoLR - Convergenc Renovation of & 1 No ------ 45 Ha Rs.120.0 11 Rs.30. 11 Rs.24.0 11 Ha Rs.19.2 12 Ha Rs.15.3

District Irrigation Plan, South West Garo Hills district

71 | P a g e

5 g MoRD e maintaince of irrigation

canals & drains

0 Ha 0 Ha 0 6

47

6

Betasin

g Sangkaregre

DoLR -

MoRD

Convergenc

e

Renovation of &

maintaince of irrigation

canals & drains

1 No ------ 35 Ha Rs.48.00 9

Ha

Rs.12.

0

9

Ha Rs.9.60 9 Ha Rs.7.7 8 Ha Rs.6.14

47

7

Betasin

g Andherkona

DoLR -

MoRD

Convergenc

e

Renovation of &

maintaince of irrigation

canals & drains

1 No ------ 40 Ha Rs.124.0

0

10

Ha

Rs.31.

0

10

Ha

Rs.24.8

0 10 Ha Rs.19.8 10 Ha

Rs.15.8

7

47

8

Betasin

g Bashbari

DoLR -

MoRD

Convergenc

e

Renovation of &

maintaince of irrigation

canals & drains

1 No ------ 45 Ha Rs.140.0

0

11

Ha

Rs.35.

0

11

Ha

Rs.28.0

0 11 Ha Rs.22.4 12 Ha

Rs.17.9

2

47

9

Betasin

g Muji A.galgre

DoLR -

MoRD

Convergenc

e

Renovation of &

maintaince of irrigation

canals & drains

1 No ------ 70 Ha Rs.80.00 18

Ha

Rs.20.

0

18

Ha

Rs.16.0

0 18 Ha Rs.12.8 16 Ha

Rs.10.2

4

48

0

Betasin

g Gopijhora

DoLR -

MoRD

Convergenc

e

Renovation of &

maintaince of irrigation

canals & drains

1 No ------ 50 Ha Rs.72.00 13

Ha

Rs.18.

0

13

Ha

Rs.14.4

0 13 Ha Rs.11.5 11 Ha Rs.9.22

48

1

Betasin

g Kokilla

DoLR -

MoRD

Convergenc

e

Renovation of &

maintaince of irrigation

canals & drains

1 No ------ 50 Ha Rs.68.00 13

Ha

Rs.17.

0

13

Ha

Rs.13.6

0 13 Ha Rs.10.9 11 Ha Rs.8.70

48

2

Betasin

g Grenggandhi

DoLR -

MoRD

Convergenc

e

Renovation of &

maintaince of irrigation

canals & drains

1 No ------ 45 Ha Rs.56.00 11

Ha

Rs.14.

0

11

Ha

Rs.11.2

0 11 Ha Rs.9.0 12 Ha Rs.7.17

48

3

Betasin

g Dengnakpara

DoLR -

MoRD

Convergenc

e

Renovation of &

maintaince of irrigation

canals & drains

1 No ------ 45 Ha Rs.200.0

0

11

Ha

Rs.50.

0

11

Ha

Rs.40.0

0 11 Ha Rs.32.0 12 Ha

Rs.25.6

0

48

4

Betasin

g Chelipara

State

Irrigation

Department

HKKP Surface Minor Irrigation 1 No 0.0002 16 Ha Rs.26.50 -----

- Rs.15

16

Ha

Rs.11.5

0 ------ ------ ------ ------

48

5

Betasin

g Chondonpara

State

Irrigation

Department

HKKP Surface Minor Irrigation 1 No 0.0004 18 Ha Rs.40.00 -----

- Rs.25

18

Ha

Rs.15.0

0 ------ ------ ------ ------

48

6

Betasin

g Mokpara

State

Irrigation

Department

HKKP Surface Minor Irrigation 1 No 0.0004 17 Ha Rs.39.00 -----

- Rs.20

17

Ha

Rs.19.0

0 ------ ------ ------ ------

48

7

Betasin

g Bollonggre

State

Irrigation

Department

HKKP Surface Minor Irrigation 1 No 0.0003 13 Ha Rs.22.00 -----

- Rs.17

13

Ha Rs.5.00 ------ ------ ------ ------

48

8

Betasin

g

Ronsang

Abagre

State

Irrigation

Department

HKKP Surface Minor Irrigation 1 No 0.0005 17 Ha Rs.42.00 -----

- Rs.20

17

Ha

Rs.22.0

0 ------ ------ ------ ------

48

9

Betasin

g Dailaga

State

Irrigation HKKP Surface Minor Irrigation 1 No 0.0003 16 Ha Rs.39.84

-----

- Rs.16

16

Ha

Rs.23.8

4 ------ ------ ------ ------

District Irrigation Plan, South West Garo Hills district

72 | P a g e

Department

49

0

Betasin

g Dalbotpara

State

Irrigation

Department

HKKP Surface Minor Irrigation 1 No 0.0003 15 Ha Rs.38.10 -----

- ------

-----

-

Rs.25.0

0 15 Ha Rs.13.1 ------ ------

49

1

Betasin

g Arengre

State

Irrigation

Department

HKKP Surface Minor Irrigation 1 No 0.0003 25 Ha Rs.62.25 -----

- Rs.25

25

Ha

Rs.37.2

5 ------ ------ ------ ------

49

2

Betasin

g Bakwe

State

Irrigation

Department

HKKP Surface Minor Irrigation 1 No 0.0003 17 Ha Rs.42.33 -----

- ------

-----

-

Rs.17.0

0 17 Ha Rs.25.3 ------ ------

49

3

Betasin

g Ampatigre

State

Irrigation

Department

HKKP Surface Minor Irrigation 1 No 0.0002 15 Ha Rs.37.35 -----

- ------

-----

- ------ ------ Rs.15.0 15 Ha

Rs.22.3

5

49

4

Betasin

g

Chengkompar

a

State

Irrigation

Department

HKKP Surface Minor Irrigation 1 No 0.0002 13 Ha Rs.32.37 -----

- ------

-----

- ------ ------ Rs.13.0 13 Ha

Rs.19.3

7

49

5

Betasin

g Rangatari

State

Irrigation

Department

HKKP Surface Minor Irrigation 1 No 0.0002 17 Ha Rs.42.33 -----

- ------

-----

- ------ ------ Rs.17.0 17 Ha

Rs.25.3

3

49

6

Betasin

g Chringpara

State

Irrigation

Department

HKKP Surface Minor Irrigation 1 No 0.0003 17 Ha Rs.42.33 -----

- ------

-----

-

Rs.17.0

0 17 Ha Rs.25.3 ------ ------

49

7

Betasin

g Malchapara

State

Irrigation

Department

HKKP Surface Minor Irrigation 1 No 0.0003 16 Ha Rs.39.84 -----

- Rs.16

16

Ha

Rs.23.8

4 ------ ------ ------ ------

49

8

Betasin

g Jongdikgre

State

Irrigation

Department

HKKP Surface Minor Irrigation 1 No 0.0003 16 Ha Rs.39.84 -----

- ------

-----

-

Rs.16.0

0 16 Ha Rs.23.8 ------ ------

49

9

Betasin

g Muji Agalgre

State

Irrigation

Department

HKKP

Improvement &

moderization of existing

schemes

1 No 0.0014 173 Ha Rs.91.00 -----

-

Rs.30.

3

173

Ha

Rs.60.6

7 ------ ------ ------ ------

50

0

Betasin

g Thalang

State

Irrigation

Department

HKKP

Improvement &

moderization of existing

schemes

1 No 0.0009 80 Ha Rs.90.00 -----

- ------

-----

- Rs.36.0 80 Ha Rs.54 ------ ------

50

1

Betasin

g Grenggandhi

State

Irrigation

Department

HKKP

Improvement &

moderization of existing

schemes

1 No 0.0010 55 Ha Rs.56.00 -----

-

Rs.14.

0

55

Ha

Rs.42.0

0 ------ ------ ------ ------

50

2

Betasin

g Sangkaregre

State

Irrigation

Department

HKKP

Improvement &

moderization of existing

schemes

1 No 0.0008 45 Ha Rs.108.0

0

-----

- ------

-----

- Rs.43 45 Ha Rs.65 ------ ------

50

3

Betasin

g Chisegre

State

Irrigation

Department

HKKP

Improvement &

moderization of existing

schemes

1 No 0.0007 60 Ha Rs.70.20 -----

- ------

-----

- Rs.28 60 Ha Rs.42 ------ ------

District Irrigation Plan, South West Garo Hills district

73 | P a g e

50

4

Betasin

g Andherkona

State

Irrigation

Department

HKKP

Improvement &

moderization of existing

schemes

1 No 0.0014 200 Ha Rs.315.0

0

-----

- ------

-----

- Rs.126

200

Ha Rs.189 ------ ------

50

5

Betasin

g Jewilgre

State

Irrigation

Department

HKKP

Improvement &

moderization of existing

schemes

1 No 0.0004 60 Ha Rs.54.00 -----

- ------

-----

- Rs.22 60 Ha Rs.32 ------ ------

50

6

Betasin

g Kokilla

State

Irrigation

Department

HKKP

Improvement &

moderization of existing

schemes

1 No 0.0011 150 Ha Rs.283.5

0

-----

- ------

-----

- ------ 60 Ha Rs.113 90 Ha Rs.171

50

7

Betasin

g Goragre

State

Irrigation

Department

HKKP

Improvement &

moderization of existing

schemes

1 No 0.0008 97 Ha Rs.189.0

0

-----

- ------

-----

- ------ 39 Ha Rs.76 58 Ha Rs.113

50

8

Betasin

g Marakapara

State

Irrigation

Department

HKKP

Improvement &

moderization of existing

schemes

1 No 0.0011 100 Ha Rs.360.0

0

-----

- ------

-----

- Rs.144 40 Ha Rs.216 ------ ------

50

9

Betasin

g Bashbari

State

Irrigation

Department

HKKP

Improvement &

moderization of existing

schemes

1 No 0.0019 140 Ha Rs.165.0

0

-----

- ------

-----

- ------ 56 Ha Rs.66 84 Ha Rs.99

51

0

Betasin

g Dolbari

State

Irrigation

Department

HKKP

Improvement &

moderization of existing

schemes

1 No 0.0009 60 Ha Rs.162.0

0

-----

-

Rs.40.

5

180

Ha Rs.122 ------ ------ ------ ------

51

1

Betasin

g Chidekgre

State

Irrigation

Department

HKKP SMR 1 No 0.0019 80 Ha Rs.250 -----

-

Rs.12

5

280

Ha Rs.125 ------ ------ ------ ------

51

2

Betasin

g Doldigre

State

Irrigation

Department

HKKP SMR 1 No 0.0020 70 Ha Rs.220 -----

-

Rs.11

0

120

Ha Rs.110 ------ ------ ------ ------

51

3

Betasin

g Bolchugre

State

Irrigation

Department

HKKP SMR 1 No 0.0020 75 Ha Rs.797.5

0

-----

- ------

-----

- Rs.319 75 Ha Rs.479 ------ ------

51

4

Betasin

g Danak

State

Irrigation

Department

HKKP SMR 1 No 0.0030 60 Ha Rs.870.0

0

-----

- ------

-----

- Rs.348 60 Ha Rs.522 ------ ------

51

5

Betasin

g Bandalkona

State

Irrigation

Department

HKKP SMR 1 No 0.0011 80 Ha Rs.1058.

5

-----

- ------

-----

- Rs.212 80 Ha Rs.847 ------ ------

51

6

Betasin

g Dalbotpara

State

Irrigation

Department

HKKP SMR 1 No 0.0011 70 Ha Rs.1058.

5

-----

- ------

-----

- Rs.212 70 Ha Rs.847 ------ ------

51

7

Betasin

g Darugre

State

Irrigation

Department

HKKP SMR 1 No 0.0014 60 Ha Rs.1189.

0

-----

- ------

-----

- Rs.238 60 Ha Rs.951 ------ ------

51 Betasin Rangsang State HKKP SMR 1 No 0.0015 50 Ha Rs.1125. ----- ------ ----- Rs.225 50 Ha Rs.900 ------ ------

District Irrigation Plan, South West Garo Hills district

74 | P a g e

8 g Ajigre Irrigation

Department

2 - -

51

9

Betasin

g Arichengre

State

Irrigation

Department

HKKP SMR 1 No 0.0024 45 Ha Rs.1102 -----

- ------

-----

- Rs.441 45 Ha Rs.661 ------ ------

52

0

Betasin

g Asangre

State

Irrigation

Department

HKKP SMR 1 No 0.0024 60 Ha Rs.1253 -----

- ------

-----

- Rs.501 60 Ha Rs.752 ------ ------

52

1

Betasin

g Doldigre

State

Irrigation

Department

HKKP SMR 1 No 0.0018 75 Ha Rs.1264 -----

- ------

-----

- Rs.379 75 Ha Rs.885 ------ ------

52

2

Betasin

g Rongkon

State

Irrigation

Department

HKKP SMR 1 No 0.0029 60 Ha Rs.2030 -----

- ------

-----

- Rs.609 60 Ha

Rs.142

1 ------ ------

52

3

Betasin

g Malchpara

State

Irrigation

Department

HKKP SMR 1 No 0.0029 65 Ha Rs.805 -----

- ------

-----

- Rs.242 65 Ha Rs.563 ------ ------

52

4

Betasin

g Bolsal Dokgre

State

Irrigation

Department

HKKP SMR 1 No 0.0024 60 Ha Rs.725 -----

- ------

-----

- Rs.218 60 Ha Rs.507 ------ ------

52

5

Betasin

g Ajonggre

State

Irrigation

Department

HKKP SMR 1 No 0.0019 75 Ha Rs.750 -----

- ------

-----

- Rs.225 75 Ha Rs.525 ------ ------

52

6

Betasin

g

Gara

Bokmangre

State

Irrigation

Department

HKKP SMR 1 No 0.0016 70 Ha Rs.700 -----

- ------

-----

- Rs.210 70 Ha Rs.490 ------ ------

52

7

Betasin

g Kebolpara

State

Irrigation

Department

HKKP SMR 1 No 0.0017 80 Ha Rs.800 -----

- ------

-----

- Rs.240 80 Ha Rs.560 ------ ------

52

8

Betasin

g Grenggandhi

State

Irrigation

Department

HKKP SMR 1 No 0.0027 60 Ha Rs.725 -----

- ------

-----

- Rs.218 60 Ha Rs.507 ------ ------

52

9

Betasin

g Mawapara

State

Irrigation

Department

HKKP SMR 1 No 0.0018 75 Ha Rs.928 -----

- ------

-----

- Rs.278 75 Ha Rs.650 ------ ------

53

0

Betasin

g Mankingre

State

Irrigation

Department

HKKP SMR 1 No 0.0019 60 Ha Rs.754 -----

- ------

-----

- Rs.226 60 Ha Rs.528 ------ ------

53

1

Betasin

g Bando Raja

State

Irrigation

Department

HKKP SMR 1 No 0.0019 55 Ha Rs.1740 -----

- ------

-----

- Rs.522 55 Ha

Rs.121

8 ------ ------

53

2

Betasin

g

Rongsang

Songma

State

Irrigation HKKP SMR 1 No 0.0029 80 Ha Rs.725

-----

- ------

-----

- Rs.218 80 Ha Rs.507 ------ ------

District Irrigation Plan, South West Garo Hills district

75 | P a g e

Department

53

3

Betasin

g Bolchugre

State

Irrigation

Department

HKKP SMR 1 No 0.0023 75 Ha Rs.870 -----

- ------

-----

- Rs.261 75 Ha Rs.609 ------ ------

53

4

Betasin

g Jelbongpara

State

Irrigation

Department

HKKP SMR 1 No 0.0028 85 Ha Rs.450 -----

-

Rs.11

3

85

Ha Rs.338 ------ ------ ------ ------

53

5

Betasin

g Jongchetpara

State

Irrigation

Department

HKKP SMR 1 No 0.0020 90 Ha Rs.667 -----

- ------

-----

- Rs.200 90 Ha Rs.467 ------ ------

53

6

Betasin

g Bandalkona

State

Irrigation

Department

HKKP SMR 1 No 0.0019 80 Ha Rs.986 -----

- ------

-----

- Rs.296 80 Ha Rs.690 ------ ------

53

7

Betasin

g Jangnapara

State

Irrigation

Department

HKKP SMR 1 No 0.0019 60 Ha Rs.551 -----

- ------

-----

- Rs.165 60 Ha Rs.386 ------ ------

53

8

Betasin

g Darugre

State

Irrigation

Department

HKKP SMR 1 No 0.0020 70 Ha Rs.609 -----

- ------

-----

- Rs.183 70 Ha Rs.426 ------ ------

53

9

Betasin

g

Rongsang

Songma

State

Irrigation

Department

HKKP SMR 1 No 0.0018 65 Ha Rs.638 -----

- ------

-----

- Rs.191 65 Ha Rs.447 ------ ------

54

0

Betasin

g

Rongsang

A.jrigre

State

Irrigation

Department

HKKP SMR 1 No 0.0027 80 Ha Rs.682 -----

- ------

-----

- Rs.204 80 Ha Rs.478 ------ ------

54

1

Betasin

g Maltagre

State

Irrigation

Department

HKKP SMR 1 No 0.0024 85 Ha Rs.754 -----

- ------

-----

- ------ 34 Ha Rs.226 51 Ha Rs.528

54

2

Betasin

g Golmangre

State

Irrigation

Department

HKKP SMR 1 No 0.0027 75 Ha Rs.899 -----

- ------

-----

- ------ 30 Ha Rs.279 45 Ha Rs.620

54

3

Betasin

g Baladinggre

State

Irrigation

Department

HKKP SMR 1 No 0.0026 60 Ha Rs.945 -----

- ------

-----

- ------ 24 Ha Rs.303 36 Ha Rs.642

54

4

Betasin

g Goldagre

State

Irrigation

Department

HKKP SMR 1 No 0.0027 55 Ha Rs.911 -----

- ------

-----

- ------ 22 Ha Rs.300 33 Ha Rs.611

54

5

Betasin

g

Simsang

Bokmangre

State

Irrigation

Department

HKKP SMR 1 No 0.0024 75 Ha Rs.609 -----

- ------

-----

- ------ 30 Ha Rs.207 45 Ha Rs.402

54

6

Betasin

g Kebolpara

State

Irrigation

Department

HKKP SMR 1 No 0.0026 60 Ha Rs.609 -----

- ------

-----

- ------ 24 Ha Rs.213 36 Ha Rs.396

District Irrigation Plan, South West Garo Hills district

76 | P a g e

54

7

Betasin

g

Gara

Bokmangre

State

Irrigation

Department

HKKP SMR 1 No 0.0025 70 Ha Rs.626 -----

- ------

-----

- ------ 28 Ha Rs.226 42 Ha Rs.400

54

8

Betasin

g Bandoraja

State

Irrigation

Department

HKKP SMR 1 No 0.0031 60 Ha Rs.667 -----

- ------

-----

- ------ 24 Ha Rs.247 36 Ha Rs.420

54

9

Betasin

g Asanggre

State

Irrigation

Department

HKKP SMR 1 No 0.0022 50 Ha Rs.667 -----

- ------

-----

- ------ 20 Ha Rs.253 30 Ha Rs.414

55

0

Betasin

g A.jonggre

State

Irrigation

Department

HKKP SMR 1 No 0.0031 55 Ha Rs.870 -----

- ------

-----

- ------ 22 Ha Rs.339 33 Ha Rs.531

55

1

Betasin

g

Bolsal

Dobokgre

State

Irrigation

Department

HKKP SMR 1 No 0.0018 70 Ha Rs.899 -----

- ------

-----

- ------ 28 Ha Rs.360 42 Ha Rs.539

55

2

Betasin

g Malchapara

State

Irrigation

Department

HKKP SMR 1 No 0.0029 50 Ha Rs.894 -----

- ------

-----

- ------ 20 Ha Rs.367 30 Ha Rs.527

55

3

Betasin

g Arenggre

State

Irrigation

Department

HKKP SMR 1 No 0.0024 65 Ha Rs.910 -----

- ------

-----

- ------ 26 Ha Rs.382 39 Ha Rs.528

55

4

Betasin

g Masangpani

State

Irrigation

Department

HKKP SMR 1 No 0.0019 60 Ha Rs.650 -----

- ------

-----

- ------ 24 Ha Rs.280 36 Ha Rs.370

55

5

Betasin

g Gimbilgre

State

Irrigation

Department

HKKP SMR 1 No 0.0016 75 Ha Rs.546 -----

- ------

-----

- ------ 30 Ha Rs.240 45 Ha Rs.306

55

6

Betasin

g Sasatbolgre

State

Irrigation

Department

HKKP SMR 1 No 0.0017 80 Ha Rs.728 -----

- ------

-----

- Rs.218

280

Ha Rs.80 ------ ------

55

7

Betasin

g

Hatisil

Bollongre

State

Irrigation

Department

HKKP SMR 1 No 0.0027 60 Ha Rs.520 -----

- ------

-----

- Rs.156

200

Ha Rs.60 ------ ------

55

8

Betasin

g Boro Latri

State

Irrigation

Department

HKKP SMR 1 No 0.0018 85 Ha Rs.676 -----

- ------

-----

- Rs.203

260

Ha Rs.85 ------ ------

55

9

Betasin

g Murchani

State

Irrigation

Department

HKKP SMR 1 No 0.0019 55 Ha Rs.806 -----

- ------

-----

- Rs.242

310

Ha Rs.55 ------ ------

56

0

Betasin

g Bangkapara

State

Irrigation

Department

HKKP SMR 1 No 0.0019 60 Ha Rs.728 -----

- ------

-----

- ------ 24 Ha Rs.291 36 Ha Rs.437

56 Betasin Jolgaon State HKKP SMR 1 No 0.0029 55 Ha Rs.692 ----- ------ ----- ------ 22 Ha Rs.284 33 Ha Rs.408

District Irrigation Plan, South West Garo Hills district

77 | P a g e

1 g Irrigation

Department

- -

56

2

Betasin

g Taskunbari

State

Irrigation

Department

HKKP SMR 1 No 0.0023 70 Ha Rs.780 -----

- ------

-----

- ------ 28 Ha Rs.328 42 Ha Rs.452

56

3

Betasin

g Monabari

State

Irrigation

Department

HKKP SMR 1 No 0.0028 55 Ha Rs.806 -----

- ------

-----

- ------ 22 Ha Rs.347 33 Ha Rs.459

56

4

Betasin

g Perengpara

State

Irrigation

Department

HKKP SMR 1 No 0.0022 60 Ha Rs.754 -----

- ------

-----

- ------ 24 Ha Rs.332 36 Ha Rs.422

56

5

Betasin

g Bashbari

State

Irrigation

Department

HKKP Protection & Rejuvination

of springs 1 No

0.00000

4 5 Ha Rs.20.00

5

Ha Rs.5.0

-----

- ------ ------ ------ ------ ------

56

6

Betasin

g Chondonpara

State

Irrigation

Department

HKKP Protection & Rejuvination

of springs 1 No

0.00000

1 6 Ha Rs.17.50

6

Ha Rs.4.4

-----

- ------ ------ ------ ------ ------

56

7

Betasin

g

Chondonpara

Songgitcham

State

Irrigation

Department

HKKP Protection & Rejuvination

of springs 1 No

0.00000

2 4 Ha Rs.15.00

4

Ha Rs.3.8

-----

- ------ ------ ------ ------ ------

56

8

Betasin

g

Lotubari

Hajong

State

Irrigation

Department

HKKP Protection & Rejuvination

of springs 1 No

0.00000

1 5 Ha Rs.18.00

5

Ha Rs.4.5

-----

- ------ ------ ------ ------ ------

56

9

Betasin

g lotubari Koch

State

Irrigation

Department

HKKP Protection & Rejuvination

of springs 1 No

0.00000

1 4 Ha Rs.15.75

4

Ha Rs.3.9

-----

- ------ ------ ------ ------ ------

57

0

Betasin

g Monabari

State

Irrigation

Department

HKKP Protection & Rejuvination

of springs 1 No

0.00000

1 6 Ha Rs.13.00

6

Ha Rs.3.3

-----

- ------ ------ ------ ------ ------

57

1

Betasin

g Damalgre

State

Irrigation

Department

HKKP Protection & Rejuvination

of springs 1 No

0.00000

4 7 Ha Rs.27.75

7

Ha Rs.6.9

-----

- ------ ------ ------ ------ ------

57

2

Betasin

g Jewilgre

State

Irrigation

Department

HKKP Protection & Rejuvination

of springs 1 No

0.00000

2 5 Ha Rs.22.25

5

Ha Rs.5.6

-----

- ------ ------ ------ ------ ------

57

3

Betasin

g Masudi

State

Irrigation

Department

HKKP Protection & Rejuvination

of springs 1 No

0.00000

4 4 Ha Rs.19.00

4

Ha Rs.4.8

-----

- ------ ------ ------ ------ ------

57

4

Betasin

g Rongsong

State

Irrigation

Department

HKKP Protection & Rejuvination

of springs 1 No

0.00000

1 5 Ha Rs.15.75

-----

- ------

5

Ha

Rs.15.7

5 ------ ------ ------ ------

57

5

Betasin

g Belbari

State

Irrigation HKKP

Protection & Rejuvination

of springs 1 No

0.00000

1 3 Ha Rs.18.00

-----

- ------

3

Ha

Rs.18.0

0 ------ ------ ------ ------

District Irrigation Plan, South West Garo Hills district

78 | P a g e

Department

57

6

Betasin

g Rongramgre

State

Irrigation

Department

HKKP Protection & Rejuvination

of springs 1 No

0.00000

1 5 Ha Rs.20.50

-----

- ------

5

Ha

Rs.20.5

0 ------ ------ ------ ------

57

7

Betasin

g Dengnakpara

State

Irrigation

Department

HKKP Protection & Rejuvination

of springs 1 No

0.00000

1 6 Ha Rs.23.25

-----

- ------

6

Ha

Rs.23.2

5 ------ ------ ------ ------

57

8

Betasin

g Adugre

State

Irrigation

Department

HKKP Protection & Rejuvination

of springs 1 No

0.00000

3 5 Ha Rs.17.00

-----

- ------

-----

- ------ 5 Ha Rs.17 ------ ------

57

9

Betasin

g Godalgre

State

Irrigation

Department

HKKP Protection & Rejuvination

of springs 1 No

0.00000

2 4 Ha Rs.18.00

-----

- ------

-----

- ------ 4 Ha Rs.18 ------ ------

58

0

Betasin

g Nirgini

State

Irrigation

Department

HKKP Protection & Rejuvination

of springs 1 No

0.00000

1 5 Ha Rs.15.25

-----

- ------

-----

- ------ 5 Ha Rs.15 ------ ------

58

1

Betasin

g Skagre

State

Irrigation

Department

HKKP Protection & Rejuvination

of springs 1 No

0.00000

2 4 Ha Rs.17.25

4

Ha Rs.4.3

-----

- ------ ------ ------ ------ ------

58

2

Betasin

g Grenggandi

State

Irrigation

Department

HKKP Protection & Rejuvination

of springs 1 No

0.00000

2 3 Ha Rs.18.25

-----

- ------

-----

- ------ 7 Ha Rs.18 ------ ------

58

3

Betasin

g

Chondon

Nokat

State

Irrigation

Department

HKKP Protection & Rejuvination

of springs 1 No

0.00000

2 4 Ha Rs.15.50

-----

- ------

-----

- ------ 7 Ha ------ 6 Ha

Rs.15.5

0

58

4

Betasin

g Nagrasket

State

Irrigation

Department

HKKP Protection & Rejuvination

of springs 1 No

0.00000

1 5 Ha Rs.20.75

-----

- ------

-----

- ------ ------ ------ 8 Ha

Rs.20.7

5

58

5

Betasin

g Hatisil

State

Irrigation

Department

HKKP Protection & Rejuvination

of springs 1 No

0.00000

1 4 Ha Rs.23.13

-----

- ------

-----

- ------ ------ ------ 9 Ha

Rs.23.1

3

58

6

Betasin

g

Chengkompar

a

State

Irrigation

Department

HKKP Protection & Rejuvination

of springs 1 No

0.00000

1 3 Ha Rs.21.50

-----

- ------

-----

- ------ ------ ------ 9 Ha

Rs.21.5

0

58

7

Betasin

g

Adugre

Songma

State

Irrigation

Department

HKKP Protection & Rejuvination

of springs 1 No

0.00000

1 5 Ha Rs.18.88

-----

- ------

-----

- ------ ------ ------ 8 Ha

Rs.18.8

8

58

8

Betasin

g Belbari

Externally

aided

projects

(NEC)

HKKP

Water Harvesting,

rejuvination of streams &

recharging of water table

1 No 0.0013 70 Ha Rs.350 -----

-

Rs.17

5

28

Ha Rs.175 42 Ha ------ ------ ------

58

9

Betasin

g Chodon Nokat

Externally

aided HKKP

Water Harvesting,

rejuvination of streams & 1 No 0.0018 90 Ha

Rs.220.0

0

-----

-

Rs.11

0

36

Ha Rs.110 54 Ha ------ ------ ------

District Irrigation Plan, South West Garo Hills district

79 | P a g e

projects

(NEC)

recharging of water table

59

0

Betasin

g Chandragre

Externally

aided

projects

(NEC)

HKKP

Water Harvesting,

rejuvination of streams &

recharging of water table

1 No 0.0018 75 Ha Rs.200.0

0

-----

-

Rs.10

0

30

Ha Rs.100 45 Ha ------ ------ ------

59

1

Betasin

g Solbi

Externally

aided

projects

(NEC)

HKKP

Water Harvesting,

rejuvination of streams &

recharging of water table

1 No 0.0017 55 Ha Rs.500.0

0

-----

- ------

-----

- Rs.200 55 Ha Rs.300 ------ ------

59

2

Betasin

g

Simsang

Bokmangre

Externally

aided

projects

(NEC)

HKKP

Water Harvesting,

rejuvination of streams &

recharging of water table

1 No 0.0013 55 Ha Rs.800.0

0

-----

- ------

-----

- Rs.320 55 Ha Rs.480 ------ ------

59

3

Betasin

g

Manwapara

(wadagre)

Externally

aided

projects

(NEC)

HKKP

Water Harvesting,

rejuvination of streams &

recharging of water table

1 No 0.0015 90 Ha Rs.825.0

0

-----

- ------

-----

- Rs.330 90 Ha Rs.495 ------ ------

59

4

Betasin

g Asangre

Externally

aided

projects

(NEC)

HKKP

Water Harvesting,

rejuvination of streams &

recharging of water table

1 No 0.0014 65 Ha Rs.650.0

0

-----

- ------

-----

- Rs.260 65 Ha Rs.390 ------ ------

59

5

Betasin

g Arengre

Externally

aided

projects

(NEC)

HKKP

Water Harvesting,

rejuvination of streams &

recharging of water table

1 No 0.0010 70 Ha Rs.775.0

0

-----

- ------

-----

- Rs.310 70 Ha Rs.465 ------ ------

59

6

Betasin

g Baladingre

Externally

aided

projects

(NEC)

HKKP

Water Harvesting,

rejuvination of streams &

recharging of water table

1 No 0.0011 90 Ha Rs.805.0

0

-----

- ------

-----

- Rs.322 90 Ha Rs.483 ------ ------

59

7

Betasin

g

Damalgre

(Dolis)

Externally

aided

projects

(NEC)

HKKP

Water Harvesting,

rejuvination of streams &

recharging of water table

1 No 0.0014 70 Ha Rs.825.0

0

-----

- ------

-----

- Rs.330 70 Ha Rs.495 ------ ------

59

8

Betasin

g Skagre

Externally

aided

projects

(NEC)

HKKP

Water Harvesting,

rejuvination of streams &

recharging of water table

1 No 0.0017 60 Ha Rs.720.0

0

-----

- ------

-----

- Rs.288 60 Ha Rs.432 ------ ------

59

9

Betasin

g Gambegre

Externally

aided

projects

(NEC)

HKKP

Water Harvesting,

rejuvination of streams &

recharging of water table

1 No 0.0023 95 Ha Rs.690.0

0

-----

- ------

-----

- Rs.276 95 Ha Rs.414 ------ ------

60

0

Betasin

g

Jebongpara

(Daru)

Externally

aided HKKP

Water Harvesting,

rejuvination of streams & 1 No 0.0014 80 Ha

Rs.742.5

0

-----

- ------

-----

- Rs.297 80 Ha Rs.446 ------ ------

District Irrigation Plan, South West Garo Hills district

80 | P a g e

projects

(NEC)

recharging of water table

60

1

Betasin

g Bolchugre

Externally

aided

projects

(NEC)

HKKP

Water Harvesting,

rejuvination of streams &

recharging of water table

1 No 0.0020 70 Ha Rs.775.0

0

-----

- ------

-----

- Rs.310 70 Ha Rs.465 ------ ------

60

2

Betasin

g Jongchetpara

Externally

aided

projects

(NEC)

HKKP

Water Harvesting,

rejuvination of streams &

recharging of water table

1 No 0.0014 90 Ha Rs.777.5

0

-----

- ------

-----

- Rs.311 90 Ha Rs.467 ------ ------

60

3

Betasin

g Watregre

Externally

aided

projects

(NEC)

HKKP

Water Harvesting,

rejuvination of streams &

recharging of water table

1 No 0.0014 65 Ha Rs.700.0

0

-----

- ------

-----

- ------ ------ Rs.280 65 Ha Rs.420

60

4

Betasin

g Jelbongpara

Externally

aided

projects

(NEC)

HKKP

Water Harvesting,

rejuvination of streams &

recharging of water table

1 No 0.0020 75 Ha Rs.775.0

0

-----

- ------

-----

- ------ ------ Rs.310 75 Ha Rs.465

60

5

Betasin

g Goldatgre

Externally

aided

projects

(NEC)

HKKP

Water Harvesting,

rejuvination of streams &

recharging of water table

1 No 0.0014 65 Ha Rs.650.0

0

-----

- ------

-----

- ------ ------ Rs.260 65 Ha Rs.390

60

6

Betasin

g

Ampati

Songma

Externally

aided

projects

(NEC)

HKKP

Water Harvesting,

rejuvination of streams &

recharging of water table

1 No 0.0013 80 Ha Rs.700.0

0

-----

- ------

-----

- ------ ------ Rs.280 80 Ha Rs.420

60

7

Betasin

g Chipra

Externally

aided

projects

(NEC)

HKKP

Water Harvesting,

rejuvination of streams &

recharging of water table

1 No 0.0012 75 Ha Rs.750.0

0

-----

- ------

-----

- ------ ------ Rs.300 75 Ha Rs.450

60

8

Betasin

g Chigitchakre

Externally

aided

projects

(NEC)

HKKP

Water Harvesting,

rejuvination of streams &

recharging of water table

1 No 0.0011 60 Ha Rs.700.0

0

-----

- ------

-----

- ------ ------ Rs.280 60 Ha Rs.420

60

9

Betasin

g A.galgre

Externally

aided

projects

(NEC)

HKKP

Water Harvesting,

rejuvination of streams &

recharging of water table

1 No 0.0011 70 Ha Rs.725.0

0

-----

- ------

-----

- ------ ------ Rs.290 70 Ha Rs.435

61

0

Betasin

g

Ampati

Bazaar

Externally

aided

projects

(NEC)

HKKP

Water Harvesting,

rejuvination of streams &

recharging of water table

1 No 0.0013 75 Ha Rs.775.0

0

-----

- ------

-----

- ------ ------ Rs.310 75 Ha Rs.465

61

1

Betasin

g Kasi Bill

Externally

aided HKKP

Water Harvesting,

rejuvination of streams & 1 No 0.0013 65 Ha

Rs.715.0

0

-----

- ------

-----

- ------ ------ Rs.286 65 Ha Rs.429

District Irrigation Plan, South West Garo Hills district

81 | P a g e

projects

(NEC)

recharging of water table

61

2

Betasin

g Bollonggitok

Externally

aided

projects

(NEC)

HKKP

Water Harvesting,

rejuvination of streams &

recharging of water table

1 No 0.0017 70 Ha Rs.625.0

0

-----

- ------

-----

- ------ ------ Rs.250 70 Ha Rs.375

61

3

Betasin

g Damdiloka

Externally

aided

projects

(NEC)

HKKP

Water Harvesting,

rejuvination of streams &

recharging of water table

1 No 0.0018 55 Ha Rs.675.0

0

-----

- ------

-----

- Rs.270 55 Ha Rs.405 ------ ------

61

4

Betasin

g Skagre

Externally

aided

projects

(NEC)

HKKP

Water Harvesting,

rejuvination of streams &

recharging of water table

1 No 0.0013 75 Ha Rs.740.0

0

-----

- ------

-----

- Rs.296 75 Ha Rs.444 ------ ------

61

5

Betasin

g Jaranggre

Externally

aided

projects

(NEC)

HKKP

Water Harvesting,

rejuvination of streams &

recharging of water table

1 No 0.0013 60 Ha Rs.775.0

0

-----

- ------

-----

- Rs.310 60 Ha Rs.465 ------ ------

61

6

Betasin

g Porasinga

Externally

aided

projects

(NEC)

HKKP

Water Harvesting,

rejuvination of streams &

recharging of water table

1 No 0.0014 70 Ha Rs.725.0

0

-----

- ------

-----

- Rs.290 70 Ha Rs.435 ------ ------

61

7

Betasin

g Bashbari

Other loan

projects like

NABARD

HKKP Renovation 1 No 0.0026 120 Ha Rs.762.0

0

-----

-

Rs.38

1

120

Ha Rs.381 ------ ------ ------ ------

61

8

Betasin

g Baghmara

Other loan

projects like

NABARD

HKKP Renovation 1 No 0.0018 90 Ha Rs.330.0

0

-----

-

Rs.16

5

90

Ha Rs.165 ------ ------ ------ ------

61

9

Betasin

g Gopijhaora

Other loan

projects like

NABARD

HKKP Renovation 1 No 0.0019 60 Ha Rs.150.0

0

-----

- Rs.75

60

Ha Rs.75 ------ ------ ------ ------

62

0

Betasin

g Ringdee

Other loan

projects like

NABARD

HKKP Renovation 1 No 0.0015 90 Ha Rs.450.0

0

-----

- ------

36

Ha Rs.180 54 Ha Rs.270 ------ ------

62

1

Betasin

g Sankagre

Other loan

projects like

NABARD

HKKP Renovation 1 No 0.0016 75 Ha Rs.840.0

0

-----

- ------

-----

- ------ 30 Ha Rs.420 45 Ha

Rs.420.

0

62

2

Betasin

g Chisegre

Other loan

projects like

NABARD

HKKP Renovation 1 No 0.0014 80 Ha Rs.800.0

0

-----

- ------

-----

- ------ 32 Ha Rs.400 48 Ha

Rs.400.

0

62

3

Betasin

g Kokilla

Other loan

projects like

NABARD

HKKP Renovation 1 No 0.0013 60 Ha Rs.825.0

0

-----

- ------

-----

- ------ 24 Ha Rs.413 36 Ha

Rs.412.

0

District Irrigation Plan, South West Garo Hills district

82 | P a g e

62

4

Betasin

g Muji Agal

Other loan

projects like

NABARD

HKKP Renovation 1 No 0.0016 173 Ha Rs.400.0

0

-----

- ------

-----

- ------ 69 Ha Rs.200

104

Ha

Rs.200.

0

62

5

Betasin

g Garobaha

Other loan

projects like

NABARD

HKKP Solar pumpsets 25

Nos ------ 13 Ha Rs.13.75

-----

- ------

8

No. Rs.4.00 8 No. Rs.4.00 9 No. Rs.5.75

62

6

Betasin

g Betasing

Other loan

projects like

NABARD

HKKP Solar pumpsets 25

Nos ------ 13 Ha Rs.13.75

-----

- ------

8

No. Rs.4.00 8 No. Rs.4.00 9 No. Rs.5.75

62

7

Betasin

g Ampati

Other loan

projects like

NABARD

HKKP Solar pumpsets 25

Nos ------ 13 Ha Rs.13.75

-----

- ------

8

No. Rs.4.00 8 No. Rs.4.00 9 No. Rs.5.75

62

8

Betasin

g Rangsakona

Other loan

projects like

NABARD

HKKP Solar pumpsets 25

Nos ------ 13 Ha Rs.13.75

-----

- ------

8

No. Rs.4.00 8 No. Rs.4.00 9 No. Rs.5.75

62

9

Betasin

g Damalgre

Other loan

projects like

NABARD

HKKP Solar pumpsets 25

Nos ------ 13 Ha Rs.13.75

-----

- ------

8

No. Rs.4.00 8 No. Rs.4.00 9 No. Rs.5.75

63

0

Betasin

g Garodobha

Other loan

projects like

NABARD

HKKP Solar pumpsets 25

Nos ------ 13 Ha Rs.13.75

-----

- ------

8

No. Rs.4.00 8 No. Rs.4.00 9 No. Rs.5.75

63

1

Betasin

g Monabari

Other loan

projects like

NABARD

HKKP Solar pumpsets 25

Nos ------ 13 Ha Rs.13.75

-----

- ------

8

No. Rs.4.00 8 No. Rs.4.00 9 No. Rs.5.75

63

2

Betasin

g Bandalkona

Other loan

projects like

NABARD

HKKP Solar pumpsets 20

Nos ------ 10 Ha Rs.11.00

-----

- ------

6

No. Rs.3.00 6 No. Rs.3.00 8 No. Rs.5.00

63

3

Betasin

g Hathisi

Other loan

projects like

NABARD

HKKP Solar pumpsets 20

Nos ------ 10 Ha Rs.11.00

-----

- ------

6

No. Rs.3.00 6 No. Rs.3.00 8 No. Rs.5.00

63

4

Betasin

g Samati

Other loan

projects like

NABARD

HKKP Solar pumpsets 25

Nos ------ 13 Ha Rs.13.75

-----

- ------

8

No. Rs.4.00 8 No. Rs.4.00 9 No. Rs.5.75

63

5

Betasin

g Melim

Other loan

projects like

NABARD

HKKP Solar pumpsets 10

Nos ------ 5 Ha Rs.5.50

-----

- ------

3

No. Rs.2.00 3 No. Rs.2.00 4 No. Rs.1.50

63

6

Betasin

g Grenggandhi

Other loan

projects like

NABARD

HKKP Solar pumpsets 10

Nos ------ 5 Ha Rs.5.50

-----

- ------

3

No. Rs.2.00 3 No. Rs.2.00 4 No. Rs.1.50

63

7

Betasin

g Jelbongpara

Other loan

projects like

NABARD

HKKP Solar pumpsets 25

Nos ------ 13 Ha Rs.13.75

-----

- ------

8

No. Rs.4.00 8 No. Rs.4.00 9 No. Rs.5.75

63 Betasin Jolgaon Other loan HKKP Solar pumpsets 20 ------ 10 Ha Rs.11.00 ----- ------ 6 Rs.3.00 6 No. Rs.3.00 8 No. Rs.5.00

District Irrigation Plan, South West Garo Hills district

83 | P a g e

8 g projects like

NABARD

Nos - No.

63

9

Betasin

g Borkona

Other loan

projects like

NABARD

HKKP Solar pumpsets 20

Nos ------ 10 Ha Rs.11.00

-----

- ------

6

No. Rs.3.00 6 No. Rs.3.00 8 No. Rs.5.00

64

0

Betasin

g Ichaguri

Other loan

projects like

NABARD

HKKP Solar pumpsets 20

Nos ------ 10 Ha Rs.11.00

-----

- ------

6

No. Rs.3.00 6 No. Rs.3.00 8 No. Rs.5.00

64

1

Betasin

g Jewilgre

Other loan

projects like

NABARD

HKKP Solar pumpsets 20

Nos ------ 10 Ha Rs.11.00

-----

- ------

6

No. Rs.3.00 6 No. Rs.3.00 8 No. Rs.5.00

64

2

Betasin

g Mukdangra

Other loan

projects like

NABARD

HKKP Solar pumpsets 20

Nos ------ 10 Ha Rs.11.00

-----

- ------

6

No. Rs.3.00 6 No. Rs.3.00 8 No. Rs.5.00

64

3

Betasin

g Dorambok

Other loan

projects like

NABARD

HKKP Solar pumpsets 20

Nos ------ 10 Ha Rs.11.00

-----

- ------

6

No. Rs.3.00 6 No. Rs.3.00 8 No. Rs.5.00

64

4

Betasin

g Chisigre

Other loan

projects like

NABARD

HKKP Solar pumpsets 20

Nos ------ 10 Ha Rs.11.00

-----

- ------

6

No. Rs.3.00 6 No. Rs.3.00 8 No. Rs.5.00

64

5

Betasin

g Nogapara

Other loan

projects like

NABARD

HKKP Solar pumpsets 20

Nos ------ 10 Ha Rs.11.00

-----

- ------

6

No. Rs.3.00 6 No. Rs.3.00 8 No. Rs.5.00

64

6

Betasin

g Aderkhona

Other loan

projects like

NABARD

HKKP Solar pumpsets 20

Nos ------ 10 Ha Rs.11.00

-----

- ------

6

No. Rs.3.00 6 No. Rs.3.00 8 No. Rs.5.00

64

7

Betasin

g Baghmara

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.8.25

-----

- ------

5

No. Rs.2.00 5 No. Rs.2.00 5 No. Rs.4.25

64

8

Betasin

g

Rongchadengg

re

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.8.25

-----

- ------

5

No. Rs.2.00 5 No. Rs.2.00 5 No. Rs.4.25

64

9

Betasin

g

Rongsang

A.bagre

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.8.25

-----

- ------

5

No. Rs.2.00 5 No. Rs.2.00 5 No. Rs.4.25

65

0

Betasin

g Naragre

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.8.25

-----

- ------

5

No. Rs.2.00 5 No. Rs.2.00 5 No. Rs.4.25

65

1

Betasin

g Melim

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.8.25

-----

- ------

5

No. Rs.2.00 5 No. Rs.2.00 5 No. Rs.4.25

65

2

Betasin

g Dengnakpara

Other loan

projects like HKKP Solar pumpsets

15

Nos ------ 8 Ha Rs.8.25

-----

- ------

5

No. Rs.2.00 5 No. Rs.2.00 5 No. Rs.4.25

District Irrigation Plan, South West Garo Hills district

84 | P a g e

NABARD

65

3

Betasin

g Goragre'

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.8.25

-----

- ------

5

No. Rs.2.00 5 No. Rs.2.00 5 No. Rs.4.25

65

4

Betasin

g Matchallang

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.8.25

-----

- ------

5

No. Rs.2.00 5 No. Rs.2.00 5 No. Rs.4.25

65

5

Betasin

g Masudi

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.8.25

-----

- ------

5

No. Rs.2.00 5 No. Rs.2.00 5 No. Rs.4.25

65

6

Betasin

g Rongsong

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.8.25

-----

- ------

5

No. Rs.2.00 5 No. Rs.2.00 5 No. Rs.4.25

65

7

Betasin

g Rangatary

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.8.25

-----

- ------

5

No. Rs.2.00 5 No. Rs.2.00 5 No. Rs.4.25

65

8

Betasin

g skagre

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.8.25

-----

- ------

5

No. Rs.2.00 5 No. Rs.2.00 5 No. Rs.4.25

65

9

Betasin

g Bashbari

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.8.25

-----

- ------

5

No. Rs.2.00 5 No. Rs.2.00 5 No. Rs.4.25

66

0

Betasin

g Chondonpara

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.8.25

-----

- ------

5

No. Rs.2.00 5 No. Rs.2.00 5 No. Rs.4.25

66

1

Betasin

g chondonnokat

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.8.25

-----

- ------

5

No. Rs.2.00 5 No. Rs.2.00 5 No. Rs.4.25

66

2

Betasin

g Rongramgre

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.8.25

-----

- ------

5

No. Rs.2.00 5 No. Rs.2.00 5 No. Rs.4.25

66

3

Betasin

g Belbari

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.8.25

-----

- ------

5

No. Rs.2.00 5 No. Rs.2.00 5 No. Rs.4.25

66

4

Betasin

g Kasra

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.8.25

-----

- ------

5

No. Rs.2.00 5 No. Rs.2.00 5 No. Rs.4.25

66

5

Betasin

g

Betasing

Bazaar

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.8.25

-----

- ------

5

No. Rs.2.00 5 No. Rs.2.00 5 No. Rs.4.25

66

6

Betasin

g Bainapara

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.8.25

-----

- ------

5

No. Rs.2.00 5 No. Rs.2.00 5 No. Rs.4.25

District Irrigation Plan, South West Garo Hills district

85 | P a g e

66

7

Betasin

g Chringpara

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.8.25

-----

- ------

5

No. Rs.2.00 5 No. Rs.2.00 5 No. Rs.4.25

District Irrigation Plan, South West Garo Hills district

86 | P a g e

Zikzak Block

Sl.

No.

Name

of

Block

Name of

village

Concerened

Ministry/

Department

Component Activity

Total in Nos.

/Capacity (in

Cum)

Total

comman

d area

(in Ha.)

Total

fund (in

Rs.

Lakhs)

16 -

17

Are

a

16 -

17

Cost

17 -

18

Are

a

17 - 18

Cost

18 -

19

Are

a

18 - 19

Cost

19 -

20

Are

a

19 - 20

Cost

1

Zikza

k Jhonjona MoWR HKKP Surface minor irrigation 1 No 0.00420 310 Ha

Rs.467.0

0

467

Ha

Rs.20

0

-----

- ------

-----

- ------

-----

- ------

2

Zikza

k Bokman MoWR HKKP Surface minor irrigation 1 No 0.00282 120 Ha

Rs.236.0

0

-----

- Rs.47

48

Ha Rs.94

48

Ha Rs.94

-----

- ------

3

Zikza

k Bongka MoWR HKKP Surface minor irrigation 1 No 0.00247 120 Ha

Rs.234.0

0

-----

- Rs.47

48

Ha Rs.94

48

Ha Rs.94

-----

- ------

4

Zikza

k Kongbangpara MoWR HKKP Surface minor irrigation 1 No 0.00167 90 Ha

Rs.128.0

0

-----

- Rs.26

36

Ha Rs.51

36

Ha Rs.51

-----

- ------

5

Zikza

k Tarapara MoWR HKKP Surface minor irrigation 1 No 0.00173 320 Ha

Rs.615.0

0

-----

-

Rs.12

3

128

Ha Rs.246

128

Ha Rs.246

-----

- ------

6

Zikza

k Rongkai MoWR HKKP Surface minor irrigation 1 No 0.00486 820 Ha

Rs.2050.

0

-----

-

Rs.20

5

-----

- Rs.820

820

Ha

Rs.102

5

-----

- ------

7

Zikza

k

Koligaon

Kajalgopi MoWR HKKP Surface minor irrigation 1 No 0.00218 130 Ha

Rs.325.0

0

-----

- ------

-----

- Rs.130

130

Ha Rs.195

-----

- ------

8

Zikza

k Balughat MoWR HKKP Surface minor irrigation 1 No 0.00195 70 Ha

Rs.175.0

0

-----

- ------

-----

- Rs.70

70

Ha Rs.105

-----

- ------

9

Zikza

k Bairagopi MoWR HKKP Surface minor irrigation 1 No 0.00179 100 Ha

Rs.400.0

0

-----

- ------

-----

- ------

-----

- Rs.160

100

Ha Rs.240

10

Zikza

k Bahadur Khatta MoWR HKKP Surface minor irrigation 1 No 0.00119 400 Ha Rs.2000

-----

- ------

-----

- Rs.800

400

Ha

Rs.120

0

-----

- ------

11

Zikza

k Phuljura MoWR HKKP Surface minor irrigation 1 No 0.00188 60 Ha

Rs.200.0

0

-----

- ------

-----

- Rs.80

60

Ha Rs.120

-----

- ------

12

Zikza

k Barmanpara MoWR HKKP Surface minor irrigation 1 No 0.00163 120 Ha

Rs.400.0

0

-----

- ------

-----

- Rs.160

120

Ha Rs.240

-----

- ------

13

Zikza

k Demdema MoWR HKKP Surface minor irrigation 1 No 0.00126 50 Ha

Rs.150.0

0

-----

- ------

-----

- ------

-----

- Rs.60

50

Ha Rs.90

14

Zikza

k Amtuli MoWR HKKP Surface minor irrigation 1 No 0.00158 100 Ha

Rs.450.0

0

-----

- ------

-----

- ------

-----

- Rs.180

100

Ha Rs.270

15

Zikza

k Pislajhora MoWR HKKP Surface minor irrigation 1 No 0.00232 120 Ha

Rs.537.5

0

-----

- ------

-----

- ------

-----

- Rs.215

120

Ha Rs.323

16

Zikza

k Chapahati MoWR HKKP Surface minor irrigation 1 No 0.00091 45 Ha

Rs.225.0

0

-----

- ------

-----

- ------

-----

- Rs.90

45

Ha Rs.135

17

Zikza

k Kebolpara MoWR HKKP Surface minor irrigation 1 No 0.00198 55 Ha

Rs.175.0

0

-----

- ------

-----

- Rs.70

55

Ha Rs.105

-----

- ------

18

Zikza

k Dinagre MoWR HKKP Surface minor irrigation 1 No 0.00132 90 Ha

Rs.300.0

0

-----

- ------

-----

- Rs.120

90

Ha Rs.180

-----

- ------

19

Zikza

k Dalamgre MoWR HKKP Surface minor irrigation 1 No 0.00203 75 Ha

Rs.212.5

0

-----

- ------

-----

- ------

-----

- Rs.85

75

Ha Rs.128

District Irrigation Plan, South West Garo Hills district

87 | P a g e

20

Zikza

k Salmanpara 1 MoWR HKKP Surface minor irrigation 1 No 0.00173 90 Ha

Rs.375.0

0

-----

- ------

-----

- Rs.150

90

Ha Rs.225

-----

- ------

21

Zikza

k

New

Salmanpara MoWR HKKP Surface minor irrigation 1 No 0.00211 100 Ha

Rs.337.5

0

-----

- ------

-----

- ------

-----

- Rs.135

100

Ha Rs.203

22

Zikza

k Grenggre MoWR HKKP Surface minor irrigation 1 No 0.00166 90 Ha

Rs.287.5

0

-----

- ------

-----

- ------

-----

- Rs.115

90

Ha Rs.173

23

Zikza

k

Lower

boldakgre MoWR HKKP Surface minor irrigation 1 No 0.00188 80 Ha

Rs.337.5

0

-----

- ------

-----

- Rs.135

80

Ha Rs.203

-----

- ------

24

Zikza

k

Upper

Boldakgre MoWR HKKP Surface minor irrigation 1 No 0.00131 70 Ha

Rs.375.0

0

-----

- ------

-----

- Rs.150

70

Ha Rs.225

-----

- ------

25

Zikza

k Samgong A.we MoWR HKKP Surface minor irrigation 1 No 0.00087 60 Ha

Rs.450.0

0

-----

- ------

-----

- ------

-----

- Rs.180

55

Ha Rs.270

26

Zikza

k Ronmilgre MoWR HKKP Surface minor irrigation 1 No 0.00158 55 Ha

Rs.300.0

0

-----

- ------

-----

- ------

-----

- Rs.120

60

Ha Rs.180

27

Zikza

k Bokgre MoWR HKKP Surface minor irrigation 1 No 0.00176 60 Ha

Rs.375.0

0

-----

- ------

-----

- ------

-----

- Rs.150

55

Ha Rs.225

28

Zikza

k Udalgre MoWR HKKP Surface minor irrigation 1 No 0.00112 55 Ha

Rs.250.0

0

-----

- ------

-----

- ------

-----

- Rs.100

40

Ha Rs.150

29

Zikza

k Satihari MoWR HKKP Surface minor irrigation 1 No 0.00125 40 Ha

Rs.225.0

0

-----

- Rs.23

-----

- Rs.90

40

Ha Rs.112

-----

- ------

30

Zikza

k Nachilpara MoWR HKKP Surface minor irrigation 1 No 0.00125 65 Ha

Rs.200.0

0

-----

- Rs.20

-----

- Rs.80

65

Ha Rs.100

-----

- ------

31

Zikza

k Jhorjora MoWR HKKP Surface minor irrigation 1 No 0.00420 170 Ha

Rs.280.0

0

280

Ha

Rs.10

0

-----

- ------

-----

- ------

-----

- ------

32

Zikza

k Gonchukol MoWR HKKP Surface minor irrigation 1 No 0.00066 75 Ha

Rs.230.0

0

-----

- Rs.23

-----

- Rs.92

75

Ha Rs.115

-----

- ------

33

Zikza

k Rokkalpara MoWR HKKP Surface minor irrigation 1 No 0.00063 92 Ha

Rs.175.0

0

-----

- Rs.18

-----

- Rs.70

92

Ha Rs.87

-----

- ------

34

Zikza

k Anangpara MoWR HKKP Surface minor irrigation 1 No 0.00073 120 Ha

Rs.174.0

0

-----

- Rs.17

-----

- Rs.70

120

Ha Rs.87

-----

- ------

35

Zikza

k Wadagre MoWR HKKP Surface minor irrigation 1 No 0.00063 160 Ha

Rs.242.0

0

-----

- Rs.24

-----

- Rs.97

160

Ha Rs.121

-----

- ------

36

Zikza

k Bakdagre MoWR HKKP Surface minor irrigation 1 No 0.00087 70 Ha

Rs.237.5

0

-----

- ------

-----

- ------

-----

- Rs.70

95

Ha Rs.143

37

Zikza

k Rapapaanggre MoWR HKKP Surface minor irrigation 1 No 0.00110 60 Ha

Rs.312.5

0

-----

- ------

-----

- ------

-----

- Rs.60

125

Ha Rs.188

38

Zikza

k Hulukona MoWR HKKP Surface minor irrigation 1 No 0.00109 50 Ha

Rs.222.5

0

-----

- ------

-----

- Rs.89

50

Ha Rs.134

-----

- ------

39

Zikza

k Domapara MoWR HKKP Surface minor irrigation 1 No 0.00087 70 Ha

Rs.300.0

0

-----

- ------

-----

- Rs.120

70

Ha Rs.180

-----

- ------

40

Zikza

k Kangknaggre MoWR HKKP Surface minor irrigation 1 No 0.00139 60 Ha

Rs.255.0

0

-----

- ------

-----

- ------

-----

- Rs.102

60

Ha Rs.153

41 Zikza Agonggittim MoWR HKKP Surface minor irrigation 1 No 0.00086 50 Ha Rs.240.0 ----- ------ ----- ------ ----- Rs.96 50 Rs.144

District Irrigation Plan, South West Garo Hills district

88 | P a g e

k 0 - - - Ha

42

Zikza

k Managre MoWR HKKP Surface minor irrigation 1 No 0.00133 60 Ha

Rs.250.0

0

-----

- ------

-----

- Rs.100

60

Ha Rs.150

-----

- ------

43

Zikza

k Rongsolgre MoWR HKKP Surface minor irrigation 1 No 0.00091 50 Ha

Rs.300.0

0

-----

- ------

-----

- ------

-----

- Rs.120

50

Ha Rs.180

44

Zikza

k Menggongpara MoWR HKKP Surface minor irrigation 1 No 0.00121 75 Ha

Rs.400.0

0

-----

- ------

-----

- Rs.160

75

Ha Rs.240

-----

- ------

45

Zikza

k Marengpara MoWR HKKP Surface minor irrigation 1 No 0.00129 60 Ha

Rs.257.5

0

-----

- ------

-----

- Rs.103

60

Ha Rs.155

-----

- ------

46

Zikza

k Damagre MoWR HKKP Surface minor irrigation 1 No 0.00102 70 Ha

Rs.375.0

0

-----

- ------

-----

- Rs.150

70

Ha Rs.225

-----

- ------

47

Zikza

k Wagepara MoWR HKKP Surface minor irrigation 1 No 0.00073 60 Ha

Rs.267.5

0

-----

- ------

-----

- ------

-----

- Rs.107

60

Ha Rs.161

48

Zikza

k Torangpara MoWR HKKP Surface minor irrigation 1 No 0.00089 65 Ha

Rs.247.5

0

-----

- ------

-----

- Rs.99

65

Ha Rs.149

-----

- ------

49

Zikza

k Zikzak MoWR HKKP Lift irrigation

15

Nos 0.0005

52.50

Ha Rs.8.25

-----

- ------

16

Ha Rs.2

16

Ha Rs.2

21

Ha Rs.3.30

50

Zikza

k Salmanpara 1 MoWR HKKP Lift irrigation

15

Nos 0.0006

52.50

Ha Rs.8.25

-----

- ------

16

Ha Rs.2

16

Ha Rs.2

21

Ha Rs.3.30

51

Zikza

k Mahendraganj MoWR HKKP Lift irrigation

15

Nos 0.0007

52.50

Ha Rs.8.25

-----

- ------

16

Ha Rs.2

16

Ha Rs.2

21

Ha Rs.3.30

52

Zikza

k Kalaichar MoWR HKKP Lift irrigation

15

Nos 0.0006

52.50

Ha Rs.8.25

-----

- ------

16

Ha Rs.2

16

Ha Rs.2

21

Ha Rs.3.30

53

Zikza

k Katuligre MoWR HKKP Lift irrigation

15

Nos 0.0006

52.50

Ha Rs.8.25

-----

- ------

16

Ha Rs.2

16

Ha Rs.2

21

Ha Rs.3.30

54

Zikza

k Lokaichar MoWR HKKP Lift irrigation

15

Nos 0.0004

52.50

Ha Rs.8.25

-----

- ------

16

Ha Rs.2

16

Ha Rs.2

21

Ha Rs.3.30

55

Zikza

k Wadagre MoWR HKKP Lift irrigation

15

Nos 0.0004

52.50

Ha Rs.8.25

-----

- ------

16

Ha Rs.2

16

Ha Rs.2

21

Ha Rs.3.30

56

Zikza

k Anangpara MoWR HKKP Lift irrigation

15

Nos 0.0003

52.50

Ha Rs.8.25

-----

- ------

16

Ha Rs.2

16

Ha Rs.2

21

Ha Rs.3.30

57

Zikza

k Mekdual MoWR HKKP Lift irrigation

15

Nos 0.0008

52.50

Ha Rs.8.25

-----

- ------

16

Ha Rs.2

16

Ha Rs.2

21

Ha Rs.3.30

58

Zikza

k Kodaldoa MoWR HKKP Lift irrigation

15

Nos 0.0006

52.50

Ha Rs.8.25

-----

- ------

16

Ha Rs.2

16

Ha Rs.2

21

Ha Rs.3.30

59

Zikza

k Gelajhuri MoWR HKKP Lift irrigation

15

Nos 0.0006

52.50

Ha Rs.8.25

-----

- ------

16

Ha Rs.2

16

Ha Rs.2

21

Ha Rs.3.30

60

Zikza

k Nogorpara MoWR HKKP Lift irrigation

15

Nos 0.0004

52.50

Ha Rs.8.25

-----

- ------

16

Ha Rs.2

16

Ha Rs.2

21

Ha Rs.3.30

61

Zikza

k Barmanpara MoWR HKKP Lift irrigation

15

Nos 0.0004

52.50

Ha Rs.8.25

-----

- ------

16

Ha Rs.2

16

Ha Rs.2

21

Ha Rs.3.30

62

Zikza

k Daspara MoWR HKKP Lift irrigation

15

Nos 0.0005

52.50

Ha Rs.8.25

-----

- ------

16

Ha Rs.2

16

Ha Rs.2

21

Ha Rs.3.30

District Irrigation Plan, South West Garo Hills district

89 | P a g e

63

Zikza

k Amtulli MoWR HKKP Lift irrigation

15

Nos 0.0003

52.50

Ha Rs.8.25

-----

- ------

16

Ha Rs.2

16

Ha Rs.2

21

Ha Rs.3.30

64

Zikza

k TunrurChar MoWR HKKP Lift irrigation

15

Nos 0.0005

52.50

Ha Rs.8.25

-----

- ------

16

Ha Rs.2

16

Ha Rs.2

21

Ha Rs.3.30

65

Zikza

k Nadirchar MoWR HKKP Lift irrigation

15

Nos 0.0007

52.50

Ha Rs.8.25

-----

- ------

16

Ha Rs.2

16

Ha Rs.2

21

Ha Rs.3.30

66

Zikza

k Tarapara MoWR HKKP Lift irrigation

15

Nos 0.0004

52.50

Ha Rs.8.25

-----

- ------

16

Ha Rs.2

16

Ha Rs.2

21

Ha Rs.3.30

67

Zikza

k Modakpara MoWR HKKP Lift irrigation

15

Nos 0.0003

52.50

Ha Rs.8.25

-----

- ------

16

Ha Rs.2.48

16

Ha Rs.2.48

21

Ha Rs.3.30

68

Zikza

k

Chelipara

Nokat MoWR HKKP Lift irrigation

15

Nos 0.0002

52.50

Ha Rs.8.25

-----

- ------

16

Ha Rs.2.48

16

Ha Rs.2.48

21

Ha Rs.3.30

69

Zikza

k Jangrapara MoWR HKKP Lift irrigation

15

Nos 0.0003

52.50

Ha Rs.8.25

-----

- ------

16

Ha Rs.2.48

16

Ha Rs.2.48

21

Ha Rs.3.30

70

Zikza

k Matkolgre MoWR HKKP Lift irrigation

15

Nos 0.0004

52.50

Ha Rs.8.25

-----

- ------

16

Ha Rs.2.48

16

Ha Rs.2.48

21

Ha Rs.3.30

71

Zikza

k Ponchapara MoWR HKKP Lift irrigation

15

Nos 0.0004

52.50

Ha Rs.8.25

-----

- ------

16

Ha Rs.2.48

16

Ha Rs.2.48

21

Ha Rs.3.30

72

Zikza

k Boldakgre MoWR HKKP Lift irrigation

15

Nos 0.0003

52.50

Ha Rs.8.25

-----

- ------

16

Ha Rs.2.48

16

Ha Rs.2.48

21

Ha Rs.3.30

73

Zikza

k Demdemakona MoWR HKKP Lift irrigation

15

Nos 0.0002

52.50

Ha Rs.8.25

-----

- ------

16

Ha Rs.2.48

16

Ha Rs.2.48

21

Ha Rs.3.30

74

Zikza

k Damagre MoWR HKKP Lift irrigation

15

Nos 0.0003

52.50

Ha Rs.8.25

-----

- ------

16

Ha Rs.2.48

16

Ha Rs.2.48

21

Ha Rs.3.30

75

Zikza

k Sanjangpara MoWR HKKP Lift irrigation

15

Nos 0.0003

52.50

Ha Rs.8.25

-----

- ------

16

Ha Rs.2.48

16

Ha Rs.2.48

21

Ha Rs.3.30

76

Zikza

k Jigatolpara MoWR HKKP Lift irrigation

15

Nos 0.0004

52.50

Ha Rs.8.25

-----

- ------

16

Ha Rs.2.48

16

Ha Rs.2.48

21

Ha Rs.3.30

77

Zikza

k Nachilgre MoWR HKKP Lift irrigation

15

Nos 0.0004

52.50

Ha Rs.8.25

-----

- ------

16

Ha Rs.2.48

16

Ha Rs.2.48

21

Ha Rs.3.30

78

Zikza

k Mondolpara MoWR HKKP Lift irrigation

15

Nos 0.0005

52.50

Ha Rs.8.25

-----

- ------

16

Ha Rs.2.48

16

Ha Rs.2.48

21

Ha Rs.3.30

79

Zikza

k Rokkolpara MoWR HKKP Lift irrigation

15

Nos 0.0004

52.50

Ha Rs.8.25

-----

- ------

16

Ha Rs.2.48

16

Ha Rs.2.48

21

Ha Rs.3.30

80

Zikza

k Nayapara MoWR HKKP Lift irrigation

15

Nos 0.0005

52.50

Ha Rs.8.25

-----

- ------

16

Ha Rs.2.48

16

Ha Rs.2.48

21

Ha Rs.3.30

81

Zikza

k Dollonggre MoWR HKKP Lift irrigation

15

Nos 0.0004

52.50

Ha Rs.8.25

-----

- ------

16

Ha Rs.2.48

16

Ha Rs.2.48

21

Ha Rs.3.30

82

Zikza

k Boldamgre MoWR HKKP Lift irrigation

15

Nos 0.0004

52.50

Ha Rs.8.25

-----

- ------

16

Ha Rs.2.48

16

Ha Rs.2.48

21

Ha Rs.3.30

83

Zikza

k Gopinath Killa MoWR HKKP Lift irrigation

15

Nos 0.0004

52.50

Ha Rs.8.25

-----

- ------

16

Ha Rs.2.48

16

Ha Rs.2.48

21

Ha Rs.3.30

84 Zikza Debajane MoWR HKKP Lift irrigation 15 0.0004 52.50 Rs.8.25 ----- ------ 16 Rs.2.48 16 Rs.2.48 21 Rs.3.30

District Irrigation Plan, South West Garo Hills district

90 | P a g e

k Nos Ha - Ha Ha Ha

85

Zikza

k Dangsapara MoWR HKKP Ground water development 3 Nos 0.0011 75 Ha

Rs.187.5

0

-----

- ------

-----

- Rs.75

75

Ha Rs.113

-----

- ------

86

Zikza

k Nandirchar MoWR HKKP Ground water development 2 Nos 0.0013 50 Ha

Rs.125.0

0

-----

- ------

-----

- Rs.50

50

Ha Rs.75

-----

- ------

87

Zikza

k Majherchar MoWR HKKP Ground water development 2 Nos 0.0016 50 Ha

Rs.125.0

0

-----

- ------

-----

- Rs.50

50

Ha Rs.75

-----

- ------

88

Zikza

k Salmanpara MoWR HKKP Ground water development 2 Nos 0.0017 50 Ha

Rs.125.0

0

-----

- ------

-----

- Rs.50

50

Ha Rs.75

-----

- ------

89

Zikza

k Jamgre MoWR HKKP Ground water development 2 Nos 0.0007 50 Ha

Rs.125.0

0

-----

- ------

-----

- Rs.50

50

Ha Rs.75

-----

- ------

90

Zikza

k Gandeigre MoWR HKKP Ground water development 2 Nos 0.0010 50 Ha

Rs.125.0

0

-----

- ------

-----

- Rs.50

50

Ha Rs.75

-----

- ------

91

Zikza

k Kalaicharpara MoWR HKKP Ground water development 2 Nos 0.0011 50 Ha

Rs.125.0

0

-----

- ------

-----

- Rs.50

50

Ha Rs.75

-----

- ------

92

Zikza

k Hatibelpara MoWR HKKP Ground water development 2 Nos 0.0013 50 Ha

Rs.125.0

0

-----

- ------

-----

- Rs.50

50

Ha Rs.75

-----

- ------

93

Zikza

k Nachipara MoWR HKKP Ground water development 2 Nos 0.0017 50 Ha

Rs.125.0

0

-----

- ------

-----

- ------

-----

- Rs.50

50

Ha Rs.75

94

Zikza

k Amtuli MoWR HKKP Ground water development 2 Nos 0.0011 50 Ha

Rs.125.0

0

-----

- ------

-----

- ------

-----

- Rs.50

50

Ha Rs.75

95

Zikza

k Gopinathkilla MoWR HKKP Ground water development 2 Nos 0.0012 50 Ha

Rs.125.0

0

-----

- ------

-----

- ------

-----

- Rs.50

50

Ha Rs.75

96

Zikza

k Jongsetpara MoWR HKKP Ground water development 2 Nos 0.0009 50 Ha

Rs.125.0

0

-----

- ------

-----

- ------

-----

- Rs.50

50

Ha Rs.75

97

Zikza

k Didoba MoWR HKKP Ground water development 2 Nos 0.0010 50 Ha

Rs.125.0

0

-----

- ------

-----

- ------

-----

- Rs.50

50

Ha Rs.75

98

Zikza

k Baksapara MoWR HKKP Ground water development 2 Nos 0.0011 50 Ha

Rs.125.0

0

-----

- ------

-----

- ------

-----

- Rs.50

50

Ha Rs.75

99

Zikza

k Katuli MoWR HKKP R.R.R of water bodies 1 No 0.0073 60 Ha

Rs.441.0

0

-----

- Rs.88

24

Ha Rs.353

36

Ha ------

-----

- ------

100

Zikza

k Kawahagra MoWR HKKP R.R.R of water bodies 1 No 0.0030 45 Ha

Rs.140.0

0

-----

- Rs.28

18

Ha Rs.112

27

Ha ------

-----

- ------

101

Zikza

k Kolaigaon MoWR HKKP R.R.R of water bodies 1 No 0.0026 80 Ha

Rs.592.2

0

-----

- ------

-----

-

Rs.177.

7

80

Ha Rs.355

-----

- ------

102

Zikza

k Dengna FIP MoWR HKKP R.R.R of water bodies 1 No 0.0024 158 Ha Rs.46.44

158

Ha

Rs.46.

44

-----

- ------

-----

- ------

-----

- ------

103

Zikza

k Jhorjhora MoWR HKKP R.R.R of water bodies 1 No 0.0036 80 Ha

Rs.382.2

0

-----

- ------

-----

- ------

-----

- Rs.229

80

Ha Rs.153

104

Zikza

k Jonjhonagre MoWR HKKP R.R.R of water bodies 1 No 0.0027 80 Ha

Rs.651.0

0

-----

- ------

-----

- ------

-----

- Rs.391

80

Ha Rs.260

105

Zikza

k Tarapara MoWR HKKP R.R.R of water bodies 1 No 0.0028 120 Ha

Rs.672.0

0

-----

- ------

-----

- ------

-----

- Rs.403

120

Ha Rs.269

District Irrigation Plan, South West Garo Hills district

91 | P a g e

106

Zikza

k Bokman MoWR HKKP R.R.R of water bodies 1 No 0.0035 100 Ha

Rs.252.0

0

-----

- ------

-----

- ------

-----

- Rs.151

100

Ha Rs.101

107

Zikza

k Gopi FIP MoWR HKKP R.R.R of water bodies 1 No 0.0033 186 Ha Rs.67.09

186

Ha

Rs.67.

09

-----

- ------ -----

------ ----- ------

108

Zikza

k Jhojona MoWR HKKP Lined field channel 1 No 0.0023 90 Ha

Rs.270.0

0

-----

- ------

-----

- ------

36

Ha Rs.81

54

Ha Rs.189

109

Zikza

k Jhojhora MoWR HKKP Lined field channel 1 No 0.0025 65 Ha

Rs.162.0

0

-----

- ------

-----

- ------

26

Ha Rs.49

39

Ha Rs.113

110

Zikza

k Kuligaon MoWR HKKP Lined field channel 1 No 0.0040 55 Ha

Rs.153.0

0

-----

- ------

-----

- ------

22

Ha Rs.46

33

Ha Rs.107

111

Zikza

k Kolaigaon MoWR HKKP Lined field channel 1 No 0.0034 50 Ha

Rs.162.0

0

-----

- ------

-----

- ------

20

Ha Rs.49

30

Ha Rs.113

112

Zikza

k Tarapara MoWR HKKP Lined field channel 1 No 0.0028 45 Ha

Rs.180.0

0

-----

- ------

-----

- ------

18

Ha Rs.54

27

Ha Rs.126

113

Zikza

k Kongbangpara MoWR HKKP Lined field channel 1 No 0.0026 60 Ha

Rs.144.0

0

-----

- ------

-----

- ------

24

Ha Rs.43

36

Ha Rs.101

114

Zikza

k Bokman MoWR HKKP Lined field channel 1 No 0.0027 50 Ha

Rs.135.0

0

-----

- ------

-----

- ------

20

Ha Rs.41

30

Ha Rs.94

115

Zikza

k Bongka MoWR HKKP Lined field channel 1 No 0.0017 30 Ha

Rs.153.0

0

-----

- ------

-----

- ------

12

Ha Rs.46

18

Ha Rs.107

116

Zikza

k Rongkai MoWR HKKP Lined field channel 1 No 0.0025 100 Ha

Rs.400.0

0

-----

- ------

-----

- ------

40

Ha Rs.120

60

Ha Rs.280

117

Zikza

k Anangpara MoWR HKKP Lined field channel 1 No 0.0027 50 Ha

Rs.180.0

0

-----

- ------

-----

- ------

20

Ha Rs.54

30

Ha Rs.126

118

Zikza

k Wadagre MoWR HKKP Lined field channel 1 No 0.0030 126 Ha

Rs.252.0

0

-----

- ------

-----

- ------

50

Ha Rs.76

76

Ha Rs.176

119

Zikza

k Anagpara' MoWR HKKP Unlined field channel 1 No 0.0033 5 Ha Rs.2.70

-----

- ------

5

Ha Rs.2.70

-----

- ------

-----

- ------

120

Zikza

k Chatiarai MoWR HKKP Unlined field channel 1 No 0.0040 3 Ha Rs.2.40

-----

- ------

3

Ha Rs.2.40

-----

- ------

-----

- ------

121

Zikza

k Jonjonagre MoWR HKKP Unlined field channel 1 No 0.0039 2 Ha Rs.2.40

-----

- ------

2

Ha Rs.2.40

-----

- ------

-----

- ------

122

Zikza

k Kachigaon MoWR HKKP Unlined field channel 1 No 0.0050 4 Ha Rs.2.70

-----

- ------

4

Ha Rs.2.70

-----

- ------

-----

- ------

123

Zikza

k Kambakpara MoWR HKKP Unlined field channel 1 No 0.0027 3 Ha Rs.2.10

-----

- ------

3

Ha Rs.2.10

-----

- ------

-----

- ------

124

Zikza

k Kebolpara 1 MoWR HKKP Unlined field channel 1 No 0.0030 4 Ha Rs.2.10

-----

- ------

4

Ha Rs.2.10

-----

- ------

-----

- ------

125

Zikza

k Kebolpara 2 MoWR HKKP Unlined field channel 1 No 0.0024 5 Ha Rs.2.70

-----

- ------

5

Ha Rs.2.70

-----

- ------

-----

- ------

126

Zikza

k Janggre 1 MoWR HKKP Unlined field channel 1 No 0.0020 3 Ha Rs.2.79

-----

- ------

3

Ha Rs.2.79

-----

- ------

-----

- ------

127 Zikza Janggre 2 MoWR HKKP Unlined field channel 1 No 0.0027 2 Ha Rs.2.40 ----- ------ 2 Rs.2.40 ----- ------ ----- ------

District Irrigation Plan, South West Garo Hills district

92 | P a g e

k - Ha - -

128

Zikza

k Tewali MoWR HKKP Unlined field channel 1 No 0.0027 4 Ha Rs.2.10

-----

- ------

4

Ha Rs.2.10

-----

- ------

-----

- ------

129

Zikza

k Tewali 1 MoWR HKKP Unlined field channel 1 No 0.0026 3 Ha Rs.1.80

-----

- ------

3

Ha Rs.1.80

-----

- ------

-----

- ------

130

Zikza

k Tewali 2 MoWR HKKP Unlined field channel 1 No 0.0028 4 Ha Rs.2.70

-----

- ------

4

Ha Rs.2.70

-----

- ------

-----

- ------

131

Zikza

k Demdema MoWR HKKP Unlined field channel 1 No 0.0028 5 Ha Rs.2.40

-----

- ------

5

Ha Rs.2.40

-----

- ------

-----

- ------

132

Zikza

k Kuligaoon MoWR HKKP Unlined field channel 1 No 0.0027 4 Ha Rs.2.10

-----

- ------

4

Ha Rs.2.10

-----

- ------

-----

- ------

133

Zikza

k Boldamgre MoWR HKKP Micro irrigation 1 No 0.00003 5.00 Ha Rs.16.50

-----

- ------

5

Ha

Rs.16.5

0

-----

- ------

-----

- ------

134

Zikza

k

upper

Boldamgre MoWR HKKP Micro irrigation 1 No 0.00003 4.00 Ha Rs.20.00

-----

- ------

4

Ha

Rs.20.0

0

-----

- ------

-----

- ------

135

Zikza

k Katuligre MoWR HKKP Micro irrigation 1 No 0.00003 3.00 Ha Rs.17.50

-----

- ------

3

Ha

Rs.17.5

0

-----

- ------

-----

- ------

136

Zikza

k Katuligaon MoWR HKKP Micro irrigation 1 No 0.00004 7.00 Ha Rs.20.00

-----

- ------

7

Ha

Rs.20.0

0

-----

- ------

-----

- ------

137

Zikza

k Dufrigaon MoWR HKKP Micro irrigation 1 No 0.00004 6.00 Ha Rs.17.50

-----

- ------

6

Ha

Rs.17.5

0

-----

- ------

-----

- ------

138

Zikza

k

Dufrigaon

Koch MoWR HKKP Micro irrigation 1 No 0.00007 5.00 Ha Rs.12.50

-----

- ------

5

Ha

Rs.12.5

0

-----

- ------

-----

- ------

139

Zikza

k Chilapara MoWR HKKP Micro irrigation 1 No 0.00004 4.00 Ha Rs.14.75

-----

- ------

4

Ha

Rs.14.7

5

-----

- ------

-----

- ------

140

Zikza

k Kambakpara MoWR HKKP Micro irrigation 1 No 0.00003 7.00 Ha Rs.13.75

-----

- ------

7

Ha

Rs.13.7

5

-----

- ------

-----

- ------

141

Zikza

k

kambakpara

Sonngitcham MoWR HKKP Micro irrigation 1 No 0.00003 9.00 Ha Rs.20.00

-----

- ------

-----

- ------

-----

- ------

9

Ha

Rs.20.0

0

142

Zikza

k Demiligre MoWR HKKP Micro irrigation 1 No 0.00002 4.00 Ha Rs.17.50

-----

- ------

-----

- ------

-----

- ------

4

Ha

Rs.17.5

0

143

Zikza

k Ameshgittim MoWR HKKP Micro irrigation 1 No 0.00003 6.00 Ha Rs.23.00

-----

- ------

-----

- ------

-----

- ------

6

Ha

Rs.23.0

0

144

Zikza

k Chatihari MoWR HKKP Micro irrigation 1 No 0.00004 5.00 Ha Rs.23.25

-----

- ------

-----

- ------

-----

- ------

5

Ha

Rs.23.2

5

145

Zikza

k Dangsapara MoWR HKKP Micro irrigation 1 No 0.00003 4.00 Ha Rs.10.00

-----

- ------

-----

- ------

-----

- ------

4

Ha

Rs.10.0

0

146

Zikza

k

Kuligaon

hajong MoWR HKKP Micro irrigation 1 No 0.00003 7.00 Ha Rs.23.00

-----

- ------

7

Ha

Rs.23.0

0

-----

- ------

-----

- ------

147

Zikza

k Kuligaon Koch MoWR HKKP Micro irrigation 1 No 0.00004 6.00 Ha Rs.15.00

-----

- ------

6

Ha

Rs.15.0

0

-----

- ------

-----

- ------

148

Zikza

k

Boldam

A.kongggre MoWR HKKP Micro irrigation 1 No 0.00004 5.00 Ha Rs.22.50

-----

- ------

5

Ha

Rs.22.5

0

-----

- ------

-----

- ------

District Irrigation Plan, South West Garo Hills district

93 | P a g e

149

Zikza

k Janggre MoWR HKKP Micro irrigation 1 No 0.00007 4.00 Ha Rs.23.75

-----

- ------

-----

- ------

4

Ha

Rs.23.7

5

-----

- ------

150

Zikza

k Janggre Samar MoWR HKKP Micro irrigation 1 No 0.00004 6.00 Ha Rs.20.00

-----

- ------

-----

- ------

6

Ha

Rs.20.0

0

-----

- ------

151

Zikza

k gandigre Garo MoWR HKKP Micro irrigation 1 No 0.00003 5.00 Ha Rs.14.75

-----

- ------

-----

- ------

5

Ha

Rs.14.7

5

-----

- ------

152

Zikza

k

gandigreBuram

an MoWR HKKP Micro irrigation 1 No 0.00003 4.00 Ha Rs.15.75

-----

- ------

-----

- ------

4

Ha

Rs.15.7

5

-----

- ------

153

Zikza

k wadagre MoWR HKKP Micro irrigation 1 No 0.00002 6.00 Ha Rs.23.25

-----

- ------

-----

- ------

6

Ha

Rs.23.2

5

-----

- ------

154

Zikza

k Kalaicharpara MoWR HKKP Micro irrigation 1 No 0.00003 4.00 Ha Rs.17.50

-----

- ------

-----

- ------

4

Ha

Rs.17.5

0

-----

- ------

155

Zikza

k

Lower

kalaichar MoWR HKKP Micro irrigation 1 No 0.00003 3.00 Ha Rs.20.00

-----

- ------

-----

- ------

3

Ha

Rs.20.0

0

-----

- ------

156

Zikza

k Mondalpara MoWR HKKP Micro irrigation 1 No 0.00002 5.00 Ha Rs.22.50

-----

- ------

5

Ha

Rs.22.5

0

-----

- ------

-----

- ------

157

Zikza

k Wannaggre MoWR HKKP Micro irrigation 1 No 0.00003 3.00 Ha Rs.17.25

-----

- ------

3

Ha

Rs.17.2

5

-----

- ------

-----

- ------

158

Zikza

k

upper

wananggre MoWR HKKP Micro irrigation 1 No 0.00004 5.00 Ha Rs.20.25

-----

- ------

-----

- ------

5

Ha

Rs.20.2

5

-----

- ------

159

Zikza

k Sobokgre MoWR HKKP Micro irrigation 1 No 0.00003 5.00 Ha Rs.19.25

-----

- ------

-----

- ------

5

Ha

Rs.19.2

5

-----

- ------

160

Zikza

k

Boldam

Songgitalgre MoWR HKKP Micro irrigation 1 No 0.00003 5.50 Ha Rs.20.00

-----

- ------

-----

- ------

6

Ha

Rs.20.0

0

-----

- ------

161

Zikza

k Dinangpara MoWR HKKP Micro irrigation 1 No 0.00004 4.00 Ha Rs.17.50

-----

- ------

-----

- ------

4

Ha

Rs.17.5

0

-----

- ------

162

Zikza

k Jongnogre MoWR HKKP Micro irrigation 1 No 0.00004 5.00 Ha Rs.20.00

-----

- ------

-----

- ------

5

Ha

Rs.20.0

0

-----

- ------

163

Zikza

k Satbone MoWR HKKP Micro irrigation 1 No 0.00003 6.00 Ha Rs.17.25

-----

- ------

-----

- ------

6

Ha

Rs.17.2

5

-----

- ------

164

Zikza

k Dangsinpara MoWR HKKP Micro irrigation 1 No 0.00003 5.00 Ha Rs.21.25

-----

- ------

-----

- ------

5

Ha

Rs.21.2

5

-----

- ------

165

Zikza

k Kuligre MoWR HKKP Micro irrigation 1 No 0.00002 4.00 Ha Rs.23.75

-----

- ------

-----

- ------

4

Ha

Rs.23.7

5

-----

- ------

166

Zikza

k

Kolaigaon

Tillapara MoWR HKKP Micro irrigation 1 No 0.00004 3.00 Ha Rs.17.50

-----

- ------

-----

- ------

3

Ha

Rs.17.5

0

-----

- ------

167

Zikza

k

Kolaigaon

Momdolpara MoWR HKKP Micro irrigation 1 No 0.00004 5.00 Ha Rs.20.00

-----

- ------

-----

- ------

-----

- ------

5

Ha

Rs.20.0

0

168

Zikza

k Billipara MoWR HKKP Micro irrigation 1 No 0.00003 4.00 Ha Rs.15.75

-----

- ------

-----

- ------

-----

- ------

4

Ha

Rs.15.7

5

169

Zikza

k Nayapara MoWR HKKP Micro irrigation 1 No 0.00003 4.50 Ha Rs.19.25

-----

- ------

-----

- ------

-----

- ------

5

Ha

Rs.19.2

5

170 Zikza Katabaripara MoWR HKKP Micro irrigation 1 No 0.00002 4.00 Ha Rs.17.00 ----- ------ ----- ------ 4 Rs.17.0 ----- ------

District Irrigation Plan, South West Garo Hills district

94 | P a g e

k - - Ha 0 -

171

Zikza

k kashipara MoWR HKKP Micro irrigation 1 No 0.00003 3.80 Ha Rs.23.75

-----

- ------

-----

- ------

4

Ha

Rs.23.7

5

-----

- ------

172

Zikza

k

Upper

Kalaichar MoWR HKKP Micro irrigation 1 No 0.00004 4.00 Ha Rs.17.25

-----

- ------

-----

- ------

4

Ha

Rs.17.2

5

-----

- ------

173

Zikza

k Bollongre MoWR HKKP Micro irrigation 1 No 0.00003 5.00 Ha Rs.24.75

-----

- ------

-----

- ------

5

Ha

Rs.24.7

5

-----

- ------

174

Zikza

k

Upper

Bollongre MoWR HKKP Micro irrigation 1 No 0.00003 4.50 Ha Rs.20.00

-----

- ------

-----

- ------

5

Ha

Rs.20.0

0

-----

- ------

175

Zikza

k Bolddenggre MoWR HKKP Micro irrigation 1 No 0.00004 5.00 Ha Rs.17.50

-----

- ------

-----

- ------

-----

- ------

5

Ha

Rs.17.5

0

176

Zikza

k Tewaligre MoWR HKKP Micro irrigation 1 No 0.00004 6.00 Ha Rs.20.00

-----

- ------

-----

- ------

-----

- ------

6

Ha

Rs.20.0

0

177

Zikza

k Pagolpara MoWR HKKP Micro irrigation 1 No 0.00007 4.00 Ha Rs.17.25

-----

- ------

4

Ha

Rs.17.2

5

-----

- ------

-----

- ------

178

Zikza

k Paglapara MoWR HKKP Micro irrigation 1 No 0.00003 3.00 Ha Rs.21.25

-----

- ------

3

Ha

Rs.21.2

5

-----

- ------

-----

- ------

179

Zikza

k Dengnagre MoWR HKKP Micro irrigation 1 No 0.00003 4.00 Ha Rs.13.25

-----

- ------

4

Ha

Rs.13.2

5

-----

- ------

-----

- ------

180

Zikza

k Anangpara MoWR HKKP Micro irrigation 1 No 0.00004 5.00 Ha Rs.23.00

-----

- ------

5

Ha

Rs.23.0

0

-----

- ------

-----

- ------

181

Zikza

k Chelipara MoWR HKKP Micro irrigation 1 No 0.00004 3.00 Ha Rs.20.00

-----

- ------

3

Ha

Rs.20.0

0

-----

- ------

-----

- ------

182

Zikza

k Darugre MoWR HKKP Micro irrigation 1 No 0.00007 4.00 Ha Rs.23.00

-----

- ------

-----

- ------

-----

- ------

4

Ha

Rs.23.0

0

183

Zikza

k Bengdapara MoWR HKKP Micro irrigation 1 No 0.00004 3.00 Ha Rs.17.50

-----

- ------

-----

- ------

-----

- ------

3

Ha

Rs.17.5

0

184

Zikza

k Kimdegre MoWR HKKP Micro irrigation 1 No 0.00003 4.00 Ha Rs.15.00

-----

- ------

-----

- ------

-----

- ------

4

Ha

Rs.15.0

0

185

Zikza

k Okchokgre MoWR HKKP Micro irrigation 1 No 0.00003 4.50 Ha Rs.23.00

-----

- ------

-----

- ------

-----

- ------

4.5

Ha

Rs.23.0

0

186

Zikza

k Sindilgre MoWR HKKP Micro irrigation 1 No 0.00002 4.00 Ha Rs.19.25

-----

- ------

-----

- ------

4

Ha

Rs.19.2

5

-----

- ------

187

Zikza

k Kedapara MoWR HKKP Micro irrigation 1 No 0.00003 3.00 Ha Rs.20.00

-----

- ------

-----

- ------

3

Ha

Rs.20.0

0

-----

- ------

188

Zikza

k Kerupara MoWR HKKP Micro irrigation 1 No 0.00003 5.00 Ha Rs.17.50

-----

- ------

-----

- ------

5

Ha

Rs.17.5

0

-----

- ------

189

Zikza

k Dinapara MoWR HKKP Micro irrigation 1 No 0.00002 4.00 Ha Rs.20.00

-----

- ------

-----

- ------

4

Ha

Rs.20.0

0

-----

- ------

190

Zikza

k Nachipara MoWR HKKP Micro irrigation 1 No 0.00003 3.00 Ha Rs.18.25

-----

- ------

-----

- ------

3

Ha

Rs.18.2

5

-----

- ------

191

Zikza

k Chepagre MoWR HKKP Micro irrigation 1 No 0.00002 4.00 Ha Rs.21.25

-----

- ------

-----

- ------

4

Ha

Rs.21.2

5

-----

- ------

District Irrigation Plan, South West Garo Hills district

95 | P a g e

192

Zikza

k

New

Anangpara

Songgitcham

MoWR HKKP Micro irrigation 1 No 0.00003 4.00 Ha Rs.23.75 -----

- ------

-----

- ------

4

Ha

Rs.23.7

5

-----

- ------

193

Zikza

k Matkolgre MoWR HKKP Micro irrigation 1 No 0.00004 3.00 Ha Rs.17.50

-----

- ------

-----

- ------

3

Ha

Rs.17.5

0

-----

- ------

194

Zikza

k Mandalgre MoWR HKKP Micro irrigation 1 No 0.00003 5.00 Ha Rs.20.00

-----

- ------

-----

- ------

5

Ha

Rs.20.0

0

-----

- ------

195

Zikza

k Chipra MoWR HKKP Micro irrigation 1 No 0.00003 5.00 Ha Rs.23.25

-----

- ------

-----

- ------

5

Ha

Rs.23.2

5

-----

- ------

196

Zikza

k Tallimgre MoWR HKKP Micro irrigation 1 No 0.00004 4.00 Ha Rs.19.25

-----

- ------

4

Ha

Rs.19.2

5

-----

- ------

-----

- ------

197

Zikza

k Domapara MoWR HKKP Micro irrigation 1 No 0.00004 3.00 Ha Rs.17.00

-----

- ------

3

Ha

Rs.17.0

0

-----

- ------

-----

- ------

198

Zikza

k Puljhuri MoWR HKKP Micro irrigation 1 No 0.00007 4.00 Ha Rs.23.75

-----

- ------

4

Ha

Rs.23.7

5

-----

- ------

-----

- ------

199

Zikza

k Sentpara MoWR HKKP Micro irrigation 1 No 0.00003 3.50 Ha Rs.23.00

-----

- ------

4

Ha

Rs.23.0

0

-----

- ------

-----

- ------

200

Zikza

k Kawahgra MoWR HKKP Micro irrigation 1 No 0.00004 3.00 Ha Rs.19.25

-----

- ------

3

Ha

Rs.19.2

5

-----

- ------

-----

- ------

201

Zikza

k salmanpara MoWR HKKP Micro irrigation 1 No 0.00007 4.00 Ha Rs.20.00

-----

- ------

4

Ha

Rs.20.0

0

-----

- ------

-----

- ------

202

Zikza

k Nogorpara MoWR HKKP Micro irrigation 1 No 0.00003 3.50 Ha Rs.17.50

-----

- ------

4

Ha

Rs.17.5

0

-----

- ------

-----

- ------

203

Zikza

k Doromchas MoWR HKKP Micro irrigation 1 No 0.00003 4.00 Ha Rs.20.00

-----

- ------

4

Ha

Rs.20.0

0

-----

- ------

-----

- ------

204

Zikza

k Kolaigaon

MoA & FW

DAC -&

FW

PDMC Secondry storage structure 1 No 0.00378 80 Ha Rs.900 -----

- ------

-----

-

Rs.270.

0

80

Ha Rs.630

-----

- ------

205

Zikza

k Boldorenggre

MoA & FW

DAC -&

FW

PDMC Secondry storage structure 1 No 0.00277 90 Ha Rs.1050 -----

- ------

-----

-

Rs.315.

0

90

Ha Rs.735

-----

- ------

206

Zikza

k Marahalipara

MoA & FW

DAC -&

FW

PDMC Secondry storage structure 1 No 0.00353 80 Ha Rs.1200 -----

- ------

-----

- ------

-----

-

Rs.360.

0

80

Ha Rs.840

207

Zikza

k Debilla

MoA & FW

DAC -&

FW

PDMC Secondry storage structure 1 No 0.00026 7.00 Ha Rs.15.84 7

Ha Rs.46

-----

- ------

-----

- ------

-----

- ------

208

Zikza

k Bodakgre

MoA & FW

DAC -&

FW

PDMC Secondry storage structure 1 No 0.00052 8.00 Ha Rs.19.50 8

Ha Rs.46

-----

- ------

-----

- ------

-----

- ------

209

Zikza

k Kolmesal

MoA & FW

DAC -&

FW

PDMC Secondry storage structure 2 No 0.00044 9.00 Ha Rs.22.50 -----

- ------

9

Ha

Rs.22.5

0

-----

- ------

-----

- ------

District Irrigation Plan, South West Garo Hills district

96 | P a g e

210

Zikza

k Damgre

MoA & FW

DAC -&

FW

PDMC Secondry storage structure 2 No 0.00029 11.00

Ha Rs.27.50

-----

- ------

11

Ha

Rs.27.5

0

-----

- ------

-----

- ------

211

Zikza

k Asimgre

MoA & FW

DAC -&

FW

PDMC Secondry storage structure 1 No 0.00018 10.00

Ha Rs.25.00

-----

- ------

-----

- ------

10

Ha Rs.25

-----

- ------

212

Zikza

k Rongmu

MoA & FW

DAC -&

FW

PDMC Secondry storage structure 1 No 0.00020 6.00 Ha Rs.15.00 -----

- ------

6

Ha

Rs.15.0

0

-----

- ------

-----

- ------

213

Zikza

k Nachilgre

MoA & FW

DAC -&

FW

PDMC Secondry storage structure 3 No 0.00018 8.00 Ha Rs.20.00 -----

- ------

8

Ha

Rs.20.0

0

-----

- ------

-----

- ------

214

Zikza

k

Bolmoram

Awe

MoA & FW

DAC -&

FW

PDMC Secondry storage structure 1 No 0.00034 9.30 Ha Rs.23.25 -----

- ------

9

Ha

Rs.23.2

5

-----

- ------

-----

- ------

215

Zikza

k Gondu

MoA & FW

DAC -&

FW

PDMC Secondry storage structure 1 No 0.00023 8.00 Ha Rs.20.00 8

Ha Rs.46

-----

- ------

-----

- ------

-----

- ------

216

Zikza

k Dolsi

MoA & FW

DAC -&

FW

PDMC Secondry storage structure 1 No 0.00016 11.00

Ha Rs.27.50

11

Ha Rs.46

-----

- ------

-----

- ------

-----

- ------

217

Zikza

k Damgre

MoA & FW

DAC -&

FW

PDMC Secondry storage structure 1 No 0.00023 13.00

Ha Rs.32.50

13

Ha Rs.46

-----

- ------

-----

- ------

-----

- ------

218

Zikza

k Kilga

MoA & FW

DAC -&

FW

PDMC Secondry storage structure 1 No 0.00010 8.00 Ha Rs.20.00 8

Ha Rs.46

-----

- ------

-----

- ------

-----

- ------

219

Zikza

k Adokgre

MoA & FW

DAC -&

FW

PDMC Secondry storage structure 1 No 0.00016 13.00

Ha Rs.32.50

-----

- ------

13

Ha

Rs.32.5

0

-----

- ------

-----

- ------

220

Zikza

k

New

Salmapara

MoA & FW

DAC -&

FW

PDMC Secondry storage structure 5 No 0.00015 7.00 Ha Rs.17.50 7

Ha Rs.46

-----

- ------

-----

- ------

-----

- ------

221

Zikza

k

Old

Salmanpara

MoA & FW

DAC -&

FW

PDMC Secondry storage structure 5 No 0.00015 11.00

Ha Rs.27.50

11

Ha Rs.46

-----

- ------

-----

- ------

-----

- ------

222

Zikza

k Jogchetpara

MoA & FW

DAC -&

FW

PDMC Secondry storage structure 3 No 0.00020 9.30 Ha Rs.23.25 9

Ha Rs.46

-----

- ------

-----

- ------

-----

- ------

223

Zikza

k Golagre

MoA & FW

DAC -&

FW

PDMC Secondry storage structure 2 No 0.00016 7.20 Ha Rs.18.00 -----

- ------

7

Ha

Rs.18.0

0

-----

- ------

-----

- ------

224 Zikza Jhonjona MoA & FW Convergenc Land Development 1 No 0.00420 15 Ha Rs.93.0 ----- ------ 7.5 Rs.47 7.5 Rs.46 ----- ------

District Irrigation Plan, South West Garo Hills district

97 | P a g e

k DAC -&

FW

e - Ha Ha -

225

Zikza

k Jhorjora

MoA & FW

DAC -&

FW

Convergenc

e Land Development 1 No 0.00282 20 Ha Rs.36.0

-----

- ------

10.0

Ha Rs.18

10.0

Ha Rs.18

-----

- ------

226

Zikza

k Bokman

MoA & FW

DAC -&

FW

Convergenc

e Land Development 1 No 0.00282 15 Ha Rs.36.0

-----

- ------

7.5

Ha Rs.18

7.5

Ha Rs.18

-----

- ------

227

Zikza

k Bongka

MoA & FW

DAC -&

FW

Convergenc

e Land Development 1 No 0.00247 20 Ha Rs.36.0

-----

- ------

10.0

Ha Rs.18

10.0

Ha Rs.18

-----

- ------

228

Zikza

k Kongbangpara

MoA & FW

DAC -&

FW

Convergenc

e Land Development 1 No 0.00167 15 Ha Rs.27.0

-----

- ------

7.5

Ha Rs.14

7.5

Ha Rs.13

-----

- ------

229

Zikza

k Tarapara

MoA & FW

DAC -&

FW

Convergenc

e Land Development 1 No 0.00173 10 Ha Rs.96.0

-----

- ------

5.0

Ha Rs.48

5.0

Ha Rs.48

-----

- ------

230

Zikza

k Rongkai

MoA & FW

DAC -&

FW

Convergenc

e Land Development 1 No 0.00486 25 Ha Rs.246.0

-----

- ------

-----

- ------

25

Ha

Rs.246.

0

-----

- ------

231

Zikza

k

Koligaon

Kajalgopi

MoA & FW

DAC -&

FW

Convergenc

e Land Development 1 No 0.00218 20 Ha Rs.39.0

-----

- ------

-----

- ------

20

Ha Rs.39.0

-----

- ------

232

Zikza

k Balughat

MoA & FW

DAC -&

FW

Convergenc

e Land Development 1 No 0.00195 15 Ha Rs.21.0

-----

- ------

-----

- ------

15

Ha Rs.21.0

-----

- ------

233

Zikza

k Bairagopi

MoA & FW

DAC -&

FW

Convergenc

e Land Development 1 No 0.00179 10 Ha Rs.48.0

-----

- ------

-----

- ------

10

Ha Rs.48.0

-----

- ------

234

Zikza

k Bahadur Khatta

MoA & FW

DAC -&

FW

Convergenc

e Land Development 1 No 0.00119 20 Ha Rs.240.0

-----

- ------

-----

- ------

20

Ha

Rs.240.

0

-----

- ------

235

Zikza

k Phuljura

MoA & FW

DAC -&

FW

Convergenc

e Land Development 1 No 0.00188 15 Ha Rs.24.0

-----

- ------

-----

- ------

-----

- ------

15

Ha Rs.24

236

Zikza

k Barmanpara

MoA & FW

DAC -&

FW

Convergenc

e Land Development 1 No 0.00163 10 Ha Rs.48.0

-----

- ------

-----

- ------

-----

- ------

10

Ha Rs.48

237

Zikza

k Demdema

MoA & FW

DAC -&

FW

Convergenc

e Land Development 1 No 0.00126 12 Ha Rs.18.0

-----

- ------

-----

- ------

-----

- ------

12

Ha Rs.18

238

Zikza

k Amtuli

MoA & FW

DAC -&

Convergenc

e Land Development 1 No 0.00158 10 Ha Rs.54.0

-----

- ------

-----

- ------

-----

- ------

10

Ha Rs.54

District Irrigation Plan, South West Garo Hills district

98 | P a g e

FW

239

Zikza

k Pislajhora

DoLR -

MoRD

Convergenc

e Land Development 1 No 0.00232 12 Ha Rs.64.5

-----

- ------

-----

- ------

12

Ha Rs.64.5

-----

- ------

240

Zikza

k Chapahati

DoLR -

MoRD

Convergenc

e Land Development 1 No 0.00091 10 Ha Rs.27.0

-----

- ------

-----

- ------

10

Ha Rs.27.0

-----

- ------

241

Zikza

k Salmanpara 1

DoLR -

MoRD

Convergenc

e Land Development 1 No 0.00173 8 Ha Rs.45.00

-----

- ------

-----

- ------

8

Ha Rs.45.0

-----

- ------

242

Zikza

k

New

Salmanpara

DoLR -

MoRD

Convergenc

e Land Development 1 No 0.00211 7 Ha Rs.40.50

-----

- ------

-----

- ------

7

Ha Rs.40.5

-----

- ------

243

Zikza

k Grenggre

DoLR -

MoRD

Convergenc

e Land Development 1 No 0.00166 10 Ha Rs.34.50

-----

- ------

-----

- ------

10

Ha Rs.34.5

-----

- ------

244

Zikza

k

Lower

boldakgre

DoLR -

MoRD

Convergenc

e Land Development 1 No 0.00188 12 Ha Rs.40.50

-----

- ------

-----

- ------

12

Ha Rs.40.5

-----

- ------

245

Zikza

k

Upper

Boldakgre

DoLR -

MoRD

Convergenc

e Land Development 1 No 0.00131 9 Ha Rs.45.00

-----

- ------

-----

- ------

9

Ha Rs.45.0

-----

- ------

246

Zikza

k Samgong A.we

DoLR -

MoRD

Convergenc

e Land Development 1 No 0.00087 8 Ha Rs.54.00

-----

- ------

-----

- ------

8

Ha Rs.54.0

-----

- ------

247

Zikza

k Ronmilgre

DoLR -

MoRD

Convergenc

e Land Development 1 No 0.00158 7 Ha Rs.36.00

-----

- ------

-----

- ------

7

Ha Rs.36.0

-----

- ------

248

Zikza

k Bokgre

DoLR -

MoRD

Convergenc

e Land Development 1 No 0.00176 10 Ha Rs.45.00

-----

- ------

-----

- ------

10

Ha Rs.45.0

-----

- ------

249

Zikza

k Udalgre

DoLR -

MoRD

Convergenc

e Land Development 1 No 0.00112 12 Ha Rs.19.50

-----

- ------

-----

- ------

12

Ha Rs.19.5

-----

- ------

250

Zikza

k Satihari

DoLR -

MoRD

Convergenc

e Land Development 1 No 0.00125 12 Ha Rs.27.00

-----

- ------

-----

- ------

12

Ha Rs.27.0

-----

- ------

251

Zikza

k Nachilpara

DoLR -

MoRD

Convergenc

e Land Development 1 No 0.00224 10 Ha Rs.22.20

-----

- ------

-----

- ------

10

Ha Rs.22.2

-----

- ------

252

Zikza

k Babngkapara

DoLR -

MoRD

Convergenc

e Land Development 1 No 0.00224 13 Ha Rs.33.00

-----

- ------

-----

- ------

13

Ha Rs.33.0

-----

- ------

253

Zikza

k Gonchukol

DoLR -

MoRD

Convergenc

e Land Development 1 No 0.00066 15 Ha Rs.22.50

-----

- ------

-----

- ------

-----

- ------

15

Ha Rs.23

254

Zikza

k Rokkalpara

DoLR -

MoRD

Convergenc

e Land Development 1 No 0.00063 20 Ha Rs.19.20

-----

- ------

-----

- ------

-----

- ------

20

Ha Rs.19

255

Zikza

k Anangpara

DoLR -

MoRD

Convergenc

e Land Development 1 No 0.00073 15 Ha Rs.17.10

-----

- ------

-----

- ------

-----

- ------

15

Ha Rs.17

256

Zikza

k Wadagre

DoLR -

MoRD

Convergenc

e Land Development 1 No 0.00063 10 Ha Rs.27.90

-----

- ------

-----

- ------

-----

- ------

10

Ha Rs.28

257

Zikza

k Bakdagre

DoLR -

MoRD

Convergenc

e Land Development 1 No 0.00087 15 Ha Rs.28.50

-----

- ------

-----

- ------

15

Ha Rs.28.5

-----

- ------

258

Zikza

k Rapapaanggre

DoLR -

MoRD

Convergenc

e Land Development 1 No 0.00110 10 Ha Rs.27.30

-----

- ------

-----

- ------

10

Ha Rs.27.3

-----

- ------

259

Zikza

k Hulukona

DoLR -

MoRD

Convergenc

e Land Development 1 No 0.00109 10 Ha Rs.26.70

-----

- ------

-----

- ------

10

Ha Rs.26.7

-----

- ------

District Irrigation Plan, South West Garo Hills district

99 | P a g e

260

Zikza

k Domapara

DoLR -

MoRD

Convergenc

e Land Development 1 No 0.00087 10 Ha Rs.26.40

-----

- ------

-----

- ------

10

Ha Rs.26.4

-----

- ------

261

Zikza

k Kangknaggre

DoLR -

MoRD

Convergenc

e Land Development 1 No 0.00139 8 Ha Rs.30.60

-----

- ------

-----

- ------

8

Ha Rs.30.6

-----

- ------

262

Zikza

k Agonggittim

DoLR -

MoRD

Convergenc

e Land Development 1 No 0.00086 7 Ha Rs.28.80

-----

- ------

-----

- ------

7

Ha Rs.28.8

-----

- ------

263

Zikza

k Managre

DoLR -

MoRD

Convergenc

e Land Development 1 No 0.00133 9 Ha Rs.25.80

-----

- ------

-----

- ------

9

Ha Rs.25.8

-----

- ------

264

Zikza

k Rongsolgre

DoLR -

MoRD

Convergenc

e Land Development 1 No 0.00091 10 Ha Rs.24.60

-----

- ------

-----

- ------

10

Ha Rs.24.6

-----

- ------

265

Zikza

k Menggongpara

DoLR -

MoRD

Convergenc

e Land Development 1 No 0.00121 15 Ha Rs.27.00

-----

- ------

-----

- ------

15

Ha Rs.27.0

-----

- ------

266

Zikza

k Marengpara

DoLR -

MoRD

Convergenc

e Land Development 1 No 0.00129 11 Ha Rs.30.90

-----

- ------

-----

- ------

11

Ha Rs.30.9

-----

- ------

267

Zikza

k Damagre

DoLR -

MoRD

Convergenc

e Land Development 1 No 0.00102 15 Ha Rs.33.15

-----

- ------

-----

- ------

15

Ha Rs.33.2

-----

- ------

268

Zikza

k Wagepara

DoLR -

MoRD

Convergenc

e Land Development 1 No 0.00073 10 Ha Rs.32.10

-----

- ------

-----

- ------

-----

- ------

10

Ha Rs.32

269

Zikza

k Torangpara

DoLR -

MoRD

Convergenc

e Land Development 1 No 0.00089 11 Ha Rs.29.70

-----

- ------

-----

- ------

-----

- ------

11

Ha Rs.30

270

Zikza

k Kebolpara

DoLR -

MoRD

Convergenc

e Land Development 1 No 0.00198 12 Ha Rs.13.80

-----

- ------

-----

- ------

-----

- ------

12

Ha Rs.14

271

Zikza

k Dinagre

DoLR -

MoRD

Convergenc

e Land Development 1 No 0.00132 9 Ha Rs.36.00

-----

- ------

-----

- ------

-----

- ------

9

Ha Rs.36

272

Zikza

k Dalamgre

DoLR -

MoRD

Convergenc

e Land Development 1 No 0.00203 10 Ha Rs.25.50

-----

- ------

-----

- ------

-----

- ------

10

Ha Rs.26

273

Zikza

k Jhonjona

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00420 25 Ha

Rs.138.4

0

-----

- ------

8

Ha

Rs.46.1

3

8

Ha Rs.36.9

10

Ha

Rs.29.5

3

274

Zikza

k Bokman

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00282 30 Ha Rs.96.00

-----

- ------

-----

- ------

-----

- ------

30

Ha

Rs.24.0

0

275

Zikza

k Bongka

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00247 50 Ha Rs.96.00

-----

- ------

-----

- ------

-----

- ------

50

Ha

Rs.24.0

0

276

Zikza

k Kongbangpara

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00167 45 Ha Rs.52.00

-----

- ------

-----

- ------

-----

- ------

45

Ha

Rs.13.0

0

277

Zikza

k Tarapara

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00173 55 Ha

Rs.256.0

0

-----

- ------

-----

- ------

-----

- ------

55

Ha

Rs.64.0

0

278

Zikza

k Rongkai

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00486 100 Ha

Rs.656.0

0

-----

- ------

-----

- ------

-----

- ------

100

Ha Rs.164

279

Zikza

k

Koligaon

Kajalgopi

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00218 50 Ha Rs.88.00

-----

- ------

-----

- ------

-----

- ------

50

Ha

Rs.22.0

0

280

Zikza

k Balughat

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00195 40 Ha Rs.52.00

-----

- ------

-----

- ------

-----

- ------

40

Ha

Rs.13.0

0

281 Zikza Bairagopi DoLR - Convergenc Renovation of & maintaince 1 No 0.00179 75 Ha Rs.128.0 ----- ------ ----- ------ ----- ------ 75 Rs.32.0

District Irrigation Plan, South West Garo Hills district

100 | P a g e

k MoRD e of irrigation canals & drains 0 - - - Ha 0

282

Zikza

k Bahadur Khatta

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00119 100 Ha

Rs.640.0

0

-----

- ------

-----

- ------

-----

- ------

100

Ha Rs.160

283

Zikza

k Phuljura

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00188 40 Ha Rs.64.00

-----

- ------

-----

- ------

-----

- ------

40

Ha

Rs.16.0

0

284

Zikza

k Barmanpara

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00163 30 Ha Rs.52.00

-----

- ------

-----

- ------

-----

- ------

30

Ha

Rs.13.0

0

285

Zikza

k Dinangpara

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00126 20 Ha Rs.16.00

-----

- ------

-----

- ------

-----

- ------

20

Ha Rs.4.00

286

Zikza

k Dangsapara

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00158 31 Ha Rs.24.80

-----

- ------

-----

- ------

-----

- ------

31

Ha Rs.6.20

287

Zikza

k Sanjangpara

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00232 28 Ha Rs.22.40

-----

- ------

-----

- ------

-----

- ------

28

Ha Rs.5.60

288

Zikza

k Demdema

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00091 60 Ha Rs.48.00

-----

- ------

-----

- ------

-----

- ------

60

Ha

Rs.12.0

0

289

Zikza

k Chepagre 2

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00173 15 Ha Rs.12.00

-----

- ------

-----

- ------

-----

- ------

15

Ha Rs.3.00

290

Zikza

k Amtuli

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00211 90 Ha

Rs.144.0

0

-----

- ------

-----

- ------

-----

- ------

90

Ha

Rs.36.0

0

291

Zikza

k Pislajhora

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00166 80 Ha

Rs.172.0

0

20

Ha

Rs.16.

0

20

Ha

Rs.12.8

0

20

Ha Rs.10.2

20

Ha Rs.8.19

292

Zikza

k RangaJhora

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00188 15 Ha Rs.24.00

-----

- ------

-----

- ------

-----

- ------

15

Ha Rs.6.00

293

Zikza

k Chapahati

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00131 15 Ha Rs.60.00

-----

- ------

-----

- ------

-----

- ------

15

Ha

Rs.15.0

0

294

Zikza

k Durgapara

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00087 10 Ha Rs.24.00

-----

- ------

-----

- ------

-----

- ------

10

Ha Rs.6.00

295

Zikza

k Kuligaon

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00158 40 Ha Rs.64.00

10

Ha

Rs.16.

0

10

Ha

Rs.12.8

0

10

Ha Rs.10.2

10

Ha Rs.8.19

296

Zikza

k Kebolpara

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00176 35 Ha Rs.36.80

-----

- ------

-----

- ------

-----

- ------

46

Ha Rs.9.20

297

Zikza

k Chepa

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00112 50 Ha Rs.96.00

13

Ha

Rs.24.

0

13

Ha

Rs.19.2

0

13

Ha Rs.15.4

13

Ha

Rs.12.2

9

298

Zikza

k Dalamgre

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00125 50 Ha Rs.68.00

-----

- ------

-----

- ------

-----

- ------

50

Ha

Rs.17.0

0

299

Zikza

k Salmanpara 1

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00224 35 Ha Rs.90.00

9

Ha

Rs.20.

0

9

Ha

Rs.20.0

0

9

Ha Rs.20.0

9

Ha

Rs.12.2

9

300

Zikza

k

New

Salmanpara

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00112 40 Ha

Rs.108.0

0

-----

- ------

-----

- ------

-----

- ------

40

Ha

Rs.27.0

0

301

Zikza

k Grenggre

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00066 35 Ha Rs.92.00

-----

- ------

-----

- ------

-----

- ------

35

Ha

Rs.23.0

0

302

Zikza

k

Lower

boldakgre

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00063 40 Ha

Rs.108.0

0

-----

- ------

-----

- ------

-----

- ------

40

Ha

Rs.27.0

0

District Irrigation Plan, South West Garo Hills district

101 | P a g e

303

Zikza

k

Upper

Boldakgre

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00073 35 Ha

Rs.120.0

0

-----

- ------

-----

- ------

-----

- ------

35

Ha

Rs.30.0

0

304

Zikza

k Samgong A.we

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00063 30 Ha

Rs.144.0

0

-----

- ------

-----

- ------

-----

- ------

30

Ha

Rs.36.0

0

305

Zikza

k Ronmilgre

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00087 25 Ha Rs.96.00

-----

- ------

-----

- ------

-----

- ------

25

Ha

Rs.24.0

0

306

Zikza

k Bokgre

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00110 15 Ha

Rs.120.0

0

-----

- ------

-----

- ------

-----

- ------

15

Ha

Rs.30.0

0

307

Zikza

k Udalgre

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00109 45 Ha Rs.52.00

-----

- ------

-----

- ------

-----

- ------

11

Ha

Rs.13.0

0

308

Zikza

k Jangrapara

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00087 10 Ha Rs.21.60

-----

- ------

-----

- ------

-----

- ------

3

Ha Rs.5

309

Zikza

k

Chelipara

nokat

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00139 15 Ha Rs.23.20

-----

- ------

-----

- ------

-----

- ------

4

Ha Rs.5.80

310

Zikza

k Satihari

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00086 45 Ha Rs.72.00

-----

- ------

-----

- ------

-----

- ------

11

Ha

Rs.18.0

0

311

Zikza

k Nachilpara

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00133 30 Ha Rs.59.20

-----

- ------

-----

- ------

-----

- ------

8

Ha

Rs.14.8

0

312

Zikza

k Bangkapara

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00091 55 Ha Rs.88.00

-----

- ------

-----

- ------

-----

- ------

14

Ha

Rs.22.0

0

313

Zikza

k Gonchukol

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00121 40 Ha Rs.3.75

-----

- ------

-----

- ------

-----

- ------

10

Ha Rs.0.94

314

Zikza

k Rokkalpara

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00129 30 Ha Rs.3.20

-----

- ------

-----

- ------

-----

- ------

8

Ha Rs.0.80

315

Zikza

k Anangpara

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00102 25 Ha Rs.2.85

-----

- ------

-----

- ------

-----

- ------

6

Ha Rs.0.71

316

Zikza

k Wadagre

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00073 50 Ha Rs.4.65

-----

- ------

-----

- ------

-----

- ------

13

Ha Rs.1

317

Zikza

k Bakdagre

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00089 40 Ha Rs.4.75

-----

- ------

-----

- ------

-----

- ------

10

Ha Rs.1.19

318

Zikza

k Rapapaanggre

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00198 35 Ha Rs.4.55

-----

- ------

-----

- ------

-----

- ------

9

Ha Rs.1.14

319

Zikza

k Hulukona

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00132 30 Ha Rs.4.45

-----

- ------

-----

- ------

-----

- ------

8

Ha Rs.1.11

320

Zikza

k Domapara

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00203 25 Ha Rs.4.40

-----

- ------

-----

- ------

-----

- ------

6

Ha Rs.1.10

321

Zikza

k Kangknaggre

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00247 50 Ha Rs.5.10

-----

- ------

-----

- ------

-----

- ------

13

Ha Rs.1.28

322

Zikza

k Agonggittim

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00167 35 Ha Rs.4.80

-----

- ------

-----

- ------

-----

- ------

9

Ha Rs.1.20

323

Zikza

k Managre

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00173 30 Ha Rs.4.30

-----

- ------

-----

- ------

-----

- ------

8

Ha Rs.1.08

324 Zikza Rongsolgre DoLR - Convergenc Renovation of & maintaince 1 No 0.00486 40 Ha Rs.4.10 ----- ------ ----- ------ ----- ------ 10 Rs.1.03

District Irrigation Plan, South West Garo Hills district

102 | P a g e

k MoRD e of irrigation canals & drains - - - Ha

325

Zikza

k Menggongpara

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00218 35 Ha Rs.4.50

-----

- ------

-----

- ------

-----

- ------

9

Ha Rs.1.13

326

Zikza

k Marengpara

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00195 40 Ha Rs.5.15

-----

- ------

-----

- ------

-----

- ------

10

Ha Rs.1.29

327

Zikza

k Dengna

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00109 35 Ha Rs.53.04

9

Ha

Rs.13.

3

9

Ha

Rs.10.6

1

9

Ha Rs.8.5

9

Ha Rs.6.79

328

Zikza

k Gopi

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 1 No 0.00087 45 Ha Rs.85.60

11

Ha

Rs.21.

4

11

Ha

Rs.17.1

2

11

Ha Rs.13.7

11

Ha

Rs.10.9

6

329

Zikza

k Jhorjora

DoLR -

MoRD

Convergenc

e

Renovation of & maintaince

of irrigation canals & drains 2 No 0.00139 30 Ha Rs.79.20

8

Ha

Rs.19.

8

8

Ha

Rs.15.8

4

8

Ha Rs.12.7

8

Ha

Rs.10.1

4

330

Zikza

k Nachil Awe

State

Irrigation

Department

HKKP Surface Minor Irrigation 1 No. 0.0002 16 Ha Rs.39.84 -----

- ------

-----

-

Rs.18.0

0

16

Ha Rs.21.8

-----

- ------

331

Zikza

k Wadapgre

State

Irrigation

Department

HKKP Surface Minor Irrigation 1 No. 0.0003 18 Ha Rs.44.82 -----

- ------

-----

-

Rs.17.0

0

18

Ha Rs.27.8

-----

- ------

332

Zikza

k Salmanpara

State

Irrigation

Department

HKKP Surface Minor Irrigation 1 No. 0.0004 17 Ha Rs.42.33 -----

- ------

-----

-

Rs.13.0

0

17

Ha Rs.29.3

-----

- ------

333

Zikza

k

Upper

Samanpara

State

Irrigation

Department

HKKP Surface Minor Irrigation 1 No. 0.0004 13 Ha Rs.32.37 -----

- ------

-----

- ------

-----

- Rs.13.0

13

Ha

Rs.19.3

7

334

Zikza

k Bollonggre

State

Irrigation

Department

HKKP Surface Minor Irrigation 1 No. 0.0003 17 Ha Rs.22.00 17

Ha Rs.15

-----

- ------

-----

- ------

-----

- ------

335

Zikza

k Dudara

State

Irrigation

Department

HKKP Surface Minor Irrigation 1 No. 0.0003 16 Ha Rs.39.84 -----

- ------

-----

-

Rs.16.0

0

16

Ha Rs.23.8

-----

- ------

336

Zikza

k Denagpara

State

Irrigation

Department

HKKP Surface Minor Irrigation 1 No. 0.0003 15 Ha Rs.38.10 -----

- ------

-----

-

Rs.15.0

0

15

Ha Rs.23.1

-----

- ------

337

Zikza

k Dangsapara

State

Irrigation

Department

HKKP Surface Minor Irrigation 1 No. 0.0003 13 Ha Rs.33.12 -----

- ------

-----

-

Rs.13.0

0

13

Ha Rs.20.1

-----

- ------

338

Zikza

k Chelipara Apal

State

Irrigation

Department

HKKP Surface Minor Irrigation 1 No. 0.0002 17 Ha Rs.42.33 -----

- ------

-----

-

Rs.17.0

0

17

Ha Rs.25.3

-----

- ------

339

Zikza

k Hati Belpara

State

Irrigation

Department

HKKP Surface Minor Irrigation 1 No. 0.0003 15 Ha Rs.37.35 -----

- ------

-----

-

Rs.15.0

0

15

Ha Rs.22.4

-----

- ------

340

Zikza

k Dinangpara

State

Irrigation HKKP Surface Minor Irrigation 1 No. 0.0003 13 Ha Rs.32.37

-----

- ------

-----

-

Rs.13.0

0

13

Ha Rs.19.4

-----

- ------

District Irrigation Plan, South West Garo Hills district

103 | P a g e

Department

341

Zikza

k Dangsapara

State

Irrigation

Department

HKKP Surface Minor Irrigation 1 No. 0.0003 17 Ha Rs.42.33 -----

- ------

-----

- ------

-----

- Rs.17.0

17

Ha

Rs.25.3

3

342

Zikza

k Sanjangpara

State

Irrigation

Department

HKKP Surface Minor Irrigation 1 No. 0.0003 17 Ha Rs.42.33 -----

- ------

-----

- ------

-----

- Rs.17.0

17

Ha

Rs.25.3

3

343

Zikza

k Chepagre 2

State

Irrigation

Department

HKKP Surface Minor Irrigation 1 No. 0.0002 16 Ha Rs.39.84 -----

- ------

-----

- ------

-----

- Rs.17.0

16

Ha

Rs.22.8

4

344

Zikza

k RangaJhora

State

Irrigation

Department

HKKP Surface Minor Irrigation 1 No. 0.0002 17 Ha Rs.42.33 -----

- ------

-----

- ------

-----

- Rs.18.0

17

Ha

Rs.24.3

3

345

Zikza

k Durgapara

State

Irrigation

Department

HKKP Surface Minor Irrigation 1 No. 0.0004 18 Ha Rs.44.82 -----

- ------

-----

- ------

-----

- Rs.20.0

18

Ha

Rs.24.8

2

346

Zikza

k Kuligaon

State

Irrigation

Department

HKKP Surface Minor Irrigation 1 No. 0.0004 19 Ha Rs.47.31 -----

- ------

-----

- ------

-----

- Rs.21.0

19

Ha

Rs.26.3

1

347

Zikza

k Jangrapara

State

Irrigation

Department

HKKP Surface Minor Irrigation 1 No. 0.0004 20 Ha Rs.49.80 -----

- ------

-----

- ------

-----

- Rs.23.0

20

Ha

Rs.26.8

0

348

Zikza

k

Chelipara

nokat

State

Irrigation

Department

HKKP Surface Minor Irrigation 1 No. 0.0002 21 Ha Rs.52.29 -----

- ------

-----

- ------

-----

- Rs.25.0

21

Ha

Rs.27.2

9

349

Zikza

k Kawahagra

State

Irrigation

Department

HKKP Impv. & Mordz. 1 No. 0.0018 80 Ha Rs.165.0

0

-----

- ------

-----

-

Rs.66.0

0

80

Ha Rs.99.0

-----

- ------

350

Zikza

k Koligaon

State

Irrigation

Department

HKKP Impv. & Mordz. 1 No. 0.0021 70 Ha Rs.209.0

0

-----

- ------

-----

-

Rs.84.0

0

70

Ha

Rs.125.

0

-----

- ------

351

Zikza

k Kuligaon

State

Irrigation

Department

HKKP Impv. & Mordz. 1 No. 0.0024 65 Ha Rs.176.0

0

-----

- ------

-----

-

Rs.70.0

0

65

Ha

Rs.106.

0

-----

- ------

352

Zikza

k Chepagre

State

Irrigation

Department

HKKP Impv. & Mordz. 1 No. 0.0002 60 Ha Rs.66.00 -----

- ------

-----

-

Rs.26.0

0

60

Ha Rs.40.0

-----

- ------

353

Zikza

k Babelapara

State

Irrigation

Department

HKKP Impv. & Mordz. 1 No. 0.0012 90 Ha Rs.220.0

0

-----

- ------

-----

-

Rs.88.0

0

90

Ha

Rs.132.

0

-----

- ------

354

Zikza

k

Jebobgpara

Nokat

State

Irrigation

Department

HKKP Multipurpose reseviours 1 No. 0.0022 90 Ha Rs.735.0

0

-----

- ------

-----

- Rs.294

90

Ha

Rs.441.

0

-----

- ------

District Irrigation Plan, South West Garo Hills district

104 | P a g e

355

Zikza

k

Koligaon

Kajalgopi

State

Irrigation

Department

HKKP Multipurpose reseviours 1 No. 0.0030 120 Ha Rs.857.5

0

-----

- ------

-----

- Rs.343

120

Ha

Rs.514.

5

-----

- ------

356

Zikza

k Balughat

State

Irrigation

Department

HKKP Multipurpose reseviours 1 No. 0.0029 100 Ha Rs.686.0

0

-----

- ------

-----

- Rs.274

100

Ha

Rs.412.

0

-----

- ------

357

Zikza

k

Salmanpara

East

State

Irrigation

Department

HKKP Multipurpose reseviours 1 No. 0.0021 90 Ha Rs.759.5

0

-----

- ------

-----

- Rs.304

90

Ha

Rs.455.

5

-----

- ------

358

Zikza

k Wadagre

State

Irrigation

Department

HKKP Multipurpose reseviours 1 No. 0.0025 85 Ha Rs.894.2

5

-----

- ------

-----

- Rs.358

85

Ha

Rs.536.

3

-----

- ------

359

Zikza

k Jangrapara

State

Irrigation

Department

HKKP Multipurpose reseviours 1 No. 0.0040 80 Ha Rs.661.5

0

-----

- ------

-----

- Rs.265

80

Ha

Rs.396.

5

-----

- ------

360

Zikza

k Golmangre

State

Irrigation

Department

HKKP Multipurpose reseviours 1 No. 0.0026 75 Ha Rs.644.3

5

-----

- ------

-----

- Rs.258

75

Ha

Rs.386.

4

-----

- ------

361

Zikza

k Salmanapara 1

State

Irrigation

Department

HKKP Multipurpose reseviours 1 No. 0.0027 90 Ha Rs.624.7

5

-----

- ------

-----

- Rs.250

90

Ha

Rs.374.

8

-----

- ------

362

Zikza

k

Salmanpara

West

State

Irrigation

Department

HKKP Multipurpose reseviours 1 No. 0.0026 95 Ha Rs.661.5

0

-----

- ------

-----

- ------

-----

-

Rs.311.

0

95

Ha Rs.351

363

Zikza

k

Samapara

North

State

Irrigation

Department

HKKP Multipurpose reseviours 1 No. 0.0022 65 Ha Rs.705.6

0

-----

- ------

-----

- ------

-----

-

Rs.332.

0

65

Ha Rs.374

364

Zikza

k Sildegre

State

Irrigation

Department

HKKP Multipurpose reseviours 1 No. 0.0030 90 Ha Rs.595.3

5

-----

- ------

-----

- Rs.238

90

Ha

Rs.357.

4

-----

- ------

365

Zikza

k Boldakgre

State

Irrigation

Department

HKKP Multipurpose reseviours 1 No. 0.0029 85 Ha Rs.735.0

0

-----

- ------

-----

- ------

-----

-

Rs.345.

0

85

Ha Rs.390

366

Zikza

k Demasi

State

Irrigation

Department

HKKP Multipurpose reseviours 1 No. 0.0021 90 Ha Rs.705.6

0

-----

- ------

-----

- Rs.282

90

Ha

Rs.423.

6

-----

- ------

367

Zikza

k Hulokhona

State

Irrigation

Department

HKKP Multipurpose reseviours 1 No. 0.0025 75 Ha Rs.624.7

5

-----

- ------

-----

- Rs.250

75

Ha

Rs.374.

8

-----

- ------

368

Zikza

k Damdiloka

State

Irrigation

Department

HKKP Multipurpose reseviours 1 No. 0.0027 80 Ha Rs.661.5

0

-----

- ------

-----

- Rs.265

80

Ha

Rs.396.

5

-----

- ------

369 Zikza Debajani State HKKP Multipurpose reseviours 1 No. 0.0040 75 Ha Rs.686.0 ----- ------ ----- Rs.274 75 Rs.412. ----- ------

District Irrigation Plan, South West Garo Hills district

105 | P a g e

k Irrigation

Department

0 - - Ha 0 -

370

Zikza

k Turanpara

State

Irrigation

Department

HKKP Multipurpose reseviours 1 No. 0.0026 80 Ha Rs.759.5

0

-----

- ------

-----

- Rs.304

80

Ha

Rs.455.

5

-----

- ------

371

Zikza

k Ponchapara

State

Irrigation

Department

HKKP Multipurpose reseviours 1 No. 0.0027 75 Ha Rs.588.0

0

-----

- ------

-----

- Rs.235

75

Ha

Rs.353.

0

-----

- ------

372

Zikza

k Radanpara

State

Irrigation

Department

HKKP Multipurpose reseviours 1 No. 0.0025 90 Ha Rs.710.5

0

-----

- ------

-----

- Rs.284

90

Ha

Rs.426.

5

-----

- ------

373

Zikza

k Dansinpara

State

Irrigation

Department

HKKP Multipurpose reseviours 1 No. 0.0040 100 Ha Rs.759.5

0

-----

- ------

-----

- ------

-----

-

Rs.357.

0

40

Ha Rs.403

374

Zikza

k Anchenggre

State

Irrigation

Department

HKKP Multipurpose reseviours 1 No. 0.0026 60 Ha Rs.142.5

0

-----

- ------

-----

- ------

-----

- Rs.67.0

24

Ha Rs.76

375

Zikza

k Wagepara

State

Irrigation

Department

HKKP Multipurpose reseviours 1 No 0.0014 100 Ha Rs.1102 -----

- ------

-----

- ------

-----

-

Rs.518.

0

40

Ha Rs.584

376

Zikza

k Sangjangpara

State

Irrigation

Department

HKKP Multipurpose reseviours 1 No 0.0014 90 Ha Rs.754.0

0

-----

- ------

-----

- ------

-----

-

Rs.354.

0

36

Ha Rs.400

377

Zikza

k Gopinat Killa

State

Irrigation

Department

HKKP Multipurpose reseviours 1 No 0.0014 95 Ha Rs.783.0

0

-----

- ------

-----

- ------

-----

-

Rs.368.

0

38

Ha Rs.415

378

Zikza

k Tiwaligre

State

Irrigation

Department

HKKP Multipurpose reseviours 1 No 0.0011 70 Ha Rs.681.5

0

-----

- ------

-----

- ------

-----

-

Rs.320.

0

28

Ha Rs.362

379

Zikza

k Sokbokgre

State

Irrigation

Department

HKKP Multipurpose reseviours 1 No 0.0015 80 Ha Rs.638.0

0

-----

- ------

-----

- ------

-----

-

Rs.300.

0

32

Ha Rs.338

380

Zikza

k Salmapara

State

Irrigation

Department

HKKP Multipurpose reseviours 1 No 0.0015 25 Ha Rs.62.50 10

Ha Rs.25

15

Ha Rs.38

-----

-

381

Zikza

k Pislajhora

State

Irrigation

Department

HKKP Multipurpose reseviours 1 No 0.0015 200 Ha Rs.500.0

0

80

Ha

Rs.20

0

120

Ha Rs.300

-----

-

382

Zikza

k Matkolgre

Externally

aided

projects

(NEC)

HKKP Water Harvesting 1 No. 0.00323 90 Ha Rs.710.5

0

-----

- ------

-----

- Rs.284

90

Ha

Rs.426.

5

-----

- ------

383 Zikza Ponchapara Externally HKKP Water Harvesting 1 No. 0.00296 110 Ha Rs.759.5 ----- ------ ----- Rs.304 110 Rs.455. ----- ------

District Irrigation Plan, South West Garo Hills district

106 | P a g e

k aided

projects

(NEC)

0 - - Ha 5 -

384

Zikza

k Zikzak

Externally

aided

projects

(NEC)

HKKP Water Harvesting 1 No. 0.00312 100 Ha Rs.710.5

0

-----

- ------

-----

- Rs.284

100

Ha

Rs.426.

5

-----

- ------

385

Zikza

k Salmanpara

Externally

aided

projects

(NEC)

HKKP Water Harvesting 2 No. 0.00368 90 Ha Rs.2646.

0

-----

- ------

-----

-

Rs.132

3

36

Ha

Rs.132

3

54

Ha

Rs.132

3

386

Zikza

k Magdual

Externally

aided

projects

(NEC)

HKKP Water Harvesting 1 No. 0.00317 90 Ha Rs.686.0

0

-----

- ------

-----

- Rs.274

90

Ha

Rs.412.

0

-----

- ------

387

Zikza

k Garagre

Externally

aided

projects

(NEC)

HKKP Water Harvesting 1 No. 0.00386 95 Ha Rs.563.5

0

-----

- ------

-----

- Rs.225

95

Ha

Rs.338.

5

-----

- ------

388

Zikza

k Dembema

Externally

aided

projects

(NEC)

HKKP Water Harvesting 1 No. 0.00404 80 Ha Rs.710.5

0

-----

- ------

-----

- Rs.284

80

Ha

Rs.426.

5

-----

- ------

389

Zikza

k Sokbokgre

Externally

aided

projects

(NEC)

HKKP Water Harvesting 1 No. 0.00403 100 Ha Rs.624.7

5

-----

- ------

-----

- ------

-----

-

Rs.294.

0

40

Ha Rs.331

390

Zikza

k Megerngipara

Externally

aided

projects

(NEC)

HKKP Water Harvesting 1 No. 0.00244 120 Ha Rs.686.0

0

-----

- ------

-----

- ------

-----

-

Rs.329.

0

48

Ha Rs.357

391

Zikza

k Bagina

Externally

aided

projects

(NEC)

HKKP Water Harvesting 1 No. 0.00247 90 Ha Rs.710.5

0

-----

- ------

-----

- ------

-----

-

Rs.348.

0

36

Ha Rs.363

392

Zikza

k Kuligaon

Other loan

projects like

NABARD

HKKP Renovation 1 No. 0.0025 95 Ha Rs.500.0

0

-----

- ------

-----

- ------

48

Ha Rs.250

48

Ha Rs.250

393

Zikza

k Koligaon

Other loan

projects like

NABARD

HKKP Renovation 1 No. 0.0024 70 Ha Rs.450.0

0

-----

- ------

-----

- ------

35

Ha Rs.225

35

Ha Rs.225

394

Zikza

k Dengna

Other loan

projects like

NABARD

HKKP Renovation 1 No. 0.0027 75 Ha Rs.525.0

0

-----

- ------

30

Ha Rs.210

45

Ha Rs.315

-----

- ------

District Irrigation Plan, South West Garo Hills district

107 | P a g e

395

Zikza

k Gopi

Other loan

projects like

NABARD

HKKP Renovation 1 No. 0.0034 60 Ha Rs.540.0

0

-----

- ------

-----

- ------

24

Ha Rs.270

36

Ha Rs.270

396

Zikza

k Kawahagra

Other loan

projects like

NABARD

HKKP Renovation 1 No. 0.0022 85 Ha Rs.525.0

0

-----

- ------

34

Ha Rs.210

51

Ha Rs.315

-----

- ------

397

Zikza

k Chepa

Other loan

projects like

NABARD

HKKP Renovation 1 No. 0.0004 65 Ha Rs.175.0

0

-----

- ------

-----

- ------

26

Ha Rs.88

26

Ha Rs.87

398

Zikza

k Jhonjona

Other loan

projects like

NABARD

HKKP Renovation 1 No. 0.0021 90 Ha Rs.750.0

0

-----

- ------

-----

- ------

36

Ha Rs.375

36

Ha Rs.375

399

Zikza

k Jhorjora

Other loan

projects like

NABARD

HKKP Renovation 1 No. 0.0023 95 Ha Rs.775.0

0

-----

- ------

-----

- ------

38

Ha Rs.388

38

Ha Rs.387

400

Zikza

k Boldamgre

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

401

Zikza

k Katuligre

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

402

Zikza

k Katuligaon

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

403

Zikza

k Dufrigaon

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

404

Zikza

k

Dufrigaon

Koch

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

405

Zikza

k Chilapara

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

406

Zikza

k Kambakpara

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

407

Zikza

k

kambakpara

Sonngitcham

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

408

Zikza

k Demiligre

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

409 Zikza Ameshgittim Other loan HKKP Solar pumpsets 15 ------ 8 Ha Rs.7.50 ----- ------ 5 Rs.2.25 5 Rs.2.25 6 Rs.3.00

District Irrigation Plan, South West Garo Hills district

108 | P a g e

k projects like

NABARD

Nos - No. No. No.

410

Zikza

k Chatihari

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

411

Zikza

k Dangsapara

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

412

Zikza

k

Kuligaon

hajong

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

413

Zikza

k Kuligaon Koch

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

414

Zikza

k

Boldam

A.kongggre

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

415

Zikza

k Janggre

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

416

Zikza

k Janggre Samar

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

417

Zikza

k gandigre Garo

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

418

Zikza

k

gandigreBuram

an

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

419

Zikza

k wadagre

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

420

Zikza

k Kalaicharpara

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

421

Zikza

k

Lower

kalaichar

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

422

Zikza

k Mondalpara

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

423

Zikza

k Wannaggre

Other loan

projects like HKKP Solar pumpsets

15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

District Irrigation Plan, South West Garo Hills district

109 | P a g e

NABARD

424

Zikza

k

upper

wananggre

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

425

Zikza

k Sobokgre

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

426

Zikza

k

Boldam

Songgitalgre

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

427

Zikza

k Dinangpara

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

428

Zikza

k Jongnogre

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

429

Zikza

k Satbone

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

430

Zikza

k Dangsinpara

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

431

Zikza

k Kuligre

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

432

Zikza

k

Kolaigaon

Tillapara

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

433

Zikza

k

Kolaigaon

Momdolpara

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

434

Zikza

k Billipara

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

435

Zikza

k Nayapara

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

436

Zikza

k Katabaripara

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

437

Zikza

k kashipara

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

District Irrigation Plan, South West Garo Hills district

110 | P a g e

438

Zikza

k

Upper

Kalaichar

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

439

Zikza

k Bollongre

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

440

Zikza

k

Upper

Bollongre

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

441

Zikza

k Bolddenggre

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

442

Zikza

k Tewaligre

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

443

Zikza

k Pagolpara

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

444

Zikza

k Paglapara

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

445

Zikza

k Dengnagre

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

446

Zikza

k Anangpara

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

447

Zikza

k Chelipara

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

448

Zikza

k Darugre

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

449

Zikza

k Bengdapara

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

450

Zikza

k Kimdegre

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

451

Zikza

k Okchokgre

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

452 Zikza Sindilgre Other loan HKKP Solar pumpsets 15 ------ 8 Ha Rs.7.50 ----- ------ 5 Rs.2.25 5 Rs.2.25 6 Rs.3.00

District Irrigation Plan, South West Garo Hills district

111 | P a g e

k projects like

NABARD

Nos - No. No. No.

453

Zikza

k Kedapara

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

454

Zikza

k Kerupara

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

455

Zikza

k Dinapara

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

456

Zikza

k Nachipara

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

457

Zikza

k Chepagre

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

458

Zikza

k

New

Anangpara

Songgitcham

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

459

Zikza

k Matkolgre

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

460

Zikza

k Mandalgre

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

461

Zikza

k Chipra

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

462

Zikza

k Tallimgre

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

463

Zikza

k Domapara

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

464

Zikza

k Puljhuri

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

465

Zikza

k Sentpara

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

466

Zikza

k Kawahgra

Other loan

projects like HKKP Solar pumpsets

15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

District Irrigation Plan, South West Garo Hills district

112 | P a g e

NABARD

467

Zikza

k salmanpara

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

468

Zikza

k Nogorpara

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

469

Zikza

k Doromchas

Other loan

projects like

NABARD

HKKP Solar pumpsets 15

Nos ------ 8 Ha Rs.7.50

-----

- ------

5

No. Rs.2.25

5

No. Rs.2.25

6

No. Rs.3.00

470

Zikza

k

Damal

Songgitcham

State

Irrigation

Department

HKKP Protection & Rejuvination of

springs 1 No.

0.00002

8 8.00 Rs.20.00

8

Ha

Rs.20.

0

-----

- ------

-----

- ------

-----

- ------

471

Zikza

k Damagre

State

Irrigation

Department

HKKP Protection & Rejuvination of

springs 1 No.

0.00003

5 7.00 Rs.17.50

7

Ha

Rs.17.

5

-----

- ------

-----

- ------

-----

- ------

472

Zikza

k Boldak songma

State

Irrigation

Department

HKKP Protection & Rejuvination of

springs 1 No.

0.00005

6 6.00 Rs.15.00

6

Ha

Rs.15.

0

-----

- ------

-----

- ------

-----

- ------

473

Zikza

k Anagre

State

Irrigation

Department

HKKP Protection & Rejuvination of

springs 1 No.

0.00005

4 7.20 Rs.18.00

-----

- ------

7

Ha

Rs.18.0

0

-----

- ------

-----

- ------

474

Zikza

k Kilma Gittim

State

Irrigation

Department

HKKP Protection & Rejuvination of

springs 1 No.

0.00005

9 6.30 Rs.15.75

6

Ha

Rs.15.

8

-----

- ------

-----

- ------

-----

- ------

475

Zikza

k Asigre

State

Irrigation

Department

HKKP Protection & Rejuvination of

springs 1 No.

0.00004

3 5.20 Rs.13.00

-----

- ------

5

Ha

Rs.13.0

0

-----

- ------

-----

- ------

476

Zikza

k Tapsi

State

Irrigation

Department

HKKP Protection & Rejuvination of

springs 1 No.

0.00004

0 6.20 Rs.15.50

-----

- ------

6

Ha

Rs.15.5

0

-----

- ------

-----

- ------

477

Zikza

k Salangre

State

Irrigation

Department

HKKP Protection & Rejuvination of

springs 1 No.

0.00005

7 7.20 Rs.18.00

-----

- ------

7

Ha

Rs.18.0

0

-----

- ------

-----

- ------

478

Zikza

k Purakasia

State

Irrigation

Department

HKKP Protection & Rejuvination of

springs 1 No.

0.00004

7 8.20 Rs.20.50

8

Ha

Rs.20.

5

-----

- ------

-----

- ------

-----

- ------

479

Zikza

k Salmanpara

State

Irrigation

Department

HKKP Protection & Rejuvination of

springs 1 No.

0.00005

4 9.20 Rs.23.00

-----

- ------

-----

- ------

9

Ha Rs.23

-----

- ------

480

Zikza

k Debajani

State

Irrigation

Department

HKKP Protection & Rejuvination of

springs 1 No.

0.00005

9 8.00 Rs.25.50

-----

- ------

-----

- ------

10

Ha Rs.26

-----

- ------

District Irrigation Plan, South West Garo Hills district

113 | P a g e

481

Zikza

k Mahendraganj

State

Irrigation

Department

HKKP Protection & Rejuvination of

springs 1 No.

0.00004

3 7.00 Rs.28.00

11

Ha

Rs.28.

0

-----

- ------

-----

- ------

-----

- ------

482

Zikza

k Babelapara

State

Irrigation

Department

HKKP Protection & Rejuvination of

springs 1 No.

0.00004

0 6.00 Rs.30.50

-----

- ------

-----

- ------

-----

- ------

12

Ha

Rs.30.5

0

483

Zikza

k Chepagre

State

Irrigation

Department

HKKP Protection & Rejuvination of

springs 1 No.

0.00004

3 5.00 Rs.33.00

-----

- ------

-----

- ------

-----

- ------

13

Ha

Rs.33.0

0

484

Zikza

k Chelipara

State

Irrigation

Department

HKKP Protection & Rejuvination of

springs 1 No.

0.00004

0 7.00 Rs.35.50

-----

- ------

14

Ha

Rs.35.5

0

-----

- ------

-----

- ------

485

Zikza

k Jangrapara

State

Irrigation

Department

HKKP Protection & Rejuvination of

springs 1 No.

0.00005

7 8.00 Rs.38.00

-----

- ------

15

Ha

Rs.38.0

0

-----

- ------

-----

- ------

486

Zikza

k Kawahagra

State

Irrigation

Department

HKKP Protection & Rejuvination of

springs 1 No.

0.00004

7 4.00 Rs.40.50

-----

- ------

-----

- ------

16

Ha Rs.41

-----

- ------

487

Zikza

k Patijhora

State

Irrigation

Department

HKKP Protection & Rejuvination of

springs 1 No.

0.00005

4 6.00 Rs.43.00

-----

- ------

-----

- ------

17

Ha Rs.43

-----

- ------

488

Zikza

k Magurmari

State

Irrigation

Department

HKKP Protection & Rejuvination of

springs 1 No.

0.00004

3 5.00 Rs.45.50

-----

- ------

18

Ha

Rs.45.5

0

-----

- ------

-----

- ------

489

Zikza

k Damagre

State

Irrigation

Department

HKKP Protection & Rejuvination of

springs 1 No.

0.00004

0 7.00 Rs.48.00

19

Ha

Rs.48.

0

-----

- ------

-----

- ------

-----

- ------

490

Zikza

k Boldakgre

State

Irrigation

Department

HKKP Protection & Rejuvination of

springs 1 No.

0.00004

0 6.00 Rs.48.00

19

Ha

Rs.48.

0

-----

- ------

-----

- ------

-----

- ------

District Irrigation Plan, South West Garo Hills district

114 | P a g e

Dalu Block

Sl.

No.

Nam

e of

Bloc

k

Name of

village

Concerened

Ministry/

Department

Component Activity

Total in Nos.

/Capacity (in

Cum)

Total

comman

d area

(in Ha.)

Total

fund (in

Rs.

Lakhs)

16 -

17

Are

a

16 -

17

Cost

17 -

18

Are

a

17 - 18

Cost

18 -

19

Are

a

18 - 19

Cost

19 -

20

Are

a

19 - 20

Cost

1 Dalu Sanda MoWR HKKP Surface minor irrigation 1 No 0.00578 285 Ha Rs.730

-----

-

Rs.14

6

228

Ha Rs.139

-----

- ------

-----

- ------

2 Dalu Sanda Adu MoWR HKKP Surface minor irrigation 1 No 0.00473 120 Ha Rs.700

-----

- ------

-----

- Rs.210

48

Ha Rs.210

72

Ha Rs.280

3 Dalu Genapara MoWR HKKP Surface minor irrigation 1 No 0.00519 100 Ha

Rs.700.0

0

-----

-

Rs.14

0

40

Ha Rs.280

60

Ha Rs.280

-----

- ------

4 Dalu Puran Bazaar MoWR HKKP Surface minor irrigation 1 No 0.00367 50 Ha

Rs.475.0

0

-----

- ------

-----

- ------

-----

- Rs.95

20

Ha Rs.380

5 Dalu Purakhasia MoWR HKKP Surface minor irrigation 1 No 0.00436 60 Ha

Rs.400.0

0

-----

- ------

-----

- ------

-----

- Rs.80

24

Ha Rs.320

6 Dalu Jarangkona MoWR HKKP Surface minor irrigation 1 No 0.00341 60 Ha

Rs.450.0

0

-----

- ------

-----

- ------

-----

- Rs.90

24

Ha Rs.360

7 Dalu Chongnapara MoWR HKKP Surface minor irrigation 1 No 0.00326 70 Ha

Rs.225.0

0

-----

- ------

-----

- ------

-----

- Rs.45

28

Ha Rs.180

8 Dalu Purakhasia MoWR HKKP Lift irrigation

20

Nos 0.00150 70 Ha Rs.10.00

-----

- ------

18

Ha Rs.2.50

18

Ha

Rs.2.5

0

35

Ha Rs.5.00

9 Dalu Babellapara MoWR HKKP Lift irrigation

20

Nos 0.00108 70 Ha Rs.10.00

-----

- ------

18

Ha Rs.2.50

18

Ha

Rs.2.5

0

35

Ha Rs.5.00

10 Dalu Genapara MoWR HKKP Lift irrigation

20

Nos 0.00075 70 Ha Rs.10.00

-----

- ------

18

Ha Rs.2.50

18

Ha

Rs.2.5

0

35

Ha Rs.5.00

11 Dalu Sandagre MoWR HKKP G/water 5 Nos 0.00075 35 Ha

Rs.540.0

0

-----

- ------

-----

- Rs.162

35

Ha Rs.540

-----

- ------

12 Dalu Sanda MoWR HKKP Lined F/C 1 No

0.00578

0 60 Ha

Rs.127.5

0

-----

- ------

-----

- ------

24

Ha Rs.51

36

Ha Rs.77

13 Dalu Babelapara MoWR HKKP Lined F/C 1 No

0.00108

0 50 Ha Rs.340

-----

- ------

-----

- ------

20

Ha Rs.136

30

Ha Rs.204

14 Dalu Genapara MoWR HKKP Lined F/C 1 No

0.00075

0 70 Ha Rs.238

-----

- ------

-----

- ------

28

Ha Rs.95

42

Ha Rs.143

15 Dalu Darong Adu MoWR HKKP unlined F/C 1 No 0.0001 50 Ha Rs.12.00

-----

- ------

-----

- ------

20

Ha Rs.5

30

Ha Rs.7

16 Dalu Sanda

DoLR -

MoRD

Convergenc

e Land Development 1 No ------ 10 Ha Rs.99.75

-----

- ------

-----

- ------

10

Ha

Rs.99.

8

-----

- ------

17 Dalu Sanda Adu

DoLR -

MoRD

Convergenc

e Land Development 1 No ------ 9 Ha Rs.98.00

-----

- ------

-----

- ------

9

Ha

Rs.98.

0

-----

- ------

18 Dalu Genapara DoLR - Convergenc Land Development 1 No ------ 8 Ha Rs.98.00 ----- ------ ----- ------ 8 Rs.98. ----- ------

District Irrigation Plan, South West Garo Hills district

115 | P a g e

MoRD e - - Ha 0 -

19 Dalu Puran Bazaar

DoLR -

MoRD

Convergenc

e Land Development 1 No ------ 6 Ha Rs.66.50

-----

- ------

-----

- ------

-----

- ------

6

Ha Rs.67

20 Dalu Purakhasia

DoLR -

MoRD

Convergenc

e Land Development 1 No ------ 10 Ha Rs.56.00

-----

- ------

-----

- ------

-----

- ------

10

Ha Rs.56

21 Dalu Jarangkona

DoLR -

MoRD

Convergenc

e Land Development 1 No ------ 7 Ha Rs.63.00

-----

- ------

-----

- ------

-----

- ------

7

Ha Rs.63

22 Dalu Chongnapara

DoLR -

MoRD

Convergenc

e Land Development 1 No ------ 6 Ha Rs.31.50

-----

- ------

-----

- ------

-----

- ------

6

Ha Rs.32

23

Dalu Wagepara

State

Irrigation

Department

HKKP Surface Minor Irrigation 1 No 0.0002 25 Ha Rs.249.0

0

-----

- ------

-----

- Rs.75

25

Ha Rs.174

-----

- ------

24

Dalu Madra

State

Irrigation

Department

HKKP Surface Minor Irrigation 1 No 0.0004 45 Ha Rs.298.8

0

-----

- ------

-----

- Rs.90

45

Ha Rs.209

-----

- ------

25

Dalu Naronggre

State

Irrigation

Department

HKKP Surface Minor Irrigation 1 No 0.0004 20 Ha Rs.224.1

0

-----

- ------

-----

- Rs.67

20

Ha Rs.157

-----

- ------

26

Dalu Jarangkona

State

Irrigation

Department

HKKP Surface Minor Irrigation 1 No 0.0003 21 Ha Rs.52.29 -----

- ------

-----

- Rs.16

21

Ha Rs.36

-----

- ------

27

Dalu Wakmedamgr

e

State

Irrigation

Department

HKKP Surface Minor Irrigation 1 No 0.0005 28 Ha Rs.69.72 -----

- ------

-----

- Rs.21

28

Ha Rs.49

-----

- ------

28

Dalu Chengapara

State

Irrigation

Department

HKKP Surface Minor Irrigation 1 No 0.0003 20 Ha Rs.79.68 -----

- ------

-----

- ------

8

Ha Rs.32

12

Ha Rs.48

29

Dalu Jewilgre

State

Irrigation

Department

HKKP Surface Minor Irrigation 1 No 0.0003 22 Ha Rs.89.64 -----

- ------

-----

- ------

9

Ha Rs.36

13

Ha Rs.54

30

Dalu Purakasi

State

Irrigation

Department

HKKP Surface Minor Irrigation 1 No 0.0003 26 Ha Rs.249.0

0

-----

- ------

-----

- ------

10

Ha Rs.100

16

Ha Rs.149

31

Dalu Genapara

State

Irrigation

Department

HKKP Surface Minor Irrigation 1 No 0.0003 18 Ha Rs.44.82 -----

- ------

-----

- ------

7

Ha Rs.18

11

Ha Rs.27

32

Dalu Babelpara

State

Irrigation

Department

HKKP Surface Minor Irrigation 1 No 0.0002 22 Ha Rs.54.78 -----

- ------

-----

- Rs.13

13

Ha Rs.42

-----

- ------

33

Dalu Bolanggre

State

Irrigation

Department

HKKP Surface Minor Irrigation 1 No 0.0001 13 Ha Rs.32.37 -----

- ------

-----

- Rs.15

15

Ha Rs.17

-----

- ------

34 Dalu Chongnapara State HKKP Surface Minor Irrigation 1 No 0.0003 15 Ha Rs.37.35 ----- ------ ----- Rs.18 18 Rs.19 ----- ------

District Irrigation Plan, South West Garo Hills district

116 | P a g e

Irrigation

Department

- - Ha -

35

Dalu Santang

Nokatgre

State

Irrigation

Department

HKKP Surface Minor Irrigation 1 No 0.0004 18 Ha Rs.44.82 -----

- ------

-----

- Rs.21

21

Ha Rs.24

-----

- ------

36

Dalu Gopinath

Killa

State

Irrigation

Department

HKKP Surface Minor Irrigation 1 No 0.0002 21 Ha Rs.52.29 -----

- ------

-----

- ------

-----

- Rs.21

21

Ha Rs.31

37

Dalu Kotchu Adok

State

Irrigation

Department

HKKP Surface Minor Irrigation 1 No 0.0006 15 Ha Rs.199.2

0

-----

- ------

-----

- ------

-----

- Rs.80

15

Ha Rs.120

38

Dalu Doreng Jasi

State

Irrigation

Department

HKKP Protection & Rejuvination

of springs 1 No 0.0021 7 Ha Rs.26.1

-----

- ------

7

Ha

Rs.20.0

0

-----

- ------

-----

- ------

39

Dalu Narongkolgre

State

Irrigation

Department

HKKP Protection & Rejuvination

of springs 1 No.

0.00002

8 5 Ha Rs.20.00

-----

- ------

5

Ha Rs.18

-----

- ------

-----

- ------

40

Dalu Darong Adu

State

Irrigation

Department

HKKP Protection & Rejuvination

of springs 1 No.

0.00003

5 5 Ha Rs.17.50

-----

- ------

5

Ha Rs.15

-----

- ------

-----

- ------

41

Dalu Babelapara

State

Irrigation

Department

HKKP Protection & Rejuvination

of springs 1 No.

0.00005

6 4 Ha Rs.15.00

-----

- ------

4

Ha Rs.15

-----

- ------

-----

- ------

42

Dalu Purakasi

State

Irrigation

Department

HKKP Protection & Rejuvination

of springs 1 No.

0.00005

4 7 Ha Rs.18.00

-----

- ------

-----

- ------

-----

- ------

-----

- ------

43

Dalu Babelapara

State

Irrigation

Department

HKKP Protection & Rejuvination

of springs 1 No.

0.00002

8 4 Ha Rs.20.00

-----

- ------

-----

- ------

4

Ha Rs.20

-----

- ------

44

Dalu Sanda Adugre

State

Irrigation

Department

HKKP Protection & Rejuvination

of springs 1 No.

0.00003

5 7 Ha Rs.17.50

-----

- ------

-----

- ------

7

Ha Rs.18

-----

- ------

45

Dalu Gopinath

Killa

State

Irrigation

Department

HKKP Protection & Rejuvination

of springs 1 No.

0.00005

6 5 Ha Rs.15.00

-----

- ------

-----

- ------

5

Ha Rs.15

-----

- ------

46

Dalu Salmanpara

East

State

Irrigation

Department

HKKP Protection & Rejuvination

of springs 1 No.

0.00005

4 7 Ha Rs.18.00

-----

- ------

-----

- ------

-----

- ------

7

Ha

Rs.18.0

0

47

Dalu Salmanpara

West

State

Irrigation

Department

HKKP Protection & Rejuvination

of springs 1 No.

0.00002

8 6 Ha Rs.20.00

-----

- ------

-----

- ------

-----

- ------

6

Ha

Rs.20.0

0

District Irrigation Plan, South West Garo Hills district

117 | P a g e

Annexure II : Strategic Action Plan by Soil Conservation Department

Betasing Block Name of the Block: BETASING

2016-17 2017-18 2018-19 2019-20

S.

No

.

Name of the

Village

Concerne

d

Ministry/

Departme

nt

Compone

nt Activity

Total

Number/Capac

ity (cum)

TotalComma

nd Area

(hac.)

Total

Funds

(in Rs.

Lacs.)

Comma

nd Area

(hac.)

Fund

(lacs.)

Comma

nd Area

(hac.)

Fund

(lacs.)

Comma

nd Area

(hac.)

Fun

d

(lacs

.)

Comma

nd Area

(hac.)

Fun

d

(lacs

.)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A

MUJI PRJ

(ONGOING)

MoWR HKKP

Bolchugre Weir 5 Nos/660 cum 459.84 337.94 459.84 337.94 --- --- --- --- --- ---

Chigitchakgre channel 8 Nos --- 498.325 --- 498.32

5 --- --- --- --- --- ---

Hatisil WHS 3 Nos/562 cum --- 51.704 --- 51.704 --- --- --- --- --- ---

Masangpani Aquaduct 2 Nos --- 6.241 --- 6.241 --- --- --- --- --- ---

Murchapani,

Sasatbolgre Disposal Dam 2 Nos/172 cum --- 25.31 --- 25.31 --- --- --- --- --- ---

B

MALCHAPA

RA PRJ

MoWR HKKP

Malchapara

RCC Weir 2 Nos/478 cum 106 92.437 106 92.437 --- --- --- --- --- ---

Channel 3 Nos 0 150.399 --- 28.535

121.86

4 --- --- --- ---

Aquaduct 1 No 0 6.755 --- ---

6.755 --- --- --- ---

Disposal Dam 2 Nos/120 cum 0 15.409 --- ---

15.409 --- --- --- ---

C

Jelbongpara,

Rongsang

Abagre,

Marakkapara,

Skagre

MoWR HKKP

R.R.R for water

Bodies

Water harvesting

strucure

13 Nos/3900

cum 336.8 842 --- --- 204.96 512.4 131.84

329.

6

Grand Total 41 Nos/5892

cum 902.64 2026.52 565.84

1040.4

92 204.96

656.42

8 131.84

329.

6 0 0

District Irrigation Plan, South West Garo Hills district

118 | P a g e

Name of the Block: BETASING

S.

No

.

Name of the

Village

Concerned

Ministry/

Departmen

t

Compone

nt Activity

Total

Number/Capac

ity (cum)

Total

Command

Area (hac.)

(9+11+13+1

5)

Total Funds

(Lacs)

(10+12+14+1

6)

2016-17 2017-18 2018-19 2019-20

Comman

d Area

(hac.)

Fund

(lacs.

)

Comman

d Area

(hac.)

Fund

(lacs.)

Comman

d Area

(hac.)

Fund

(lacs.)

Comman

d Area

(hac.)

Fund

(lacs.)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A

BATCH-VI

MoRD/DoL

R Watershed

Banggre

Bolchugre

Bongpara

Goragre

Grenggandi

Harigaon

Jaluagre

Jamanggre

Matchokpara

Rangsagre

Rangsakona

Rongchadengg

re

Sangkarigre

Wakantagre

A)

Watershed

Works

Check Dam 67 Nos/3216

cum 106.7 53.35 0 0 7.5 3.75 67.2 33.6 32 16

Irrigation

Dam 7 Nos/378 cum 141.13 77.62 0 0 25.24 13.88 89.22 49.07 26.67 14.67

Contour

Trenches 3010 Nos 66.89 30.1 0 0 7.78 3.5 46.67 21 12.44 5.6

Gabion

structure 71 Nos 47.33 35.5 0 0 3.33 2.5 37.33 28 6.67 5

Land

Development 109.2 Ha 36.4 16.38 0 0 6.07 2.73 23.33 10.5 7 3.15

Afforestation 72.8 Ha 0 10.92 0 0 0 2.52 0 6.3 0 2.1

Horticulture 154 Ha 0 23.1 0 0 0 4.2 0 14.7 0 4.2

B)

Livelihood

activities

0 0 39.69 0 0 0 4.41 0 13.23 0 22.05

C)

Production

System

0 0 44.1 0 0 0 4.41 0 13.23 0 26.46

D) DPR

preparation 0 0 4.41 0 4.41 0 0 0 0 0 0

E) Entry

point activity 0 0 17.64 0 17.64 0 0 0 0 0 0

F) Capacity

Building 0 0 22.05 0 4.41 0 8.82 0 4.41 0 4.41

G)

Administrati

ve Cost

0 0 44.1 0 0 0 8.82 0 22.05 0 13.23

H)

Monitoring 0 0 4.41 0 0 0 0.88 0 2.21 0 1.32

I) Evaluation 0 0 4.41 0 0 0 1.32 0 2.21 0 0.88

District Irrigation Plan, South West Garo Hills district

119 | P a g e

J)

Consolidatio

n Phase

0 0 13.23 0 0 0 0 0 0 0 13.23

SUB-TOTAL OF A 74 Nos/ 3594

cum 398.45 441.01 0 26.46 49.92 61.74 263.75 220.51 84.78 132.3

B

BATCH-VII

MoRD/DoL

R Watershed

Amjana

Korkora

Arenggre

Bainapara

Bainapara

Koch

Bandalkona

Chigitchakgre

Chigitchakgre

Chiringpara

Dengnakpara

Dolbari

Dombagre

Dumnigaon

Gasura

Golmangre

Gondugre

Jelbongpara

Jelbongpara

Nokat

Jewilgre

Kasibil

Kolkatola

Lower

Damalgre

Lutubari

Malchapara

Mangsanggre

Mohesbatanpa

ra

Murchapani

Murchapani

Koch

Rongsang

Abagre

Rongsang

Abrenggre

Rongsang

A)

Watershed

Works

Check Dam 290 Nos/ 14616

cum 459.8 229.9 0 0 63 31.5 297.6 148.8 99.2 49.6

Irrigation

Dam

28 Nos/1680

cum 603.48 331.91 0 0 55.11 30.31 409.32

225.12

5 139.05 76.475

Contour

Trenches 3984 Nos 81.47 39.84 0 0 19.2 8.64 51.67 23.25 10.6 7.95

Gabion

structure 84 Nos 61.33 42 0 0 6.67 5 41.33 31 13.33 6

Land

Development 341 Ha 80.6 51.15 0 0 15.5 6.975 49.6 37.2 15.5 6.975

Afforestation 217 Ha 0 32.55 0 0 0 9.3 0 18.6 0 4.65

Horticulture 527 Ha 0 79.05 0 0 0 16.27

5 0 48.825 0 13.95

B)

Livelihood

activities

0 0 129.6 0 0 0 14.4 0 43.2 0 72

C)

Production

System

0 0 144 0 0 0 14.4 0 43.2 0 86.4

D) DPR

preparation 0 0 14.4 0 14.4 0 0 0 0 0 0

E) Entry

point activity 0 0 57.6 0 57.6 0 0 0 0 0 0

F) Capacity

Building 0 0 72 0 14.4 0 28.8 0 14.4 0 14.4

G)

Administrati

ve Cost

0 0 144 0 0 0 28.8 0 72 0 43.2

H)

Monitoring 0 0 14.4 0 0 0 2.88 0 7.2 0 4.32

I) Evaluation 0 0 14.4 0 0 0 4.32 0 7.2 0 2.88

J)

Consolidatio

n Phase

0 0 43.2 0 0 0 0 0 0 0 43.2

District Irrigation Plan, South West Garo Hills district

120 | P a g e

Songma

Salbari

Sasatbolgre

Skagre

Taktaki

Uppar

Damalgre

Wadagre

SUB-TOTAL OF B 318 Nos/ 16296

cum 1286.68 1440 0 86.4 159.48 201.6 849.52 720 277.68 432

C

BATCH-IX

MoRD/DoL

R Watershed

Adugre

Agalgre

Asinagre

Bangkapara

Bisindagre

Bolgangre

Bollonggre

Bolsalgre

Bongpara

Borolatri

Chidekgre

Chimisenggre

Chisregre

Damdama

Dilnigre

Dorambokgre

Gambagre

Gimbilgre

Jenggichakgre

Latrigre

Marakkapara

Naragre

Wakagre

Wakka

Akongre

Wakka Kama

Watregre

A)

Watershed

Works

Check Dam 16 Nos/752 cum 27.05 13.525 0 0 0 0 0 0 27.05 13.525

Irrigation

Dam 2 Nos/192 cum 46.03 25.315 0 0 0 0 0 0 46.03 25.315

Contour

Trenches 420 Nos 9.33 4.2 0 0 0 0 0 0 9.33 4.2

Gabion

structure 15 Nos 10 7.5 0 0 0 0 0 0 10 7.5

Land

Development 21 Ha 4.2 3.15 0 0 0 0 0 0 4.2 3.15

Afforestation 10.5 Ha 0 1.575 0 0 0 0 0 0 0 1.575

Horticulture 44.1 Ha 0 6.615 0 0 0 0 0 0 0 6.615

B)

Livelihood

activities

0 0 8.25 0 0 0 0 0 0 0 8.25

C)

Production

System

0 0 8.25 0 0 0 0 0 0 0 8.25

D) DPR

preparation 0 0 8.25 0 0 0 0 0 8.25 0 0

E) Entry

point activity 0 0 33 0 0 0 0 0 33 0 0

F) Capacity

Building 0 0 24.75 0 0 0 0 0 8.25 0 16.5

G)

Administrati

ve Cost

0 0 16.5 0 0 0 0 0 0 0 16.5

H)

Monitoring 0 0 1.65 0 0 0 0 0 0 0 1.65

I) Evaluation 0 0 2.48 0 0 0 0 0 0 0 2.48

District Irrigation Plan, South West Garo Hills district

121 | P a g e

J)

Consolidatio

n Phase

0 0 0 0 0 0 0 0 0 0 0

SUB-TOTAL OF C 18 Nos/944 cum 96.61 165.01 0 0 0 0 0 49.5 96.61 115.51

D

BATCH-X

MoRD/DoL

R Watershed

Chelipara

Nokat

Chelipara

Songma

Gara

Bokmangre

Goldatgre

Rongchadengg

re

Simsang

Bokmangre

A)

Watershed

Works

Check Dam 0 0 0 0 0 0 0 0 0 0 0

Irrigation

Dam 0 0 0 0 0 0 0 0 0 0 0

Contour

Trenches 0 0 0 0 0 0 0 0 0 0 0

Gabion

structure 0 0 0 0 0 0 0 0 0 0 0

Land

Development 0 0 0 0 0 0 0 0 0 0 0

Afforestation 0 0 0 0 0 0 0 0 0 0 0

Horticulture 0 0 0 0 0 0 0 0 0 0 0

B)

Livelihood

activities

0 0 0 0 0 0 0 0 0 0 0

C)

Production

System

0 0 0 0 0 0 0 0 0 0 0

D) DPR

preparation 0 0 0 0 0 0 0 0 0 0 1.854

E) Entry

point activity 0 0 0 0 0 0 0 0 0 0 7.416

F) Capacity

Building 0 0 0 0 0 0 0 0 0 0 1.854

G)

Administrati

ve Cost

0 0 0 0 0 0 0 0 0 0 0

H)

Monitoring 0 0 0 0 0 0 0 0 0 0 0

I) Evaluation 0 0 0 0 0 0 0 0 0 0 0

J)

Consolidatio

n Phase

0 0 0 0 0 0 0 0 0 0 0

SUB-TOTAL OF D

0 0 0 0 0 0 0 0 0 11.124

GRAND TOTAL 410 Nos/ 20834

cum 1781.74 2046.02 0

112.8

6 209.4

263.3

4 1113.27 990.01 459.07

690.93

4

District Irrigation Plan, South West Garo Hills district

122 | P a g e

Name of the Block: BETASING

s.n

o village

Concerne

d

Ministry/

Departme

nt

Component Activity

Total

Number/Cap

acity (cum)

Total

Command

Area

(hac.)

(9+11+13+

15)

Total

Funds

(Lacs)

(10+12+14

+16)

2016-17 2017-18 2018-19 2019-20

Comman

d Area

(hac.)

Fun

d

(lac

s.)

Comma

nd Area

(hac.)

Fun

d

(lacs

.)

Comma

nd Area

(hac.)

Fun

d

(lacs

.)

Comma

nd Area

(hac.)

Fun

d

(lac

s.)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1

Bainapara

Banggre

Bisindagre

Bolsalgre

Chidekgre

Chigitchakgr

e

Dolbari

Dumnigaon

Jaluagre

Jelbongpara

Jenggichakg

re

Kasibil

Malchapara

Marakkapara

Matchokpara

Naragre

Rangsagre

Rangsakona

Rongsang

Abagre

Sasatbolgre

Skagre

Watregre

MoRD/Do

LR

Convergence with

MGNREGA

Waer harvesting

structure

15 Nos/

1369 cum 174 78.25 39 17.5 78 35 22 10 35

15.7

5

2 MoRD/Do

LR

Convergence with

MGNREGA Land Development 66 Ha 66 26.4 11 4.4 19 7.6 23 9.2 13 5.2

Grand Total

12 Nos/

1296 cum 240 104.65 50 21.9 97 42.6 45 19.2 48

20.9

5

District Irrigation Plan, South West Garo Hills district

123 | P a g e

Zikzak Block Name of the Block: ZIKZAK

2016-17 2017-18 2018-19 2019-20

S.

No

.

Name of the

Village

Concerned

Ministry/

Departmen

t

Componen

t Activity

Total

Number/Capacit

y (cum)

TotalComman

d Area (hac.)

Total Funds

(in Rs.

Lacs.)

Comman

d Area

(hac.)

Fund

(lacs.)

Comman

d Area

(hac.)

Fund

(lacs.)

Comman

d Area

(hac.)

Fund

(lacs.

)

Comman

d Area

(hac.)

Fund

(lacs.

)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A

BONBANGA

PRJ

MoWR HKKP

Bonbanga

RCC Weir 3 Nos/409 cum 98 107.812 98 107.81

2 --- --- --- --- --- ---

Channel 5 Nos 0 123.678 ---

--- 123.67

8 --- --- --- ---

Aquaduct 2 Nos 0 13.51 ---

--- 13.51 --- --- --- ---

B

DEMDEMA

PRJ

MoWR HKKP

Kalaipara,

Noomati

RCC Weir 1 No/300 cum 144 157.282 144 86.102 --- 71.18 --- --- --- ---

Channel 6 Nos 0 180.419 --- 38.023 --- 142.39

6 --- --- --- ---

Aquaduct 1 No 0 22.299 --- 22.299 ---

--- --- --- ---

C

DIMLI PROJ

MoWR HKKP

Dangsapara RCC Weir 4 Nos/638 cum 142 217.167 57.09 113.03

8 84.91

104.12

9 --- --- --- ---

Dinangpara Channel 5 Nos 0 131.078 --- 22.936 --- 108.14

2 --- --- --- ---

Katuli Aquaduct 1 No 0 6.755 --- 6.755 --- 0 --- --- --- ---

D

GARUGHAT

PRJ

MoWR HKKP

Chatihari,

Chengkompar

a

RCC Weir 3 Nos/396 cum 74 97.21 30.06 56.744 43.94 40.466 --- --- --- ---

Disposal

Dam 2 Nos/124 cum 0 18.404 --- 18.404 --- 0 --- --- --- ---

Channel 3 Nos 0 69.386 --- 0 --- 69.386 --- --- --- ---

E

KULI PRJ

MoWR HKKP

Kalaichar

RCC Weir 3 Nos/831 cum 226 263.876 91.79 203.43

9 134.21 60.437 --- --- --- ---

Distributio

n Dam 2 Nos/96 cum 0 26.048 --- 26.048 --- 0 --- --- --- ---

Disposal

Dam 3 Nos/316 cum 0 27.606 --- 0 --- 27.606 --- --- --- ---

Channel 9 Nos 0 247.47 --- 0 --- 247.47 --- --- --- ---

F Salmanpara, MoWR HKKP RRR for Water Bodies

District Irrigation Plan, South West Garo Hills district

124 | P a g e

Chopapara,

Nachilpara,

Rongkaigre,

Bangdapara

Water

Harvesting

structure

12 Nos/4860 cum 368.64 921.6 --- --- 173.28 433.2 195.36 488.4 --- ---

Grand Total 65 Nos/7973

cum 1052.64 2631.6 420.94 701.6 436.34 1441.6 195.36 488.4 0 0

Name of the Block:ZIKZAK

S.

No

.

Name of the

Village

Concerned

Ministry/

Departmen

t

Compone

nt Activity

Total

Number/Capaci

ty (cum)

Total

Comman

d Area

(hac.)

Total

Funds

(Lacs)

2016-17 2017-18 2018-19 2019-20

Comman

d Area

(hac.)

Fund

(lacs.)

Comman

d Area

(hac.)

Fund

(lacs.)

Comman

d Area

(hac.)

Fund

(lacs.)

Comman

d Area

(hac.)

Fund

(lacs.

)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A

BATCH-V (ON-

GOING)

MoRD/DoL

R Watershed

Aningpara

Chopapara

Dangsapara

Dimligre

Dinangpara

Domapara Apalgre

Dosagre

Ganggekona

Jangnapara

Kambakpara

Amesgittim

Kerupara

Matkolgre

Megapgre

Okchokgre

Santogre

Sindilgre

Tochapara

A)

Watershed

Works

Irrigation

Dam

7 Nos/

630 cum 175.16

87.5830

1 11.7 5.85076 163.46

81.7322

5 0 0 0 0

Water

harvesting

structure

13 Nos/

936 cum 124.19

68.3016

8 20.82

11.4486

2 63.64 35 39.73 21.85306 0 0

Dug out

Pond

23 Nos/

1030 cum 41 34.856 16.05 13.646 11.64 9.898 13.31 11.312 0 0

Irrigation

Channel 12 Nos 9.91 7.43457 1.02 0.765 6.61 4.95802 2.28 1.71155 0 0

Protection

wall 11 Nos 26.67 20 0 0 18.67 14 8 6 0 0

Embankment 1 No 6.22 2.8 0 0 6.22 2.8 0 0 0 0

Check Dam 9 Nos/

518 cum 94.03 51.7163 0 0 69.73

38.3525

5 24.3 13.36375 0 0

Land

Developmen

t

170.895 Ha 46.86 21.0857

7 11.41 5.13612 19.73 8.877 15.72 7.07265 0 0

Afforestation 330.43 Ha 0 12.5454

8 0 0 0

11.4654

8 0 1.08 0 0

Horticulture 277.2 Ha 0 27.9972 0 7.9285 0 13.8067 0 6.262 0 0

B)

Livelihood

activities

0 0 53.73 0 5.97 0 17.91 0 29.85 0 0

C) 0 0 59.7 0 5.97 0 17.91 0 35.82 0 0

District Irrigation Plan, South West Garo Hills district

125 | P a g e

Production

System

D) DPR

preparation 0 0 0 0 0 0 0 0 0 0 0

E) Entry

point activity 0 0 0 0 0 0 0 0 0 0 0

F) Capacity

Building 0 0 23.88 0 11.94 0 5.97 0 5.97 0 0

G)

Administrati

ve Cost

0 0 59.7 0 11.94 0 29.85 0 17.91 0 0

H)

Monitoring 0 0 5.97 0 1.194 0 2.985 0 1.791 0 0

I) Evaluation 0 0 5.97 0 1.791 0 2.985 0 1.194 0 0

J)

Consolidatio

n Phase

0 0 17.91 0 0 0 0 0 17.91 0 0

SUB-TOTAL OF A 52 Nos/ 3114

cum 524.04 561.18 61 83.58 359.7 298.5 103.34

179.1000

1 0 0

B

BATCH-VIII

MoRD/DoL

R Watershed

Aragittim

Bahadurkutta

Baksapara

Bettola

Bildoba

Bonbanga

Chibonggre

Damdilaka

Danganatong

Dathbanga ( Garo )

Dathbanga ( Koch

)

Debajani

Demdemakona

Dhola Agia

Dhoromchas

Dinapara

Dingampara

Gofraigaon

Gongrapara

Gopinathkilla

Gujangpara

Hullukona

A)

Watershed

Works

Check Dam 234 Nos/ 12355

cum 375.04 187.52 0 0 0 0 30.4 15.2 344.64

172.3

2

Irrigation

Dam

18 Nos/

1944 cum 409.39 225.165 0 0 0 0 66.66 36.665 342.73 188.5

Contour

Trenches 2365 Nos 52.55 23.65 0 0 0 0 19.11 8.6 33.44 15.05

Gabion

structure 30 Nos 20 15 0 0 0 0 6 4.5 14 10.5

Land

Developmen

t

219.3 Ha 73.1 32.895 0 0 0 0 15.77 7.095 57.33 25.8

Afforestation 137.6 Ha 0 20.64 0 0 0 0 0 7.74 0 12.9

Horticulture 301 Ha 0 45.15 0 0 0 0 0 12.9 0 32.25

B)

Livelihood

activities

0 0 49.44 0 0 0 0 0 12.36 0 37.08

C)

Production

System

0 0 49.44 0 0 0 0 0 12.36 0 37.08

D) DPR 0 0 12.36 0 0 0 12.36 0 0 0 0

District Irrigation Plan, South West Garo Hills district

126 | P a g e

Josipara

Kawahagra

Kentrikona

Kongbangpara

Malmua

Marengpara

Nachilpara

Nogorpara

Rapangpanggiri

Rimtangpara

Ritekpara

Rongkaigre

Salampara

Salmanpara

Santangpara

Silghaguri

Songmagiri

Tarapara

Tongnapara

Torangpara

Tungrurchar

preparation

E) Entry

point activity 0 0 49.44 0 0 0 49.44 0 0 0 0

F) Capacity

Building 0 0 49.44 0 0 0 12.36 0 24.72 0 12.36

G)

Administrati

ve Cost

0 0 86.52 0 0 0 0 0 24.72 0 61.8

H)

Monitoring 0 0 8.65 0 0 0 0 0 2.47 0 6.18

I) Evaluation 0 0 9.89 0 0 0 0 0 3.71 0 6.18

J)

Consolidatio

n Phase

0 0 0 0 0 0 0 0 0 0 0

SUB-TOTAL OF B 252 Nos/ 14299

cum 930.08 865.2 0 0 0 74.16 137.94 173.04 792.14 618

C

BATCH-X

MoRD/DoL

R Watershed

Banangpara

Bhoirakupi

Bhoirakupi(Beltuli

)

Bhoirakupi(Marah

ali)

Bhoirakupi(Nolbar

i)

Bhorikupi

(Lutubari)

Bollonggiri A (

Diglakona )

Bollonggiri B

Bollonggiri I

Bollonggiri-II

Chelapara

Dufrigaon

Dufrigaon Koch

Matrongkolgre

A)

Watershed

Works

Check Dam 0 0 0 0 0 0 0 0 0 0 0

Irrigation

Dam 0 0 0 0 0 0 0 0 0 0 0

Contour

Trenches 0 0 0 0 0 0 0 0 0 0 0

Gabion

structure 0 0 0 0 0 0 0 0 0 0 0

Land

Developmen

t

0 0 0 0 0 0 0 0 0 0 0

Afforestation 0 0 0 0 0 0 0 0 0 0 0

Horticulture 0 0 0 0 0 0 0 0 0 0 0

B)

Livelihood

activities

0 0 0 0 0 0 0 0 0 0 0

C) 0 0 0 0 0 0 0 0 0 0 0

District Irrigation Plan, South West Garo Hills district

127 | P a g e

Satboni

Sokbokgre

Wagepara

Production

System

D) DPR

preparation 0 0 4.326 0 0 0 0 0 0 0 4.326

E) Entry

point activity 0 0 17.304 0 0 0 0 0 0 0

17.30

4

F) Capacity

Building 0 0 4.326 0 0 0 0 0 0 0 4.326

G)

Administrati

ve Cost

0 0 0 0 0 0 0 0 0 0 0

H)

Monitoring 0 0 0 0 0 0 0 0 0 0 0

I) Evaluation 0 0 0 0 0 0 0 0 0 0 0

J)

Consolidatio

n Phase

0 0 0 0 0 0 0 0 0 0 0

SUB-TOTAL OF C

0 25.956 0 0 0 0 0 0 0 25.95

6

GRAND TOTAL 304 Nos/ 17413

cum 1454.12 1452.34 61.00 83.58 359.70 372.66 241.28 352.14 792.14

643.9

6

District Irrigation Plan, South West Garo Hills district

128 | P a g e

Name of the Block: ZIKZAK

s.n

o village

Concerne

d

Ministry/

Departme

nt

Component Activity

Total

Number/Capa

city (cum)

Total

Command

Area

(hac.)

(9+11+13+

15)

Total

Funds

(Lacs)

(10+12+14+

16)

2016-17 2017-18 2018-19 2019-20

Comma

nd Area

(hac.)

Fun

d

(lacs

.)

Comma

nd Area

(hac.)

Fun

d

(lacs

.)

Comma

nd Area

(hac.)

Fun

d

(lacs

.)

Comma

nd Area

(hac.)

Fun

d

(lacs

.)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1

Aningpara

Banangpara

Bhoirakupi

Chelapara

Chopapara

Damdilaka

Danganaton

g

Demdemak

ona

Dimligre

Dinangpara

Dinapara

Dufrigaon

Gopinathkil

la

Hullukona

Jangnapara

Kawahagra

Kentrikona

Nachilpara

Rongkaigre

Salmanpara

Satboni

Sokbokgre

Songmagiri

Tochapara

MoRD/Do

LR

Convergence with

MGNREGA

Waer harvesting

structure

12 Nos/

1296 cum 139 63 31 14 62 28 23 10.5 23 10.5

2 MoRD/Do

LR

Convergence with

MGNREGA Land Development 60 Ha 60 24 10 4 20 8 20 8 10 4

Grand Total

12 Nos/

1296 cum 199 87 41 18 82 36 43 18.5 33 14.5

District Irrigation Plan, South West Garo Hills district

129 | P a g e

Annexure III : Strategic Action Plan by Agriculture Department

Sl.

No

Name of

the Village Block

Concerned

Ministry/

Departmen

t

Compone

nt Activity

Total 2016-17 2017-18 2018-19 2019-20

Total

Num

ber/

Capa

city

(Cu

m)

Comm

ands

Area

(ha.)

Fun

d

(lacs

)

Total

Num

ber/

Capa

city

(Cu

m)

Comm

ands

Area

(ha.)

Fun

d

(lacs

)

Total

Num

ber/

Capa

city

(Cu

m)

Com

mand

Area

(ha.)

Fun

d

(lacs

)

Total

Num

ber/

Capa

city

(Cu

m)

Com

mand

Area

(ha.)

Fun

d

(lacs

)

Total

Num

ber/

Capa

city

(Cu

m)

Com

mand

Area

(ha.)

Fun

d

(lac

s)

1 Babelapara Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 12.00 36.0

0 1.00 12.00

36.0

0 --- --- --- --- --- --- --- --- ---

2 Genapara Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 8.00 35.0

0 1.00 8.00

35.0

0 --- --- --- --- --- --- --- --- ---

3 Lower

Babelapara Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 10.00 35.0

0 1.00 10.00

35.0

0 --- --- --- --- --- --- --- --- ---

4 Hatimara Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 6.00 28.0

0 1.00 6.00

28.0

0 --- --- --- --- --- --- --- --- ---

5 Pokasindig

ri Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 5.00 32.0

0 1.00 5.00

32.0

0 --- --- --- --- --- --- --- --- ---

6 Gopramgre Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 5.00 30.0

0 1.00 5.00

30.0

0 --- --- --- --- --- --- --- --- ---

7 Agalgre Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 4.00 30.0

0 1.00 4.00

30.0

0 --- --- --- --- --- --- --- --- ---

8 Bakdakgri Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

1.00 8.00 35.0

0 1.00 8.00

35.0

0 --- --- --- --- --- --- --- --- ---

District Irrigation Plan, South West Garo Hills district

130 | P a g e

channel

9 Rapangpan

ggri Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 6.00 28.0

0 1.00 6.00

28.0

0 --- --- --- --- --- --- --- --- ---

10 Dingampar

a Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 5.00 31.0

0 1.00 5.00

31.0

0 --- --- --- --- --- --- --- --- ---

11 Wakmeda

mgre Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 4.00 31.0

0 1.00 4.00

31.0

0 --- --- --- --- --- --- --- --- ---

12 Gopinathki

lla Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 6.00 38.6

0 1.00 6.00

38.6

0 --- --- --- --- --- --- --- --- ---

13 Damdiloka Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 4.00 29.0

0 1.00 4.00

29.0

0 --- --- --- --- --- --- --- --- ---

14 Josipara Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 5.00 32.0

0 1.00 5.00

32.0

0 --- --- --- --- --- --- --- --- ---

15 Songmagre Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 4.00 26.5

0 1.00 4.00

26.5

0 --- --- --- --- --- --- --- --- ---

16 Anangpara Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 7.00 34.0

0 1.00 7.00

34.0

0 --- --- --- --- --- --- --- --- ---

17 Chipra Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 6.00 33.0

0 1.00 6.00

33.0

0 --- --- --- --- --- --- --- --- ---

18 Chepagre Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 5.00 30.0

0 1.00 5.00

30.0

0 --- --- --- --- --- --- --- --- ---

19 Kodaldow

a Zikzak

MoA &

FW-DAC &

Har Khet

Ko Pani

Check Dam

with 1.00 18.00

38.0

0 1.00 18.00

38.0

0 --- --- --- --- --- --- --- --- ---

District Irrigation Plan, South West Garo Hills district

131 | P a g e

FW irrigation

channel

20 Gandigre Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 8.00 4.73 1.00 8.00 4.73 --- --- --- --- --- --- --- --- ---

21 Wanangre Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 10.00 3.16 1.00 10.00 3.16 --- --- --- --- --- --- --- --- ---

22 Chapahati Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 15.00 6.31 1.00 15.00 6.31 --- --- --- --- --- --- --- --- ---

23 Lokaichar Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 10.00 6.31 1.00 10.00 6.31 --- --- --- --- --- --- --- --- ---

24 Mahendrag

anj Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 15.00 6.94 1.00 15.00 6.94 --- --- --- --- --- --- --- --- ---

25 Kalaichar Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 20.00 9.47 1.00 20.00 9.47 --- --- --- --- --- --- --- --- ---

26 Morahalip

ara Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 10.00 36.0

0 1.00 10.00

36.0

0 --- --- --- --- --- --- --- --- ---

27 Paglapara

M.Ganj Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 10.00 35.6

5 1.00 10.00

35.6

5 --- --- --- --- --- --- --- --- ---

28 Chellipara Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 15.00 25.0

0 1.00 15.00

25.0

0 --- --- --- --- --- --- --- --- ---

29 Chiprakam

a

Betasin

g

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 20.00 30.0

0 1.00 20.00

30.0

0 --- --- --- --- --- --- --- --- ---

30 Goldatgre Betasin MoA & Har Khet Check Dam 1.00 20.00 20.0 1.00 20.00 20.0 --- --- --- --- --- --- --- --- ---

District Irrigation Plan, South West Garo Hills district

132 | P a g e

g FW-DAC &

FW

Ko Pani with

irrigation

channel

0 0

31 Belbupara Betasin

g

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 15.00 18.0

0 1.00 15.00

18.0

0 --- --- --- --- --- --- --- --- ---

32

Gara

Bokmangr

e

Betasin

g

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 15.00 15.0

0 1.00 15.00

15.0

0 --- --- --- --- --- --- --- --- ---

33 Simsangbo

kmangre

Betasin

g

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 20.00 18.0

0 1.00 20.00

18.0

0 --- --- --- --- --- --- --- --- ---

34 Kebolpara Betasin

g

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 20.00 20.0

0 1.00 20.00

20.0

0 --- --- --- --- --- --- --- --- ---

35 Jangnapara Betasin

g

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 20.00 15.0

0 1.00 20.00

15.0

0 --- --- --- --- --- --- --- --- ---

36 Bangkapar

a

Betasin

g

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 15.00 15.0

0 1.00 15.00

15.0

0 --- --- --- --- --- --- --- --- ---

37 Jolgaon Betasin

g

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 20.00 30.0

0 1.00 20.00

30.0

0 --- --- --- --- --- --- --- --- ---

38 Jongchetpa

ra Songma

Betasin

g

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 15.00 25.0

0 1.00 15.00

25.0

0 --- --- --- --- --- --- --- --- ---

39

Jongchetpa

ra

Christian

Betasin

g

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 10.00 22.0

0 1.00 10.00

22.0

0 --- --- --- --- --- --- --- --- ---

40 Jelbongpar

a

Betasin

g

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 20.00 35.0

0 1.00 20.00

35.0

0 --- --- --- --- --- --- --- --- ---

District Irrigation Plan, South West Garo Hills district

133 | P a g e

41 Bandalkon

a

Betasin

g

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 15.00 40.0

0 1.00 15.00

40.0

0 --- --- --- --- --- --- --- --- ---

42 Korkatola Betasin

g

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 15.00 18.0

0 1.00 15.00

18.0

0 --- --- --- --- --- --- --- --- ---

43 Murchapan

i

Betasin

g

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 20.00 15.0

0 1.00 20.00

15.0

0 --- --- --- --- --- --- --- --- ---

44

Tour

Programm

e

Betasin

g

MoA &

FW-DAC &

FW

Per Drop

More

Crop

Exposure trip

of farmers to

different

Agricultural

important

places in

India

2

Nos.

(Tour

)

100

farmers 5.00

2

Nos.

(Tour

)

100

farmers 5.00 --- --- --- --- --- --- --- --- ---

45 Patijora Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 7.00 32.0

0 --- --- --- 1.00 7.00

32.0

0 --- --- --- --- --- ---

46 Dathbhang

a Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 7.00 37.0

0 --- --- --- 1.00 7.00

37.0

0 --- --- --- --- --- ---

47 Paglapara Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 8.00 28.0

0 --- --- --- 1.00 8.00

28.0

0 --- --- --- --- --- ---

48 Radanpara Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 5.00 40.0

0 --- --- --- 1.00 5.00

40.0

0 --- --- --- --- --- ---

49 Tarapara Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 13.00 41.0

0 --- --- --- 1.00 13.00

41.0

0 --- --- --- --- --- ---

50 Arakgittim Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 6.00 40.0

0 --- --- --- 1.00 6.00

40.0

0 --- --- --- --- --- ---

51 Kentrikona Zikzak MoA & Har Khet Check Dam 1.00 10.00 26.0 --- --- --- 1.00 10.00 26.0 --- --- --- --- --- ---

District Irrigation Plan, South West Garo Hills district

134 | P a g e

FW-DAC &

FW

Ko Pani with

irrigation

channel

0 0

52 Baksapara Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 6.00 36.0

0 --- --- --- 1.00 6.00

36.0

0 --- --- --- --- --- ---

53 Debajani Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 8.00 38.0

0 --- --- --- 1.00 8.00

38.0

0 --- --- --- --- --- ---

54 Jengrimpar

a Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 8.00 36.0

0 --- --- --- 1.00 8.00

36.0

0 --- --- --- --- --- ---

55 Wagepara Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 7.00 37.0

0 --- --- --- 1.00 7.00

37.0

0 --- --- --- --- --- ---

56 Dombagre Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 5.00 33.0

0 --- --- --- 1.00 5.00

33.0

0 --- --- --- --- --- ---

57 Hullukona Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 11.00 34.0

0 --- --- --- 1.00 11.00

34.0

0 --- --- --- --- --- ---

58 Dolsigre Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 6.00 29.0

0 --- --- --- 1.00 6.00

29.0

0 --- --- --- --- --- ---

59 Banangpar

a Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 5.00 29.0

0 --- --- --- 1.00 5.00

29.0

0 --- --- --- --- --- ---

60 Tewaligre Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 5.00 40.0

0 --- --- --- 1.00 5.00

40.0

0 --- --- --- --- --- ---

61 Pagalpara Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 5.00 36.0

0 --- --- --- 1.00 5.00

36.0

0 --- --- --- --- --- ---

District Irrigation Plan, South West Garo Hills district

135 | P a g e

62 Aningpara Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 5.00 30.0

0 --- --- --- 1.00 5.00

30.0

0 --- --- --- --- --- ---

63 Garagre Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 5.00 36.0

0 --- --- --- 1.00 5.00

36.0

0 --- --- --- --- --- ---

64 Gopinathki

lla Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 6.00 40.0

0 --- --- --- 1.00 6.00

40.0

0 --- --- --- --- --- ---

65 Mahendrag

anj Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 30.00 37.0

0 --- --- --- 1.00 30.00

37.0

0 --- --- --- --- --- ---

66 Baladinggr

e Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 10.00 15.0

0 --- --- --- 1.00 10.00

15.0

0 --- --- --- --- --- ---

67 Sasatbolgr

e Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 15.00 18.0

0 --- --- --- 1.00 15.00

18.0

0 --- --- --- --- --- ---

68 Dalbotpara Betasin

g

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 10.00 15.0

0 --- --- --- 1.00 10.00

15.0

0 --- --- --- --- --- ---

69 Abagre Betasin

g

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 15.00 18.0

0 --- --- --- 1.00 15.00

18.0

0 --- --- --- --- --- ---

70 Rongsengg

re

Betasin

g

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 20.00 35.0

0 --- --- --- 1.00 20.00

35.0

0 --- --- --- --- --- ---

71 Godalgre Betasin

g

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 15.00 20.0

0 --- --- --- 1.00 15.00

20.0

0 --- --- --- --- --- ---

72 Kasibil Betasin

g

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 10.00 18.0

0 --- --- --- 1.00 10.00

18.0

0 --- --- --- --- --- ---

District Irrigation Plan, South West Garo Hills district

136 | P a g e

73 Golmanggr

e

Betasin

g

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 10.00 15.0

0 --- --- --- 1.00 10.00

15.0

0 --- --- --- --- --- ---

74 Kashra Betasin

g

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 15.00 25.0

0 --- --- --- 1.00 15.00

25.0

0 --- --- --- --- --- ---

75 Kashra

Koch

Betasin

g

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 20.00 22.0

0 --- --- --- 1.00 20.00

22.0

0 --- --- --- --- --- ---

76 Kashra

Hajong

Betasin

g

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 15.00 22.0

0 --- --- --- 1.00 15.00

22.0

0 --- --- --- --- --- ---

77 Dakupara Betasin

g

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 10.00 24.0

0 --- --- --- 1.00 10.00

24.0

0 --- --- --- --- --- ---

78 Badagre Betasin

g

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 15.00 25.0

0 --- --- --- 1.00 15.00

25.0

0 --- --- --- --- --- ---

79 Rongramgr

e

Betasin

g

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 15.00 25.0

0 --- --- --- 1.00 15.00

25.0

0 --- --- --- --- --- ---

80 Chadonpar

a Nokat

Betasin

g

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 10.00 18.0

0 --- --- --- 1.00 10.00

18.0

0 --- --- --- --- --- ---

81

Tour

Programm

e

Betasin

g

MoA &

FW-DAC &

FW

Per Drop

More

Crop

Exposure trip

of farmers to

different

Agricultural

important

places in

India

2

Nos.

(Tour

)

100

farmers 5.00 --- --- ---

2

Nos.

(Tour

)

100

farmer

s

5.00 --- --- --- --- --- ---

82 Katuligaon Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 18.00 32.0

0 --- --- --- --- --- --- 1.00 18.00

32.0

0 --- --- ---

83 Katuli Zikzak MoA & Har Khet Check Dam 1.00 15.00 26.0 --- --- --- --- --- --- 1.00 15.00 26.0 --- --- ---

District Irrigation Plan, South West Garo Hills district

137 | P a g e

Garo FW-DAC &

FW

Ko Pani with

irrigation

channel

0 0

84 Chellapara Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 15.00 35.0

0 --- --- --- --- --- --- 1.00 15.00

35.0

0 --- --- ---

85 Kambakpa

ra Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 8.00 30.0

0 --- --- --- --- --- --- 1.00 8.00

30.0

0 --- --- ---

86 Dimiligre Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 15.00 35.0

0 --- --- --- --- --- --- 1.00 15.00

35.0

0 --- --- ---

87 Dangsapar

a Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 10.00 32.0

0 --- --- --- --- --- --- 1.00 10.00

32.0

0 --- --- ---

88 Dinangpar

a Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 6.00 33.0

0 --- --- --- --- --- --- 1.00 6.00

33.0

0 --- --- ---

89 Baldan

Akong Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 7.00 35.0

0 --- --- --- --- --- --- 1.00 7.00

35.0

0 --- --- ---

90 Satboni Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 6.00 26.0

0 --- --- --- --- --- --- 1.00 6.00

26.0

0 --- --- ---

91 Nogorpara Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 10.00 45.0

0 --- --- --- --- --- --- 1.00 10.00

45.0

0 --- --- ---

92 Demdema

kona Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 13.00 31.0

0 --- --- --- --- --- --- 1.00 13.00

31.0

0 --- --- ---

93 Tongnapar

a Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 15.00 28.0

0 --- --- --- --- --- --- 1.00 15.00

28.0

0 --- --- ---

District Irrigation Plan, South West Garo Hills district

138 | P a g e

94 Gopraigao

n Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 12.00 34.0

0 --- --- --- --- --- --- 1.00 12.00

34.0

0 --- --- ---

95 Kalaigaon Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 18.00 31.0

0 --- --- --- --- --- --- 1.00 18.00

31.0

0 --- --- ---

96 Kalaigaon

Nayapara Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 15.00 41.0

0 --- --- --- --- --- --- 1.00 15.00

41.0

0 --- --- ---

97 Mondolpar

a Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 12.00 37.0

0 --- --- --- --- --- --- 1.00 12.00

37.0

0 --- --- ---

98 Kuligre Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 10.00 36.0

0 --- --- --- --- --- --- 1.00 10.00

36.0

0 --- --- ---

99 Balughat Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 11.00 32.0

0 --- --- --- --- --- --- 1.00 11.00

32.0

0 --- --- ---

100 Bollonggre

A Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 12.00 33.0

0 --- --- --- --- --- --- 1.00 12.00

33.0

0 --- --- ---

101 Bildoba Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Lift irrigation

channel 15.00 8.00 4.73 --- --- --- --- --- --- 15.00 8.00 4.73 --- --- ---

102 Silgaguri Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Lift irrigation

channel 16.00 11.00 5.05 --- --- --- --- --- --- 16.00 11.00 5.05 --- --- ---

103 Bidukura Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Lift irrigation

channel 12.00 10.00 3.79 --- --- --- --- --- --- 12.00 10.00 3.79 --- --- ---

104 Bollonggre Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Lift irrigation

channel 15.00 8.00 4.73 --- --- --- --- --- --- 15.00 8.00 4.73 --- --- ---

105 Kalaicharp

ara Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Lift irrigation

channel 15.00 10.00 4.73 --- --- --- --- --- --- 15.00 10.00 4.73 --- --- ---

District Irrigation Plan, South West Garo Hills district

139 | P a g e

106 Mahendrag

anj Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Lift irrigation

channel 44.00 20.00

13.8

9 --- --- --- --- --- --- 44.00 20.00

13.8

9 --- --- ---

107 Wategre Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

15.00 10.00 18.0

0 --- --- --- --- --- --- 15.00 10.00

18.0

0 --- --- ---

108 Okkapara

Apalgre Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

25.00 30.00 42.0

0 --- --- --- --- --- --- 25.00 30.00

42.0

0 --- --- ---

109 Jongdikgre Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

1.00 15.00 25.0

0 --- --- --- --- --- --- 1.00 15.00

25.0

0 --- --- ---

110 Dengnakpa

ra Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

20.00 10.00 26.0

0 --- --- --- --- --- --- 20.00 10.00

26.0

0 --- --- ---

111 Noagre Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

18.00 25.00 27.0

0 --- --- --- --- --- --- 18.00 25.00

27.0

0 --- --- ---

112 Dombagre Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

15.00 10.00 15.0

0 --- --- --- --- --- --- 15.00 10.00

15.0

0 --- --- ---

113 Grenggand

i Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

25.00 25.00 34.0

0 --- --- --- --- --- --- 25.00 25.00

34.0

0 --- --- ---

114 Bolchugre Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

18.00 15.00 31.0

0 --- --- --- --- --- --- 18.00 15.00

31.0

0 --- --- ---

115 Chisegre Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

20.00 18.00 28.0

0 --- --- --- --- --- --- 20.00 18.00

28.0

0 --- --- ---

116 Jensilpara Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

15.00 20.00 32.0

0 --- --- --- --- --- --- 15.00 20.00

32.0

0 --- --- ---

District Irrigation Plan, South West Garo Hills district

140 | P a g e

117 Akinpara Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

12.00 15.00 20.0

0 --- --- --- --- --- --- 12.00 15.00

20.0

0 --- --- ---

118 Salbari Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

with

irrigation

channel

12.00 10.00 22.0

0 --- --- --- --- --- --- 12.00 10.00

22.0

0 --- --- ---

119 Bongpara

Nokat Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani Lift irrigation 15.00 15.00

25.0

0 --- --- --- --- --- --- 15.00 15.00

25.0

0 --- --- ---

120 Monabari Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani Lift irrigation 20.00 30.00 7.00 --- --- --- --- --- --- 20.00 30.00 7.00 --- --- ---

121 Skagre Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani Lift irrigation 50.00 10.00

29.0

7 --- --- --- --- --- --- 50.00 10.00

29.0

7 --- --- ---

122

Tour

Programm

e

Zikzak

MoA &

FW-DAC &

FW

Per Drop

More

Crop

Exposure trip

of farmers to

different

Agricultural

important

places in

India

2

Nos.

(Tour

)

100

farmers 5.00 --- --- --- --- --- ---

2

Nos.

(Tour

)

100

farmer

s

5.00 --- --- ---

123 Hatibelpar

a Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

With

Irrigation

channel

1.00 10.00 26.0

0 --- --- --- --- --- --- --- --- --- 1.00 10.00

26.0

0

124 PuljuriPara Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

With

Irrigation

channel

1.00 11.00 37.0

0 --- --- --- --- --- --- --- --- --- 1.00 11.00

37.0

0

125 Ganggikon

a Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

With

Irrigation

channel

1.00 8.00 28.0

0 --- --- --- --- --- --- --- --- --- 1.00 8.00

28.0

0

126 Boiragupip

ara Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

With

Irrigation

channel

1.00 13.00 32.0

0 --- --- --- --- --- --- --- --- --- 1.00 13.00

32.0

0

127 Rakhalduli Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

With

Irrigation

channel

1.00 5.00 30.0

0 --- --- --- --- --- --- --- --- --- 1.00 5.00

30.0

0

District Irrigation Plan, South West Garo Hills district

141 | P a g e

128 Paglipara Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

With

Irrigation

channel

1.00 5.00 28.0

0 --- --- --- --- --- --- --- --- --- 1.00 5.00

28.0

0

129 kisangpara Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

With

Irrigation

channel

1.00 5.00 27.0

0 --- --- --- --- --- --- --- --- --- 1.00 5.00

27.0

0

130 Gorbuipara Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

With

Irrigation

channel

1.00 5.00 30.0

0 --- --- --- --- --- --- --- --- --- 1.00 5.00

30.0

0

131 Noonmati Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

With

Irrigation

channel

1.00 11.00 28.0

0 --- --- --- --- --- --- --- --- --- 1.00 11.00

28.0

0

132 Koraitola Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

With

Irrigation

channel

1.00 13.00 36.0

0 --- --- --- --- --- --- --- --- --- 1.00 13.00

36.0

0

133 Anchengg

gre Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

With

Irrigation

channel

1.00 6.00 27.0

0 --- --- --- --- --- --- --- --- --- 1.00 6.00

27.0

0

134 Makdual Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

With

Irrigation

channel

1.00 8.00 26.0

0 --- --- --- --- --- --- --- --- --- 1.00 8.00

26.0

0

135 Damalgre Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

With

Irrigation

channel

1.00 7.00 30.0

0 --- --- --- --- --- --- --- --- --- 1.00 7.00

30.0

0

136 Salmanpar

a Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

With

Irrigation

channel

1.00 8.00 30.0

0 --- --- --- --- --- --- --- --- --- 1.00 8.00

30.0

0

137 Darugre Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

With

Irrigation

channel

1.00 6.00 25.0

0 --- --- --- --- --- --- --- --- --- 1.00 6.00

25.0

0

138 Bangdapar

a Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

With

Irrigation

channel

1.00 6.00 28.0

0 --- --- --- --- --- --- --- --- --- 1.00 6.00

28.0

0

District Irrigation Plan, South West Garo Hills district

142 | P a g e

139 Dinapara Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

With

Irrigation

channel

1.00 6.00 30.0

0 --- --- --- --- --- --- --- --- --- 1.00 6.00

30.0

0

140 Bakdagre Zikzak

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

With

Irrigation

channel

1.00 6.00 31.0

0 --- --- --- --- --- --- --- --- --- 1.00 6.00

31.0

0

141 Parengpara Betasin

g

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

With

Irrigation

channel

1.00 15.00 25.0

0 --- --- --- --- --- --- --- --- --- 1.00 15.00

25.0

0

142 Chiringpar

a

Betasin

g

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

With

Irrigation

channel

1.00 10.00 18.0

0 --- --- --- --- --- --- --- --- --- 1.00 10.00

18.0

0

143 Takuranba

ri

Betasin

g

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

With

Irrigation

channel

1.00 20.00 43.0

0 --- --- --- --- --- --- --- --- --- 1.00 20.00

43.0

0

144 Nepalgre Betasin

g

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

With

Irrigation

channel

1.00 15.00 18.0

0 --- --- --- --- --- --- --- --- --- 1.00 15.00

18.0

0

145 Jarangre Betasin

g

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

With

Irrigation

channel

1.00 10.00 18.0

0 --- --- --- --- --- --- --- --- --- 1.00 10.00

18.0

0

146 Malchapar

a

Betasin

g

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

With

Irrigation

channel

1.00 10.00 20.0

0 --- --- --- --- --- --- --- --- --- 1.00 10.00

20.0

0

147 Bainapara

Koch

Betasin

g

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

With

Irrigation

channel

1.00 15.00 22.0

0 --- --- --- --- --- --- --- --- --- 1.00 15.00

22.0

0

148 Bandoraja Betasin

g

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

With

Irrigation

channel

1.00 15.00 25.0

0 --- --- --- --- --- --- --- --- --- 1.00 15.00

25.0

0

149 Sonamite Betasin

g

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

With

Irrigation

channel

1.00 20.00 35.0

0 --- --- --- --- --- --- --- --- --- 1.00 20.00

35.0

0

District Irrigation Plan, South West Garo Hills district

143 | P a g e

150 Doguripara Betasin

g

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

With

Irrigation

channel

1.00 18.00 25.0

0 --- --- --- --- --- --- --- --- --- 1.00 18.00

25.0

0

151 Jaluagre Betasin

g

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

With

Irrigation

channel

1.00 38.00 40.0

0 --- --- --- --- --- --- --- --- --- 1.00 38.00

40.0

0

152 Bangre Betasin

g

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

With

Irrigation

channel

1.00 45.00 50.0

0 --- --- --- --- --- --- --- --- --- 1.00 45.00

50.0

0

153 Adugre Betasin

g

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

With

Irrigation

channel

1.00 30.00 38.0

0 --- --- --- --- --- --- --- --- --- 1.00 30.00

38.0

0

154 Joyfar Betasin

g

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

With

Irrigation

channel

1.00 30.00 38.0

0 --- --- --- --- --- --- --- --- --- 1.00 30.00

38.0

0

155 Rangsakon

a

Betasin

g

MoA &

FW-DAC &

FW

Har Khet

Ko Pani

Check Dam

With

Irrigation

channel

1.00 35.00 45.0

0 --- --- --- --- --- --- --- --- --- 1.00 35.00

45.0

0

156

Tour

Programm

e

Betasin

g

MoA &

FW-DAC &

FW

Per Drop

More

Crop

Exposure trip

of farmers to

different

Agricultural

important

places in

India

2

Nos.

(Tour

)

100

farmers 5.00 --- --- --- --- --- --- --- --- ---

2

Nos.

(Tour

)

100

farmer

s

5.00

Total 529.0

0

1892.0

0

4190

.68 43.00 501.00

1086

.68 36.00 373.00

1055

.00

417.0

0 553.00

1055

.00 33.00 465.00

994.

00

District Irrigation Plan, South West Garo Hills district

144 | P a g e

Annexure IV : Strategic Action Plan by Horticulture Department

Name of the Block : Betasing

Sl.

No

Concerned

Ministry/

Department

Component Activity

Total

Command

Area (Ha.)

Total Estimated

Cost (in Rs.

Lacs)

2016-17 2017-18 2018-19 2019-20

Commands

Area (ha.)

Fund

(lacs)

Command

Area (ha.)

Fund

(lacs)

Command

Area (ha.)

Fund

(lacs)

Command

Area (ha.)

Fund

(lacs)

1 2 3 4 5 6 7 8 9 10 11 12 13 14

1 MoA&FW-

DAC&FW

Per Drop More

Crop

Water harvesting Structures 140 480 35 120 35 120 35 120 35 120

2 Community tanks 144 400 36 100 36 100 36 100 36 100

3 Har Khet Ko Pani Treadle Pumps 200 208 50 52 50 52 50 52 50 52

Sub Total 484 1088 121 272 121 272 121 272 121 272

Name of the Block : Zikzak

Sl.

No

Concerned

Ministry/

Department

Component Activity

Total

Command

Area (Ha.)

Total Estimated

Cost (in Rs.

Lacs)

2016-17 2017-18 2018-19 2019-20

Commands

Area (ha.)

Fund

(lacs)

Command

Area (ha.)

Fund

(lacs)

Command

Area (ha.)

Fund

(lacs)

Command

Area (ha.)

Fund

(lacs)

1 2 3 4 5 6 7 8 9 10 11 12 13 14

1 MoA&FW-

DAC&FW

Per Drop More

Crop

Water harvesting Structures 140 480 35 120 35 120 35 120 35 120

2 Community tanks 144 400 36 100 36 100 36 100 36 100

3 Har Khet Ko Pani Treadle Pumps 200 208 50 52 50 52 50 52 50 52

Sub Total 484 1088 121 272 121 272 121 272 121 272

Grand Total 968 2176 242 544 242 544 242 544 242 544

District Irrigation Plan, South West Garo Hills district

145 | P a g e