distribution planning use of smart distribution automation control system (dacs) presented by: ed...

22
Distribution Planning Use of SMART Distribution Automation Control System (DACS) Presented by: Ed Briggs, P.E. Created by: Ed Briggs & Greg Wickliffe [email protected]

Upload: vincent-greene

Post on 13-Jan-2016

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Distribution Planning Use of SMART Distribution Automation Control System (DACS) Presented by: Ed Briggs, P.E. Created by: Ed Briggs & Greg Wickliffe edwin.briggs@centerpointenergy.com

Distribution Planning Use of SMART

Distribution Automation Control System (DACS)

Presented by: Ed Briggs, P.E. Created by: Ed Briggs & Greg Wickliffe [email protected]

Page 2: Distribution Planning Use of SMART Distribution Automation Control System (DACS) Presented by: Ed Briggs, P.E. Created by: Ed Briggs & Greg Wickliffe edwin.briggs@centerpointenergy.com

How did the Swine Flu get started?

Page 3: Distribution Planning Use of SMART Distribution Automation Control System (DACS) Presented by: Ed Briggs, P.E. Created by: Ed Briggs & Greg Wickliffe edwin.briggs@centerpointenergy.com
Page 4: Distribution Planning Use of SMART Distribution Automation Control System (DACS) Presented by: Ed Briggs, P.E. Created by: Ed Briggs & Greg Wickliffe edwin.briggs@centerpointenergy.com

Load growth is one of the main drivers that challenge electric distribution planners to determine the most reasonable method to accommodate the new loads.

Page 5: Distribution Planning Use of SMART Distribution Automation Control System (DACS) Presented by: Ed Briggs, P.E. Created by: Ed Briggs & Greg Wickliffe edwin.briggs@centerpointenergy.com

To accommodate load growth, previous design criteria required adding another transformer to substation.

Page 6: Distribution Planning Use of SMART Distribution Automation Control System (DACS) Presented by: Ed Briggs, P.E. Created by: Ed Briggs & Greg Wickliffe edwin.briggs@centerpointenergy.com

The use of SMART Distribution Automation Control System (DACS) is an alternative to installing new substation transformers.

SMART DACS controls internal substation circuit switching and distribution circuit switching to prevent substation transformer overloading under a single transformer outage.

Remote Control (RC) distribution switches will automatically transfer load to one or more adjacent substations.

Page 7: Distribution Planning Use of SMART Distribution Automation Control System (DACS) Presented by: Ed Briggs, P.E. Created by: Ed Briggs & Greg Wickliffe edwin.briggs@centerpointenergy.com

Our SMART DACS system is designed to send out notification via pagers or e-mails when single contingency transformer loading gets to 85% and again at 90%.

When single contingency transformer loading gets to 95% then the SMART DACS system is automatically armed and notification is sent via pagers and e-mail.

Page 8: Distribution Planning Use of SMART Distribution Automation Control System (DACS) Presented by: Ed Briggs, P.E. Created by: Ed Briggs & Greg Wickliffe edwin.briggs@centerpointenergy.com
Page 9: Distribution Planning Use of SMART Distribution Automation Control System (DACS) Presented by: Ed Briggs, P.E. Created by: Ed Briggs & Greg Wickliffe edwin.briggs@centerpointenergy.com
Page 10: Distribution Planning Use of SMART Distribution Automation Control System (DACS) Presented by: Ed Briggs, P.E. Created by: Ed Briggs & Greg Wickliffe edwin.briggs@centerpointenergy.com

DACS switching moves 3 MW of load from Spencer circuits SP-03 to SP-11 and 6 MW of load from CA-01 to SP-03.

Page 11: Distribution Planning Use of SMART Distribution Automation Control System (DACS) Presented by: Ed Briggs, P.E. Created by: Ed Briggs & Greg Wickliffe edwin.briggs@centerpointenergy.com

3 MW of switchable load 719 customers

6 MW of switchable load 974 customers

Page 12: Distribution Planning Use of SMART Distribution Automation Control System (DACS) Presented by: Ed Briggs, P.E. Created by: Ed Briggs & Greg Wickliffe edwin.briggs@centerpointenergy.com

Antenna

Antenna

Lightning Arrestor

Switch Motor Operator

12kV Bridges Remote Control Pole Top Switch # 4678 - Closed Position

Page 13: Distribution Planning Use of SMART Distribution Automation Control System (DACS) Presented by: Ed Briggs, P.E. Created by: Ed Briggs & Greg Wickliffe edwin.briggs@centerpointenergy.com

Switch Control with

RTU & PLC

Page 14: Distribution Planning Use of SMART Distribution Automation Control System (DACS) Presented by: Ed Briggs, P.E. Created by: Ed Briggs & Greg Wickliffe edwin.briggs@centerpointenergy.com
Page 15: Distribution Planning Use of SMART Distribution Automation Control System (DACS) Presented by: Ed Briggs, P.E. Created by: Ed Briggs & Greg Wickliffe edwin.briggs@centerpointenergy.com
Page 16: Distribution Planning Use of SMART Distribution Automation Control System (DACS) Presented by: Ed Briggs, P.E. Created by: Ed Briggs & Greg Wickliffe edwin.briggs@centerpointenergy.com

DACS switching moves 13 MW of load from Lyondell circuit LY-44 to King circuit KG-42 and 12 MW of load from Lyondell Circuit LY-41 to Newport circuit NP-44.

Page 17: Distribution Planning Use of SMART Distribution Automation Control System (DACS) Presented by: Ed Briggs, P.E. Created by: Ed Briggs & Greg Wickliffe edwin.briggs@centerpointenergy.com

13 MW of switchable load

883 customers12 MW of switchable

load1100 customers

Page 18: Distribution Planning Use of SMART Distribution Automation Control System (DACS) Presented by: Ed Briggs, P.E. Created by: Ed Briggs & Greg Wickliffe edwin.briggs@centerpointenergy.com

35kV Bridges Remote Control Pole Top Switch #13680 - Closed Position

Antenna

Antenna

Lightning Arrestor

Switch Control with

RTU & PLC

Page 19: Distribution Planning Use of SMART Distribution Automation Control System (DACS) Presented by: Ed Briggs, P.E. Created by: Ed Briggs & Greg Wickliffe edwin.briggs@centerpointenergy.com

Antenna

Antenna

Lightning Arrestor

35kV Bridges Remote Control Pole Top Switch #13680 - Closed Position

Switch Motor Operator

Page 20: Distribution Planning Use of SMART Distribution Automation Control System (DACS) Presented by: Ed Briggs, P.E. Created by: Ed Briggs & Greg Wickliffe edwin.briggs@centerpointenergy.com

DACS Fault Detection and Sectionalizing to avoid circuit lockout.

• A fault on distribution circuit occurs.

• Circuit breaker trips open and closes back.

• Fault still present, thus circuit breaker opens again.

• Circuit breaker stays open for 25 seconds.

• DACS algorithms analyze RC switch data to determine location of fault.

• RC switches are opened and closed to isolate fault.

• Circuit breaker closes and holds – No circuit lockout.• Avoids third substation transformer through fault.

Page 21: Distribution Planning Use of SMART Distribution Automation Control System (DACS) Presented by: Ed Briggs, P.E. Created by: Ed Briggs & Greg Wickliffe edwin.briggs@centerpointenergy.com

CenterPoint Energy utilizes other SMART Systems:

• SMART BLOCK

• SMART TAP

• SMART CASCADE

Page 22: Distribution Planning Use of SMART Distribution Automation Control System (DACS) Presented by: Ed Briggs, P.E. Created by: Ed Briggs & Greg Wickliffe edwin.briggs@centerpointenergy.com

Questions ?